Base station, user equipment and method

The flexible frame structure design in NR-U addresses the challenges of integrating LAA/eLAA into 5G/NR networks by dynamically adjusting transport block sizes and slot configurations, reducing processing complexity and power consumption while maintaining spectral efficiency and fair coexistence.

JP7601084B2Active Publication Date: 2024-12-17NEC CORP
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2022210481
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2018-09-28
Filing Date
2022-12-27
Publication Date
2024-12-17
Estimated Expiration
2039-09-11

AI Technical Summary

Technical Problem

The integration of Licensed Assisted Access (LAA) and enhanced LAA (eLAA) capabilities into 5G/NR communications networks poses challenges due to the random nature of transmission opportunities in unlicensed spectrum, leading to difficulties in implementing schedule-based transmissions and increasing complexity and power consumption at both the base station and user equipment (UE).

Method used

A method and apparatus are introduced to support flexible frame structure design in NR-U, allowing for dynamic adjustment of transport block sizes and UL/DL slot configurations based on actual code rates and LBT outcomes, using mechanisms like rate matching and dynamic indication of slot structures to minimize processing load and interference.

Benefits of technology

This approach reduces processing complexity and power consumption while maintaining spectral efficiency, ensuring fair coexistence with other unlicensed spectrum users by optimizing channel utilization and minimizing overhead.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007601084000008
    Figure 0007601084000008
  • Figure 0007601084000009
    Figure 0007601084000009
  • Figure 0007601084000010
    Figure 0007601084000010
Patent Text Reader

Abstract

A base station, a user device, and a method for performing downlink signal transmission in an unlicensed spectrum in a cellular communication system are provided. [Solution] In a communication network 200, a base station 5 includes a means for transmitting information to UEs (User Equipment) 3-1 to 3-4 indicating resources on which a physical downlink shared channel (PDSCH) can be transmitted during a channel occupation time, a means for executing an LBT (Listen-Before-Talk) procedure for accessing an unlicensed frequency, and a means for transmitting a PDSCH to the UE in accordance with the obtained information if access to the unlicensed frequency is obtained during the current slot as a result of the LBT procedure.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a base station, a user equipment and a method, including, but not limited to, cellular communication system based access to unlicensed spectrum. In particular, but not exclusively, the present invention relates to frame structure design aspects in the context of accessing unlicensed spectrum (known as NR Unlicensed or "NR-U") by New Radio (NR) based access. [Background technology]

[0002] In particular, but not exclusively, the present invention relates to wireless communication networks implemented in accordance with various standards defined by the 3rd Generation Partnership Project (3GPP), for example, the present invention relates to Long Term Evolution (LTE) networks, LTE-Advanced (LTE-A) networks, extensions and developments related to LTE / LTE-A, and more recent communication technology developments beyond LTE / LTE, so-called "5G" or "NR" technologies.

[0003] In 3GPP standards, a NodeB (or "eNB", "NR-BS" in LTE, "gNB" in 5G, etc.) is a base station of a Radio Access Network (RAN) through which communication devices (User Equipment or "UE") connect to the core network and communicate with other communication devices or remote servers. Communication devices include, for example, mobile communication devices such as mobile phones, smartphones, user equipment, personal digital assistants, laptop / tablet computers, web browsers, e-book readers, etc. Such mobile (or generally fixed) devices are typically operated by users, but so-called Internet of Things (IoT) devices, and similar Machine-Type Communication (MTC) devices, can also be connected to the network. For ease of explanation, in this application, the term base station refers to any such base station, and the term mobile device or UE refers to any such communication device. The core network (e.g., EPC in LTE, NGC in NR / 5G, etc.) oversees functions such as subscriber management, mobility management, charging, security, and call session management (etc.) and connects communication devices to external networks such as the Internet.

[0004] Prior to the development of 5G / NR technology, the growing demand for wireless broadband data and the need for additional capabilities to complement the LTE / LTE-A technology platform led to the unlicensed or “public” spectrum (usually the 5 GHz band) being considered as a possible source of further enhancements. While the benefits of communication over unlicensed spectrum cannot currently be compared to those achieved through licensed means, the efficient use of unlicensed spectrum to complement the use of licensed spectrum was seen as having the potential to significantly enhance the overall service offering. The use of unlicensed “public” spectrum in combination with licensed spectrum to augment provisioning over licensed bands is referred to as “Licensed Assisted Access” (or “LAA”).

[0005] Since the idea of ​​using unlicensed spectrum as a complement to licensed spectrum was first conceived, significant advances have been made in technology development with the introduction of several features: Licensed Assisted Access (LAA) and enhanced LAA (eLAA).

[0006] With the evolution of cellular technology as part of the development of 5G / NR and the associated development of wider bandwidth waveforms, there is consideration to incorporate LAA / eLAA functionality into 5G / NR, which is referred to as "NR-based access to unlicensed spectrum".

[0007] NR-based unlicensed access using component carriers (CCs) in unlicensed bands with wider bandwidths (e.g., 80 or 100 MHz) also has the potential to reduce implementation complexity for both eNBs and UEs (when handling large amounts of spectrum while mobile, compared to carriers with narrower bandwidths).

[0008] As NR develops, or to maximize the availability of NR-based unlicensed access, solutions applicable to unlicensed bands below and above 6 GHz (e.g., 5 GHz, 37 GHz, 60 GHz, etc.) are being studied. Similarly, scenarios and solutions are being studied for anchoring NR-LAA to legacy LTE carriers by dual connectivity (DC) similar to the non-standalone (NSA) mode of normal NR operation, and by carrier aggregation (CA)-based aggregation with 5G NR anchors. Furthermore, early consideration of NR standalone operation in unlicensed spectrum would be beneficial and should be the focus of research.

[0009] Most countries have regulatory requirements that aim to minimize the potential for interference between users of unlicensed spectrum. Even where the regulatory requirements are not particularly stringent, they are considered necessary to allow fair coexistence between LTE and other technologies, such as Wi-Fi. Therefore, it is not enough to simply minimize interference to meet regulatory requirements; it is also important that deployed systems behave in a "good neighbor" manner and do not significantly impact other users of the unlicensed spectrum.

[0010] One of the mechanisms for coexistence is the so-called "Listen Before Talk" (LBT) mechanism, which governs when a communication device can access a channel in an unlicensed band. For example, European regulations for load-based equipment require a Clear Channel Assessment (CCA) (also called "channel sensing" or "CS") to be performed before starting a new transmission. In CCA, a communication channel is listened to before transmitting on it to determine whether it is occupied or not. When listening to a channel, an extended CCA can be performed if an initial CCA determines that the communication medium is occupied, and then the transmission is postponed until the channel is deemed clear. After the base station or UE has gained access to the channel, it can transmit for a limited period of time called the "Maximum Channel Occupancy Time (MCOT)".

[0011] Recently, the concept of COT sharing was introduced. This is a mechanism that allows a device to share the COT using a gapped 25μs LBT if the device subsequently acquires the COT after a successful LBT (assuming the overall transmission volume does not exceed the MCOT limit). For example, for 5G / NR, single and multiple switching points from DL (DownLink) to UL (UpLink) and UL to DL must be supported within a shared gNB COT, but the details of the LBT requirements to support single or multiple switching points need to be specified. If the switching gap is less than 16μs, the so-called "no-LBT" option can be used. The restrictions / conditions for when the no-LBT option can be used, taking into account fair coexistence, have not yet been specified. For gaps between 16μs and 25μs, one-shot LBT (different from Cat4 LBT with backoff) can be used, but the restrictions / conditions for when the one-shot LBT option can be used, taking into account fair coexistence, have not yet been specified. In the case of a single switching point, if the gap between DL and UL transmissions exceeds 25 μs, one-shot LBT will be used, although the number of one-shot LBT attempts allowed for a granted UL transmission has yet to be established.

[0012] However, introducing LAA into 5G / NR communications networks (and possibly into similar networks using non-LTE technologies) in this way presents several challenges, making it difficult to successfully apply said technology without first addressing potential conflicts with existing technologies.

[0013]

number

[0014]

number

[0015] FIG. 1 shows the respective slot lengths for various NR numerologies (for μ=0, μ=1, and μ=2).

[0016] Slots can be supplemented with so-called "minislots" to support transmissions with flexible starting positions and shorter durations than the normal slot length. Initially, minislots were intended to be as short as one symbol and theoretically could start at any time. However, only three OFDM symbol lengths were ultimately specified: 2, 4, and 7 symbols.

[0017] Minislots are particularly useful in several scenarios, for example, transmissions in unlicensed spectrum.

[0018] However, in LBT, due to the random nature of transmission opportunities, it is extremely difficult to realize schedule-based transmission.

[0019] For example, when transmitting in an unlicensed spectrum, it is beneficial to start transmission immediately after the LBT. Specifically, when a base station gets a transmission opportunity (TXOP) via the LBT, the base station should be able to start a downlink (DL) control transmission (e.g., a Physical Downlink Control CHannel (PDCCH)) and / or a downlink data transmission (e.g., a Physical Downlink Shared CHannel (PDSCH)) at any symbol in the slot, for example, to efficiently utilize the channel and avoid channel loss. Summary of the Invention [Problem to be solved by the invention]

[0020] However, the length of the "remaining" slot after a successful LBT cannot be known in advance, so mapping a TB (Transport Block) containing downlink data (i.e., the payload of the shared channel) to a partial slot creates difficulties because it is not known in advance what size of TB is required to successfully transmit in the remaining part of the slot.

[0021] It is theoretically possible to split the data into TBs and update the corresponding codeword encoding dynamically (or "on the fly") as soon as the remaining length of the slot after a successful LBT is known. However, doing so would increase the complexity and cost of the transmitter to ensure that the timing requirements are met.

[0022] Alternatively, since there may not be enough time for packets to be generated between the end of the LBT and the start of the PDSCH transmission, another option is for the base station to prepare multiple PDSCHs of various lengths before the LBT is successfully completed, and then transmit the PDSCH with the length that best fits the remaining partial slot length after the LBT is successfully completed. However, using this option also increases the processing load on the base station.

[0023] Furthermore, since the UE does not know the starting position of DL transmission, the flexible starting position in NR-U means that the UE needs to monitor all possible CORESET (Control Resource Set) opportunities in all slots to perform blind detection of the CORESET transmitted over the corresponding PDCCH, which can significantly increase the complexity and power consumption of the UE.

[0024] The present invention seeks to provide a method and corresponding apparatus that supports or improves upon current proposals / agreements regarding NR-U. In particular, examples relating to (but not limited to) aspects of frame structure design for NR-U operation, such as DL flexible transmission start point, transmission detection, and COT structure indication, are described below.

[0025] An exemplary aspect of the present invention provides a method performed by a base station of a communication system in which downlink and uplink communications are organized in a sequence of subframes on a time axis, each subframe including at least one slot, each slot including a plurality of symbols, the method comprising: performing an LBT procedure for accessing an unlicensed frequency; if as a result of the LBT procedure the base station gains access to the unlicensed frequency during a current slot, preparing a TB including data to transmit to a UE; determining an expected real code rate when the TB is rate matched with the remaining symbols in the current slot; and transmitting the data of the TB based on the determined real code rate, wherein if the determined real code rate satisfies a criterion, the data of the TB is transmitted using a first symbol set, and if not, the data of the TB is transmitted using a second symbol set different from the first symbol set.

[0026] One of the first symbol set and the second symbol set includes the remaining symbols in the current slot, and the other of the first symbol set and the second symbol set includes the set of both the remaining symbols in the current slot and all symbols of a subsequent slot.

[0027] The TB is prepared to have a TBS (Transport Block Size) that corresponds to all symbols in a full-sized slot, and the TB is prepared to have a TBS that corresponds to symbols of a partial slot (or mini-slot) that includes a predetermined number of symbols in the full-sized slot.

[0028] The transmission of the TB data comprises: rate matching the TB data to the first symbol set if the determined actual code rate satisfies the criterion; and rate matching the TB data to the second symbol set otherwise. Whether the determined actual code rate satisfies the criterion is determined based on a comparison of the determined actual code rate to a target code rate. Whether the determined actual code rate satisfies the criterion is determined based on a comparison of the determined actual code rate to a sum of the target code rate and a threshold (e.g., a code rate fluctuation threshold). Whether the determined actual code rate satisfies the criterion is determined based on whether the determined actual code rate is less than or equal to (or simply less than) the sum of the target code rate and a threshold (e.g., a code rate fluctuation threshold). Whether the determined actual code rate satisfies the criterion is determined based on whether the determined actual code rate is greater than or equal to (or simply more than) the sum of the target code rate and a threshold (e.g., a code rate fluctuation threshold). The threshold is a code rate fluctuation threshold. The threshold value may be pre-configured in the base station or dynamically calculated in the base station if necessary, for example based on a statistical average of the signal-to-noise ratio (SNR) received at the base station over a period of time.

[0029] An exemplary aspect of the present invention provides a method performed by a base station of a communication system, comprising: obtaining an UL / DL slot configuration to be used during a shared COT; and providing an indication of the UL / DL slot configuration to at least one UE, the indication of the UL / DL slot configuration including a bitmap, each bit of the bitmap being set to represent the UL / DL slot configuration.

[0030] The indication of the UL / DL slot configuration is provided using a Group Common Physical Downlink Control CHannel (GC-PDCCH). The method further comprises: recognizing that a change has occurred to the UL / DL slot configuration; and, in response to the change, providing to the at least one UE an updated indication of the changed UL / DL slot configuration including a changed bitmap representing the changed UL / DL slot configuration.

[0031] The base station is a 5G / NR base station or a gNB, and the communication system is a 5G / NR communication system.

[0032] An exemplary aspect of the present invention provides a method performed by a UE of a communication system, comprising: receiving from a base station an indication of a UL / DL slot configuration to be used during a shared COT, the indication including a bitmap, each bit of the bitmap being set to represent the UL / DL slot configuration; and monitoring downlink control information based on the UL / DL slot configuration.

[0033] In an exemplary aspect of the present invention, a method is provided for a base station of a communication system in which downlink and uplink communications are organized in a sequence of subframes on a time axis, each subframe including at least one slot, each slot including a plurality of symbols, the method comprising: means for performing an LBT procedure for accessing an unlicensed frequency; means for preparing data to be transmitted to a UE; and means for determining an actual code rate, wherein if as a result of the LBT procedure the base station gains access to the unlicensed frequency during a current slot, the preparing means is configured to prepare a TB including data to be transmitted to the UE, the determining means is configured to determine an expected actual code rate when the TB is rate matched with the remaining symbols in the current slot; and means for transmitting data of the TB based on the determined actual code rate, wherein if the determined actual code rate satisfies a criterion, the data of the TB is transmitted using a first symbol set, and otherwise the data of the TB is transmitted using a second symbol set different from the first symbol set.

[0034] In one exemplary aspect of the present invention, a base station of a communication system is provided, comprising: means for obtaining a UL / DL slot configuration to be used during a shared COT; and means for providing an indication of the UL / DL slot configuration to at least one UE, the indication of the UL / DL slot configuration including a bitmap, each bit of the bitmap being set to represent the UL / DL slot configuration.

[0035] In one exemplary aspect of the present invention, a UE of a communication system is provided, the UE comprising: means for receiving from a base station an indication of a UL / DL slot configuration to be used during a shared COT, the indication of the UL / DL slot configuration including a bitmap, each bit of the bitmap being set to represent the UL / DL slot configuration; and means for monitoring downlink control information based on the UL / DL slot configuration.

[0036] In one exemplary aspect of the present invention, a base station of a communication system in which downlink and uplink communications are organized in a sequence of subframes on a time axis, each subframe including at least one slot, each slot including a plurality of symbols, comprising a controller and a transceiver circuit, wherein the controller is configured to control the transceiver circuit to perform an LBT procedure for accessing an unlicensed frequency, and if the base station gains access to the unlicensed frequency during a current slot, the controller is configured to prepare a TB including data to be transmitted to a UE and to determine an expected actual code rate when the TB is rate-matched with the remaining symbols in the current slot, and the controller is configured to control the transceiver circuit to transmit data of the TB based on the determined actual code rate, and if the determined actual code rate satisfies a criterion, the data of the TB is transmitted using a first symbol set, and if not, the data of the TB is transmitted using a second symbol set different from the first symbol set.

[0037] In one exemplary aspect of the present invention, a base station of a communication system is provided, the base station comprising: a controller and a transceiver circuit, the controller configured to obtain a UL / DL slot configuration to be used during a shared COT and to control the transceiver circuit to cause at least one UE to provide an indication of the UL / DL slot configuration, the indication of the UL / DL slot configuration including a bitmap, each bit of the bitmap being set to represent the UL / DL slot configuration.

[0038] In one exemplary aspect of the present invention, a UE of a communication system is provided, the UE comprising: a controller and a transceiver circuit, the controller configured to control the transceiver circuit to receive from a base station an indication of a UL / DL slot configuration to be used during a shared COT, the indication of the UL / DL slot configuration including a bitmap, each bit of the bitmap being set to represent the UL / DL slot configuration, and the controller configured to control the transceiver circuit to monitor downlink control information based on the UL / DL slot configuration.

[0039] An exemplary aspect of the invention extends to a computer program product, such as a computer readable storage medium, storing instructions operable to program a programmable processor to perform the methods described in the exemplary aspects above and the possibilities described in the claims, and / or to program a suitably adapted computer to provide an apparatus as described in any of the claims.

[0040] Each feature disclosed in this specification (including the claims) and / or shown in the drawings may be incorporated in the present invention independently (or in combination) with other disclosed and / or shown features. In particular, features recited in claims dependent on a particular independent claim may be introduced in that independent claim in any combination or individually, but without limitation. [Brief description of the drawings]

[0041] Examples of illustrative embodiments of the present invention will now be described with reference to the accompanying drawings. [Figure 1] FIG. 1 is a diagram illustrating different slot lengths in different NR numerologies. [Diagram 2] FIG. 2 is a schematic diagram of a communication network. [Diagram 3] FIG. 3 illustrates several options for supporting flexible PDSCH starting position in the NR-U context. [Figure 4] FIG. 4 illustrates several options for supporting flexible PDSCH starting position in the NR-U context. [Diagram 5] FIG. 5 illustrates several options for supporting flexible PDSCH starting position in the NR-U context. [Figure 6] FIG. 6 is a simplified block diagram showing the main components of a UE. [Figure 7] FIG. 7 is a simplified block diagram showing the main components of a base station. [Figure 8] FIG. 8 is a simplified flow chart illustrating a mechanism for supporting flexible PDSCH starting position in the context of NR-U. [Figure 9] FIG. 9 is a simplified message sequence diagram illustrating a mechanism for providing dynamic UL / DL slot structure indication. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0042] (overview) FIG. 2 is a schematic diagram of a communication network 200 in which UEs 3-1 to 3-4 (mobile phones and / or other communication devices) can communicate with each other via a RAN node 5. In the illustrated example, the RAN node 5 includes a NR / 5G base station or "gNB" 5 that operates a corresponding cell 9. Communications via the base station 5 are typically routed through a core network (e.g., a 5G core network or an EPC (Evolved Packet Core network), not shown), and such core network is accessed using an appropriate RAT (Radio Access Technology). In addition, a number of unlicensed band transceiver nodes 7-1 to 7-3 operate in the vicinity of the base station 5, each operating in unlicensed spectrum (e.g., bands below 6 GHz, such as 5 GHz, and / or bands above 6 GHz, such as 37 GHz or 60 GHz). Although multiple UEs 3-1 to 3-4, one base station 5, and three unlicensed band transceiver nodes 7-1 to 7-3 are shown in FIG. 1 for illustrative purposes, it will be apparent to those skilled in the art that when the system is implemented, other base stations, unlicensed band transceiver nodes 7 and UEs 3 will typically be included.

[0043] The base station 5 and the UE 3 are configured to operate according to the corresponding standard (in this example, the 3GPP standard corresponding to NR / 5G). For example, the base station 5 transmits to the UE 3 using DL channels such as PDCCH and PDSCH, and receives from the UE 3 using UL channels such as PUCCH (Physical Uplink Control CHannel) and PUSCH (Physical Uplink Shared CHannel). The base station 5 can also transmit control data to a group 4 of UEs using a so-called GC-PDCCH (Group Common-PDCCH).

[0044] The base station 5 and the UE 3 are also configured to employ NR-based access to unlicensed spectrum (i.e., NR unlicensed or "NR-U").

[0045] Specifically, the base station 5 performs an LBT procedure for the unlicensed band when it has data to transmit. The LBT procedure can be any suitable procedure, such as, for example, an LBT Cat4 procedure, in which the device performs an initial clear channel assessment (iCCA) to check if the channel is idle for a predefined period of time. If the channel is determined to be free, it can proceed with transmission. If the channel is determined to be free, the device performs a slotted random backoff procedure, in which it selects a random number from a specified interval called the "contention window." A backoff countdown is performed each time the channel is determined to be free, and transmission begins when the backoff counter reaches zero.

[0046] As shown in Figure 2, once a channel in an unlicensed band is assessed as clear and a transmission opportunity (TXOP) is available, the base station 5 can start downlink signaling for a channel occupation time (COT). This downlink signaling typically consists of control data (such as a control resource set (CORESET)) on the PDCCH and user data on the PDSCH.

[0047] The base station 5 and UE 3 are configured to share a COT (within an overall Maximum COT (MCOT)) for a given UL / DL configuration. Thus, when transmission switches from UL to DL, a one-shot LBT can be performed (or "non-LBT" is also an option depending on the switching gap) before starting the UL transmission (e.g., PUSCH transmission).

[0048] As shown in Figure 2, it can be seen that the LBT procedure may succeed in the middle of a slot, and therefore the starting position of the PDSCH transmission within the slot may vary. To support such a flexible PDSCH starting position, several options exist. Some examples are shown in Figures 3 to 5.

[0049] For example, referring to Figure 3, an option is illustrated that supports DL transmissions only on fixed length minislot boundaries (e.g., 4-symbol and 7-symbol boundaries). For example, in Figure 3(a), there are 12 symbols that can be transmitted in the partial slots before the first full slot. Therefore, before transmitting a full-sized transport block (TB3, TB4, etc.), two smaller sized transport blocks (TB1 and TB2) are prepared and transmitted in the partial slots, the first of which corresponds to a 4-symbol minislot and the second of which corresponds to a 7-symbol minislot.

[0050] On the other hand, in Fig. 3(b), only 5 symbols can be transmitted in the partial slot before the first full slot, so only one smaller transport block (TB1) is prepared and transmitted in the partial slot corresponding to the 4-symbol minislot.

[0051] To avoid losing the channel to other existing users if the end of a successful LBT does not coincide with a minislot boundary (as shown in Figures 3(a) and (b)), a reservation signal can be transmitted by the base station until the start of the next minislot.

[0052] However, this approach has the drawback that the overhead of transmitting reservation signals, control channels and demodulation reference signals (DMRS), and the increased burden of blind decoding of DL control channels at the UE side may cause a waste of spectrum resources. Moreover, small transport blocks have a worse performance compared to large transport blocks.

[0053] Another option (not shown) is to support a minimum length (2 OFDM symbols) minislot-based transmission granularity to efficiently fill a partial slot after a successful LBT and support slot-level granularity from the next slot boundary onwards. This approach has the potential to reduce overhead compared to the above options.

[0054] Figure 4 illustrates another option of determining the transport block size according to the full slot length (Figure 4(a)) or possibly half the slot length (Figure 4(a)) and rate matching the coded data to fit the transmission of the transport block (PDSCH) to the remaining resources available in the partial slot. This approach may result in reduced overhead compared to both of the above options, at the expense of a higher actual code rate than the target code rate.

[0055] It can be seen that rate matching in PDSCH essentially matches the number of bits in the TB to the number of bits that can be transmitted in a given resource set.

[0056] Figure 5 shows another option where the size of the transport block depends on the total length of the slot, but the remaining resources of the partial slot are effectively treated as aggregated with the resources of the following full slot. The coded data is then rate matched to match the transport block (PDSCH) transmission to the resources of the aggregated slot. This approach has the potential to at least partially mitigate the issues of higher overhead and higher actual code rates in the above options.

[0057] However, while the option in Figure 5 appears to be optimal and increases the chances of successful decoding due to the lower actual code rate, it also has the potential to reduce spectral efficiency, especially when the partial slots are not significantly shorter than the full length of the slot, as shown in Figure 5(b).

[0058] Thus, while the base station 5 may employ any of the above-mentioned options, in this example, it employs a particularly beneficial and flexible mechanism that reduces the degradation of spectral efficiency. Specifically, as will be described in more detail below, to support flexible downlink PDSCH starting positions following a successful LBT, which helps to minimize the processing burden on the base station 5, the base station 5 employs a hybrid approach in which the transport block size is determined based on a full slot. However, if the difference between the actual code rate and the target code rate is within a certain threshold, the coded data is rate-matched to partial slots (e.g., as shown in FIG. 4). Alternatively, the coded data is rate-matched to an aggregate resource of partial slots and full slots (e.g., as shown in FIG. 5).

[0059] This threshold is the "code rate fluctuation threshold Δ CR,th The actual code rate of a sub-slot after a successful LBT is called the target code rate +Δ CR,th The coded data is rate-matched only with the available resources in the partial slot if it is determined that the actual code rate of the partial slot after the LBT is successfully performed is less than or equal to the target code rate +Δ CR,th If the total number of bits in the aggregated slot is greater than 1, then the coded data is rate matched with the available resources in the aggregated slot (the partial slot and the subsequent full slot).

[0060] As explained in the introduction, flexible starting positions in NR-U pose a problem when the UE performs blind detection of the CORESET. However, the base station 5 and UE 3 in this example adopt a procedure to avoid the high complexity blind PDCCH detection by implementing an alternative low complexity DL transmission detection mechanism.

[0061] Specifically, the base station 5 is configured to provide an initial / wake-up signal for recognizing the start of downlink transmission in NR-U. More specifically, an initial / wake-up burst identification signal is transmitted to indicate the start of downlink transmission. The UE 3 is configured to detect the initial / wake-up burst and trigger CORESET monitoring upon detection of the trigger signal. The burst identification signal may have any suitable design, for example, a preamble transmission, a cell specific identification signal, DMRS, PSS / SSS (Primary Synchronisation Signal / Secondary Synchronisation Signal), CSI-RS (Channel State Information Reference Signal), PDCCH DMRS (Wideband), etc. may be used.

[0062] The base station 5 is also advantageously configured to dynamically indicate to the UE 3 the UL / DL configuration of the slot structure for the duration of the MCOT.

[0063] Providing such an indication to the UE 3 allows the UE 3 to monitor DL ​​control information only in the DL portion (i.e., not all slots in the MCOT), thus reducing the UE power consumption. Providing such an indication to the UE 3 also allows the UE 3 to accurately determine the transmission and reception timing of periodic DL / UL signaling (e.g., signaling of SSBs (Synchronization Signal Blocks) including associated signaling components (e.g., PSS, SSS, PBCH DMRS, PBCH (Physical Broadcast CHannel), etc.), signaling related to PRACH (Physical Random Access CHannel) procedures and configured grants, fine channel tracking, etc.). Dynamically indicating the UL / DL configuration of the MCOT is particularly useful since the MCOT structure may change frequently due to the result of LBT and the instability of the local interference environment.

[0064] Beneficially, the base station 5 is configured to indicate the UL / DL configuration only if the configuration has been changed by the base station 5, thereby overriding a previously configured slot structure.

[0065] Specifically, as will be described in more detail with reference to FIG. 9, in order to dynamically configure the UL / DL resource configuration within a slot (without the need to pre-configure a potentially large set of slot formats at the UE), the base station 5 is configured to generate (each time there is a change in the slot configuration) a bitmap representing the UL / DL configuration of each symbol of each slot (e.g., each bit corresponds to a symbol and is set to 1 or 0 (or vice versa) representing UL or DL, respectively). The generated bitmap is transmitted on GC-PDCCH to one or more UEs in group 4, indicating the UL / DL configuration of each symbol of each slot of the multiple slots. Thus, upon receiving the bitmap, the UEs 3 in group 4 can determine when downlink transmissions are expected, i.e. when they should monitor for control information (e.g., CORESET). When a subsequent GC-PDCCH is detected with the new bitmap, the previous configuration can be overridden.

[0066] It can therefore be seen that the communication system described above has several beneficial features. For example, it defines a mechanism for generating transport blocks and transmitting them on a PDSCH, which allows for flexible PDSCH starting positions in the NR-U context while minimizing the impact on the processing load at the base station. This mechanism has the potential to achieve a reasonable balance between issues related to signaling overhead and high actual code rates on the one hand, and issues related to reduced spectral efficiency on the other hand.

[0067] The communication system also provides a particularly flexible mechanism for indicating MCOT UL / DL configurations (at the granularity of each symbol in each slot of multiple slots), allowing any UL / DL configuration to be configured without the need to set up a large set of pre-configured configurations in the UE.

[0068] (User device) Figure 6 is a block diagram illustrating the main components of a UE 3 (e.g., a mobile phone or other user equipment) shown in Figure 2. As shown, the UE 3 includes transceiver circuitry 31 operable to transmit and receive signals to and from a base station 5 via one or more antennas 33.

[0069] The UE 3 has a controller 37 for controlling the operation of the UE 3. The controller 37 is associated with a memory 39 and coupled to the transceiver circuitry 31. Although not necessary for operation, it will be apparent that the UE 3 may include all of the standard functionality of a typical mobile phone 3 (such as a user interface 35), which may be implemented by any one or any combination of hardware, software, and firmware as appropriate. The software may be pre-installed in the memory 39 and / or may be downloaded, for example, over a communications network or from a removable data storage device (RMD).

[0070] The controller 37, in this example, is configured to control the overall operation of the mobile device 3 by means of program or software instructions stored in memory 39. As shown, these software instructions include, among others, an operating system 41, a communication control module 43, a control data module 44, a user data module 45, a slot structure determination module 47, and an LBT module 49.

[0071] The communication control module 43 controls the overall communication between the UE 3 and the base station 5 .

[0072] The control data module 44 manages the monitoring, reception and decoding of DL control data (e.g., control data transmitted on the PDCCH, GC-PDCCH and / or other similar control channels such as E-PDCCH / M-PDCCH) transmitted from the base station 5 to the UE 3. The control data module 44 also manages the encoding and transmission of UL control data to the base station 5 (e.g., ACK / NACK signaling on the PUCCH and / or RACH related signaling during the PRACH procedure).

[0073] The user data module 45 manages the reception and decoding of DL user data (e.g., user data transmitted on a PDSCH, etc.) transmitted from the base station 5 to the UE 3. The user data module 45 also manages the encoding and transmission of UL user data (e.g., user data transmitted on a PUSCH, etc.) to the base station 5.

[0074] The slot structure determination module 47 determines the slot structure for a given MCOT from any slot structure indication received from the base station (e.g. a slot structure indication bitmap provided in the GC-PDCCH) and informs this to the control data module 43 so that the control data module 43 can monitor the downlink control data at the appropriate time.

[0075] The LBT module 49 manages the performance of the CCA / CS required as an LBT requirement in the UE 3 .

[0076] (RAN node) Figure 7 is a schematic block diagram showing the main components of the base station 5 shown in Figure 2. As shown, the base station 5 includes a transceiver circuit 51 for transmitting and receiving signals to and from a communication device (such as UE 3) via one or more antennas 53, and at least one network interface 55 for transmitting and receiving signals to and from the NR core network (and / or other networks such as the EPC network).

[0077] The base station 5 comprises a controller 57 for controlling the operation of the base station 5. The controller 57 is associated with a memory 59. Although not necessarily shown in Figure 7, it will be apparent that the base station 5 may comprise all standard functionality of an NR gNB, which may be suitably realised by any one or any combination of hardware, software and firmware. The software may be pre-installed in the memory 59 and / or may be downloaded, for example, via the communication network 1 or from an RMD.

[0078] The controller 57, in this example, is configured to control the operation of the entire base station 5 by means of program or software instructions stored in memory 59. As shown, these software instructions include, among others, an operating system 61, a communication control module 63, a control data module 64, a user module 65, a slot structure configuration module 67, and an LBT module 69.

[0079] The communication control module 63 controls the overall communication between the base station 5 and the UEs.

[0080] The control data module 64 manages the coding and transmission of DL control data (e.g. control data transmitted on PDCCH, GC-PDCCH and / or other similar control channels such as E-PDCCH / M-PDCCH) transmitted from the base station 5 to the UE 3. The control data module 64 also manages the monitoring, reception and decoding of UL control data at the base station 5 (e.g. ACK / NACK signals on the PUCCH and / or RACH related signaling during the PRACH procedure).

[0081] The user data module 65 manages the encoding and transmission of DL user data (e.g., user data transmitted on a PDSCH, etc.) transmitted from the base station 5 to the UE 3. The user data module 65 also manages the reception and decoding of UL user data (e.g., user data transmitted on a PUSCH, etc.) at the base station 5.

[0082] The slot structure configuration module 67 is responsible for configuring and reconfiguring the slot structure in the shared COT during the MCOT and dynamically generating a slot structure indication (e.g., a slot structure indication bitmap provided in the GC-PDCCH) corresponding to the configured slot structure. When a slot structure change occurs, the slot structure configuration module 67 notifies the control data module 63 and provides an updated slot structure indication (e.g., a bitmap) accordingly, so that the control data module 63 can inform the UE 3 of the updated slot structure configuration.

[0083] The LBT module 69 manages the CCA / CS performance required as an LBT requirement in the base station 5 .

[0084] (Flexible PDSCH start position) FIG. 8 is a flow chart illustrating mechanisms that can be implemented in base station 5 to support flexible PDSCH starting position in an NR-U context.

[0085] As shown in FIG. 8, in S801, a code rate fluctuation threshold (Δ CR,th ) is configured in the base station 5. The code rate variation threshold can be determined in any of a number of different ways. For example, the code rate variation threshold can be pre-configured in the base station, dynamically calculated / reconfigured "on the fly" in the base station, or reconfigured based on, for example, a statistical average of the received signal-to-noise ratio (SNR) at the base station over a period of time.

[0086] When the base station 5 acquires the TXOP by the LBT, in S802, it generates a transport block to be transmitted on the corresponding PDSCH. The transport block is generated with a size corresponding to the full slot length, regardless of the timing at which the TXOP occurs in a given slot.

[0087] If the TXOP occurs in the middle of a slot, in S803, the base station 5 determines the actual code rate that will be obtained if the generated transport block is rate-matched with the remaining partial slots. The base station 5 calculates the target code rate by adding the actual code rate to a code rate fluctuation threshold (effectively, the code rate that would be expected if a full slot were available) (i.e., the target code rate + Δ CR,th ) for comparison.

[0088]

number

[0089] On the other hand, as a result of the comparison, as shown in S809, the actual code rate is greater than the target code rate plus the code rate fluctuation threshold (i.e., > target code rate + Δ CR,th ), then the coded data in the transport block is rate matched with the resources (symbols) of the subsequent (full) slot and the aggregated partial slots in S807.

[0090] Therefore, if the LBT result of the TXOP is obtained in the middle of a slot, a TB of a size corresponding to a full slot is generated. Otherwise, the TB is rate-matched with less symbols than a full slot (e.g., the symbols of the remaining partial slot) or more symbols than a full slot (e.g., the symbols of the remaining partial slot and all symbols of the following full slot).

[0091] (Dynamic UL / DL slot structure indication) FIG. 9 is a message sequence diagram illustrating the mechanism for providing dynamic UL / DL slot structure indication to a UE 3.

[0092] As shown in Figure 9, when using a COT shared between UL and DL, the base station 5 configures the UL / DL slot structure with symbol level granularity at S901. The base station 5 generates an associated bitmap, where each bit in the bitmap represents the UL or DL ​​configuration of each symbol of a slot in the shared COT during the MCOT period (e.g., 1 = UL and 0 = DL, or vice versa). The base station 5 then transmits the bitmap to a group 4 including one or more UEs 3 using the GC-PDCCH at S903.

[0093] If the UL / DL slot configuration needs to be changed, the base station 5 reconfigures the UL / DL slot configuration in S905 and generates and transmits an updated bitmap on the GC-PDCCH to the group 4 of one or more UEs 3. This procedure is dynamically repeated (as shown in S909 and S911) whenever a change in the UL / DL slot configuration is required.

[0094] (Variations and Alternatives) Although exemplary embodiments have been described in detail above, it will be apparent to those skilled in the art that numerous modifications and alternatives to the exemplary aspects described above are possible and that the invention so embodied can achieve the same benefits. For purposes of illustration, only some examples of these modifications and alternatives are described.

[0095] Although a communication system has been described above that implements several beneficial features, it is understood that it is not necessary to implement all of the features, for example the system would still be advantageous if it implemented a mechanism supporting flexible PDSCH starting position, or if it implemented a mechanism providing dynamic UL / DL slot structure indication, or if it implemented one other beneficial feature.

[0096] Furthermore, another possible approach to recognize the start of downlink transmission in NR-U using initial / wake-up signals is to perform frequent CORESET monitoring to detect the preceding PDCCH within a reduced (limited) downlink COT search range. Then, after detecting the start of downlink transmission, the UE can switch to less frequent but more complex PDCCH monitoring. Although this alternative approach has the advantage of reduced complexity compared to blind decoding, the example approach utilizing initial / wake-up signals has the potential to further reduce the UE complexity significantly.

[0097] Although it is particularly beneficial to indicate the UL / DL configuration only if the configuration has changed, it shall be possible for the dynamic indication to be done periodically (e.g. regardless of whether there has been a change in the configuration or not). The indication may be done, for example, at the start of the MCOT or multiple times per MCOT (e.g. every few slots, at the start of each slot, etc.). Provisioning an MCOT structure indication every multiple slots allows the configuration to be updated / changed more frequently if required. In case of such periodic indication, the periodicity of the MCOT structure indication shall be configurable without needing to be fixed. Provisioning a periodic indication may mitigate the risk that the UE does not receive the configuration update (but incurs extra control signaling overhead).

[0098] The base station shall be reconfigurable to either do periodic indication or change triggered indication depending on the requirements. It is clear that there are multiple options for indicating the UL / DL slot structure in the MCOT other than using a bitmap. For example, an implicit indication can be done in the form of DL / UL scheduling downlink control information (DCI). However, this only allows for the configuration of a fixed slot type (DL-centric or UL-centric) and does not provide the flexibility to dynamically configure the ratio of UL and DL resources within a slot.

[0099] Another option for indicating the UL / DL slot configuration is to have a slot format indicator (SFI) on the GC-PDCCH. On the surface, this is a relatively simple indication mechanism, since it is already supported in the NR Release 15 standard, allows for a flexible frame structure, and hypothetically, is relatively easy to introduce in NR-U to indicate the slot structure of MCOT. However, although the SFI allows for flexibility in indicating the transmission direction (UL / DL) of each symbol in a slot, this mechanism requires a set of (potentially many) formats at the UE, which may not be suitable.

[0100]

number

[0101] Other options for indicating the UL / DL slot configuration include a separate field in the DL burst identification signal or the use of a dedicated preamble to indicate the slot structure.

[0102] In the above exemplary embodiment, a number of software modules have been described. As will be apparent to those skilled in the art, the software modules may be provided in compiled or uncompiled form and may be provided to the target equipment (UE, RAN, eNB, gNB, etc.) via a computer network or on a recording medium. Furthermore, the functions performed by some or all of this software may be performed using one or more dedicated hardware circuits. However, the use of the software modules is recommended in order to facilitate updates to improve the functionality of the base station or mobile device.

[0103] Each controller may include any form of processing circuitry, including, but not limited to, one or more computer processors implemented in hardware; a microprocessor; a CPU (Central Processing Unit); an ALU (Arithmetic Logic Unit); IO (Input / Output) circuitry; internal memory / cache (program and / or data); processing registers; communication buses (e.g., control, data and / or address buses); DMA (Direct Memory Access) functionality; and hardware or software implemented counters, pointers, timers, etc.

[0104] Base stations may include "distributed" base stations that comprise a central unit "CU" (Central Unit) and one or more individual distributed units "DU" (Distributed Unit).

[0105] Although the base station and UE have been described as a 5G base station (gNB) and corresponding UE, the above-described features are also applicable to gNBs and UEs of LTE / LTE-Advanced and other communication technologies.

[0106] A user equipment (or "UE", "mobile station", "mobile device" or "wireless device") in this disclosure is an entity that is connected to a network via a radio interface. It is noted that this disclosure is not limited to dedicated communication devices, but is applicable to any device having communication capabilities, as described in the following paragraphs.

[0107] The terms "user equipment" or "UE" (the terminology used in 3GPP), "mobile station", "mobile device", and "wireless device" are generally intended to be synonymous with each other and include standalone mobile stations such as terminals, cell phones, smartphones, tablets, cellular IoT devices, IoT devices, machines, etc. Additionally, the terms "mobile station" and "mobile device" are intended to encompass devices that remain stationary for extended periods of time.

[0108] The UE may be, for example, production or manufacturing equipment and / or energy related machinery (including, for example, boilers, engines, turbines, solar panels, wind turbines, hydroelectric generators, thermal generators, nuclear generators, batteries, nuclear systems and / or related equipment, heavy electrical machinery, pumps including vacuum pumps and the like, compressors, fans, blowers, hydraulic equipment, pneumatic equipment, metal processing machinery, manipulators, robots and / or application systems thereof, tools, moulds or dies, rolls, conveying equipment, lifting equipment, material handling equipment, textile machinery, sewing machinery, printing and / or related machinery, paper processing machinery, chemical machinery, mining and / or construction machinery and / or related equipment, machinery and / or implements for agriculture, forestry and / or fishing, safety and / or environmental protection equipment, tractors, precision bearings, chains, gears, power transmission equipment, lubrication equipment, valves, pipe fittings and / or application systems of the above equipment or machinery, etc.).

[0109] The UE may be, for example, a transportation device (e.g., a rolling stock, a car, a motorcycle, a bicycle, a train, a bus, a cart, a rickshaw, a boat, another watercraft, an aircraft, a rocket, a satellite, a drone, a balloon, or other transportation equipment).

[0110] The UE may be, for example, an information and communication device (eg, information and communication devices such as electronic computers and related devices, communications and related devices, electronic components, etc.).

[0111] The UE may be, for example, a refrigerator, a refrigeration application, commercial and / or service industry equipment, a vending machine, an automated service machine, an office machine or equipment, a household appliance and electronic device, etc. (including, for example, household appliances such as audio equipment, video equipment, loudspeakers, radios, televisions, microwave ovens, rice cookers, coffee makers, dishwashers, washing machines, dryers, electric fans or related equipment, cleaners, etc.).

[0112] The UE may be, for example, an electrical application system or device (eg, an x-ray system, a particle accelerator, a radioactive application device, a sonic application device, an electromagnetic application device, a motorized application device, or the like).

[0113] The UE may be, for example, an electronic lamp, a lighting fixture, a measuring instrument, an analyzer, a tester, or a monitoring / sensing device (e.g., a smoke alarm, an occupancy alarm sensor, a motion sensor, a radio tag, or other monitoring or sensing device), a wristwatch or watch, laboratory equipment, optical equipment, medical equipment and / or systems, a weapon, a knife, a hand tool, etc.

[0114] A UE may be, for example, a wireless-enabled personal digital assistant or related equipment, such as a wireless card or module designed to be attached to or inserted into another electronic device (e.g., a personal computer, electronic instrument, etc.).

[0115] The UE may be a device or part of a system that uses various wired and / or wireless communication technologies to provide the applications, services, and solutions described below for the Internet of Things (IoT).

[0116] Internet of Things devices (or "Things") may be equipped with appropriate electronics, software, sensors, network connections, etc. that enable them to collect and exchange data with each other and with other communicating devices. IoT devices may consist of automated machines that follow instructions from software stored in their internal memory. IoT devices may operate without the need for human supervision or intervention. MTC devices may also remain stationary and / or inactive for long periods of time. IoT devices may be implemented as part of a (usually) stationary device. IoT devices may be embedded in non-stationary devices (e.g. vehicles) or attached to animals or people being monitored / tracked.

[0117] IoT technologies may be implemented on any communications device capable of connecting to a communications network to send and receive data, whether the communications device is controlled by human input or by software instructions stored in a memory.

[0118] An IoT device may also be called an MTC device or a Machine-to-Machine (M2M) communication device. A UE may support one or more IoT or MTC applications. Examples of MTC applications are listed in the following table (source: Annex B of 3GPP TS22.368V13.1.0, the contents of which are incorporated herein by reference). This list is not exhaustive and is intended to illustrate examples of applications of machine-type communication. [Table 3]

[0119] The applications, services, and solutions may be MVNO (Mobile Virtual Network Operator) services, emergency wireless communication systems, PBX (Private Branch eXchange) systems, PHS (Personal Handy-phone System) / digital cordless communication systems, POS (Point of Sales) systems, advertising systems, MBMS (Multimedia Broadcast and Multicast Service), V2X (Vehicle to Everything) systems, train wireless systems, positioning-related services, disaster / emergency wireless communication services, community services, video streaming services, femtocell application services, VoLTE (Voice over LTE) services, charging services, radio on demand services, roaming services, behavior monitoring services, telecommunications carrier / communication NW selection services, function restriction services, PoC (Proof of Concept) services, personal information management services, ad hoc networks / DTN (Delay Tolerant Networking) services, and the like.

[0120] Furthermore, the above UE categories are merely examples of application of the technical ideas and exemplary embodiments described in this document. Needless to say, these technical ideas and exemplary embodiments are not limited to the above UEs and may be modified in various ways.

[0121] Various other modifications will be apparent to those skilled in the art and will not be described in further detail herein.

[0122] This application claims the benefit of priority to UK Patent Application No. 1815910.3, filed 28 September 2018, the disclosure of which is incorporated herein in its entirety.

Claims

1. means for transmitting, to a user equipment (UE), information indicating that downlink data is to be transmitted during a channel occupancy time (COT); means for performing a Listen-Before-Talk (LBT) procedure for accessing an unlicensed frequency when uplink data transmission from the UE is terminated during the COT; means for causing the UE to transmit the downlink data in the current slot during the COT according to the information if the UE has gained access to the unlicensed frequency during the current slot during the COT as a result of the LBT procedure; A base station comprising:

2. The base station of claim 1 , wherein the information is transmitted by a Physical Downlink Control Channel (PDCCH).

3. The base station according to claim 1 or 2, wherein the information is configured to support a transmission granularity of at least two symbols.

4. transmitting information to a user equipment (UE) indicating that downlink data is transmitted during a channel occupancy time (COT); uplink data transmission from the UE is terminated during the COT, and performing a Listen-Before-Talk (LBT) procedure for accessing an unlicensed frequency; A method in a base station comprising: if, as a result of the LBT procedure, access to the unlicensed frequency during a current slot in the COT is obtained, transmitting the downlink data to the UE within the current slot in the COT according to the information.

5. A user equipment (UE), comprising: means for receiving, from a base station, information indicating that downlink data is to be transmitted during a Channel Occupancy Time (COT); means for receiving the downlink data from the base station in the current slot during the COT according to the information, when the base station has gained access to the unlicensed frequency during the current slot during the COT as a result of a Listen-Before-Talk (LBT) procedure for accessing the unlicensed frequency performed by the base station after uplink data transmission from the UE is terminated during the COT; A UE comprising:

6. A method in a user equipment (UE), comprising: receiving information from a base station indicating that downlink data is to be transmitted during a Channel Occupancy Time (COT); receiving the downlink data from the base station in the current slot during the COT according to the information, when the base station has gained access to the unlicensed frequency during the current slot during the COT as a result of a Listen-Before-Talk (LBT) procedure for accessing an unlicensed frequency performed by the base station upon termination of uplink data transmission from the UE during the COT; A method comprising:

Citation Information

Patent Citations

  • communication systems

    JP2022500934A

  • User terminal and wireless communication system

    WO2016072218A1