Battery management device and battery management method

The storage battery management device corrects FCC using correction SOCs from the OCV method to enhance SOC estimation accuracy, addressing inaccuracies in existing methods by managing state and measurement errors.

JP7596552B2Active Publication Date: 2024-12-09MUSASHI SEIMITSU INDUSTRY CO LTD
View PDF 12 Cites 0 Cited by

Patent Information

Application Number
JP2023550781
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-09-28
Publication Date
2024-12-09
Estimated Expiration
2041-09-28

AI Technical Summary

Technical Problem

Existing methods for estimating the State of Charge (SOC) of storage batteries, such as the OCV method and current integration method, face inaccuracies due to measurement errors and state errors, particularly when using low-accuracy Full Charge Capacity (FCC), leading to unreliable SOC estimation.

Method used

A storage battery management device that corrects the FCC used in the current integration method based on a correction SOC obtained from the OCV method, ensuring accurate SOC estimation by managing the battery's state errors and measurement inaccuracies through specific correction conditions and processes.

Benefits of technology

The device achieves high-accuracy SOC estimation by correcting the FCC based on correction SOCs, improving estimation accuracy even in conditions where state errors and measurement errors are significant.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007596552000001
    Figure 0007596552000001
  • Figure 0007596552000002
    Figure 0007596552000002
  • Figure 0007596552000003
    Figure 0007596552000003
Patent Text Reader

Abstract

The present invention addresses the problem of precisely estimating SOC based on an electric current integration method. This storage battery management device manages a storage battery having an SOC-OCV characteristic that includes a first region in which an OCV change rate, which is the absolute value of an amount of change in the OCV in relation to an amount of change in the SOC, is equal to or less than a prescribed value, and a second region in which the OCV change rate exceeds the prescribed value. The storage battery management device comprises: a coulomb counting processing unit that calculates the capacity of the storage battery by integrating the electric current measured by an electric current measuring unit; an SOC estimating unit that estimates the SOC of the storage battery on the basis of the SOC at a reference time, an amount of change in the capacity of the storage battery from the reference time, and the FCC of the storage battery; an OCV acquisition unit that acquires the OCV of the storage battery; and a correction unit that corrects, on the basis of an SOC for correction, the storage battery FCC used by the SOC estimating unit in a case in which a correction condition has been satisfied that includes the required condition that the SOC for correction, which is an SOC corresponding to the storage battery OCV acquired by the OCV acquisition unit, is within the second region.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The technology disclosed in this specification relates to a storage battery management device and a storage battery management method. [Background technology]

[0002] The OCV (Open Circuit Voltage) method is known as a method for estimating the SOC (State of Charge) of a storage battery (see, for example, Patent Document 1). In the OCV method, the OCV of the storage battery is acquired, and the SOC is estimated based on the acquired OCV and the correspondence relationship in the SOC-OCV (Open Circuit Voltage) characteristic curve of the storage battery. In the OCV method, for example, the time when the SOC can be estimated is restricted to the time when the OCV of the storage battery can be acquired, and the SOC may not be accurately estimated for a storage battery having SOC-OCV characteristics that include a region (e.g., a plateau region) in which the absolute value of the amount of change in OCV relative to the amount of change in SOC is relatively small.

[0003] Meanwhile, a current integration method is known as another method for estimating the SOC of a storage battery. In the current integration method, the amount of change in the capacity of the storage battery from the initial time is identified by integrating the measurement result of the current flowing through the storage battery, and the SOC is estimated based on the initial capacity, the amount of change in the identified capacity, and the FCC (Full Charge Capacity). Unlike the OCV, the current integration method can estimate the SOC without being affected by the constraints of the time when the OCV can be obtained or the plateau region, but there is a risk that the SOC cannot be estimated accurately due to a measurement error of a current measurement unit that measures the current flowing through the storage battery. In response to this, a method of using the current integration method and the OCV method in combination has been known (for example, see Patent Document 2). In this method, a method is known in which the initial capacity is reset to the SOC estimated by the OCV method at each timing when the OCV can be measured, thereby eliminating an integration error due to a measurement error of the current measurement unit. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent Publication No. 2021-81244 [Patent Document 2] JP 2020-60581 A Summary of the Invention [Problem to be solved by the invention]

[0005] Factors that affect the accuracy of SOC estimation in the current integration method include not only the measurement error of the current measurement unit, but also the error between the assumed state of the storage battery and the actual state (hereinafter referred to as "storage battery state error"). Examples of factors that cause storage battery state errors include individual differences at the time of shipping storage batteries and aging of storage batteries. For example, if the storage battery state error is relatively large, the FCC used in the current integration method may also contain a large error, which may have a greater effect on the accuracy of SOC estimation than the measurement error of the current measurement unit. Even in the above-mentioned method that uses the current integration method and the OCV method in combination, as long as a low-precision FCC is used, the SOC estimated by the current integration method will continue to contain errors due to the storage battery state error in addition to the measurement error of the current measurement unit. As a result, there is a problem that the SOC cannot be accurately estimated by the current integration method.

[0006] This specification discloses a technique that can solve the above-mentioned problems. [Means for solving the problem]

[0007] The technology disclosed in this specification can be realized, for example, in the following forms.

[0008] (1) A battery management device disclosed in this specification is a battery management device that manages a battery having SOC-OCV characteristics including a first region in which an OCV change rate, which is an absolute value of an amount of change in OCV relative to an amount of change in SOC, is equal to or less than a predetermined value, and a second region in which the OCV change rate exceeds the predetermined value, and includes a current measurement unit that measures a current flowing through the battery, a coulomb counting processing unit that calculates a capacity of the battery by integrating the current measured by the current measurement unit, a SOC estimation unit that estimates an SOC of the battery based on an SOC at a reference time, an amount of change in capacity of the battery from the reference time calculated by the coulomb counting processing unit, and an FCC of the battery, an OCV acquisition unit that acquires the OCV of the battery, and a correction unit that corrects the FCC of the battery used in the SOC estimation unit based on the correction SOC when a correction condition is satisfied, the correction SOC being an SOC corresponding to the OCV of the battery acquired by the OCV acquisition unit, is within the second region.

[0009] In this storage battery management device, the SOC of the storage battery is estimated based on the SOC at the reference time, the change in the capacity of the storage battery based on the integration of the current flowing through the storage battery, and the FCC of the storage battery (hereinafter referred to as "SOC estimation based on the current integration method"). The FCC used in this SOC estimation based on the current integration method is corrected based on a correction SOC. This correction SOC is an SOC corresponding to the OCV of the storage battery acquired by the OCV acquisition unit, and is an SOC within a second region (an region in which the OCV change rate, which is the absolute value of the amount of change in OCV relative to the amount of change in SOC, exceeds a predetermined value). When the SOC is within the second region, the acquisition accuracy of the SOC corresponding to the OCV is higher than when the SOC is within the first region (an region in which the above-mentioned OCV change rate is equal to or lower than a predetermined value). And, the correction SOC acquired with the relatively high accuracy reflects the actual state of the storage battery (such as individual differences and aging of the storage battery) more significantly than the SOC estimated based on the current integration method, since there is no integration error. Therefore, the FCC used in the SOC estimation based on the current integration method can be accurately corrected using this correction SOC. As a result, the battery management device corrects the FCC, making it possible to accurately estimate the SOC based on the current integration method.

[0010] (2) In the above storage battery management device, the correction unit may be configured to correct the FCC of the storage battery used in the SOC estimation unit in accordance with the difference between the SOC at the reference time and the correction SOC and the amount of change in capacity of the storage battery from the reference time. According to this storage battery management device, the FCC is corrected based on the difference between the SOC at the reference time and the correction SOC, which correlates with the actual state change of the storage battery, so that SOC estimation based on the current integration method can be performed with higher accuracy.

[0011] (3) The battery management device may further include a provisional correction unit that provisionally corrects the FCC of the battery based on a provisional correction SOC that is an SOC on the estimated SOC side in the first region where the correction SOC is located, when the correction SOC is within the first region and the SOC estimated by the SOC estimator is outside the first region where the correction SOC is located. This battery management device can perform accurate SOC estimation based on the current integration method by provisional correction, even when the correction SOC is not within the second region.

[0012] (4) The battery management device may further include a history unit that records a history of the FCC correction of the battery in the correction unit each time the correction condition is satisfied, and the correction condition may further include, as a necessary condition, that an average value of the FCC correction amounts for a predetermined number of most recent times (two or more times) recorded in the history unit is equal to or greater than a threshold. This battery management device can suppress a decrease in accuracy of the FCC correction due to, for example, noise or measurement error of a current measurement unit.

[0013] (5) The battery management device may further include a provisional correction unit that provisionally corrects the SOC at the reference time based on a provisional correction SOC that is the SOC on the estimated SOC side in the first region where the correction SOC is located when the correction SOC is within the first region and the SOC estimated by the SOC estimator is outside the first region where the correction SOC is located, and the correction condition may further include, as a necessary condition, that the provisional correction is not performed during a period corresponding to the predetermined number of times. This battery management device may, for example, prevent an error due to the execution of the provisional correction from adversely affecting the determination of the necessity of FCC correction.

[0014] (6) In the above storage battery management device, the SOC-OCV characteristic of the storage battery may include a plurality of the second regions, and the correction condition may further include, as a necessary condition, that the SOC at the reference time is within the second region different from the correction SOC. According to this storage battery management device, even when the SOC at the reference time and the correction SOC are within the same second region and the charge transfer amount of the storage battery is extremely small and FCC correction is not required, the burden of performing FCC correction can be reduced.

[0015] (7) In the battery management device, the correction condition may further include, as a necessary condition, that the difference between the reference SOC and the correction SOC is equal to or greater than a lower limit. With this battery management device, even when the difference between the reference SOC and the correction SOC (the amount of charge transfer in the battery) is extremely small and FCC correction is not required, the burden of performing FCC correction can be reduced.

[0016] (8) The battery management device may further include a temperature measurement unit that measures a temperature of the battery, and the correction condition may further include, as a necessary condition, that the temperature measured by the temperature measurement unit is within a predetermined temperature range. This battery management device can prevent a decrease in FCC correction accuracy caused by the temperature of the battery being outside the predetermined temperature range.

[0017] (9) The battery management device may further include a SOC update unit that updates the SOC at the reference time to the correction SOC when the correction condition is satisfied. This battery management device can suppress a decrease in the estimation accuracy of the SOC of the battery caused by, for example, an integration error of a current by a current measurement unit.

[0018] (10) The present specification discloses a method for managing a storage battery having SOC-OCV characteristics including a first region where the OCV change rate, which is the absolute value of the amount of change in OCV relative to the amount of change in SOC, is equal to or less than a predetermined value, and a second region where the OCV change rate exceeds the predetermined value, the method includes the steps of: measuring a current flowing through the storage battery; calculating the capacity of the storage battery by integrating the measured current; estimating the SOC of the storage battery based on the SOC at a reference time, the calculated amount of change in the capacity of the storage battery from the reference time, and the FCC of the storage battery; acquiring the OCV of the storage battery; and, when a correction condition is satisfied, including a necessary condition that the correction SOC, which is the SOC corresponding to the acquired OCV of the storage battery, is within the second region, correcting the FCC of the storage battery used in the step of estimating the SOC of the storage battery based on the correction SOC. According to the method for managing a storage battery, the FCC is corrected, so that the SOC can be accurately estimated based on the current integration method.

[0019] The technology disclosed in this specification can be realized in various forms, such as a battery management device, a battery apparatus including a battery management device and a battery, a management method thereof, a computer program for realizing those methods, a non-transitory recording medium on which that computer program is recorded, etc. [Brief description of the drawings]

[0020] [Figure 1] FIG. 1 is an explanatory diagram illustrating a schematic configuration of a battery device 100 according to an embodiment. [Diagram 2] FIG. 1 is an explanatory diagram illustrating the SOC-OCV characteristics of a storage battery 12. [Diagram 3] FIG. 1 is an explanatory diagram showing an example of a SOC-OCV table T1. [Figure 4] FIG. 13 is an explanatory diagram showing an example of an area division-OCV table T2. [Diagram 5] Flowchart showing OCV acquisition processing [Figure 6] Flowchart showing correction processing [Figure 7]FIG. 1 is an explanatory diagram illustrating the SOC-OCV characteristics of a storage battery 12. [Figure 8] 11 is a flowchart showing a correction process according to a modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0021] A. Embodiment: A-1. Configuration of battery device 100: 1 is an explanatory diagram showing a schematic configuration of a battery device 100 according to this embodiment. The battery device 100 includes a battery pack 10 and a battery management device 20.

[0022] The battery pack 10 has a configuration in which a plurality of storage batteries 12 are connected in series. In this embodiment, the battery pack 10 is composed of four storage batteries 12. The battery pack 10 is connected to a load and an external power source (not shown) via a positive terminal 42 and a negative terminal 44.

[0023] Each storage battery 12 constituting the battery pack 10 is a storage battery having a SOC (State of Charge)-OCV (Open Circuit Voltage) characteristic including a plateau region PR. FIG. 2 is an explanatory diagram showing the SOC-OCV characteristic of the storage battery 12. The plateau region PR is a region where the curve representing the SOC-OCV characteristic is almost flat, and more specifically, a region where the OCV change rate (the absolute value of the amount of change in OCV relative to the amount of change in SOC) is 2 mV / % or less. Examples of the storage battery 12 having the SOC-OCV characteristic including the plateau region PR include an iron phosphate lithium ion battery and a titanic acid lithium ion battery. The SOC-OCV characteristic of the storage battery 12 further has a change region CR. The change region CR is a region (non-plateau region) where the OCV change rate exceeds 2 mV / %. 2, the SOC-OCV characteristics of the storage battery 12 include three plateau regions PR (first plateau region PR1, second plateau region PR2, third plateau region PR3) and four change regions CR (first change region CR1, second change region CR2, third change region CR3, fourth change region CR4) arranged alternately. Note that the plateau regions PR are an example of the first region in the claims, the change regions CR are an example of the second region in the claims, and 2mV / % is an example of the predetermined value in the claims.

[0024] The battery management device 20 is a device for managing a battery device 100 including a battery pack 10. The battery management device 20 includes a voltmeter 22, an ammeter 24, a thermometer 26, a monitoring unit 28, a line switch 40, a control unit 60, a recording unit 72, a history unit 74, and an interface (I / F) unit 76.

[0025] One voltmeter 22 is provided for each storage battery 12. Each voltmeter 22 is connected in parallel to each storage battery 12, measures the voltage of each storage battery 12, and outputs a signal indicating the voltage measurement value to the monitoring unit 28. The ammeter 24 is connected in series to the battery pack 10. The ammeter 24 measures the current flowing through the battery pack 10, and outputs a signal indicating the current measurement value to the monitoring unit 28. The thermometer 26 is disposed near the battery pack 10. The thermometer 26 measures the temperature of the battery pack 10 (each storage battery 12), and outputs a signal indicating the temperature measurement value to the monitoring unit 28. Based on the signals received from the voltmeter 22, the ammeter 24, and the thermometer 26, the monitoring unit 28 outputs signals indicating the voltage of each storage battery 12, the current flowing through the battery pack 10, and the temperature of the battery pack 10 (each storage battery 12) to the control unit 60. The voltmeter 22 and the monitoring unit 28 are an example of a voltage measurement unit, the ammeter 24 and the monitoring unit 28 are an example of a current measurement unit, and the thermometer 26 and the monitoring unit 28 are an example of a battery temperature measurement unit.

[0026] The line switch 40 is disposed between the battery pack 10 and the negative terminal 44. The line switch 40 is controlled to be turned on and off by the control unit 60, thereby opening and closing the connection between the battery pack 10 and the load and the external power supply.

[0027] The control unit 60 is configured using, for example, a CPU, a multi-core CPU, or a programmable device (such as a Field Programmable Gate Array (FPGA) or a Programmable Logic Device (PLD)), and controls the operation of the battery management device 20. The control unit 60 has functions as an OCV acquisition unit 62, a coulomb counting processing unit 64, an SOC estimation unit 66, a correction unit 68, an SOC update unit 70, and a provisional correction unit 71. The functions of each of these units will be described in conjunction with the description of the SOC estimation process described below.

[0028] The recording unit 72 is configured with, for example, a ROM, a RAM, a hard disk drive (HDD), etc., and is used to store various programs and data, and as a working area and a data storage area when executing various processes. For example, the recording unit 72 stores a computer program for executing the SOC estimation process described below. The computer program is provided in a state stored in a computer-readable recording medium (not shown), such as a CD-ROM, a DVD-ROM, or a USB memory, and is stored in the recording unit 72 by installing it in the battery device 100.

[0029] The recording unit 72 also stores an SOC-OCV table T1 and an area division-OCV table T2. The SOC-OCV table T1 is a table used for SOC estimation based on the OCV method for each storage battery 12. FIG. 3 is an explanatory diagram showing an example of the SOC-OCV table T1. The SOC-OCV table T1 is a table that associates the OCV with the battery temperature and the SOC. The relationship defined in the SOC-OCV table T1 is experimentally determined in advance. As shown in FIG. 3, the SOC-OCV characteristic varies according to the change in the battery temperature. By referring to the SOC-OCV table T1, the SOC of each storage battery 12 can be estimated based on the OCV and the battery temperature of the storage battery 12. Note that in FIG. 3, the OCV is displayed as Va0, Va1, etc., but the SOC-OCV table T1 actually defines a numerical value of the OCV. FIG. 3 also shows a discharging SOC-OCV table used when discharging the storage battery 12, and a charging SOC-OCV table used when charging the storage battery 12.

[0030] The region division-OCV table T2 (FIG. 1) recorded in the recording unit 72 is a table used when determining which region (plateau region PR, change region CR) the estimated SOC is in (which region it belongs to) in the SOC-OCV characteristics. FIG. 4 is an explanatory diagram showing an example of the region division-OCV table T2. In this embodiment, the region division-OCV table T2 specifies the relationship between the OCV, each region division in the SOC-OCV characteristics, and the battery temperature. As described above, the SOC-OCV characteristics vary in response to changes in the battery temperature, and therefore each region division in the SOC-OCV characteristics varies in accordance with the variation in the SOC-OCV characteristics. Note that although the OCV is shown as Vo0, Vo1, etc. in FIG. 4, the region division-OCV table T2 actually specifies a numerical value of the OCV.

[0031] The history unit 74 is configured with, for example, a ROM, a RAM, a hard disk drive (HDD), etc., and records various histories related to the battery device 100. Examples of such histories include the OCV of the storage battery 12 and the correction contents of the FCC correction process and the provisional correction process described below. The interface unit 76 etc. communicate with other devices by wire or wirelessly. For example, the history recorded in the history unit 74 is updated by communication with other devices via the interface unit 76.

[0032] A-2.SOC Estimation Process: Next, the SOC estimation process executed by the battery management device 20 in the battery device 100 of this embodiment will be described. In this embodiment, the SOC estimation process is mainly a process of performing SOC estimation based on the current integration method, and correcting the FCC (Full Charge Capacity) used in the SOC estimation based on the current integration method based on the correction SOC acquired by the OCV method when the correction SOC is in the change region CR. In this embodiment, the SOC estimation process estimates the SOC individually for each storage battery 12 constituting the battery pack 10. In the following description, one storage battery 12 will be taken up for explanation. The SOC estimation process is started automatically, for example, when the storage battery management device 20 is started, or in response to an instruction from an administrator.

[0033] A-2-1. Estimation process of accumulated SOC(t): In the battery device 100 of this embodiment, a process is executed to estimate the SOC based on the current integration method (hereinafter referred to as "integrated SOC(t)"). Specifically, the coulomb counting processing unit 64 (FIG. 1) of the storage battery management device 20 calculates the capacity of each storage battery 12 by integrating the currents measured by the ammeter 24 and the monitoring unit 28. Next, the SOC estimation unit 66 of the storage battery management device 20 estimates the integrated SOC(t) of the storage battery based on the SOC(0) at the reference time, the amount of change Q(t) (amount of charge transfer) of the capacity of the storage battery 12 from the reference time calculated by the coulomb counting processing unit 64, and the FCC of the storage battery 12. The integrated SOC(t) can be expressed by the following formula (1). Integrated SOC(t)=SOC(0)+[Q(t) / FCC]...(1) At the beginning of the SOC estimation process, the reference time is the time of shipment of the battery device 100, and thereafter, the reference time is the time of execution of the reference SOC update process in the correction process described below. Note that the estimation process of the integrated SOC(t) is continuously executed during the SOC estimation process.

[0034] A-2-2.OCV Acquisition Process: Fig. 5 is a flowchart showing an OCV acquisition process executed in the battery device 100 of this embodiment. When the charge or discharge current to the storage battery 12 falls below a predetermined threshold or the line switch 40 transitions from a closed state to an open state, the control unit 60 determines that the storage battery 12 is in a stopped state, and the OCV acquisition unit 62 (Fig. 1) of the storage battery management device 20 executes an OCV acquisition process (Fig. 5) for the storage battery 12. Specifically, the OCV acquisition unit 62 determines whether or not the OCV acquisition timing has arrived, and executes the OCV acquisition process when it is determined that the OCV acquisition timing has arrived (S110 to S140). In this embodiment, the OCV acquisition timing for the storage battery 12 is a timing when the polarization of the storage battery 12 has been eliminated to an extent that the OCV of the storage battery 12 can be acquired, and the battery voltage has become stable.

[0035] 5, the OCV acquisition unit 62 (FIG. 1) of the control unit 60 again determines whether the line switch 40 is in the closed state (S110). The line switch 40 being in the closed state means that the storage battery 12 (battery pack 10) is electrically connected to a load, and the line switch 40 being in the open state means that the storage battery 12 is in an unloaded state in which it is not electrically connected to a load (not shown).

[0036] When the OCV acquisition unit 62 determines that the line switch 40 is in a closed state (S110: YES), it determines whether or not a stopped state in which no current flows through the storage battery 12 has continued for a predetermined time or more (S120). The control unit 60 constantly determines whether or not a current flows through the storage battery 12 based on a signal input from the monitoring unit 28, and stores the determination result as a history associated with the elapsed time. Based on this history, the OCV acquisition unit 62 can determine whether or not the stopped state of the storage battery 12 has continued for a predetermined time or more. Note that if the current flowing through the storage battery 12 is equal to or less than a reference current value (a value at which the current can be considered to be approximately zero), the OCV acquisition unit 62 determines that the current state of the storage battery 12 is a stopped state. Measurement of the current of the storage battery 12 is continuously performed during the SOC estimation process.

[0037] When the OCV acquisition unit 62 determines that the stopped state of the storage battery 12 has not continued for the predetermined time or more (S120: NO), the process returns to S110. On the other hand, when the OCV acquisition unit 62 determines that the stopped state of the storage battery 12 has continued for the predetermined time or more (S120: YES), the OCV acquisition unit 62 determines whether or not the rate of change in the battery voltage of the storage battery 12 within the predetermined time is less than a predetermined reference rate (a value at which the battery voltage of the storage battery 12 is considered to be generally stable) based on a signal input from the monitoring unit 28 (S130). Note that the measurement of the voltage of the storage battery 12 is continuously performed during the SOC estimation process.

[0038] When the OCV acquisition unit 62 determines that the rate of change in the battery voltage of the storage battery 12 within the predetermined time is equal to or greater than the reference rate (S130: NO), the process returns to S110. On the other hand, when the OCV acquisition unit 62 determines that the rate of change in the battery voltage of the storage battery 12 within the predetermined time is less than the reference rate (S130: YES), the OCV acquisition unit 62 records the measured battery voltage of the storage battery 12 in the history unit 74 as the OCV of the storage battery 12 (S140), and proceeds to a correction process (S150).

[0039] A-2-3. Correction process: 6 is a flowchart showing the correction process, which updates the SOC(0) at the reference time used in the estimation process of the integrated SOC(t) and corrects the integrated SOC(t) and FCC of the storage battery 12.

[0040] (Estimation process of SOC for correction): In this embodiment, first, an SOC (hereinafter, referred to as "correction SOC") corresponding to the OCV of the storage battery 12 acquired in the OCV acquisition process is estimated. Specifically, it is determined whether the current state immediately before the storage battery 12 transitions to the stopped state is a charging state or a discharging state (S210). For example, the signal output from the ammeter 24 is a signal corresponding to the presence or absence of a current flowing through the storage battery 12 and the direction of the current flow (a signal corresponding to the level of the voltage across a detection resistor (not shown) provided in the ammeter 24), and the control unit 60 determines the current state (charging state, discharging state, stopped state) of the storage battery 12 based on the level of the signal output from the ammeter 24 and the inversion of the level of the signal. When the control unit 60 determines that the current state immediately before the storage battery 12 transitions to the stopped state is a charging state, it refers to the charging SOC-OCV table recorded in the recording unit 72 and estimates the SOC corresponding to the OCV acquired in the OCV process as the correction SOC (S220). In addition, when the control unit 60 determines that the current state immediately before the storage battery 12 transitions to a stopped state is a discharging state, it refers to the discharging SOC-OCV table recorded in the recording unit 72 and estimates the SOC corresponding to the OCV obtained in the OCV process as a correction SOC (S230).

[0041] (Process to determine the area each SOC belongs to): The control unit 60 of the storage battery management device 20 determines which region (plateau region PR, change region CR) in the SOC-OCV characteristics of the storage battery 12 the integrated SOC(t) and the correction SOC belong to, based on the current (OCV acquisition time) integrated SOC(t), the correction SOC, and the region division-OCV table T2. As will be described next, in this embodiment, the presence or absence of correction processing and processing with different correction contents are performed depending on the combination of the regions to which the integrated SOC(t) and the correction SOC belong.

[0042] (Accumulated SOC update process): The integrated SOC update process is a process for updating (resetting) the integrated SOC(t) to the correction SOC. When it is determined that both the integrated SOC(t) and the correction SOC are within the change region CR (S240: YES and S250: YES), the SOC update unit 70 (FIG. 1) of the battery management device 20 performs the integrated SOC update process (S270). Also, when it is determined that the integrated SOC(t) is within the plateau region PR and the correction SOC is within the change region CR (S240: NO and S260: YES), the SOC update unit 70 performs the SOC(t) update process (S270). In short, the SOC update unit 70 performs the integrated SOC update process when the condition that the correction SOC is within the change region CR (hereinafter referred to as the "first condition") is satisfied. When the correction SOC is within the change region CR, the estimation accuracy of the correction SOC estimation process (S220, S230) is higher than when the correction SOC is within the plateau region PR. Therefore, by performing the integrated SOC update process using the correction SOC estimated when the first condition is satisfied, the SOC estimation accuracy can be improved.

[0043] (FCC correction processing): The FCC correction process is a process for correcting the FCC of the storage battery 12 used in the estimation process of the integrated SOC(t) based on the above-mentioned correction SOC. In this embodiment, the FCC correction process is executed when the following correction conditions are satisfied. The correction conditions include the following conditions as necessary conditions in addition to the above-mentioned first condition. Second condition: the change region CR to which the SOC(0) at the reference time belongs and the change region CR to which the correction SOC belongs are different from each other. The control unit 60 can determine whether or not the second condition is satisfied based on the determination result of the above-mentioned region determination process. Third condition: The tentative reference SOC update process (S340), which will be described later, has not been executed since the previous FCC correction process (S310). When the tentative reference SOC update process is executed, execution information of the tentative reference SOC update process (such as the tentative correction SOC) is associated with the execution time and recorded as history information in the history unit 74. The control unit 60 can determine whether the third condition is satisfied based on the history information stored in the history unit 74. Fourth condition: the average value (moving average value) of the FCC correction amount (e.g., difference ΔSOC1 in FIG. 2) for a predetermined number of most recent times (two or more times) recorded in the history unit 74 is equal to or greater than a threshold value. The FCC correction amount is recorded in the history unit 74 when predetermined conditions (the first to third conditions in this embodiment) are satisfied in each correction process. The control unit 60 can determine whether the fourth condition is satisfied based on the history information stored in the history unit 74.

[0044] Specifically, if it is determined that both the second and third conditions are satisfied (S280: YES), the control unit 60 calculates the FCC correction amount and records it in the history unit 74 as history information in association with the execution time of the current OCV acquisition process (S290). The FCC correction amount is the difference between the FCC after correction based on the correction SOC and the FCC before correction. The corrected FCC can be calculated by the following formula (2). Corrected FCC = Q(t) / (corrected SOC - reference SOC(0)) (2) Then, the control unit 60 calculates the FCC correction amount (=FCC after correction-FCC before correction) from the difference between the corrected FCC and the uncorrected FCC. If it is determined that at least one of the second condition and the third condition is not satisfied (S280: NO), the calculation and recording of the FCC correction amount (S290) and the FCC correction process (S310) are not performed, and the process proceeds to S320.

[0045] Next, if it is determined that the fourth condition is satisfied (S300: YES), the correction unit 68 executes the above-mentioned FCC correction process (S310). Specifically, the correction unit 68 corrects the FCC of the storage battery 12 used in the estimation process of the integrated SOC(t) to the corrected FCC, and proceeds to S320. Note that if it is determined that the fourth condition is not satisfied (S300: NO), the FCC correction process is not executed, and the process proceeds to S320.

[0046] (Standard SOC Update Process): In S320, the SOC update unit 70 executes a reference SOC update process. The reference SOC update process is a process for updating (resetting) the SOC(0) at the reference time in the formula (1) used in the estimation process of the integrated SOC(t) to the correction SOC. When the correction SOC is in the change region CR, the estimation accuracy of the correction SOC estimation process (S220, S230) is higher than when the correction SOC is in the plateau region PR. Therefore, by performing the reference SOC update process when the above first condition is satisfied, the accuracy of the estimation process of the integrated SOC(t) thereafter can be improved. In addition, when it is determined that both the integrated SOC(t) and the correction SOC are in the plateau region PR (S240: NO and S260: NO), the FCC correction process and the reference SOC update process are not executed.

[0047] The control unit 60 may estimate a SOH (State of Health) of the storage battery 12 based on the corrected FCC and notify the outside via the interface unit 76. The control unit 60 estimates the SOH of the storage battery 12 based on the FCC of a new storage battery 12 recorded in advance in the recording unit 72 and the corrected FCC.

[0048] (Temporary correction process): The provisional correction process is a process in which, when the correction SOC is within the plateau region PR, the integrated SOC(t) is updated (reset) to the provisional correction SOC, and the SOC(0) at the reference time in the formula (1) used in the estimation process of the integrated SOC(t) is updated (reset) to the provisional correction SOC. In this embodiment, when it is determined that the integrated SOC(t) is within the change region CR and the correction SOC is within the plateau region PR (S240: YES and S250: NO), the provisional correction unit 71 (FIG. 1) of the storage battery management device 20 executes the provisional integrated SOC update process (S330). In the provisional integrated SOC update process, the provisional correction unit 71 determines the SOC closest to the integrated SOC(t) among the plateau region PR in which the correction SOC is located as the provisional correction SOC, and updates the integrated SOC(t) to the provisional correction SOC. In this manner, by performing the integrated SOC update process using the provisional correction SOC, it is possible to improve the accuracy of estimating the SOC.

[0049] Next, the provisional correction unit 71 executes a provisional reference SOC update process (S340). In the provisional reference SOC update process, the provisional correction unit 71 updates the SOC(0) at the reference time to the provisional correction SOC. By executing the provisional reference SOC update process, it is possible to improve the accuracy of the estimation process of the integrated SOC(t) thereafter.

[0050] A-3. Advantages of the embodiment: As described above, the battery management device 20 of this embodiment is a device for managing the battery pack 10 in which a plurality of batteries 12 having SOC-OCV characteristics including a plateau region PR are connected in series. The battery management device 20 includes an ammeter 24, a thermometer 26, a monitoring unit 28, an OCV acquisition unit 62, a coulomb counting processing unit 64, an SOC estimation unit 66, a correction unit 68, an SOC update unit 70, a provisional correction unit 71, and a control unit 60. The voltmeter 22 and the monitoring unit 28 measure the voltage of the battery pack 12. The ammeter 24 and the monitoring unit 28 measure the current flowing through the battery pack 10. The coulomb counting processing unit 64 calculates the capacity of the battery pack 12 by integrating the current measured by the ammeter 24 and the monitoring unit 28 and the current during the constant current control.

[0051] The SOC estimation unit 66 estimates the SOC of the storage battery 12 based on the SOC(0) at the reference time, the amount of change Q(t) in the capacity of the storage battery 12 from the reference time calculated by the coulomb counting processing unit 64, and the FCC of the storage battery 12. The OCV acquisition unit 62 acquires the OCV of the storage battery 12. When a correction condition is satisfied, which includes a necessary condition that a correction SOC, which is an SOC corresponding to the OCV of the storage battery 12 acquired by the OCV acquisition unit 62, is within the change region CR (first condition S250: YES or S260: YES in FIG. 6), the correction unit 68 corrects the SOC estimated by the SOC estimation unit 66 and the FCC of the storage battery 12 used by the SOC estimation unit 66 based on the correction SOC (S310).

[0052] The correction SOC is an SOC corresponding to the OCV of the storage battery 12 acquired by the OCV acquisition unit 62 and is an SOC within the change region CR. When the SOC is within the change region CR, the acquisition accuracy of the SOC corresponding to the OCV is higher than when the SOC is within the plateau region PR. The correction SOC acquired with the relatively high accuracy reflects the state error of the storage battery 12 (such as individual differences at the time of shipment or manufacturing stage of the storage battery 12 and aging) more significantly than the accumulated SOC(t) estimated based on the current accumulation method, since there is no accumulation error. Therefore, the correction SOC can be used to accurately correct the FCC used in the estimation process of the accumulated SOC(t). As a result, according to this embodiment, the estimation process of the accumulated SOC(t) can be performed more accurately than in a configuration in which the FCC is not corrected.

[0053] In this embodiment, the FCC is corrected based on the difference between the SOC(0) at the reference time and the correction SOC, which correlates with the state error of the storage battery 12 (S310), so that the estimation process of the integrated SOC(t) can be performed with higher accuracy.

[0054] In this embodiment, even if the correction SOC is not within the change region CR, the provisional correction process (S330, S340) is performed. As a result, according to this embodiment, the estimation process of the integrated SOC(t) can be performed more accurately than in a configuration in which the provisional correction process is not performed.

[0055] In this embodiment, the FCC correction process is executed if the average value of the FCC correction amounts in the most recent predetermined number of FCC correction processes (two or more) is equal to or greater than a threshold (fourth condition) as a necessary condition (S300: YES). As a result, according to this embodiment, it is possible to suppress a decrease in the accuracy of the FCC correction due to, for example, noise or measurement error of the ammeter 24.

[0056] In this embodiment, the FCC correction process is executed if the change region CR to which the reference SOC(0) belongs and the change region CR to which the correction SOC belongs are different (second condition) (YES at S280). As a result, according to this embodiment, even when the reference SOC(0) and the correction SOC are in the same change region CR and the amount of charge transfer in the storage battery 12 is extremely small and FCC correction is not required, the burden of executing FCC correction can be reduced.

[0057] In this embodiment, the FCC correction process is executed if the provisional correction process described below has not been executed since the previous FCC correction process was executed (the third condition) is set as a necessary condition (S280: YES). As a result, according to this embodiment, for example, it is possible to suppress an error caused by the execution of the provisional correction from adversely affecting the determination of the necessity of FCC correction.

[0058] For example, in the example shown in FIG. 2, since both the accumulated SOC(t) and the correction SOC are within the third change region CR3 (S240: YES and S250: YES in FIG. 6), the accumulated SOC update process (S270) and the reference SOC update process (S320) are executed, and the accumulated SOC(t) and the reference time SOC(0) are updated to the correction SOC. In addition, there is a difference ΔSOC1 between the accumulated SOC(t) and the correction SOC due to the influence of the state error of the storage battery 12 and the like between the accumulated SOC(t) and the correction SOC. In this embodiment, since the reference time SOC(0) and the correction SOC are within different change regions CR2 and CR3 (S280: YES), the FCC correction process is executed. Note that even if the reference time SOC(0) and the correction SOC are within the same change region (S280: NO), if the difference between the reference time SOC(0) and the correction SOC is equal to or greater than the lower limit, the FCC correction process may be executed.

[0059] Fig. 7 is an explanatory diagram that shows a schematic SOC-OCV characteristic of the storage battery 12. In the example shown in Fig. 7, the accumulated SOC(t) is within the third change region CR3, but the correction SOC is within the third plateau region PR3 (S240: YES and S250: NO in Fig. 6), so the FCC correction process is not performed, and instead, the provisional accumulated SOC update process (S330) and the provisional reference SOC update process (S340) are performed. In the provisional accumulated SOC update process and the provisional reference SOC update process, the SOC value S2 that is closest to the accumulated SOC(t) in the third plateau region PR3 is determined as the provisional correction SOC, and the accumulated SOC(t) and the SOC(0) at the reference time of the storage battery 12 used in the estimation process of the accumulated SOC(t) are provisionally corrected based on this provisional correction SOC. Therefore, the estimation process of the integrated SOC(t) can be performed more accurately than when the tentative reference SOC update process is not performed. However, since the difference ΔSOC2 between the integrated SOC(t) and the SOC value S2 does not necessarily accurately reflect the state error of the storage battery 12, the FCC correction accuracy may be lower than that of the FCC correction process. Therefore, as described above, when the third condition is not satisfied (S280: NO), the calculation and recording of the FCC correction amount (S290) and the FCC correction process (S310) are not performed.

[0060] B. Variations: The technology disclosed in this specification is not limited to the above-described embodiments, and can be modified in various forms without departing from the spirit of the invention. For example, the following modifications are also possible.

[0061] The configuration of the battery device 100 in the above-described embodiment is merely an example, and various modifications are possible. For example, in each of the above-described embodiments, the number of storage batteries 12 constituting the battery pack 10 can be changed arbitrarily. Also, in the above-described embodiments, a thermometer 26 may be provided for each storage battery 12. The thermometer 26 may be omitted.

[0062] In the above embodiment, an iron phosphate lithium ion battery is exemplified as the storage battery, but any other secondary battery or primary battery may be used as long as the storage battery has SOC-OCV characteristics including a first region where the OCV rate is equal to or less than a predetermined value and a second region where the OCV change rate exceeds a predetermined value. The predetermined value is not limited to 2 mV / % and can be set arbitrarily. The number of first regions and second regions can be changed arbitrarily.

[0063] In the above-described embodiments, the contents of the SOC-OCV table T1 and the area division-OCV table T2 are merely examples and can be modified in various ways. The SOC-OCV table T1 and / or the area division-OCV table T2 do not necessarily need to be recorded in the recording unit 72. In each of the above-described embodiments, at least one of the functional units of the control unit 60 may be omitted.

[0064] The contents of the SOC estimation process in the above embodiment are merely examples and can be modified in various ways. For example, in the above embodiment, the SOC estimation process estimates the SOC of each storage battery 12 constituting the battery pack 10 individually, but the SOC may be estimated for the entire battery pack 10. In the OCV acquisition process in the above embodiment, a method is adopted in which the battery voltage of the storage battery 12 in a stable state is acquired as the OCV (S110 to S130 in FIG. 5), but a known method may be adopted, such as a method of estimating the OCV based on changes in the internal resistance or battery voltage of the storage battery 12.

[0065] In the SOC estimation process in the above embodiment, the reference SOC update process (S320) may not be executed. Even in such a configuration, the accuracy of the estimation process of the integrated SOC(t) can be improved by executing the FCC correction process. The correction condition for executing the FCC correction process may not include at least one of the second condition to the fourth condition. The correction condition may further include, for example, as a necessary condition, that the provisional correction is not executed in a period corresponding to the above-mentioned predetermined number of times. This makes it possible to suppress an error caused by the execution of the provisional correction from adversely affecting the determination of the necessity of the FCC correction. The correction condition may further include, as a necessary condition, that the difference between the SOC(0) at the reference time and the SOC for correction is equal to or greater than a lower limit. This makes it possible to reduce the burden of executing the FCC correction even when, for example, the difference between the SOC(0) at the reference time and the SOC for correction (the amount of charge transfer in the storage battery 12) is very small and the FCC correction is not required. The correction condition may further include, as a necessary condition, that the temperature measured by the thermometer 26 is within a predetermined temperature range. This makes it possible to prevent the FCC correction accuracy from decreasing due to the temperature of the storage battery 12 being outside a predetermined temperature range.

[0066] In the FCC correction process (S310) of the above embodiment, as an example of correcting the FCC according to the difference between the SOC(0) at the reference time and the correction SOC, a configuration was given in which the integrated SOC(t) by the current integration method is replaced with the correction SOC by the OCV method and substituted into the FCC calculation formula (2) to correct the FCC, but for example, the FCC may be corrected by replacing the integrated SOC(t) by the current integration method (e.g. 30%) with an SOC (e.g. 27%) closer to the correction SOC (e.g. 20%) and substituting it into the FCC calculation formula. Also, in the FCC process, the FCC may be corrected according to the difference between the integrated SOC(t) by the current integration method and the correction SOC.

[0067] In the provisional correction process (S320) of the above embodiment, the SOC closest to the accumulated SOC(t) in the plateau region PR where the correction SOC is located (the SOC at the boundary between the plateau region PR and the change region CR) was determined as the provisional correction SOC, but as long as it is an SOC on the accumulated SOC(t) side, for example an SOC slightly deviating from the SOC at the boundary may be determined as the provisional correction SOC.

[0068] In the above embodiment, the history of the FCC correction amount is recorded in the history unit 74 (S290), but any history of correction (e.g., a history of information correlated with the FCC correction amount) may be recorded in the history unit 74, for example, the history of the FCC value may be recorded in the history unit 74.

[0069] FIG. 8 is a flowchart showing the correction process in the modified example. As shown in FIG. 8, in this modified example, when it is determined that the second condition is satisfied (S360: YES), the calculation and recording of the FCC correction amount shown in FIG. 6 (S290) and the determination process of the fourth condition (S300) are not performed, and the FCC correction process (S310) is performed. After the provisional integrated SOC update process (S330) is performed, the provisional correction unit 71 performs the FCC provisional correction process (S350). The FCC provisional correction process is a process for provisionally correcting the FCC of the storage battery 12 used in the estimation process of the integrated SOC(t). In the FCC provisional correction process, the FCC of the storage battery 12 used in the estimation process of the integrated SOC(t) is corrected to the FCC after the provisional correction. When the FCC provisional correction process is completed, the provisional reference SOC update process is performed (S340). As a result, even if the correction SOC is not in the change region CR, the FCC provisional correction process can perform accurate SOC estimation based on the current integration method. [Explanation of symbols]

[0070] 10: Battery pack 12: Storage battery 20: Storage battery management device 22: Voltmeter 24: Ammeter 26: Thermometer 28: Monitoring unit 40: Line switch 42: Positive terminal 44: Negative terminal 60: Control unit 62: OCV acquisition unit 64: Coulomb counting processing unit 66: SOC estimation unit 68: Correction unit 70: SOC update unit 71: Provisional correction unit 72: Recording unit 74: History unit 76: Interface unit 100: Battery device CR: Change region PR: Plateau region

Claims

1. A battery management device that manages a battery having an SOC-OCV characteristic including a first region in which an OCV change rate, which is an absolute value of an amount of change in OCV relative to an amount of change in SOC, is equal to or less than a predetermined value, and a second region in which the OCV change rate exceeds the predetermined value, A current measuring unit that measures a current flowing through the storage battery; a coulomb counting processing unit that calculates a capacity of the storage battery by integrating the current measured by the current measuring unit; an SOC estimation unit that estimates an SOC of the storage battery based on an SOC at a reference time, an amount of change in capacity of the storage battery from the reference time calculated by the coulomb counting processing unit, and an FCC of the storage battery; An OCV acquisition unit that acquires an OCV of the storage battery; a correction unit that corrects an FCC of the storage battery used in the SOC estimation unit in accordance with a difference between an SOC at the reference time and the correction SOC and an amount of change in capacity of the storage battery from the reference time when a correction condition including, as a necessary condition, that a correction SOC, which is an SOC corresponding to the OCV of the storage battery acquired by the OCV acquisition unit, is within the second region, is satisfied; A battery management device comprising:

2. The battery management device according to claim 1, The battery management device further includes a provisional correction unit that, when the correction SOC is within the first region and the estimated SOC by the SOC estimation unit is outside the first region in which the correction SOC is located, provisionally corrects an FCC of the storage battery based on a provisional correction SOC, which is an SOC on the estimated SOC side in the first region in which the correction SOC is located.

3. The battery management device according to claim 1 or 2, A history unit is further provided that records a history of the correction of the FCC of the storage battery by the correction unit each time the correction condition is satisfied, The correction condition further includes, as a necessary condition, that the average value of the FCC correction amounts for a specified number of most recent times (two or more times) recorded in the history unit is equal to or greater than a threshold value.

4. A battery management device according to claim 3, a provisional correction unit that provisionally corrects an SOC at a reference time based on a provisional correction SOC that is an SOC on the estimated SOC side in the first region where the correction SOC is located, when the correction SOC is within the first region and the estimated SOC estimated by the SOC estimating unit is outside the first region where the correction SOC is located; The correction condition further includes, as a necessary condition, that the provisional correction is not executed within a period corresponding to the predetermined number of times.

5. The battery management device according to any one of claims 1 to 4, The SOC-OCV characteristic of the storage battery includes a plurality of the second regions, The correction condition further includes, as a necessary condition, that the SOC at the reference time is within the second region that is different from the correction SOC.

6. The battery management device according to any one of claims 1 to 4, The correction condition further includes, as a necessary condition, that a difference between the SOC at the reference time and the correction SOC is equal to or greater than a lower limit value.

7. The battery management device according to any one of claims 1 to 6, Further comprising a temperature measuring unit that measures a temperature of the storage battery, The battery management device, wherein the correction condition further includes, as a necessary condition, that the temperature measured by the temperature measurement unit is within a predetermined temperature range.

8. The battery management device according to any one of claims 1 to 7, The battery management device further includes an SOC update unit that updates the SOC at the reference time to the correction SOC when the correction condition is satisfied.

9. A method for managing a storage battery having an SOC-OCV characteristic including a first region in which an OCV change rate, which is an absolute value of an amount of change in OCV relative to an amount of change in SOC, is equal to or less than a predetermined value, and a second region in which the OCV change rate exceeds the predetermined value, Measuring a current flowing through the storage battery; calculating a capacity of the storage battery by integrating the measured current; estimating an SOC of the storage battery based on an SOC at a reference time, a calculated change in capacity of the storage battery from the reference time, and an FCC of the storage battery; obtaining an OCV of the storage battery; When a correction condition is satisfied, the correction SOC being an SOC corresponding to the acquired OCV of the storage battery being within the second region, correcting an FCC of the storage battery used in estimating an SOC of the storage battery in accordance with a difference between an SOC at the reference time and the correction SOC and an amount of change in capacity of the storage battery from the reference time; A method for managing a storage battery, including:

Citation Information

Patent Citations

  • Residual capacity calculation method for storage battery

    CN110658466A

  • Battery state estimating device

    JP2010266221A

  • Battery capacity detector of lithium ion secondary battery

    JP2012145403A

  • State estimation device and state estimation method

    JP2017009577A

  • State estimation device and state estimation method

    JP2017122622A