Field Water Storage System
The field water storage system addresses the challenge of adjusting water levels for crop growth and flood prevention by using a control unit to manage drainage height based on crop status and rainfall, ensuring efficient water storage and flood control.
Patent Information
- Application Number
- JP2021147180
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-09-09
- Publication Date
- 2024-12-05
- Estimated Expiration
- 2041-09-09
AI Technical Summary
Existing field water storage systems struggle to adjust the water level to a suitable height for crop growth while storing a large amount of water, particularly during heavy rain, which can lead to flooding and inefficient water management.
A field water storage system with a control unit that adjusts the drainage height based on predetermined criteria including crop growth status, predicted rainfall, and crop varieties, allowing for automatic mode switching and notification of excessive water storage, enabling the system to store more water without exceeding optimal growth levels.
The system effectively adjusts water levels to suit crop growth needs, prevents flooding, and facilitates efficient water management by storing large amounts of water while minimizing adverse effects on crops, even during heavy rainfall.
Smart Images

Figure 0007594989000001 
Figure 0007594989000002 
Figure 0007594989000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a technique for a field water storage system that stores water in a field. [Background technology]
[0002] Conventionally, techniques for storing water in farm fields have been publicly known, such as that described in Patent Document 1.
[0003] The water level regulator for paddy fields described in Patent Document 1 can store water in a field using a water level adjustment plate and a dam plate. Specifically, the water level adjustment plate is used to hold back water in the field. The height position of the upper end of the water level adjustment plate is adjusted to a height suitable for crop growth. The dam plate is used to hold back water that exceeds the water level adjustment plate. The dam plate extends to a position higher than the water level adjustment plate.
[0004] The paddy field water level regulator described in Patent Document 1 can store water in the field to a level exceeding the water level suitable for crop growth by using a dam plate to hold back the water in the field when the water level in the field rises due to heavy rain, etc. This allows the paddy field water level regulator to suppress the inflow of rainwater into rivers in the event of heavy rain, etc., and suppress the rise in river water levels and flooding. However, with the paddy field water level regulator, there was a possibility that the rise in the water level in the field due to heavy rain, etc., would make it impossible to adjust the water level in the field to a water level suitable for crop growth. There was room for improvement in this regard. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2017-51137 A Summary of the Invention [Problem to be solved by the invention]
[0006] The present invention has been made in consideration of the above-mentioned circumstances, and the problem it aims to solve is to provide a field water storage system that can store a large amount of water in a field while regulating the water level in the field to a water level suitable for crop growth. [Means for solving the problem]
[0007] The problem to be solved by the present invention has been described above, and the means for solving this problem will now be described.
[0008] That is, in claim 1, there is provided a field water storage system comprising a control unit capable of controlling a field water management device that manages the supply and drainage of a field, the control unit having, as control modes for controlling the field water management device, a first mode for adjusting the drainage height of the field in accordance with predetermined conditions, and a second mode for setting the drainage height of the field to a first drainage height higher than the drainage height in the first mode regardless of the predetermined conditions, thereby making it possible to store a larger amount of water in the field than in the first mode, and the first drainage height is automatically set based on predetermined criteria including the growth status of crops in the field. The predetermined criteria include a predicted rainfall amount, and when the predicted rainfall amount exceeds a predetermined threshold, the control unit increases the setting value of the first drainage height to a value higher than the value set based on the growth condition. It is something.
[0009] In claim 2, the predetermined criteria include the variety of the crop in the field.
[0010] In claim 3, The control unit is capable of switching the control mode for each field group including at least one field. It is something.
[0011] In claim 4, The control unit automatically sets the field group according to the growth condition. It is something.
[0012] In claim 5, The control unit prohibits switching to the second mode for a field group in which a growth condition of a crop in the field is a predetermined growth condition that has been set in advance, among the field groups. It is.
[0013] In claim 6, In the second mode, the control unit calculates a water storage rate indicating a ratio of a current water storage amount of the field to a reference water storage amount of the field, and issues a notification when the calculation result exceeds a predetermined threshold value. It is something.
[0014] In claim 7, The control unit is capable of changing the first drainage height when the calculation result of the water storage rate exceeds a predetermined threshold value. .
[0015] In claim 8, A field water storage system comprising a control unit capable of controlling a field water management device that manages the supply and drainage of a field, the control unit having control modes for controlling the field water management device, a first mode for adjusting a drainage height of the field in accordance with a predetermined condition, and a second mode for setting the drainage height of the field to a first drainage height higher than the drainage height in the first mode regardless of the predetermined condition, thereby enabling a larger amount of water to be stored in the field than in the first mode, the control unit automatically sets the first drainage height based on a predetermined criterion including a growth condition of crops in the field, and is capable of switching the control mode for each field group including at least one field, automatically sets the field group in accordance with the growth condition, and prohibits switching to the second mode for a field group among the field groups in which the growth condition of crops in the field is a predetermined growth condition that has been set in advance. It is something.
[0016] In claim 9, A field water storage system comprising a control unit capable of controlling a field water management device that manages water supply and drainage for a field, the control unit having control modes for controlling the field water management device, including a first mode for adjusting a drainage height of the field in accordance with predetermined conditions, and a second mode for setting the drainage height of the field to a first drainage height higher than the drainage height in the first mode regardless of the predetermined conditions, thereby enabling a larger amount of water to be stored in the field than in the first mode, the control unit automatically sets the first drainage height based on predetermined criteria including a growth status of crops in the field, calculates a water storage rate indicating the ratio of the current water storage volume of the field to a standard water storage volume of the field in the second mode, and issues an alert when the calculation result exceeds a predetermined threshold value, When the calculated water storage rate exceeds a predetermined threshold, the first drainage height can be changed.
[0017] In claim 10, A field water storage system comprising a control unit capable of controlling a field water management device that manages water supply and drainage in a field, the control unit having control modes for controlling the field water management device, including a first mode for adjusting a drainage height of the field in accordance with a predetermined condition, and a second mode for setting the drainage height of the field to a first drainage height higher than the drainage height in the first mode regardless of the predetermined condition, thereby enabling a larger amount of water to be stored in the field than in the first mode, and automatically setting the first drainage height based on a predetermined criterion including a growth condition of crops in the field, In the second mode, the drainage height of the field is set to a second drainage height lower than the first drainage height, the water in the field is drained once, and then the drainage height of the field is set to the first drainage height, and when setting the drainage height of the field to the second drainage height, the drainage height of the field is gradually lowered depending on the growth conditions. Effect of the Invention
[0018] The present invention has the following advantages.
[0019] In claim 1, the first drainage height can be set to an appropriate height depending on the growing conditions. Specifically, the maximum water level suitable for the growth of crops in a field varies depending on the growing conditions. In claim 1, by setting the drainage height depending on the growing conditions, the first drainage height can be set so as not to exceed the water level (maximum value) suitable for the growth. As a result, even when switching to the second mode, the water level in the field can be adjusted to a water level suitable for the growth of crops while retaining a large amount of water in the field. In addition, the first drainage height can be set to a more appropriate height based on the predicted rainfall. In addition, when heavy rain is expected, flood control can be prioritized and the first drainage height can be increased, allowing more rainfall to be stored in the fields and preventing rivers from rising or overflowing.
[0020] In claim 2, the first drainage height can be set to a more appropriate height based on the type of crop.
[0021] In claim 3, The control mode of multiple fields can be switched at once, which simplifies the management of water supply and drainage. It is possible.
[0022] In claim 4, Grouping fields according to growing conditionsIt is possible.
[0023] In claim 5, It is possible to appropriately switch to the second mode depending on the growing conditions. For example, for a group of fields where it is desirable to keep the water level low (such as a group of fields where the growing conditions are susceptible to flooding), the system does not switch from the first mode to the second mode, thereby minimizing the impact on crop growth caused by rising water levels due to heavy rain, etc. It is possible.
[0024] In claim 6, Easily identify fields with high water storage rates It is possible.
[0025] In claim 7, When the water storage rate of the field becomes high due to heavy rain, etc., it is possible to respond quickly. For example, the first drainage height can be increased to prevent rivers from rising or overflowing, or the first drainage height can be lowered to prevent adverse effects on crop growth. It is possible.
[0026] In claim 8, The first drainage height can be set to an appropriate height depending on the growing conditions. Specifically, the maximum water level suitable for the growth of crops in a field varies depending on the growing conditions. In claim 1, by setting the drainage height depending on the growing conditions, the first drainage height can be set so as not to exceed the water level (maximum value) suitable for the growth. This makes it possible to adjust the water level in the field to a water level suitable for the growth of crops while retaining a large amount of water in the field, even when switching to the second mode. In addition, the control modes of multiple fields can be switched simultaneously, which simplifies the management of water supply and drainage. Additionally, fields can be grouped according to growing conditions. In addition, it is possible to appropriately switch to the second mode depending on the growing conditions. For example, for a group of fields where it is desirable to keep the water level low (such as a group of fields where the growing conditions make the fields susceptible to flooding), it is possible to reduce the impact on crop growth of a rise in water level due to heavy rain, etc., without switching from the first mode to the second mode.
[0027] In claim 9, The first drainage height can be set to an appropriate height depending on the growing conditions. Specifically, the maximum water level suitable for the growth of crops in a field varies depending on the growing conditions. In claim 1, by setting the drainage height depending on the growing conditions, the first drainage height can be set so as not to exceed the water level (maximum value) suitable for the growth. This makes it possible to adjust the water level in the field to a water level suitable for the growth of crops while retaining a large amount of water in the field, even when switching to the second mode. It is also possible to easily identify fields with high water storage rates. Also, When the water storage rate of the field becomes high due to heavy rain, etc., a prompt response can be made. For example, the first drainage height can be increased to prevent the rise and overflow of rivers, or the first drainage height can be decreased to prevent adverse effects on crop growth.
[0028] In claim 10, The first drainage height can be set to an appropriate height depending on the growing conditions. Specifically, the maximum water level suitable for the growth of crops in a field varies depending on the growing conditions. In claim 1, by setting the drainage height depending on the growing conditions, the first drainage height can be set so as not to exceed the water level (maximum value) suitable for the growth. This makes it possible to adjust the water level in the field to a water level suitable for the growth of crops while retaining a large amount of water in the field, even when switching to the second mode. Also, By draining the water from the field once, a larger amount of water can be stored in the field. Also, by gradually lowering the drainage height, the force of the water once drained from the field can be weakened, preventing mud, pesticides, etc. from being discharged from the field. [Brief description of the drawings]
[0029] [Figure 1] FIG. 2 is an explanatory diagram showing water supply and drainage paths to a field in the field water storage system according to the first embodiment of the present invention. [Diagram 2] FIG. 1 is an explanatory diagram showing the configuration of a field water management system. [Diagram 3] FIG. 1 is a block diagram showing a field water storage system. [Figure 4] A diagram showing the flow of preventing river flooding and rising water levels using dam mode. [Diagram 5] FIG. 13 is a block diagram showing a screen generated by the water management server. [Figure 6] FIG. [Figure 7] FIG. [Figure 8] FIG. 13 is a diagram showing a weather graph setting screen. [Figure 9] A diagram showing the dam management screen. [Figure 10] A diagram showing detailed information of a field displayed on the dam management screen. [Figure 11] FIG. [Figure 12] FIG. 13 is a diagram showing how the manual mode is executed on the operation screen. [Figure 13] 4A and 4B are diagrams showing a time setting section and a group setting section of a setting screen. [Figure 14] FIG. 4 is a diagram showing a device setting section of a setting screen. [Figure 15] 13 is a flowchart showing an automatic damming process. [Figure 16] A diagram showing how "Control objects 1 to 3" are put into dam mode during automatic damming processing. [Figure 17] (a) A diagram showing the state where "Control object 1" is at "Dam preparation drainage height". (b) A diagram showing the state where "Control object 2" is at "Dam preparation drainage height". (c) A diagram showing the state where "Control object 1" is at "Dam storage drainage height". [Figure 18] 13 is a flowchart showing an automatic return process. [Figure 19] A diagram showing how "controlled objects 1 to 3" are returned to normal mode by automatic return processing. [Figure 20] (a) A diagram showing the state where "controlled object 1" is returned to the normal mode, (b) A diagram showing the state where "controlled object 2" is returned to the normal mode, and (c) A diagram showing the state where "controlled object 3" is returned to the normal mode. [Figure 21] 10 is a flowchart showing an automatic damming process according to the second embodiment. [Figure 22]Graph showing the relationship between growth status and water level in the field. [Diagram 23] 1A is a diagram showing the state of the fields before the automatic damming process is executed, and FIG. 1B is a diagram showing the state after the field groups are set. [Figure 24] (a) A diagram showing the first field group at the "dam preparation drainage level", (b) A diagram showing the third field group at the "dam preparation drainage level", [Diagram 25] (a) A diagram showing the first field group in a state where the water level is at "drainage level during dam storage", and (b) A diagram showing the third field group in a state where the water level is at "drainage level during dam storage". [Figure 26] FIG. [Figure 27] An explanatory diagram showing "bank height," "maximum discharge height," and "discharge height during dam storage." [Figure 28] FIG. 13 is a diagram showing a state in which a field with a high water storage rate is notified on the water storage rate display screen. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0030] Hereinafter, a farm water storage system 10 according to a first embodiment of the present invention will be described.
[0031] 1 is for storing precipitation in a field H in the event of heavy rainfall, etc., to prevent rivers from rising or overflowing. The field water storage system 10 includes an irrigation water management system 20 and a field water management system 30.
[0032] The water management system 20 is for managing water (irrigation water) supplied from a water source to a farm field H. The water management system 20 includes a water intake 21, a first pump 22, a water reservoir 23, a water distribution device 24, a second pump 25, a drainage gate 26, a user terminal 27, and a water management server 28.
[0033] The water intake 21 is for taking in water from a water source (in this embodiment, a main river (main stream river) R1) into an irrigation channel.
[0034] The first pump 22 is for pumping up the water taken in through the water intake 21 and supplying it to the water distribution reservoir 23.
[0035] The distributing reservoir 23 is for storing water to be supplied to the farm field H. The distributing reservoir 23 is connected to a plurality of water distribution devices 24 via water distribution pipes 23a. The water stored in the distributing reservoir 23 is sent to the water distribution devices 24 via the water distribution pipes 23a.
[0036] The water distribution device 24 adjusts the amount of water supplied to a water supply pipe 24b for supplying water to the field H. The water distribution device 24 is connected to a plurality of fields H via a water distribution pipe 24a and water supply pipes 24b connected to the water distribution pipe 24a. The water sent to the water distribution device 24 is sent to the water supply pipe 24b via the water distribution pipe 24a, and is appropriately supplied to the field H by a field water management system 30 described below. In addition, the water supplied to the field H is appropriately discharged from the field H by the field water management system 30, and sent to a tributary (tributary river) R2 via a drainage channel 24c.
[0037] The second pump 25 is for sending water from the tributary R2 to the main river R1 through a drainage gate 26. The second pump 25 is provided on the downstream side of the tributary R2 (the side closer to the main river R1).
[0038] The drainage gate 26 is provided to prevent backflow of water from the main river R1 to the tributary R2 when the water level of the main river R1 rises. The drainage gate 26 is provided at the confluence of the main river R1 and the tributary R2.
[0039] The user terminal 27 is a terminal used by a user (a person who manages irrigation water using the field water storage system 10). The user terminal 27 includes a calculation device capable of executing calculation processing, a storage device in which programs and the like are stored, an input device into which information can be input, and an output device capable of displaying the results of calculation processing and the like. The user terminal 27 is configured by a personal computer, a smartphone, or the like.
[0040] The water management server 28 shown in Figures 1 to 3 performs various processes. The water management server 28 includes a calculation device capable of executing calculation processes, a storage device in which programs and the like are stored, and the like. The water management server 28 is connected to the first pump 22, the water distribution device 24, the second pump 25, and the drainage gate 26, and can transmit signals to the first pump 22, etc. This allows the water management server 28 to control the first pump 22, etc.
[0041] The water management server 28 of this embodiment is connected to a user terminal 27, and can exchange information with the user terminal 27. The user can operate the user terminal 27 to send a predetermined signal to the water management server 28 to control the first pump 22, etc., and can arbitrarily determine the water level of the reservoir 23, the amount of water supplied to the water supply pipe 24b, the timing of flowing water from the tributary R2 to the main river R1, etc.
[0042] The field water management system 30 serves to supply and drain water to each field H. As shown in Fig. 2, the field water management system 30 includes a water supply device 31, a water level and water temperature sensor 32, a drainage device 33, a communication repeater 34, an owner terminal 35, a field management server 36, and a data center 37.
[0043] The water supply device 31 is for managing the water supply to the field H. The water supply device 31 is provided in each field H. The water supply device 31 includes a communication device for communicating with the communication repeater 34 described below, and a water supply tap (not shown) provided in a waterway connecting the water supply pipe 24b and the field H. The water supply device 31 can switch between a state in which water can be supplied to the field H and a state in which water cannot be supplied, by opening and closing the water supply tap. The water supply device 31 can also adjust the amount of water supplied to the field H depending on the opening degree of the water supply tap.
[0044] The water level and water temperature sensor 32 is for measuring the water level and water temperature in the field H. The water level and water temperature sensor 32 is provided in each field H. The water level and water temperature sensor 32 is connected to the water supplying device 31 and can transmit the measurement results of the water level and water temperature to the water supplying device 31.
[0045] The drainage device 33 is for managing the drainage of the field H. The drainage device 33 is provided in each field H. The drainage device 33 includes a communication device (not shown) for communicating with the communication repeater 34, and a lifting body 33a (see FIG. 16) provided at the drainage outlet of the field H. The drainage device 33 discharges the water of the field H that exceeds the lifting body 33a to the drainage channel 24c. In this way, water can be stored in the field H up to a water level that is the same height as the height position (height position of the upper surface) of the lifting body 33a. Hereinafter, such a height position of the lifting body 33a (water level that can be stored in the field H) is referred to as the "drainage height."
[0046] The communication repeater 34 is a device capable of wireless communication. The communication repeater 34 can exchange information with the water supply device 31, the drainage device 33, and a farm land management server 36 (described later) via wireless communication.
[0047] The owner terminal 35 is a terminal owned by the owner of the field H. The owner terminal 35 includes a calculation device capable of executing calculation processing, a storage device in which programs and the like are stored, an input device into which information can be input, and an output device capable of displaying the results of calculation processing and the like. The owner terminal 35 is configured by a smartphone, a personal computer, or the like.
[0048] The farm field management server 36 is for carrying out processes related to water supply and drainage of the farm field H. The farm field management server 36 is configured as a cloud server (strictly speaking, a server virtually constructed within the cloud server). The farm field management server 36 can exchange information with the water supply device 31 and the drainage device 33 via the communication repeater 34. The farm field management server 36 can acquire various information by receiving signals from the water supply device 31 and the drainage device 33. For example, the farm field management server 36 can acquire the opening degree of the water supply faucet and the measurement results of the water level and water temperature sensor 32 based on the signal from the water supply device 31. The farm field management server 36 can also acquire the current drainage height based on the signal from the drainage device 33.
[0049] The farm field management server 36 can also control the water supply and drainage of the field H by sending signals to the water supply device 31 and the drainage device 33. For example, the farm field management server 36 can open and close the water tap by sending a signal to the water supply device 31, and can switch between a state in which water can be supplied to the field H and a state in which water cannot be supplied, and can adjust the opening degree of the water tap. The farm field management server 36 can also change the drainage height by sending a signal to the drainage device 33. The farm field management server 36 can adjust the water level of the field H by controlling the water supply and drainage in this way.
[0050] Furthermore, the farm field management server 36 can exchange information with the owner terminal 35 via an internet line or the like. By operating the owner terminal 35, the owner can receive signals from the farm field management server 36 and check the water level and the like of the field H. By operating the owner terminal 35, the owner can also send signals to the field management server 36 and remotely control the water supply and drainage of the field H.
[0051] The data center 37 is a facility for storing various information related to the field H and the field water management system 30. The data center 37 is provided with a storage device (e.g., large-capacity storage) for storing information, and the measurement results of the water level and temperature sensor 32 and the history of changes to the drainage height are stored in the storage device. The data center 37 can store information transmitted from the field management server 36 in the storage device. Furthermore, the data center 37 can transmit the information stored in the storage device to the field management server 36 when requested by the field management server 36.
[0052] The water management server 28 of the field water storage system 10 configured as described above is connected to the field management server 36 and can exchange information with the field management server 36. The water management server 28 can obtain various information from the field water management system 30 by receiving signals from the field management server 36. Specifically, the water management server 28 can obtain information such as the opening degree of the water supply tap, the water level and water temperature of the field H, and the current drainage height.
[0053] In addition, the water management server 28 can control the field water management system 30 (the water supply device 31 and the drainage device 33) by transmitting a signal to the field management server 36. The water management server 28 has a normal mode and a dam mode as control modes for controlling the field water management system 30.
[0054] The normal mode is a mode in which the drainage height is adjusted according to a predetermined condition. The normal mode is mainly executed when the weather is stable. In the normal mode, the amount of water supplied to the field H and the drainage height are adjusted so that the water level (set water level) is suitable for the growth of the crops in the field H. The adjustment of the amount of water supplied, etc. in the normal mode is performed by the field management server 36. Specifically, the field management server 36 determines the amount of water supplied and the drainage height based on the variety and growth condition of the crop, and automatically adjusts the amount of water supplied and the drainage height based on the result of the determination. In the following, the drainage height in the normal mode is referred to as the "normal drainage height". The "normal drainage height" is preset based on the variety and growth condition of the crop, and the set value is stored in the storage device of the field management server 36. The set value can be changed at will by the owner of the field H by operating the owner terminal 35.
[0055] When the normal mode is to be executed, the water management server 28 transmits a signal instructing execution of the normal mode to the farm land management server 36. Thus, the water supply amount and the drainage height in the normal mode are adjusted by the farm land management server 36 or the owner.
[0056] Unlike the normal mode, the dam mode is a mode that allows a larger amount of water to be stored in the field H than in the normal mode, regardless of the crop growth conditions, etc. (predetermined conditions). The dam mode is executed when unstable weather is expected (such as when heavy rain is forecast). In the dam mode, water supply is stopped and the drainage height is set to a drainage height higher than the "normal drainage height". The water supply and drainage height in the dam mode are controlled by the water management server 28.
[0057] Specifically, the water management server 28 transmits signals related to the opening degree of the water supply valve and the drainage height to the field management server 36. The field management server 36 controls the water supply device 31 and the drainage device 33 based on the signals. In this way, the water management server 28 adjusts the amount of water supplied to the field H and the drainage height in the dam mode. In the dam mode in this embodiment, as described later, the drainage height is once lowered and then finally set to a drainage height higher than the "normal drainage height". Hereinafter, such a drainage height higher than the "normal drainage height" is referred to as the "dam storage drainage height". The "dam storage drainage height" is set in advance, and the set value is stored in the storage device of the water management server 28.
[0058] By executing the dam mode, the water management server 28 can use the field H as a dam to prevent the rise and flooding of rivers when heavy rain falls.
[0059] Fig. 4 is a diagram showing an example of a flow in which rising water and flooding of a river are suppressed by the dam mode. Below, an overview of the flow shown in Fig. 4 will be explained using Figs. 2 and 4.
[0060] When heavy rain is predicted, the user decides whether or not to switch from the normal mode to the dam mode. When the user decides to switch to the dam mode, the user operates the user terminal 27 and issues an instruction to the water management server 28 to switch to the dam mode (step S10).
[0061] The water management server 28 stops the water supply to the field H by the water supply device 31, and changes the drainage height of the drainage device 33 to a lower drainage height than the "normal drainage height" (step S20). The water management server 28 maintains this state for a predetermined time. This causes the water management server 28 to temporarily drain the water from the field H, and ensures the capacity of water that can be stored in the field H before heavy rain falls.
[0062] In the following, the drainage height when the water of the field H is drained once is referred to as the "dam preparation drainage height." In addition, in the following, the time for which the water is drained once (the time for which the "dam preparation drainage height" is maintained) is referred to as the "dam mode transition drainage time." The "dam preparation drainage height" and the "dam mode transition drainage time" are set in advance, and the set values are stored in the storage device of the water management server 28.
[0063] The irrigation water management server 28 raises the drainage height (step S30) after once draining the water from the field H. In this way, the irrigation water management server 28 changes the drainage height to the "drainage height during dam storage".
[0064] When rain falls in this state, the rain that falls on field H or its vicinity is stored in field H. Because the drainage height of field H is set relatively high (at "drainage height during dam storage"), a large amount of precipitation can be stored in field H (step S40). In this way, by temporarily storing precipitation in field H, it is possible to prevent a large amount of precipitation from flowing into the river (main river R1 or tributary R2), and thus to prevent the river from rising and overflowing (step S50).
[0065] The user judges whether the weather and the flooding of the river have improved. If the user judges that the weather and the flooding of the river have improved, the user operates the user terminal 27 (step S60) and issues an instruction to the water management server 28 to switch from the dam mode to the normal mode (step S70). Thus, in the field H, water supply is resumed and the drainage height of the drainage device 33 is returned to the original level (set to the "normal drainage height").
[0066] In this way, by switching between normal mode and dam mode, the water management server 28 can adjust the water level in the field H to a water level suitable for crops during normal times when the weather is stable, and can temporarily store precipitation in the field H during heavy rain to prevent rivers from rising and flooding.
[0067] The water management server 28 of this embodiment can generate a plurality of screens related to the normal mode and the dam mode as described above. Specifically, the water management server 28 can generate a map screen 110, a weather graph setting screen 120, a dam management screen 130, an operation screen 140, and a mode setting screen 150, as shown in FIG.
[0068] First, an overview of the various screens (such as the map screen 110) will be described. The various screens are dynamic Web pages generated by a CGI (Common Gateway Interface) program, etc. The various screens can be displayed on the browser of the user terminal 27.
[0069] Various screens (such as the map screen 110) are divided vertically into three by a first frame 101, a second frame 102, and a third frame 103 (see Figs. 6 to 14). The first frame 101 and the second frame 102 are sections for switching between various screens. The first frame 101 and the second frame 102 are located at the top of the screen. Character strings indicating various screens are displayed in the first frame 101 and the second frame 102. The third frame 103 is a section for displaying information corresponding to various screens. The user can change the content displayed in the third frame 103 by selecting information displayed in the first frame 101 and the second frame 102. In this way, the user can switch between various screens.
[0070] Next, the map screen 110, the weather graph setting screen 120, the dam management screen 130, the operation screen 140, and the mode setting screen 150 will be described in detail.
[0071] 6 is a screen that displays a map and rainfall (precipitation) of the field H. The map screen 110 is displayed by selecting the character string "Overall Map" in the first frame 101. The map screen 110 (third frame 103) includes a map display section 111 and a rainfall display section 112.
[0072] The map display section 111 is a section that displays a map of the field H. The irrigation water management server 28 acquires map information from a predetermined server, and displays the map information on the map display section 111. On the map display section 111, a mark 111a and a weather information button 111b are arranged.
[0073] Mark 111a is a mark indicating a predetermined point. Weather information button 111b is a button for displaying weather information for a predetermined area (for example, an area within a predetermined range including the point indicated by mark 111a, or other areas displayed on map display section 111). When weather information button 111b is pressed, water management server 28 displays the long-term predicted precipitation amount (for example, predicted precipitation amount for the next 72 hours) for the predetermined area.
[0074] The rainfall display section 112 is a section that displays, in a graph 112a, the maximum rainfall forecast for an area within a range of 50 km (100 km square) on each side of the east, west, north, and south centered on the point indicated by the mark 111a. Specifically, the water management server 28 divides the area into meshes with sides of 1 km, and acquires the rainfall forecast for each mesh from a specified server. Then, based on the acquired rainfall forecast, the water management server 28 extracts a mesh that is expected to have the most rainfall within a specified period of time (for example, within one hour or 24 hours), and creates and displays a graph 112a of the rainfall forecast for that mesh. The graph 112a is a bar graph showing the rainfall for each hour. Note that the graph 112a in this embodiment shows the maximum rainfall forecast for an area of 50 km (100 km square) on each side of the east, west, north, and south, but the range is not particularly limited and can be changed arbitrarily.
[0075] 7, when graph 112a is selected, weather information display screen 113 is displayed. Weather information display screen 113 is a screen for enlarging and displaying graph 112a. On weather information display screen 113, the vertical bars of graph 112a are displayed in different colors according to the amount of rainfall.
[0076] Specifically, the storage device of the water supply management server 28 stores, as thresholds related to rainfall, rainfall at an advisory level (e.g., 20 mm / h or more) and rainfall at an alarm level (e.g., 30 mm / h or more). The water supply management server 28 compares the hourly rainfall with the thresholds to display the graph 112a in different colors.
[0077] The weather information display screen 113 also displays the amount of rain that has fallen so far ("Actual" shown in FIG. 7) and a detailed forecast of the amount of precipitation within the next hour ("5-minute forecast"). The weather information display screen 113 also allows the user to download weather information to the user terminal 27 (download button) and check past weather information (display past actual button).
[0078] By displaying the map screen 110 configured as described above, the user can grasp upcoming weather conditions, etc., and can easily decide whether to switch between the normal mode and the dam mode.
[0079] The map screen 110 shown in Figs. 6 and 7 is an example, and the information displayed on the map screen 110 can be changed arbitrarily. For example, the map screen 110 can also display the water level of the main river R1 and the basin rainfall index (a calculated amount of rainfall that falls in an area (basin) along a river and moves downstream, quantified). With this configuration, the user can decide to switch to the dam mode when the water level of the main river R1 rises or when the basin rainfall index predicts a rise in the water level of the main river R1. The user can also decide to maintain the normal mode (not to prepare to drain the water from the field H, etc.) when the basin rainfall index predicts no rise in the water level of the main river R1. When displaying the water level of the main river R1 in this way, a water level gauge for measuring the water level can be appropriately installed in the main river R1.
[0080] The weather graph setting screen 120 shown in Fig. 8 is a screen for making settings related to the display of the rainfall display section 112 (see Fig. 6). The weather graph setting screen 120 is displayed by selecting appropriate information in the first frame 101 and the second frame 102. In the weather graph setting screen 120, thresholds and the like used for color-coding the graph 112a shown in Fig. 7 can be set (setting of warning values, etc.).
[0081] The dam management screen 130 shown in Fig. 9 is a screen for managing the field H. The dam management screen 130 is displayed by selecting the character string "Overall monitoring" in the first frame 101 and the character string "Field map" in the second frame 102. On the dam management screen 130, a mark indicating the state of the field H is displayed superimposed on the map information of the field H. Specifically, on the dam management screen 130, a mark indicating the open / closed state of the water faucet, a mark indicating whether the mode is normal or dam mode, and a mark indicating whether the current water level of the field H has reached the set water level (a target value for control (e.g., a water level suitable for crop growth)) are displayed.
[0082] Here, the storage device of the water management server 28 stores whether the field H is in normal mode or dam mode. When the water management server 28 displays the dam management screen 130 as described above, it acquires the open / closed state of the water faucet, the current water level of the field H, and the set water level of the field H from the field management server 36, and determines whether the set water level has been reached based on the acquired results. The water management server 28 appropriately displays a mark on the dam management screen 130 based on the information in the storage device, the acquired results of the open / closed state, and the determined set water level.
[0083] 10, when a specific field H is selected on the dam management screen 130, detailed information about the field H is displayed. Specifically, the dam management screen 130 displays the name of the field H, the field group G described below, the set water level, the current water level, the water supply valve opening degree, the water temperature, the drainage mode (whether it is normal mode or dam mode), the current drainage height, the name of the drainage device 33, the drainage height at the time of dam preparation, and the drainage height at the time of dam storage.
[0084] When displaying the detailed information, the water management server 28 acquires from the storage device, among the set water level etc., the field group G, drainage mode, dam preparation drainage level, and dam storage drainage level. The water management server 28 also acquires the remaining information (set water level, current water level, etc.) from the field management server 36. The water management server 28 displays the detailed information on the dam management screen 130 based on the acquired results.
[0085] By displaying the dam management screen 130 configured as described above, the user can grasp the state of the field H and easily decide whether to switch between the normal mode and the dam mode.
[0086] 9 and 10 is an example, and the information displayed on the dam management screen 130 can be changed as desired. For example, the water levels of the drainage channel 24c, the main river R1, and the tributary R2 can also be displayed on the dam management screen 130. When displaying the water levels of the main river R1 and the tributary R2 in this way, it is also possible to display the preparation water level (for example, the water level at which a flood defense unit is dispatched), the danger water level, and the flood danger water level together.
[0087] The dam management screen 130 can also display the storage volume of field H (the value obtained by multiplying the current water level of field H by the area of field H) along with the current water level of field H. The dam management screen 130 can also display the storage volume by block (such as a group of fields connected to the same water distribution device 24) or by the entire river basin.
[0088] The dam management screen 130 can also display a storage ratio that indicates how much water is stored in the field H that has been switched to dam mode. The storage ratio can be calculated, for example, by dividing the current water level of the field H by the "drainage height during storage in dam." The storage ratio can also be aggregated and displayed for the entire block or watershed. The dam management screen 130 can also display the storage ratio in different colors depending on the size of the storage ratio. Specifically, the dam management screen 130 can display a storage ratio in yellow if it exceeds "50%" and in red if it exceeds "75%."
[0089] Furthermore, the dam management screen 130 may display the water supply status under normal circumstances (when the weather is stable). For example, the dam management screen 130 may display the reduced water depth (how much the water level decreases per unit time) in addition to the set water level and current water level described above, and may display the water demand calculated from the set water level. The dam management screen 130 may also display the demand in a predetermined unit (for example, for each field H, block, and watershed (irrigation water, head works, dam, pumping station, main line (distribution pipe 23a), branch line (distribution pipe 24a))).
[0090] The operation screen 140 shown in FIG. 11 is a screen for switching between normal mode and dam mode. The operation screen 140 is displayed by selecting the character string "Overall monitoring" in the first frame 101 and the character string "Rice field dam operation" in the second frame 102. On the operation screen 140, it is possible to switch between normal mode and dam mode for each field group G (see FIG. 17). Note that a field group G is a collection of fields H. A field group G includes at least one field H. A plurality of field groups G are set and stored in the storage device of the water management server 28. The operation screen 140 includes a mode selection section 141 and a status display section 142.
[0091] The mode selection unit 141 is a part that selects a switching mode for switching between a normal mode and a dumb mode. The switching modes include an automatic mode and a manual mode.
[0092] The automatic mode is a mode in which normal mode and dam mode are automatically switched in a set order. In the automatic mode, the modes of the field groups G are switched in sequence at regular time intervals (with a time difference). The manual mode is a mode in which the modes of multiple field groups G are switched by manual operation by the user. The mode selection unit 141 is provided with an automatic button 141a, a dam mode button 141b, a normal mode button 141c, and a manual button 141d as buttons for operating in such automatic mode and manual mode.
[0093] The automatic button 141a, the dam mode button 141b, and the normal mode button 141c are buttons for switching between the normal mode and the dam mode in the automatic mode. When the automatic button 141a is pressed, the dam mode button 141b and the normal mode button 141c become pressable (see FIG. 11). By pressing the dam mode button 141b, the user can automatically switch the field group G to the dam mode. Also, by pressing the normal mode button 141c, the user can automatically switch the field group G to the normal mode. The flow of mode switching in the automatic mode will be described later.
[0094] The manual button 141d is a button for switching whether or not an operation can be performed on the status display section 142, which will be described later. The user can perform an operation on the status display section 142 by pressing the manual button 141d.
[0095] Furthermore, the user can temporarily stop the mode switching process in the automatic mode (the automatic damming process and the automatic return process described below) by pressing the manual button 141d during the process. After temporarily stopping the process, the user can resume the switching to the dam mode, etc., in the automatic mode by pressing the dam mode button 141b or the normal mode button 141c. On the other hand, after temporarily stopping the process, the user can also arbitrarily switch the state (mode) of the field group G by manual operation. In this way, for example, when the user accidentally presses the dam mode button 141b, etc., the user can emergency stop the mode switching process, and then arbitrarily switch to a desired mode.
[0096] Furthermore, the mode selection unit 141 is provided with lamps 141e corresponding to the various buttons (such as the automatic button 141a). The lamps 141e indicate which mode is currently selected. The lamps 141e are provided above the various buttons, and operate in response to the operation of the various buttons. Specifically, as shown in Figs. 11 and 12, the lamps 141e are turned on when the corresponding button (below the lamps 141e) is pressed, and are turned off when the non-corresponding button is pressed.
[0097] The status display unit 142 displays the current status of each field group G. Furthermore, in manual mode, the status display unit 142 is used to manually switch between normal mode and dam mode. The status display unit 142 displays a list of "control order," "group name," "status," and "manual operation" for each field group G.
[0098] The "control order" indicates the order of the field groups G that are switched in the automatic mode. The "group name" is a character string that indicates the name of the field group G.
[0099] "Status" indicates the state of the field group G. The states of the field group G include "Normal", which indicates that it is in normal mode, "Dam preparation (draining)", which indicates that it has switched to dam mode and is temporarily draining (the drainage height is the "drainage height during dam preparation"), and "Dam", which indicates that the drainage height has risen in dam mode (the drainage height is the "drainage height during dam storage").
[0100] The above-mentioned “control order”, “group name”, and “status” are stored in the storage device of the water management server 28.
[0101] "Manual operation" allows the user to switch between normal mode and dam mode. "Manual operation" includes the drain button 142a, the storage button 142b, and the normal button 142c. When the drain button 142a etc. is pressed, the water management server 28 transmits information identifying the drainage device 33 of the field group G corresponding to that button (in the same row), information for changing the drainage height, etc. to the field management server 36. This allows the water management server 28 to switch between normal mode and drainage mode in response to the user's operation. The functions of the various buttons will be explained in detail below.
[0102] The drain button 142a is a button for performing temporary drainage in the dam mode. When the drain button 142a is pressed, the drainage height of the field group G is changed to the "dam preparation drainage height". This allows temporary drainage of the field H. When the drain button 142a is pressed, water supply by the water supply device 31 is stopped. As shown in FIG. 12, the drain button 142a can be pressed when the field group G is in the normal mode (the "status" is "normal").
[0103] The storage button 142b is a button for increasing the drainage height. When the storage button 142b is pressed, the drainage height of the field group G is changed to the "drainage height during dam storage". This allows a large amount of water to be stored in the field H. The storage button 142b can be pressed when the field group G is temporarily draining (the "status" is "Dam preparation (draining)").
[0104] The normal button 142c is a button for switching to normal mode. When the normal button 142c is pressed, the drainage height of the field group G is changed to the "normal drainage height." Furthermore, when the normal button 142c is pressed, water supply by the water supply device 31 is resumed. The normal button 142c can be pressed when the field group G is in dam mode (when the "status" is "preparing to dam (draining)" or "dam").
[0105] The user can manually switch between the normal mode and the dam mode by pressing the drain button 142a etc. as described above at an appropriate timing. For example, when it becomes necessary to urgently store precipitation in the field H due to sudden rainfall or rising river levels, the user can switch from the normal mode to the dam mode without performing pre-drainage by pressing the drain button 142a and the storage button 142b in succession (pressing the drain button 142a and then the storage button 142b immediately after pressing the drain button 142a). In this way, the water management server 28 can essentially skip the process of temporarily draining the water of the field H in the manual mode. With this configuration, the user can quickly store precipitation in the field H as needed.
[0106] 11 and 12 are merely examples, and the configuration of the operation screen 140 can be changed as desired. For example, the storage button 142b is set to be pressable when the field group G is undergoing temporary drainage (when the "status" is "Dam preparation (draining)") (see FIG. 12), but it is also possible to set the button to be pressable when the field group G is in normal mode (when the "status" is "normal") in addition to during temporary drainage. With this configuration, when switching from normal mode to dam mode, the user can skip the process of temporarily draining the water of the field H by pressing the storage button 142b without pressing the drain button 142a.
[0107] The mode setting screen 150 shown in Fig. 13 is a screen for changing various settings related to switching between normal mode and dam mode. The mode setting screen 150 is displayed by selecting the character string "Overall monitoring" in the first frame 101 and the character string "Rice field dam setting" in the second frame 102. The mode setting screen 150 includes a control setting section 151, a group setting section 152, and a device setting section 153 (see Fig. 14).
[0108] The control setting unit 151 is a section for setting time. As described above, in the automatic mode, the modes of the field groups G are switched in sequence at regular time intervals. The control setting unit 151 can set such time intervals. Specifically, the time interval for switching to the dam mode can be set using the "drainage interval at transition to dam mode". In addition, the time interval for switching to the normal mode can be set using the "drainage interval at transition to normal mode". The set "drainage interval at transition to dam mode" and "drainage interval at transition to normal mode" are stored in the storage device of the water management server 28.
[0109] As described above, in the dam mode, the water in the field H is drained once. The control setting unit 151 can set the time for this temporary drainage. Specifically, the time for temporary drainage can be set in the "drainage time at transition to dam mode." As described above, the "drainage time at transition to dam mode" (set value) is stored in the storage device of the water management server 28.
[0110] The group setting unit 152 is a section for making settings related to the control of the field groups G. The group setting unit 152 displays a list of information related to the control of the field groups G. Specifically, the group setting unit 152 displays a list of "No.", "group name", "control order", and "deletion target" for each field group G.
[0111] "No." is a number indicating the row number. "Group name" and "Control order" are the same as those on the operation screen 140. In the group setting section 152, the values of "Group name" and "Control order" can be set. "Delete target" sets whether or not to delete a field group G. Also, in the group setting section 152, a new field group G can be created by pressing the "Add row" button.
[0112] 14 is a section for setting the field water management system 30. The device setting section 153 displays a list of information related to the field water management system 30. Specifically, the device setting section 153 displays, for each field H, a list of "No.", "Area code", "Field code", "Field name", "Drainage height at dam preparation", "Drainage height at dam storage", "Drainage device name", "Drainage height", "Dam control group", "Area", and "Remarks".
[0113] "No." is a number indicating the row number. "District code" is a number used to identify the district to which field H belongs. "Field code" is a number used to identify field H. "Field name" is a string indicating the name of field H. "Drainage device name" is a string indicating the name of drainage device 33. Note that if multiple drainage devices 33 are installed in one field H, the name of one of the drainage devices 33 is displayed. "Drainage height" indicates the current drainage height. The water management server 28 can display the above-mentioned "district code" and "field code", etc., by obtaining information from the field management server 36.
[0114] "Dam control group" indicates which field group G the field H belongs to. "Area" indicates the area of the field H. In the device setting unit 153, the "Drainage height at dam preparation", "Drainage height at dam storage", "Dam control group", "Area", and "Notes" can be set.
[0115] By displaying the mode setting screen 150 configured as described above, the user can set the "drainage height during dam preparation" and the like to appropriate values. For example, the user can set the "drainage height during dam storage" to an appropriate value taking into consideration the height and strength of the levee. Specifically, if the levee strength is low or the levee maintenance state is poor, the "drainage height during dam storage" can be set to a value somewhat lower than the height of the levee, effectively preventing the levee from collapsing when switching to dam mode. The user can also set the "drainage height during dam preparation" and the "drainage height during dam storage" taking into consideration the growth stage of the crop (for example, the process of rice cultivation).
[0116] Specifically, the maximum drainage height (maximum drainage height) of field H suitable for growing crops is predefined for each variety and growth schedule. For example, it is known that during the young panicle formation stage, the drainage height is preferably 30 cm or less. Therefore, the user can set the "drainage height during dam storage" based on the maximum drainage height. In this case, the user can also set the "drainage height during dam storage" based on the maximum drainage height only when the crops in field H are in a growth stage that requires attention.
[0117] In addition, while the herbicide is being fixed, it is desirable not to lower the water level in field H too much. Therefore, the user can set the "Drainage height during dam preparation" of field H during the fixation of the herbicide to a relatively high value.
[0118] In addition, the water management server 28 can automatically set the "drainage level during dam preparation" and the "drainage level during dam storage" based on the crop growth stage as described above, in accordance with the growth schedule stored in the field management server 36.
[0119] Even if the "Drainage height during dam storage" is set, if heavy rainfall that could cause a severe disaster is predicted, flood control can be prioritized and rainwater can be stored up to the maximum water storage capacity of field H regardless of the value set by the user (Drainage height during dam storage). For example, it is also possible to configure the setting value of the "Drainage height during dam storage" to be automatically overwritten. It is also possible to configure the setting value of the "Drainage height during dam storage" to be overwritten by instructions from related organizations such as the local government.
[0120] It should be noted that the mode setting screen 150 shown in FIG. 13 and FIG. 14 is merely an example, and the configuration of the mode setting screen 150 can be changed arbitrarily.
[0121] The following describes the process of switching between the normal mode and the dam mode using the automatic mode of the above-mentioned operation screen 140. First, the automatic damming process for switching from the normal mode to the dam mode will be described. Note that in the following, it is assumed that the state of all field groups G is the normal mode at the start of the automatic damming process.
[0122] The automatic damming process is started when the dam mode button 141b shown in Fig. 11 is pressed. As shown in Fig. 15, when the automatic damming process is started, the water management server 28 proceeds to step S110.
[0123] In step S110, the water management server 28 selects a field group G to be switched to the dam mode. At this time, the water management server 28 selects one field group G with the highest priority (the smallest value of "control order" shown in FIG. 13) from among the field groups G. At this time, the water management server 28 excludes the field groups G already selected in the series of flows shown in FIG. 15, and selects the field group G with the highest priority from among the unselected field groups G. Note that if there is no unselected field group G, the water management server 28 does not select a field group G. When the processing of step S110 ends, the water management server 28 proceeds to step S120.
[0124] In step S120, the water management server 28 determines whether there is a field group G that is to be subjected to the processing in step S130 and subsequent steps described below. Specifically, the water management server 28 determines whether or not a field group G was selected in step S110. If a field group G could not be selected (step S120: No), the water management server 28 ends the automatic damming process. In this way, when all field groups G have been put into dam mode, the water management server 28 ends the automatic damming process. On the other hand, if a field group G was selected (step S120: Yes), the water management server 28 proceeds to step S130.
[0125] In step S130, the water management server 28 determines whether the "status" of the field H belonging to the field group G selected in step S110 is other than "dam." If the "status" of the field H is other than "dam" (if it is "normal" or "preparation for dam (draining)," step S130: Yes), the water management server 28 proceeds to step S140. On the other hand, if the "status" of the field H is "dam" (step S130: No), the water management server 28 proceeds to step S110. In this way, the water management server 28 does not perform the processes in and after step S140 for the field group G that has already been switched to dam mode in manual mode (the "status" is "dam"), and selects the field group G to be switched to dam mode next.
[0126] In step S140, the water management server 28 transmits a signal to the field management server 36 to close the water supply taps of the water supply devices 31 of each field H belonging to the field group G selected in step S110, and disables (disables) remote operation of the field water management system 30 by the owner terminal 35. When the processing of step S140 ends, the water management server 28 proceeds to step S150.
[0127] In step S150, the water management server 28 transmits a signal to the field management server 36 to change the drainage height of the drainage devices 33 installed in the fields H belonging to the field group G selected in step S110 to the "dam preparation drainage height". At this time, the water management server 28 changes the drainage height to the "dam preparation drainage height" set for each field H on the mode setting screen 150 (see FIG. 14). After completing the processing of step S150, the water management server 28 executes the processing of steps S160 and S170 and the processing of step S180 in parallel.
[0128] In step S160, the water management server 28 waits for the "drainage time during dam mode transition" set on the mode setting screen 150 (see FIG. 13) to elapse. After completing the process of step S160, the water management server 28 proceeds to step S170 and changes the drainage height of the drainage device 33 installed in the field H belonging to the field group G selected in step S110 to the "drainage height during dam storage." At this time, the water management server 28 changes the drainage height to the "drainage height during dam storage" set for each field H on the mode setting screen 150 (see FIG. 14).
[0129] Furthermore, in step S180, the water management server 28 waits for the “drainage interval at transition to dam mode” set on the mode setting screen 150 (see FIG. 13) to elapse. After completing the process of step S180, the water management server 28 proceeds to step S110 and switches the next field group G to the dam mode (the process of step S120 and subsequent steps).
[0130] In this manner, the water management server 28 switches to the dam mode for each field group G at different times.
[0131] A specific example of the automatic damming process will be described below with reference to Figs. 16 and 17. Note that the following description will be given by taking as an example a case where "controlled objects 1 to 3" are set to dam mode as a field group G. Also, "controlled objects 1 to 3" are assumed to be located downstream of tributary R2 in ascending order of numbers (see Fig. 17). Note that being located downstream means that the drainage channel 24c (see Fig. 1) of field H belonging to "controlled objects 1 to 3" is connected to the downstream side of tributary R2. Also, in the following description, it is assumed that the dam mode is switched to in the order of "controlled object 1," "controlled object 2," and "controlled object 3," as set in Fig. 13.
[0132] As shown in Fig. 16, "control objects 1 to 3" are switched to normal mode in the initial state before the automatic damming process is executed. When the automatic damming process is executed in this state, the water management server 28 changes the drainage height of the field H of "control object 1" which has the highest priority to the "dam preparation drainage height" as shown in Fig. 16 and Fig. 17(a) (step S110, step S120: Yes, step S130: Yes, steps S140 and S150). In this way, the water management server 28 first temporarily drains the water of the field H belonging to "control object 1".
[0133] When the "drainage interval at dam mode transition" has elapsed since drainage of "controlled object 1" began (step S180), the water management server 28 changes the drainage height of "controlled object 2," which has the second highest priority after "controlled object 1," to the "drainage height at dam preparation," as shown in Figures 16 and 17(b).
[0134] In addition, when the "drainage interval at dam mode transition" has elapsed since the start of drainage of "controlled object 2", the water management server 28 changes the drainage height of "controlled object 3" to the "drainage height at dam preparation", as shown in Figures 16 and 17(c).
[0135] When the "drainage time during dam mode transition" has elapsed since drainage of "controlled object 1" started (step S160), the water management server 28 changes the drainage height of "controlled object 1" to the "drainage height during dam storage" (step S170) as shown in Fig. 17(c). The water management server 28 also changes the drainage height of "controlled object 2" and "controlled object 3" to the "drainage height during dam storage" (not shown) in the same way as "controlled object 1".
[0136] With this configuration, the water management server 28 can shift the timing of draining water from the field H when switching to the dam mode. This makes it possible to prevent a large amount of water from flowing into the river (the main river R1 or the tributary R2) from the field H at once, thereby suppressing the flooding of the river.
[0137] In addition, by draining the water in order from the downstream side as shown in FIG. 17, the water drainage on the upstream side is less affected by the rise in water level caused by the water drainage on the downstream side, and the water drainage of the field H can be performed efficiently.
[0138] In the above explanation, an example was given in which the dam mode button 141b was pressed when all field groups G were in normal mode, but it is also conceivable that the button may be pressed while some field groups G are being automatically switched to normal mode (while the automatic return process described below is running), or when some field groups G have already been manually switched to dam mode. In this case, the water management server 28 stops any ongoing process (automatic return process), and sequentially switches to dam mode the field groups G whose drainage height is not set to the "drainage height during dam storage" through the automatic damming process.
[0139] Specifically, in the automatic damming process, if the "status" of the field group G selected in step S110 is "normal" or "preparation to dam (draining)", the water management server 28 proceeds to the process of step S140 (step S130: Yes) and changes the drainage height, etc. of the field group G (steps S140 to S180). In this way, the water management server 28 drains water from the field group G whose "status" is "preparation to dam (draining)" again until the "drainage time at transition to dam mode" has elapsed (executes step S160).
[0140] The following describes the automatic return process for switching from the dam mode to the normal mode by the automatic mode. Note that in the following, it is assumed that the state of all field groups G is the dam mode at the start of the automatic return process.
[0141] The automatic return process is started when the normal mode button 141c shown in Fig. 11 is pressed. As shown in Fig. 18, when the automatic return process is started, the water management server 28 performs steps S210 to S230, similar to steps S110 to S130 in the automatic damming process. In this way, the water management server 28 selects a field group G in the order set in the "control order" (see Fig. 13), and performs the processes from step S240 onwards if the "status" of a field H belonging to the selected field group G is other than "normal".
[0142] In step S240, the water management server 28 transmits a signal to the field management server 36 to open the water supply taps of the water supply devices 31 of each field H belonging to the field group G selected in step S210, and also enables (enables) remote operation of the field water management system 30 by the owner terminal 35. When the processing of step S240 ends, the water management server 28 proceeds to step S250.
[0143] In step S250, the water management server 28 transmits a signal to the field management server 36 to change the drainage height of the drainage devices 33 installed in the fields H belonging to the field group G selected in step S210 to the "normal drainage height." When the process of step S240 ends, the water management server 28 proceeds to step S260.
[0144] In step S260, the water management server 28 waits for the “drainage interval at transition to normal mode” set on the mode setting screen 150 (see FIG. 13) to elapse. After completing the process of step S260, the water management server 28 proceeds to step S210 and switches the next field group G to the normal mode (the process from step S220 onwards).
[0145] In this way, the water management server 28 switches to the normal mode for each field group G at different times.
[0146] A specific example of the automatic return process will be described below with reference to Figs. 19 and 20. Note that the following will be described as an example in which "controlled objects 1 to 3" are set to normal mode as field group G. Also, it is assumed that "controlled objects 1 to 3" are located downstream of tributary R2 in ascending order of numbers (see Fig. 20). It is assumed that "controlled object 1," "controlled object 2," and "controlled object 3" are set to normal mode in this order, as set in Fig. 13.
[0147] As shown in Fig. 19, "controlled objects 1 to 3" are switched to the dam mode in the initial state before the automatic return process is executed. When the automatic return process is executed in this state, the water management server 28 changes the drainage height of the field H of "controlled object 1" with the highest priority to the "normal drainage height" as shown in Figs. 19 and 20(a) (step S210, step S220: Yes, step S230: Yes, steps S240 and S250). In this way, the water management server 28 first returns "controlled object 1" to the normal mode. This allows the water management server 28 to drain water from the fields H of the field group G belonging to "controlled object 1" among the fields H whose water level has risen due to heavy rain.
[0148] When the "drainage interval at transition to normal mode" has elapsed since "controlled object 1" was returned to normal mode (step S260), the water management server 28 changes the drainage height of "controlled object 2," which has the second highest priority after "controlled object 1," to the "normal drainage height," as shown in Figures 19 and 20(b).
[0149] In addition, when the "drainage interval at transition to normal mode" has elapsed since "controlled object 2" was returned to normal mode, the water management server 28 changes the drainage height of "controlled object 3" to the "normal drainage height" as shown in Figures 19 and 20(c).
[0150] With this configuration, it is possible to shift the timing of draining water from the field H when switching to the normal mode. This makes it possible to prevent a large amount of water from flowing into the river (main river R1 or tributary R2) from the field H all at once, thereby suppressing the flooding of the river.
[0151] In addition, by draining the water in order from the downstream side as shown in FIG. 20, the water drainage on the upstream side is less affected by the rise in water level caused by the water drainage on the downstream side, and the water drainage of the field H can be performed efficiently.
[0152] In the above explanation, an example was given in which the normal mode button 141c was pressed when all field groups G were in the dam mode, but it is also conceivable that the button may be pressed while some field groups G are being automatically switched to the dam mode (while the automatic damming process is being executed), or when some field groups G have already been switched to the normal mode by manual operation. In this case, the water management server 28 stops any ongoing process (automatic damming process) and sequentially switches the field groups G that have not been returned to the normal mode by the automatic return process to the normal mode.
[0153] Specifically, in the automatic return process, if the "status" of the field group G selected in step S210 is "Dam preparation (draining)" or "Dam", the water management server 28 proceeds to processing of step S240 (step S230: Yes) and changes the drainage height, etc. of the field group G (steps S240 to S260).
[0154] As described above, the field water storage system 10 of this embodiment is a field water storage system 10 equipped with a water management server 28 (control unit) capable of controlling the water supply device 31 and the drainage device 33 (field water management devices) that manage the water supply and drainage of the field H, and the water management server 28 has, as control modes for controlling the water supply device 31 and the drainage device 33, a normal mode (first mode) that adjusts the drainage height of the field H in accordance with predetermined conditions (in this embodiment, crop growth), and a dam mode (second mode) that sets the drainage height of the field H higher than the drainage height in the normal mode ("normal drainage height") regardless of the predetermined conditions, thereby making it possible to store a larger amount of water in the field H than in the normal mode.
[0155] With this configuration, by switching the control mode to the dam mode, a larger amount of water can be stored in the field H compared to the normal mode. This makes it possible to use the field H as a dam and suppress rising water levels and flooding of rivers due to heavy rain, etc.
[0156] In addition, in the dam mode, the water management server 28 sets the drainage height of the field H to a first drainage height ("drainage height during dam preparation") and drains the water from the field H, and then sets the drainage height of the field H to a second drainage height ("drainage height during dam storage") that is higher than the first drainage height (see Figure 16).
[0157] In this way, by temporarily draining the water in the field H, a larger amount of water can be stored in the field H.
[0158] The water management server 28 is capable of setting a plurality of field groups G, each including at least one field H (see FIG. 14), and is also capable of switching the control mode for each field group G (see FIGS. 17 and 20).
[0159] In this way, management of water supply and drainage can be simplified by dividing a plurality of fields H into a plurality of field groups G and switching the control mode for each field group G. For example, the control mode of a plurality of fields H with similar environments (such as a plurality of fields H connected to the same water distribution device 24) can be switched collectively to facilitate management of water supply and drainage.
[0160] In addition, the water management server 28 has switching modes for switching the control modes, including an automatic mode in which the control modes of the multiple field groups G are automatically switched in a set order, and a manual mode in which the control modes of the multiple field groups G are switched by manual operation by the user (see Figures 11 and 12).
[0161] With this configuration, convenience can be improved by selectively using an automatic mode in which the control mode is automatically switched and a manual mode in which the control mode is manually switched.
[0162] Moreover, in the automatic mode, the water management server 28 switches the control mode in accordance with a predetermined set time (see FIG. 16). In addition, the set times in this embodiment include a "drainage time at dam mode transition" that specifies the time for draining the water from field H, a "drainage interval at dam mode transition" that specifies the time difference between field groups G for switching to dam mode, and a "drainage interval at normal mode transition" that specifies the time difference between field groups G for switching to normal mode.
[0163] With this configuration, the control mode can be appropriately switched in accordance with a preset set time.
[0164] Moreover, the water management server 28 is capable of changing the set time (see FIG. 13).
[0165] By configuring in this way, it is possible to more appropriately switch the control mode. For example, by arbitrarily changing the set time according to the size of the river, it is possible to effectively suppress the rise and flooding of the river.
[0166] In addition, the water management server 28 is capable of changing the first drainage height in the dam mode ("drainage height during dam preparation") and / or the second drainage height ("drainage height during dam storage") for each field H (see Figure 14).
[0167] By configuring in this manner, an appropriate drainage height can be set according to the field H.
[0168] The water supply device 31 and the drainage device 33 according to this embodiment are one embodiment of a field water management device. The water management server 28 according to this embodiment is an embodiment of a control unit.
[0169] Although the embodiment of the present invention has been described above, the present invention is not limited to the above configuration, and various modifications are possible within the scope of the invention described in the claims.
[0170] For example, the water management server 28 is not particularly limited in its configuration (cloud server, on-premise server, etc.) as long as it can control the water supply device 31 and the drainage device 33. Also, the farm land management server 36 is a cloud server, but is not limited to this and may be an on-premise server.
[0171] In addition, in the present embodiment, an example has been shown in which the field water storage system 10 itself includes the field water management system 30 that supplies and drains water to and from each field H, but the present invention is not limited to this. For example, the field water storage system 10 can also cooperate with a field water management system 30 provided separately outside to utilize the field H as a dam. The field water storage system 10 may also be one that starts up the normal mode and the dam mode through API cooperation with a monitoring system (a system different from the irrigation water management system 20) that manages a drainage pumping station, drainage gates, etc.
[0172] In addition, the control of the drainage device 33 in the dam mode (the process of setting the drainage height to the "drainage height during dam preparation" and the "drainage height during dam storage") is performed by the water management server 28, but the device that controls the drainage device 33 is not particularly limited. The control of the drainage device 33 may be performed by the monitoring system through API linkage, for example.
[0173] In addition, the set values of "Dam preparation drainage height" and "Dam storage drainage height" are changed by the water management server 28 (mode setting screen 150 shown in FIG. 14), but the device that changes the set values is not particularly limited. The set values may be changed by the monitoring system through API linkage, for example.
[0174] In addition, in the normal mode, the drainage height is adjusted taking into account the growth of the crops, but the indicator used as the basis for adjusting the drainage height in the normal mode is not limited to the growth of the crops and can be changed as desired.
[0175] In addition, in this embodiment, the normal mode and the dam mode are switched for each field group G, but the unit for switching between the normal mode and the dam mode is not limited to the field group G and can be changed arbitrarily. For example, the normal mode and the dam mode may be switched for each field H.
[0176] In addition, in the dam mode, the water in the field H is once drained, but this is not limited to the above. That is, in the dam mode, the water in the field H may be raised without once draining it.
[0177] In the present embodiment, the normal mode and the dam mode can be switched automatically and manually, but the present invention is not limited to this, and the farm field water storage system 10 may be configured to switch modes only automatically (equipped with only the automatic mode). The farm field water storage system 10 may be configured to switch modes only manually (equipped with only the manual mode).
[0178] In addition, in the automatic mode, the modes of the multiple field groups G are switched with a time lag; however, this is not limited to this, and the modes of the multiple field groups G may be switched simultaneously.
[0179] In addition, in this embodiment, the user can arbitrarily set information regarding the mode (such as "drainage interval at dam mode transition" and "drainage height at dam storage"), but this is not limited to this, and the information regarding the mode may be set in advance.
[0180] In addition, the automatic mode is switched to the dam mode when the dam mode button 141b on the operation screen 140 is pressed, but the timing of switching to the dam mode is not particularly limited and can be changed arbitrarily. For example, the switching to the dam mode may be automatically performed when the rainfall forecast is equal to or greater than a preset threshold. Also, when the rainfall forecast is equal to or greater than a preset threshold, it is possible to inquire of the user whether to switch to the dam mode. Specifically, the water management server 28 displays a pop-up including a confirmation message (for example, a message saying "Heavy rain of xx mm is predicted. Do you want to start the rice field dam?") and a start button. Also, when the user presses the start button, the water management server 28 switches to the dam mode.
[0181] Furthermore, before switching to the dam mode, the water management server 28 can inquire not only of the user but also of the relevant parties of the field H (for example, the head of an agricultural association). In this case, if the relevant parties agree to the execution, the water management server 28 executes the switching to the dam mode for the fields H in the area of the relevant parties who agreed to the execution or for all fields H. At this time, the execution condition can include that the water levels of the drainage channel 24c and the river are below a specified water level. Furthermore, the water levels of the drainage channel 24c and the river can be displayed when inquiring of the relevant parties.
[0182] In addition, the water management server 28 switches between the normal mode and the dam mode in sequence based on the time that has elapsed since the drainage height was lowered, but the index used for switching the modes is not limited to this. For example, the water management server 28 may switch between the modes in sequence according to a predetermined water level that has been set in advance. Specifically, the water management server 28 may start switching the mode for the next field group G when the water level of the field H in a predetermined field group G drops to half (or one-third or one-fifth). The water management server 28 may also start switching the mode for the next field group G when the water level of the drainage channel 24c or the river has not risen (is below a predetermined threshold).
[0183] Here, in the dam mode of this embodiment, the water in the field H is drained once. For this reason, when returning from the dam mode to the normal mode in the event that heavy rain does not fall (the weather forecast is incorrect), it is necessary to supply a large amount of water to the field H. However, since there is a limit to the amount of water that can be supplied to the field H, the water level in the field H may not return to normal immediately even when the mode is returned to the normal mode.
[0184] In order to avoid such a situation, the water management server 28 may be configured to have an intermediate mode in addition to the dam mode and normal mode. In the intermediate mode, the amount of water in the field H that is temporarily drained is less than in the dam mode. In the intermediate mode, the water in the field H is temporarily drained to an extent that the water level in the field H can be quickly restored (for example, to an extent that can be restored in one day). The drainage height of the field H at this time is set to a value that is lower than the "normal drainage height" and higher than the "dam preparation drainage height". In the intermediate mode, after the water in the field H is temporarily drained, the drainage height is changed to the "dam storage drainage height". By executing such an intermediate mode, the water management server 28 can quickly restore the water level of the field H when there is no heavy rain.
[0185] In this embodiment, the fields H are grouped (setting which field group G a certain field H belongs to) by manual operation by the user (see FIG. 14), but the present invention is not limited to this. For example, the fields H may be grouped automatically by the irrigation water management server 28. In this case, the irrigation water management server 28 can group the fields H according to, for example, any arbitrary criterion. Such criteria include the area of the field H, the position of the field H relative to the tributary R2 (upstream, downstream), and the growth status of the crops. Moreover, the irrigation water management server 28 can display the criterion on the mode setting screen 150 so that the criterion can be selected arbitrarily.
[0186] When grouping the fields H according to their areas, the water management server 28 can, for example, group the fields H in descending order of area, or group the fields H so that the total areas of the fields H belonging to each field group G are approximately equal. When grouping the fields H according to their positions relative to the tributary R2, the water management server 28 can, for example, automatically group the fields H in ascending order of areas connected to the upstream side (or downstream side) of the tributary R2. When grouping the fields H according to the growth conditions of crops, the water management server 28 can, for example, group the fields H according to areas having similar growth conditions.
[0187] In this embodiment, the "control order" (priority of mode switching in automatic mode) of the field group G is set by manual operation by the user (see FIG. 13), but the present invention is not limited to this. For example, the "control order" may be set automatically by the irrigation water management server 28 according to any judgment criterion (e.g., the position of the field H relative to the tributary R2, etc.). Specifically, the irrigation water management server 28 can set the "control order" so that the field group G connected to the downstream side of the tributary R2 has a higher priority.
[0188] The following describes a farm water storage system 10 according to a second embodiment of the present invention.
[0189] The device configuration of the field water storage system 10 according to the second embodiment is similar to that of the field water storage system 10 according to the first embodiment (see Figs. 1 to 3). Therefore, in the following, the various devices (such as the water management server 28) constituting the field water storage system 10 according to the second embodiment are denoted by the same reference numerals as in the first embodiment, and the description thereof will be omitted. Below, the differences between the field water storage system 10 according to the second embodiment and the first embodiment will be described.
[0190] The field water storage system 10 according to the second embodiment differs from the field water storage system 10 according to the first embodiment in the contents of the automatic damming process (processing for increasing the drainage height of the field H in the event of heavy rain, etc.) and in the ability to display a water storage rate display screen 160 for displaying the water storage rate of the field H. First, the automatic damming process will be described below.
[0191] The automatic damming process according to the second embodiment differs from the automatic damming process according to the first embodiment in that the drainage height in dam mode for storing precipitation in the field H ("drainage height during dam storage") and the field group G (a collection of fields H) are set on the system side, and the process of switching to the dam mode is skipped when a predetermined condition is satisfied. The details are explained below.
[0192] As shown in FIG. 21, when the automatic damming process is started, the water management server 28 proceeds to step S310 and sets a field group G. At this time, the water management server 28 sets the field group G based on the growth condition (growth stage) and variety of the crop in the field H. The growth condition is a period from planting a crop in the field H to harvesting, divided into a plurality of stages. Here, the growth condition of the crop changes from planting in the field H to harvesting. In the field H, work necessary for the growth of the crop is performed in response to the change in the growth condition. The growth condition includes a stage corresponding to such a change in the growth condition of the crop and a stage corresponding to the work necessary for the growth of the crop.
[0193] In this embodiment, it is assumed that rice is grown in the field H. When growing rice in this manner, the growth status includes stages according to changes in the growth state of the rice, such as the planting time, the tillering stage, the young panicle formation stage, the booting stage, the heading stage, the ripening stage, and the maturity stage.
[0194] In the case of growing rice, the growth state includes a period of pesticide spraying work and a period of top dressing work as stages according to the work required for the growth of rice. The pesticide spraying work period is a period in which pesticides are sprayed on the field H at appropriate times for the purpose of pest control, weed control, etc., and the pesticides are allowed to spread throughout the field H without draining for a specified period of time. The top dressing work period is a period in which fertilizer is supplied to the field H to promote the growth of rice, and the fertilizer is allowed to be absorbed by the crops without draining for a specified period of time.
[0195] An example of setting the field group G will be described below. The water management server 28 acquires the crop variety and growth condition of each field H from the field management server 36 or other servers. Based on the acquired results, the water management server 28 extracts fields H with the same crop variety and growth condition, and registers the fields H in a common field group G. In this way, the water management server 28 creates a plurality of field groups G grouped according to variety and growth condition. When the process of step S310 is completed, the water management server 28 proceeds to the process of step S320.
[0196] When setting the field group G in step S310, the water management server 28 may take into consideration the reduced water depth of the field H (how much the water level decreases per unit time). For example, when there are many fields H with the same variety and growth conditions (more than a predetermined threshold), the water management server 28 may further group the fields H with the same variety and growth conditions into fields H with similar reduced water depths. When grouping is performed in this way taking reduced water depth into consideration, the water management server 28 can appropriately acquire the reduced water depth of the field H. For example, the water management server 28 may acquire the reduced water depth input by a related person (such as a worker working in the field H or a user of the field water storage system 10) based on past experience, or may acquire the reduced water depth automatically calculated from the fluctuation of the water level of the field H from a predetermined server (such as the field management server 36).
[0197] In step S320, the irrigation water management server 28 sets the "control order" (the order in which to switch to dam mode) for the field group G set in step S310 based on the crop varieties and growth conditions of the field H. As a result, the "control order" for the field group G is set in the order in which crops are most likely to grow in dam mode. This will be explained in detail below.
[0198] It is generally known that there is a certain correlation between the maximum water level (drainage height) of field H suitable for growing crops (hereinafter referred to as "maximum water level for growth") and the variety and growth condition. FIG. 22 is a graph showing an example. The horizontal axis of the graph shown in FIG. 22 indicates the growth condition, and the vertical axis ("drainage height (cm)") indicates the "maximum water level for growth" according to the growth condition of a certain variety. As shown in FIG. 22, it is known that the "maximum water level for growth" (water level of field H) at the "planting time" and "tiller stage" of a certain variety is 20 to 45 cm. It is also known that the "maximum water level for growth" at the "young panicle formation stage", "ripening stage" and "maturity stage" is 45 cm. It is also known that the "maximum water level for growth" at the "booting stage" and "heading stage" is 30 cm.
[0199] It is also generally known that there is a certain correlation between flood resistance (how long a crop can remain covered in water) and variety and growth conditions. Specifically, as shown in Figure 22, it is known that certain varieties have relatively strong resistance to flooding at the "planting stage" and "tiller stage". It is also known that they have weak resistance to flooding at the "booting stage" and "heading stage". It is also known that in other periods (the "young panicle formation stage", "ripening stage" and "maturity stage"), their resistance to flooding is stronger than the "booting stage" and "heading stage", but weaker than the "planting stage" and "tiller stage".
[0200] From the "maximum water level for growth" and resistance to flooding, it can be inferred whether or not it will be easy to grow crops even in dam mode (when the water level in field H rises). For example, if the "maximum water level for growth" is high, even if the water level in field H rises it is unlikely to exceed the "maximum water level for growth", and it is considered relatively easy to grow crops even in dam mode. Also, if resistance to flooding is high, crops can withstand flooding in field H for a certain period of time, and it is considered relatively easy to grow crops even in dam mode.
[0201] Therefore, the water management server 28 sets the "control order" in the order that is considered to be easiest for growing crops in dam mode, based on the "maximum growth water level" and resistance to flooding. Specifically, the water management server 28 obtains the "maximum growth water level" and resistance to flooding according to the growth status of the field group G from a specified server, and sets the "control order" so that the field group G with a higher "maximum growth water level" is ranked higher. Furthermore, when multiple field groups G have the same "maximum growth water level," the water management server 28 sets the "control order" so that the field group G with a stronger resistance to flooding is ranked higher.
[0202] When multiple field groups G have the same "maximum water level for growth" and resistance to flooding, the water management server 28 sets the "control order" so that the field group G that is closer to harvest is given a lower priority. As shown in Fig. 21, when the processing of step S320 ends, the water management server 28 performs the processing of steps S110 to S130. In this way, the water management server 28 selects the field groups G in the order set in step S320, and performs the processing of step S330 and subsequent steps if the "status" of a field H belonging to the selected field group G is other than "dam".
[0203] In step S320, the "control order" is set by prioritizing the "maximum water level for growth" over the strength against flooding, but the method for setting the "control order" is not limited to this and can be changed as desired. For example, in step S320, the "control order" can be set by prioritizing the strength against flooding over the "maximum water level for growth".
[0204] In step S330, the water management server 28 determines whether the growth state of the field group G selected in step S110 is in the dam prohibition stage.
[0205] The dam prohibition stage is a growth state in which switching to the dam mode needs to be prohibited. Specifically, the dam prohibition stage is a growth state in which it is considered difficult to grow crops in the dam mode. For example, when the "maximum growth water level" shown in FIG. 22 is low, the water level of the field H is likely to exceed the "maximum growth water level" as the water level of the field H rises, and it is considered that it is relatively difficult to grow crops in the dam mode. Also, when the resistance to flooding is weak, the crops in the field H cannot withstand flooding for a long period of time, and it is considered that it is relatively difficult to grow crops in the dam mode. Therefore, in this embodiment, the water management server 28 sets a growth state in which the "maximum growth water level" is low and the resistance to flooding is weak as a dam prohibition stage in advance and stores it in the storage device. The water management server 28 sets, for example, the "booting stage" and the "heading stage" as the dam prohibition stage.
[0206] As shown in Fig. 21, in step S330, the irrigation water management server 28 determines whether the growth conditions of the field group G selected in step S110 match the dam prohibition stage. If the growth conditions match (step S330: Yes), the irrigation water management server 28 proceeds to step S110 and switches the next field group G to the dam mode (processing from step S120 onwards). In this way, the irrigation water management server 28 skips the process of switching to the dam mode for the field group G in a growth condition that is considered to be difficult for crops to grow in the dam mode. On the other hand, if the growth conditions do not match (step S330: No), the irrigation water management server 28 proceeds to the process of step S140.
[0207] In step S140, the water management server 28 closes the water supply taps of the water supply devices 31 in each of the fields H belonging to the field group G selected in step S110, and disables remote operation of the field water management system 30 by the owner terminal 35. The water management server 28 then proceeds to step S340.
[0208] In step S340, the water management server 28 changes the drainage height of the field H belonging to the field group G selected in step S110 to the "dam preparation drainage height." At this time, the water management server 28 gradually lowers the drainage height of the field H, and finally lowers the drainage height to the "dam preparation drainage height." For example, when changing the drainage height from "10 cm" to "2 cm" (dam preparation drainage height), the water management server 28 repeatedly executes the process of lowering the drainage height by several cm and waiting for a predetermined time until the drainage height reaches "2 cm."
[0209] In step S340, the irrigation water management server 28 gradually lowers the drainage height in consideration of the state of the field H, such as the state of pesticide spraying, the state of top dressing, and the state of mud. For example, when draining water from the field H immediately after pesticide spraying or top dressing, or when there is a large amount of mud, there is a risk that pesticides and the like will also be discharged from the field H. Therefore, the irrigation water management server 28 gradually lowers the drainage height so that pesticides and the like are less likely to be discharged in such cases. Specifically, the irrigation water management server 28 reduces the amount of lowering when gradually lowering the drainage height of the field H to weaken the force of the water drained from the field H, or lengthens the waiting time after lowering the drainage height. The irrigation water management server 28 can appropriately determine the state of the pesticide spraying, etc. from the growth state of the crop selected in step S110, etc. Upon completion of the process of step S340, the water management server 28 executes the processes of steps S350 to S370 and the process of step S380 in parallel.
[0210] The extent of lowering and the waiting time when the drainage height of the field H is gradually lowered can be set arbitrarily by the relevant person (the worker working in the field H, the user of the field water storage system 10, etc.). In this case, the relevant person can set the extent of lowering, etc. using a specified device. Specifically, the relevant person can set the extent of lowering, etc. using the user terminal 27, the owner terminal 35, etc. In this way, by repeatedly executing the process of lowering the drainage height of the field H for each value (the extent of lowering and the waiting time) set by the relevant person, the process of gradually lowering the drainage height of the field H can be appropriately controlled. For example, the extent of lowering can be reduced to weaken the force of the water drained from the field H. In addition, the extent of lowering can be increased or the waiting time can be shortened to shorten the time required to finish lowering the drainage height to the "drainage height at the time of dam preparation".
[0211] In step S350, the water management server 28 waits for the "drainage time at dam mode transition" (waiting time for switching the field group G to dam mode with a time delay) to elapse. At this time, the water management server 28 waits, for example, for the time that has elapsed since the start of lowering the drainage height in step S340 (or since the completion of lowering to the "dam preparation drainage height") to exceed the "drainage time at dam mode transition." When the processing of step S350 ends, the water management server 28 proceeds to step S360.
[0212] In step S360, the water management server 28 calculates a setting value for the "drainage level during storage in dam" for each field H belonging to the field group G selected in step S110. At this time, the water management server 28 calculates the setting value for the "drainage level during storage in dam" based on the variety and growth condition of the field group G. An example of calculating the setting value for the "drainage level during storage in dam" will be described below.
[0213] The irrigation water management server 28 previously stores, for example, the growth state and the set value of "drainage height during storage in dam" in association with each variety. In this way, if the irrigation water management server 28 knows the variety and growth state of the field H, it can determine the set value of "drainage height during storage in dam" accordingly. The relationship between such growth state and the set value of "drainage height during storage in dam" is set based on a graph such as that shown in FIG. 22 (the relationship between growth state and "maximum growth water level") or the like. In more detail, for example, the same drainage height as the value shown in the graph in FIG. 22 is set as the "drainage height during storage in dam" for each growth state.
[0214] In step S360, the irrigation water management server 28 obtains the "drainage height during dam storage" using the relationship between the above growth conditions, etc. and the set value of "drainage height during dam storage." For example, when the growth condition of the field group G selected in step S110 is "young panicle formation stage," the irrigation water management server 28 sets the set value of "drainage height during dam storage" to "45 cm." In this way, the set value of "drainage height during dam storage" is set to a value higher than the "normal drainage height." As shown in FIG. 21, when the processing of step S360 ends, the irrigation water management server 28 proceeds to step S370.
[0215] In step S370, the water management server 28 changes the drainage height of the field H belonging to the field group G selected in step S110 to the "drainage height during storage in dam" calculated in step S350.
[0216] Furthermore, in step S380, the water management server 28 waits for the "drainage interval at dam mode transition" (waiting time for switching the field group G to the dam mode with a time difference) to elapse. At this time, the water management server 28 waits, for example, for the time that has elapsed since the start of lowering the drainage height in step S340 (or since the completion of lowering to the "dam preparation drainage height") to exceed the "drainage interval at dam mode transition". After completing the process of step S380, the water management server 28 proceeds to step S110 and switches the next field group G to the dam mode (processing from step S120 onwards).
[0217] In this way, in the automatic damming process, the setting value of the "drainage height during dam storage" is automatically set based on the variety and growth conditions of the field H (steps S360-S370). With this configuration, the drainage height of the field H can be set to an appropriate height when storing precipitation in the field H. For example, the "drainage height during dam storage" can be set so as not to exceed the drainage height ("maximum water level for growth") shown in FIG. 22, and a water level suitable for crop growth can be maintained while storing precipitation in the field H in dam mode.
[0218] A specific example of the automatic damming process according to the second embodiment will be described below with reference to FIGS.
[0219] As a premise, as shown in FIG. 23(a), it is assumed that field H includes field H where the crop growth status is the "young panicle formation stage", field H where the crop growth status is the "booting stage", and field H where the crop growth status is the "ripening stage". It is assumed that the crops in each field H are of the same variety. It is also assumed that each field H is switched to normal mode (a mode that is mainly executed when the weather is stable) in the initial state before the automatic damming process is executed.
[0220] When the automatic damming process is started, the irrigation water management server 28 sets field groups G for each variety and growth state (step S310). As a result, as shown in Fig. 23(b), each field H is divided into a first field group G1 to which fields H in the "young panicle formation stage" belong, a second field group G2 to which fields H in the "booting stage" belong, and a third field group G3 to which fields H in the "ripening stage" belong.
[0221] Once the field groups G are set, the water management server 28 sets the "control order" for each field group G based on the variety and growth condition (step S320). As shown in Fig. 22, the first field group G1 ("young panicle formation stage") and the third field group G3 ("ripening stage") have a higher "maximum water level for growth" (the maximum drainage height of the field H suitable for growing crops) than the second field group G2 ("booting stage"). The first field group G1 and the third field group G3 have similar resistance to flooding.
[0222] In this way, when the "control order" of the first field group G1 ("panicle formation stage") and the third field group G3 ("ripening stage") cannot be set based on the "maximum water level for growth" and the strength against flooding alone, the irrigation water management server 28 ranks the third field group G3, which is close to harvest, lower than the first field group G1. Thus, as shown in FIG. 23(b), the irrigation water management server 28 sets the first field group G1, which is in the "panicle formation stage", to the top of the "control order", and sets the third field group G3, which is in the "ripening stage", to the next top of the "control order". In addition, the irrigation water management server 28 sets the second field group G2 ("booting stage"), which has a lower "maximum water level for growth", to the bottom of the "control order".
[0223] When the "control order" is set, the irrigation water management server 28 judges whether the growth status of the first field group G1, which has the highest "control order" (priority), is a predetermined growth status (step S110, step S120: Yes, step S130: Yes, S330). At this time, the irrigation water management server 28 judges whether the growth status of the first field group G1 ("panicle formation stage") is in a dam prohibition stage (either "booting stage" or "heading stage"). Since the growth status of the first field group G1 is not in a dam prohibition stage, as shown in FIG. 24(a), the irrigation water management server 28 changes the drainage height of the first field group G1 to the "dam preparation drainage height" (step S330: No, steps S140-S340).
[0224] When the "drainage interval at dam mode transition" has elapsed since drainage of the first field group G1 started (step S380), the water management server 28 determines that the growth condition of the third field group G3, which has the next highest "control order" after the first field group G1, is not in the dam prohibition stage, as shown in Figure 24(b).Then, the water management server 28 changes the drainage height of the third field group G3 to the "dam preparation drainage height" (step S330: No, steps S140 to S340).
[0225] In addition, when the "drainage time at dam mode transition" has elapsed since the start of drainage of the first field group G1 (step S350), the water management server 28 changes the drainage height of the first field group G1 to the "drainage height at dam storage" (steps S360-S370), as shown in FIG. 25(a).
[0226] In addition, when the ``drainage time at dam mode transition'' has elapsed since the start of drainage of the third field group G3, the water management server 28 changes the drainage height of the third field group G3 to the ``drainage height during dam storage'' as shown in Figure 25 (b) (steps S360-S370).
[0227] Furthermore, when the "drainage interval at transition to dam mode" has elapsed since drainage of the third field group G3 started (step S380), the water management server 28 determines that the growth condition of the second field group G2, which has the lowest "control order," is in the dam prohibition stage ("booting stage") (step S330: Yes). In this way, the water management server 28 ends the automatic damming process without switching the second field group G2 to the dam mode.
[0228] In this way, the irrigation water management server 28 prohibits switching to the dam mode for the second field group G2 where it is considered difficult to grow crops (growth should be prioritized) if the mode is switched to the dam mode. This allows the irrigation water management server 28 to keep the drainage height of the second field group G2 lower in the event of heavy rain than when the mode is switched to the dam mode. This makes it possible to prevent the water level in the second field group G2 from becoming too high in the event of heavy rain, and to prevent adverse effects on the growth of crops in the second field group G2.
[0229] If necessary, the user can manually switch the second field group G2 to the dam mode (see the operation screen 140 shown in FIG. 11).
[0230] Furthermore, when executing the automatic return process (see FIG. 18) for switching the field H from the dam mode to the normal mode, the irrigation water management server 28 may set the field group G and the "control order" according to the variety and growth condition. In this case, the irrigation water management server 28 may raise the priority of the "control order" of the field group G that has a low "maximum growth water level" and is vulnerable to flooding (for example, the second field group G2 in the "booting stage"). This makes it possible to advance the timing of drainage of the field H that is considered to be difficult for crops to grow in the dam mode.
[0231] Next, the water storage rate display screen 160 will be described with reference to FIGS.
[0232] As described above, the water storage rate display screen 160 is for displaying the water storage rate of the field H. The water storage rate display screen 160 is generated by the water management server 28. The water storage rate display screen 160 is displayed on the user terminal 27 by selecting appropriate information in the first frame 101 and the second frame 102. As shown in FIG. 26 , the water storage rate display screen 160 includes a map display section 161 and a setting change section 162.
[0233] The map display unit 161 is a part that displays a map of the field H. The irrigation water management server 28 acquires map information from a predetermined server and displays the map information on the map display unit 161. The irrigation water management server 28 also displays the water storage rate of the field H within the area of the field H shown on the map.
[0234] Here, the water storage rate of field H indicates the ratio of the current water storage volume of field H to the reference water storage volume of field H. Also, the reference water storage volume indicates the amount of water that can be stored in field H. As will be described later, the reference water storage volume can be calculated based on a predetermined height. An example of calculating the water storage rate of field H will be described below with reference to FIG. 27. Note that FIG. 27 is a schematic diagram showing drainage device 33, ridge A of field H, etc.
[0235] First, the water management server 28 obtains the area of the field H, the current water level (measurement results of the water level and water temperature sensor 32), and the "maximum drainage height" from a specified server (such as the field management server 36 or another server). The "maximum drainage height" is the height position (maximum value of the drainage height) of the lifting body 33a when the lifting body 33a is raised to the maximum. The "maximum drainage height" is set in advance (for example, when the drainage device 33 is installed) and stored in the specified server.
[0236] When the water management server 28 acquires the "maximum drainage height" and the like from a predetermined server, the water management server 28 multiplies the "maximum drainage height" by the area of the field H. In this way, the water management server 28 calculates the amount of water that can be stored in the field H when the lifting body 33a is raised to the maximum, that is, the reference water storage volume based on the "maximum drainage height". The water management server 28 also calculates the current water storage volume of the field H by multiplying the current water level of the field H by the area of the field H. The water management server 28 calculates the water storage rate (%) of the field H by dividing the current water storage volume calculated in this way by the reference water storage volume. The water management server 28 calculates the water storage rate for each field H and displays the calculation result on the map display unit 161 shown in FIG. 26. In this way, the water management server 28 notifies the water storage rate of the field H.
[0237] For example, by visually checking the water storage rate of field H during heavy rainfall, the user can easily determine how much the water level of field H has risen relative to the upper limit of the water level of field H ("maximum drainage level"). Also, by visually checking the water storage rate of field H after heavy rainfall, the user can understand how much precipitation has been stored in field H. In this way, the water management server 28 according to this embodiment notifies the user of the water storage rate, thereby enabling the user to understand information about field H used as a dam (such as how much the water level of field H has risen), thereby improving convenience.
[0238] 26, the irrigation water management server 28 displays the field H on the map display unit 161 in a different color depending on the growth status of the crops in the field H. An example of a method for displaying the field H in a different color depending on the growth status will be described below.
[0239] The irrigation water management server 28 stores in advance information indicating the growth status (for example, character string information such as "young panicle formation stage") and color information for indicating the growth status by color in association with each other. When displaying the map display unit 161, the irrigation water management server 28 acquires the growth status of the crops in each field H from the farm land management server 36 or other servers. Then, based on the acquired growth status, the irrigation water management server 28 determines the color with which to color the field H. Based on the determined growth status, the irrigation water management server 28 colors the area on the map corresponding to the field H. In this way, the irrigation water management server 28 displays the field H by color in the map display unit 161 and reports the growth status together with the water storage rate of the field H. In this way, the irrigation water management server 28 reports the growth status of the field H by color and also reports the water storage rate of the field H by a numerical value.
[0240] Users can easily understand the relationship between the growth status and the water storage rate by visually checking the color-coded water storage rate of field H. This allows users to quickly determine whether the water storage rate of field H, which is in a dam prohibition stage (such as the "booting stage"), is high.
[0241] Although the water management server 28 notifies the growth status of the field H by color and the water storage rate of the field H by a numerical value, the display method of the growth status, etc. is not particularly limited and can be changed arbitrarily. For example, the water management server 28 may display the field H in different colors according to the water storage rate and display the growth status of the field H by a character string (alphanumeric characters, symbols, etc.). The water management server 28 can also alert the user to a field H with a high water storage rate (higher than a predetermined threshold). For example, the water management server 28 can periodically change the display mode of the field H with a high water storage rate. More specifically, the water management server 28 can periodically change the display mode by blinking the water storage rate (numerical value) or the area on the map (color) of the field H with a high water storage rate. This allows the user to quickly understand that the water level of the field H is high.
[0242] In addition, the irrigation water management server 28 acquires the current water level of each field H at predetermined time intervals (for example, every minute) and recalculates the water storage rate of each field H based on the acquired results. The irrigation water management server 28 then updates the display of the water storage rate on the map display unit 161 based on the recalculation results. This allows the user to grasp the latest water storage rate of the field H.
[0243] The above-mentioned method of updating the display of the water storage rate is one example and can be changed as desired. For example, the water management server 28 may change the frequency of updating the display of the water storage rate for each field H. In this case, the water management server 28 can change the frequency of updating the display of the water storage rate for each field H based on a predetermined standard (water storage rate, growth status, etc.).
[0244] For example, the water management server 28 can change the update frequency based on the water storage rate of the field H. In this case, the water management server 28 can set the update frequency to be higher as the water storage rate of the field H becomes higher. In addition, at this time, the water management server 28 can set a threshold value and change the update frequency in stages. For example, the water management server 28 sets the update frequency of the water storage rate of the field H to a specified value (for example, once every 10 minutes) during normal times when the water storage rate of the field H is lower than a predetermined first threshold value (for example, 50%). Furthermore, when the water storage rate of the field H is equal to or higher than the first threshold value (50%), the water management server 28 sets the update frequency of the water storage rate of the field H to a specified value (for example, once every 5 minutes). In addition, when the water storage rate of the field H is equal to or greater than a second threshold value (e.g., 80%) which is higher than the first threshold value (50%), the water management server 28 further increases the update frequency of the water storage rate of the field H (e.g., sets it to once per minute).
[0245] In this way, the water management server 28 can change the update frequency in multiple stages. The threshold value and the set value of the update frequency at this time can be appropriately set by the relevant parties (such as workers working in the fields H and users of the field water storage system 10). The water management server 28 can be configured to change the update frequency in various units other than for each field H. For example, the water management server 28 may change the update frequency for each field group G or for each region based on the water storage rate for each field group G or for each region.
[0246] 28, when the water storage rate of a specific field H is high, the water management server 28 displays that fact on the water storage rate display screen 160. At this time, the water management server 28 determines whether the water storage rate of the specific field H is high enough to require a notification, and appropriately displays that the water storage rate is high on the water storage rate display screen 160 based on the result of the determination.
[0247] Specifically, the water management server 28 calculates the water storage rate of each field H and compares the calculation result with a predetermined threshold value (e.g., 80%) that is set in advance. If the calculation result of the water storage rate is higher than the predetermined threshold value, the water management server 28 displays a message indicating that the water storage rate of the field H is high (e.g., a message stating "The water storage rate of field 10 has exceeded 80%."). By visually checking the message, the user can easily understand that the water storage rate of a particular field H is high.
[0248] The water management server 28 also displays the "maximum drainage height" and "drainage height during dam storage" of fields H with high water storage rates. The water management server 28 also displays a button for changing the set value of the "drainage height during dam storage." By pressing the button, the user can change the set value of the "drainage height during dam storage" while visually checking the water storage rate of a specific field H. In this case, the user can prevent water from overflowing from the field H, for example, by increasing the set value of the "drainage height during dam storage." In addition, the user can prevent adverse effects on crop growth, for example, by decreasing the set value of the "drainage height during dam storage."
[0249] As described above, the field water storage system 10 according to this embodiment is a field water storage system 10 equipped with a water management server 28 (control unit) capable of controlling the water supply device 31 and the drainage device 33 (field water management devices) that manage the water supply and drainage of the field H. The water management server 28 has, as control modes for controlling the water supply device 31 and the drainage device 33, a normal mode (first mode) that adjusts the drainage height of the field H in accordance with specified conditions, and a dam mode (second mode) that sets the drainage height of the field H to a "drainage height during dam storage" (first drainage height) that is higher than the drainage height in the normal mode, regardless of the specified conditions, thereby making it possible to store a larger amount of water in the field H than in the normal mode, and automatically sets the "drainage height during dam storage" based on specified criteria including the growth status of the crops in the field H (in this embodiment, the variety and growth status).
[0250] By configuring in this manner, the "drainage height during dam storage" can be set to an appropriate height depending on the growth conditions. Specifically, as shown in FIG. 22, the maximum water level suitable for the growth of crops in field H ("maximum growth water level") varies depending on the growth conditions. In this embodiment, by setting the drainage height depending on the growth conditions, the "drainage height during dam storage" can be set so that it does not exceed the "maximum growth water level." This allows crops to grow while a large amount of water is stored in field H, even when switching to dam mode.
[0251] The predetermined criteria also include the variety of the crop in the field H.
[0252] By configuring in this way, the "drainage height during storage in the dam" can be set to a more appropriate height based on the type of water.
[0253] The water management server 28 is also capable of switching the control mode for each field group G including at least one field H (see FIGS. 24 to 26).
[0254] With this configuration, it is possible to collectively switch the control modes of a plurality of farm fields H. This makes it possible to facilitate the management of water supply and drainage.
[0255] In addition, the water management server 28 automatically sets the field group G according to the growth conditions.
[0256] With this configuration, the fields H can be grouped according to the growth conditions. For example, by grouping the fields H with the same growth conditions into the same field group G, the control mode can be switched collectively according to the growth conditions, which makes it possible to simplify the management of water supply and drainage.
[0257] In addition, the water management server 28 prohibits switching to the dam mode for any of the field groups G in which the crop growth conditions in the field H are in a predetermined growth condition (dam prohibited stage) that has been set in advance (see Figure 26 (c)).
[0258] This configuration allows the system to switch to the dam mode appropriately depending on the growing conditions. For example, for field group G where it is desirable to keep the water level low (such as the second field group G2 where the growing conditions are susceptible to flooding), the system does not switch from the normal mode to the dam mode, and the impact on crop growth caused by rising water levels due to heavy rain, etc. can be reduced.
[0259] In addition, in the dam mode, the water management server 28 calculates a water storage rate indicating the ratio of the current water storage volume of the field H to the standard water storage volume of the field H, and issues an alert when the calculation result exceeds a predetermined threshold value (see Figure 28).
[0260] By configuring in this manner, it is possible to easily identify fields H with a high water storage rate.
[0261] Furthermore, the water management server 28 can change the "drainage height during storage in dam" when the calculation result of the water storage rate exceeds a predetermined threshold value (see FIG. 28).
[0262] By configuring in this manner, it is possible to take prompt action when the water storage rate of the field H becomes high due to heavy rain or the like.
[0263] In addition, in the dam mode, the water management server 28 sets the drainage height of the field H to the "drainage height during dam preparation" which is lower than the "drainage height during dam storage", and after draining the water from the field H, sets the drainage height of the field H to the "drainage height during dam storage", and when setting the drainage height of the field H to the "drainage height during dam preparation", the drainage height of the field H is gradually lowered depending on the growth conditions.
[0264] In this way, by draining the water from the field H once, a larger amount of water can be stored in the field H. Also, by gradually lowering the drainage height, the force of the water once drained from the field H can be weakened, and it is possible to prevent mud, pesticides, and the like from being discharged from the field H.
[0265] The water supply device 31 and the drainage device 33 according to this embodiment are one embodiment of the field water management device according to the present invention. The water management server 28 according to this embodiment is an embodiment of a control unit according to the present invention.
[0266] Although the embodiment of the present invention has been described above, the present invention is not limited to the above configuration, and various modifications are possible within the scope of the invention described in the claims.
[0267] For example, the water management server 28 is set to set the "drainage level during dam storage" according to the growth conditions of rice, but this is just one example, and the "drainage level during dam storage" can be set according to the growth conditions of various crops grown in field H, not limited to rice.
[0268] The water management server 28 sets the "drainage level during storage in the dam" based on the variety and growth condition (steps S360-S370), but the standard for setting the "drainage level during storage in the dam" (the first standard according to the present invention) is not particularly limited as long as it includes at least the growth condition. The water management server 28 can set the "drainage level during storage in the dam" based on, for example, the growth condition and the predicted rainfall.
[0269] When the "drainage height during storage in dam" is set based on the growth condition and the predicted rainfall, for example, the water management server 28 stores the set value of the "drainage height during storage in dam" in association with the growth condition and the predicted rainfall for each variety. In this way, the water management server 28 can determine the set value of the "drainage height during storage in dam" according to the growth condition and the predicted rainfall. The set value of the "drainage height during storage in dam" is appropriately set so that, for example, the higher the predicted rainfall, the higher the set value. In addition, the set value of the "drainage height during storage in dam" for a plurality of different growth conditions is lower for a growth condition with a lower "maximum growth water level" than for a growth condition with a higher "maximum growth water level" if the predicted rainfall is the same. The water management server 28 acquires the growth condition, the predicted rainfall, etc. from a predetermined server, etc. The water management server 28 determines the set value of the "drainage height during storage in dam" according to the growth condition and the predicted rainfall acquired in this way from the information stored in advance. In this way, by setting the "drainage height during storage in dam" using the predicted rainfall itself, the water management server 28 can set the "drainage height during storage in dam" to an appropriate height. For example, when the predicted rainfall is relatively low, the "drainage height during storage in dam" of the field H in a growth state where the "maximum growth water level" is low can be lowered to prevent adverse effects on the crops in the field H.
[0270] In addition, when the "drainage height during dam storage" is set based on the predicted rainfall, the water management server 28 can also set (indirectly set) the "drainage height during dam storage" by predicting future state changes from the predicted rainfall, for example. For example, the water management server 28 predicts the amount of rise in the water level of the field H from the predicted rainfall. The water management server 28 then sets the setting value of the "drainage height during dam storage" based on the prediction result and the growth condition. For example, when the "maximum growth water level" is low and the prediction result of the rise in the water level of the field H is higher than a predetermined threshold, the water management server 28 sets the setting value of the "drainage height during dam storage" relatively low. With this configuration, the water management server 28 can suppress the rise in the water level of the field H in a growth condition where the "maximum growth water level" is low in the event of heavy rain, etc., and prevent adverse effects on the crops of the field H.
[0271] Furthermore, when the "drainage height during storage in dam" is set based on the growth status and the forecast rainfall, the water management server 28 can set the "drainage height during storage in dam" by prioritizing flood control over crop growth (graph in FIG. 22) depending on the forecast rainfall. Specifically, the water management server 28 compares the forecast rainfall with a threshold value for the forecast rainfall set in consideration of flood control, and when the forecast rainfall is greater than the threshold value, the water management server 28 increases the "drainage height during storage in dam" to a height that is not suitable for crop growth (a height exceeding the graph in FIG. 22). This allows the water management server 28 to increase the "drainage height during storage in dam" when the forecast rainfall is large, and store more precipitation in the field H. This makes it possible to effectively suppress the rise and overflow of rivers. In this case, the water management server 28 may check with the relevant parties (such as the owner of field H) as to whether or not it is acceptable to prioritize flood control over cultivation (by increasing the “drainage level during dam storage”), and may increase the “drainage level during dam storage” only if permission is given by the relevant parties.
[0272] Thus, the predetermined criteria include the predicted rainfall.
[0273] By configuring in this way, the "dam storage drainage height" can be set to a more appropriate height based on the predicted rainfall.
[0274] In addition, when the predicted rainfall exceeds a predetermined threshold, the water management server 28 increases the setting value of the "drainage height during dam storage" above the value set based on the growth conditions (for example, a height that does not exceed the graph in Figure 22).
[0275] By configuring it in this way, when heavy rain is predicted, flood control can be prioritized and the "drainage height during dam storage" can be increased.
[0276] In this embodiment, the drainage height in the dam mode ("drainage height during dam storage") is set higher than the drainage height in the normal mode ("normal drainage height"), but the magnitude relationship between these drainage heights is not particularly limited. That is, the drainage height in the dam mode may be the same as the drainage height in the normal mode, or may be lower than the drainage height in the normal mode, depending on the growth conditions.
[0277] 26 and 28 are merely examples, and the information displayed on the water storage rate display screen 160 can be changed as desired. For example, the water storage rate display screen 160 displays the water storage rate of the field H as a percentage, but there are no particular limitations on how the water storage rate is displayed, and the water storage rate may be displayed as a fraction, a decimal, a percentage, or the like.
[0278] Furthermore, the method of displaying the field H in different colors on the water storage rate display screen 160 is not particularly limited and can be changed arbitrarily. For example, in this embodiment, color information for determining the color with which the field H is colored is stored in the irrigation water management server 28, but the device in which the color information is stored can be changed to the field management server 36, etc. Furthermore, instead of color-coding according to the growth status, an icon or the like indicating the growth status may be displayed on the water storage rate display screen 160.
[0279] In addition, the water management server 28 calculates the water storage rate of the field H based on the “maximum drainage height” shown in FIG. 27, but this is not limited to this, and the water storage rate of the field H may be calculated based on another height.
[0280] For example, the water management server 28 may calculate the water storage rate of the field H based on the "drainage level during storage in the dam" shown in Fig. 27 as a reference. In this case, the water management server 28 calculates the standard water storage volume of the field H based on the "drainage level during storage in the dam" and the area of the field H, and calculates the water storage rate of the field H based on the calculation result. The water management server 28 may also calculate the water storage rate of the field H based on the "bank height" shown in Fig. 27 as a reference. In this case, the water management server 28 calculates the standard water storage volume of the field H based on the "bank height" and the area of the field H, and calculates the water storage rate of the field H based on the calculation result. The water management server 28 may also calculate the water storage rate of the field H based on the "maximum water level for growth". In this case, the water management server 28 calculates the water storage rate of the field H using the reference water storage volume of the field H calculated based on the "maximum water level for growth" according to the growth condition.
[0281] Even when the water storage rate of the drainage height according to the growth condition (water storage rate based on the "maximum water level for growth") is calculated as described above, the water management server 28 can display the water storage rate itself (numerical value) or display the field H in a different color according to the water storage rate (displaying the water storage rate in color).The water management server 28 can also alert the user to a field H with a high water storage rate by, for example, flashing the water storage rate (numerical value) or the area (color) on the map.
[0282] In addition, on the water storage rate display screen 160, it may be possible to select which of the "maximum drainage level", "drainage level during dam storage", "bank height", and "maximum water level for growth" is used as a basis for calculating the water storage rate of the field H. This can improve convenience.
[0283] The irrigation water management server 28 may also calculate the water storage rate of the field H by taking into consideration the reduced water depth (how much the water level reduces per unit time) of the field H. For example, the irrigation water management server 28 corrects the current water level of the field H based on the time elapsed since the water level of the field H was acquired and the reduced water depth, and calculates the stored water volume of the field H based on the correction result. This allows the irrigation water management server 28 to more accurately determine the water storage rate of the field H.
[0284] In addition, the water management server 28 sets field groups G according to the variety and growth conditions (see Figure 23), but the criteria for setting the field groups G are not particularly limited and can be changed arbitrarily.
[0285] Furthermore, the water management server 28 is assumed to automatically set the field group G and the "control order" (priority for switching the control mode), but is not limited to this. For example, the water management server 28 may switch the control mode according to a preset field group G and "control order" (see FIG. 13). In this case, the water management server 28 acquires the growth conditions of the fields H belonging to each field group G from a predetermined server (such as the field management server 36 that manages the growth conditions) at the timing of switching each field group G to the dam mode. The water management server 28 then sets the "drainage height during dam storage" according to the set value of the growth conditions.
[0286] In this embodiment, a growth state where the "maximum growth water level" is low and the crop is vulnerable to flooding (such as the "booting stage") is set as a dam prohibition stage, but the criteria for setting the dam prohibition stage are not particularly limited and can be changed as desired. For example, in consideration of the psychological damage to farmers when crops close to harvest cannot be harvested due to the effects of heavy rain, a growth stage close to harvest (such as the "ripening stage") may be set as a dam prohibition stage.
[0287] In addition, the water management server 28 is configured not to switch to dam mode when the growth condition of the field group G is in the dam prohibited stage (step S330: No), but this is not limited to this and all field groups G may be switched to dam mode.
[0288] Further, the water management server 28 switches between the normal mode and the dam mode for each field group G, but this is not limited thereto.
[0289] In addition, when the water management server 28 sets the drainage height to the "dam preparation drainage height", it gradually lowers the field group G according to the growth conditions, but the criteria for gradually lowering the height are not limited to the growth conditions and can be changed as desired.
[0290] In addition, the water management server 28 lowers the drainage height in stages when setting the drainage height to the "dam preparation drainage height", but the manner in which the drainage height is lowered can be changed as desired. For example, the water management server 28 may continuously and slowly lower the drainage height (so that the amount of change in the drainage height per unit time is less than a predetermined threshold). In this way, the water management server 28 can weaken the force of the water that is once drained from the field H by setting the drainage height to the "dam preparation drainage height" over time. The water management server 28 may also lower the drainage height to the "dam preparation drainage height" without taking time (all at once).
[0291] Moreover, the water management server 28 only needs to set the "drainage level during dam storage" according to at least the growth condition. Therefore, the water management server 28 does not necessarily need to display the water storage rate. [Explanation of symbols]
[0292] 10. Field Water Storage System 28 Water Management Server 31 Water supply equipment 33 Drainage system H Field
Claims
1. A field water storage system including a control unit capable of controlling a field water management device that manages water supply and drainage in a field, The control unit is As a control mode for controlling the field water management device, a first mode for adjusting the drainage height of the field according to predetermined conditions; a second mode in which a drainage height of the field is set to a first drainage height higher than the drainage height in the first mode regardless of the predetermined conditions, thereby allowing a larger amount of water to be stored in the field than in the first mode; Equipped with automatically setting the first drainage height based on a predetermined criterion including a growth condition of a crop in the field; The predetermined criteria include: Includes forecast rainfall, The control unit is When the predicted rainfall exceeds a predetermined threshold, the setting value of the first drainage height is made higher than the value set based on the growth condition. Field water storage systems.
2. The predetermined criteria include: The variety of the crop in the field is included. The field water storage system according to claim 1.
3. The control unit: The control mode can be switched for each field group including at least one field. The field water storage system according to claim 1 or 2.
4. The control unit: automatically setting the field group according to the growth condition; The field water storage system according to claim 3.
5. The control unit: prohibiting switching to the second mode for a field group in which a growth condition of a crop in the field is a predetermined growth condition set in advance, among the field groups; 5. The field water storage system according to claim 4.
6. The control unit: In the second mode, a water storage rate indicating a ratio of a current water storage amount of the field to a reference water storage amount of the field is calculated, and a notification is given when the calculation result exceeds a predetermined threshold value. The field water storage system according to any one of claims 1 to 5.
7. The control unit: When the calculation result of the water storage rate exceeds a predetermined threshold, the first drainage height can be changed.
7. The field water storage system according to claim 6.
8. A field water storage system comprising a control unit capable of controlling a field water management device that manages water supply and drainage in a field, The control unit is As a control mode for controlling the field water management device, a first mode for adjusting the drainage height of the field according to predetermined conditions; a second mode in which a drainage height of the field is set to a first drainage height higher than the drainage height in the first mode regardless of the predetermined conditions, thereby allowing a larger amount of water to be stored in the field than in the first mode; Equipped with automatically setting the first drainage height based on a predetermined criterion including a growth condition of a crop in the field; The control mode is switchable for each field group including at least one field, automatically setting the field group according to the growth condition; prohibiting switching to the second mode for a field group in which a growth condition of a crop in the field is a predetermined growth condition set in advance, among the field groups; Field water storage systems.
9. A field water storage system having a control unit capable of controlling a field water management device that manages water supply and drainage in a field, The control unit is As a control mode for controlling the field water management device, a first mode for adjusting the drainage height of the field according to predetermined conditions; a second mode in which a drainage height of the field is set to a first drainage height higher than the drainage height in the first mode regardless of the predetermined conditions, thereby allowing a larger amount of water to be stored in the field than in the first mode; Equipped with automatically setting the first drainage height based on a predetermined criterion including a growth condition of a crop in the field; In the second mode, a water storage rate indicating a ratio of a current water storage amount of the field to a reference water storage amount of the field is calculated, and when the calculation result exceeds a predetermined threshold, a notification is given; When the calculation result of the water storage rate exceeds a predetermined threshold, the first drainage height can be changed. Field water storage systems.
10. A field water storage system comprising a control unit capable of controlling a field water management device that manages water supply and drainage in a field, The control unit is As a control mode for controlling the field water management device, a first mode for adjusting the drainage height of the field according to predetermined conditions; a second mode in which a drainage height of the field is set to a first drainage height higher than the drainage height in the first mode regardless of the predetermined conditions, thereby allowing a larger amount of water to be stored in the field than in the first mode; Equipped with automatically setting the first drainage height based on a predetermined criterion including a growth condition of a crop in the field; in the second mode, a drainage height of the field is set to a second drainage height lower than the first drainage height, water is once drained from the field, and then the drainage height of the field is set to the first drainage height; When setting the drainage height of the field to the second drainage height, the drainage height of the field is gradually lowered depending on the growth state. Field water storage systems.
Citation Information
Patent Citations
Disaster prevention monitoring system
JP1991233800A
Method for totally controlling irrigation of paddy field including flood control in area unit
JP1994276868A
Water level adjustment device for paddy field with rice field dam function and method for damming rice field
JP2017051137A
Irrigation water management device
JP2017111536A
Field drainage faucet, field water storage management system, water storage management server and field water storage method
JP2019110832A
