Power outage notification based on distance to malfunction
By generating and comparing time series of electrical characteristics from metering devices, the system efficiently locates faults in utility grids, reducing downtime and enhancing reliability.
Patent Information
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-06-14
- Publication Date
- 2026-04-08
AI Technical Summary
Existing utility grids face challenges in efficiently and accurately locating power outages and faults, which delays repair and affects reliability scores like CAIDI.
A system and method that utilizes metering devices to sample electrical characteristics, generate time series of rate of change, and compare these patterns with historical data to determine the relative distance to the fault location, facilitating quicker fault identification and repair.
Reduces the time to restore service and lowers CAIDI scores by accurately locating faults, thereby improving customer satisfaction and grid reliability.
Smart Images

Figure 0007842789000001 
Figure 0007842789000002 
Figure 0007842789000003
Abstract
Description
Technical Field
[0001] (Related Application) This application claims the benefit of priority under 35 U.S.C. § 119 to U.S. Provisional Patent Application No. 63 / 210,625, filed on June 15, 2021, which is hereby incorporated by reference in its entirety.
[0002] The present disclosure generally relates to systems and methods for detecting power outages within a utility grid. In particular, the systems and methods of the present disclosure can locate the epicenter of a power outage among power-lost metering devices.
Background Art
[0003] A utility distribution grid can use meters to observe or measure the supply or consumption of utilities in the grid. Among other components within a utility distribution grid, these meters can experience power outages for various reasons. Power outages in a utility distribution grid can have an adverse impact on its reliability score (e.g., the Customer Average Interruption Duration Index (CAIDI)). However, when a power outage occurs, it can be difficult to efficiently and accurately locate and repair the fault.
Summary of the Invention
[0004] The systems and methods of this disclosure relate to locating failures within a utility grid. Some utility grids may wait for customers and report outages in their area via either an online web portal or an application. In some cases, utility grids use telephone calls from customers to identify outages. Some other utility grids may use an Advanced Metering Infrastructure ("AMI") as a "last gasp" or "dying gasp" messaging system to receive reports of outages. For example, when a metering device (e.g., a customer metering device) senses or detects that its voltage has fallen below a predetermined (or set) threshold for a predetermined time (e.g., set by the utility grid or the operator of the metering device), the metering device may send a message (sometimes called a gasp, last gasp, dying gasp, or outage notification ("PON")) to the Utility Outage Management System ("OMS"). The message may include the identifier ("ID") of the metering device and a timestamp indicating the time the voltage of the metering device fell below the predetermined threshold. By transmitting PON, the OMS can identify or map which metering devices have experienced a power outage. Being able to locate the metering device closest to the fault can significantly reduce the time spent searching for the fault, thereby increasing reliability and reducing customer downtime. However, determining the location or cause of a power outage in a utility grid using only PON can be difficult, thus delaying the time required to repair physical problems or restore power to the utility grid.
[0005] The systems and methods of this disclosure may include a data processing system configured to determine the location of at least one fault (e.g., an electrical fault or a blackout) using information or signals received from metering devices on a grid. For example, a metering device may sample an analog signal, such as an electrical characteristic (e.g., voltage or current), at a sample rate (e.g., 500 Hz, 1 kHz, 1.5 kHz, 2 kHz, or higher). Each metering device may calculate at least one respective value associated with an electrical characteristic during a blackout, such as the rate of change when the electrical characteristic is below a threshold (e.g., a PON threshold). In some cases, the metering devices may generate a time series containing the rate of change values and transmit it to the data processing system. The data processing system may plot the values from individual metering devices (e.g., rate of change) on a map to generate a time series (e.g., at least one value from each metering device). The time series may show the rate of change of the electrical characteristic from the metering devices. The data processing system may compare the characteristics of a time series (e.g., gradients) with patterns (or based on the time series itself) and determine whether each metering device is upstream, downstream, or relatively close to the fault location based on the similarity or agreement between its characteristics and one or more patterns. For example, a first set of patterns might include gradients indicating that a metering device is upstream, and a second set of patterns might include gradients indicating that a metering device is downstream. These patterns may be generated based on historical data. These patterns may also be generated, for example, based on the physically inferred electrical characteristics of various metering devices during a power outage or failure. If the time series contains characteristics similar to the patterns in the first set, the data processing system may determine that the metering device is located upstream of the fault. If the time series contains characteristics similar to the patterns in the second set, the data processing system may determine that the metering device is located downstream of the fault.
[0006] Thus, by utilizing the electrical characteristics from distributed metering devices and comparing these characteristics with one or more patterns, a data processing system can determine the relative distance of a metering device to a failure. Therefore, the system and method can provide a technical solution for locating failures relative to the location of metering devices, thereby reducing the time to restore service (e.g., electrical utilities or power distribution), lowering the CAIDI score, and improving customer satisfaction.
[0007] In one embodiment, the disclosure relates to a method for locating a fault in a utility grid. The method may include detecting a degradation in electrical characteristics below a threshold indicating a fault on the distribution grid using a metering device located on the distribution grid. The method may include the metering device generating a time series of the rate of change of the electrical characteristics for a predetermined number of cycles following the detection of the degradation, in response to the degradation below the threshold. The method may include determining the location of the metering device on the distribution grid relative to the location of the fault on the distribution grid, based on a comparison of the time series of the rate of change with a predetermined pattern, using the metering device or at least one of one or more processors communicating with the metering device.
[0008] The electrical characteristics may correspond to the voltage characteristics measured by a metering device. In some cases, the electrical characteristics may correspond to the current characteristics measured by a metering device. In some cases, the method may include the metering device triggering a power outage notification (PON) in response to a detected decrease in the electrical characteristics. In response to the triggered PON, the method may include the metering device generating a time series of the rate of change of the electrical characteristics for a predetermined number of cycles.
[0009] The method may include determining the rate of change of an electrical characteristic based on the time derivative of the root mean square (RMS) of one of the voltage or current signals using a measuring device. In some cases, a given pattern may include at least an incline and a decline. The decline of a decline may be greater than the incline of an incline. The method may include determining, based on a given pattern, that the location of the measuring device is downstream of a first subset of measuring devices and upstream of a second subset of measuring devices. An incline may be associated with the first subset of measuring devices upstream of the location of the measuring device. A decline may be associated with the second measuring device downstream of the location of the measuring device.
[0010] The distribution grid may include a second metering device located at a different position from the metering device. The method may include the second metering device detecting a second dip in the electrical characteristics below a threshold indicating a fault on the distribution grid. The method may include the second metering device generating a second time series of the second rate of change of the electrical characteristics for a predetermined number of cycles following the detection of the second dip in the electrical characteristics below the threshold, in response to the second dip in the electrical characteristics below the threshold. The method may include the second metering device determining the position of the second metering device on the distribution grid relative to the location of a fault on the distribution grid based on a second comparison of the second time series of the second rate of change with a predetermined pattern.
[0011] The method may include providing a computing system, which includes one or more processors coupled to memory, with a metering device via a network, an indication of the location of at least one of a second metering device or fault on the distribution grid. In some cases, the method may include the computing system receiving multiple time series of rates of change generated by multiple metering devices located on the distribution grid in response to a degradation of electrical characteristics. The method may include the computing system normalizing the values of the multiple time series. The method may include the computing system determining the likelihood of a fault location at each of the multiple metering devices based on the normalized values of the multiple time series. The method may include the computing system determining, based on the likelihood, that the fault is located upstream of the first metering device and downstream of the second metering device.
[0012] In another embodiment, the disclosure relates to a system for locating faults in a utility grid. The system may include a metering device located on the distribution grid, the metering device including one or more processors and memory. The metering device may detect a degradation in electrical characteristics below a threshold indicating a fault on the distribution grid. In response to a degradation in electrical characteristics below the threshold, the metering device may generate a time series of the rate of change of the electrical characteristics for a predetermined number of cycles following the detection of the degradation. Based on a comparison of the time series of the rate of change with a predetermined pattern, the metering device may determine the location of the metering device on the distribution grid relative to the location of the fault on the distribution grid.
[0013] The electrical characteristics may correspond to the voltage characteristics measured by a metering device. In some cases, the electrical characteristics may correspond to the current characteristics measured by a metering device. In some cases, a metering device may trigger a power outage notification (PON) in response to a detected decrease in the electrical characteristics. In response to a triggered PON, a metering device may generate a time series of the rate of change of the electrical characteristics for a predetermined number of cycles.
[0014] A metering device can determine the rate of change of an electrical characteristic based on the time derivative of the root mean square (RMS) of one of the voltage or current signals. In some cases, a given pattern may include at least an upward and a downward slope, where the declination of the downward slope is greater than the inclination of the upward slope. The metering device can determine, based on a given pattern, that the location of the metering device is downstream of a first subset of metering devices and upstream of a second subset of metering devices, where the upward slope is associated with the first subset of metering devices upstream of the location of the metering device, and the downward slope is associated with the second metering device downstream of the location of the metering device.
[0015] The distribution grid may include a second metering device located at a different position from the metering device. The second metering device may detect a second decrease in electrical characteristics below a threshold indicating a fault on the distribution grid. In response to the second decrease in electrical characteristics below the threshold, the second metering device may generate a second time series of the second rate of change of electrical characteristics for a predetermined number of cycles following the detection of the second decrease. The second metering device may determine the position of the second metering device on the distribution grid relative to the location of a fault on the distribution grid based on a second comparison of the second time series of the second rate of change with a predetermined pattern.
[0016] In another aspect, the disclosure relates to a non-transient computer-readable storage medium for locating faults in a utility grid. The non-transient computer-readable storage medium may store instructions that, when executed by one or more processors of a computing system, cause one or more processors to receive a plurality of time series of rates of change generated by a plurality of metering devices located on a distribution grid in response to a degradation of electrical characteristics. One or more processors may normalize the values of the plurality of time series. One or more processors may determine the likelihood of a fault location in each of the plurality of metering devices based on the normalized values of the plurality of time series. One or more processors may determine, based on the likelihood, that a fault is located upstream of a first metering device and downstream of a second metering device. One or more processors may, in response to the determination, provide an indication of the fault location upstream of the first metering device and downstream of the second metering device.
[0017] One or more processors may provide a fault location indicator to a device located away from the computing system to facilitate fault repair.
[0018] These and other embodiments and implementations are discussed in detail below. The information above and the detailed description below include exemplary embodiments of various embodiments and implementations and provide an overview or framework for understanding the nature and characteristics of the claimed embodiments and implementations. The drawings, which provide examples and further understanding of various embodiments and implementations, are incorporated herein by reference and constitute part of this specification. [Brief explanation of the drawing]
[0019] The attached drawings are not intended to be drawn to scale. Similar reference numbers and names in various drawings indicate similar elements having similar structure or function. For clarity, not all components are labeled in all drawings. In the drawings, they are as follows: [Figure 1]Figure 1 is a block diagram illustrating an exemplary utility grid in one implementation configuration. [Figure 2] Figure 2 is a block diagram illustrating a system for locating faults within a utility grid, based on one implementation configuration. [Figure 3] Figure 3 is a graph of exemplary simulated failure characteristics for waveform and root mean square (RMS) signals in one implementation configuration. [Figure 4] Figure 4 is a graph of the behavior of an exemplary root-mean-square ("RMS") voltage-time derivative in the presence of a three-phase fault in one implementation configuration. [Figure 5] Figure 5A is a graph showing the precise positioning of an exemplary single-line-to-ground ("SLG") fault on the faulty phase in one implementation configuration. Figure 5B is a graph showing the precise positioning of an exemplary SLG fault across all three phases in one implementation configuration. Figure 5C is a graph showing the successful fault positioning results of exemplary SLG and three-phase faults in one implementation configuration, with and without an upstream circuit breaker. [Figure 6] Figure 6 is an illustrative flow diagram of a method for locating faults within a utility grid using one implementation configuration. [Figure 7] Figure 7 is a block diagram showing the architecture of a computer system that may be employed to implement elements of the systems and methods described and shown herein, including, for example, the utility grid configuration depicted in Figure 1, the system depicted in Figure 2, and the operations depicted in Figures 3-6.
[0020] The features and advantages of this solution will become more apparent from the detailed description below when considered in conjunction with the drawings, in which similar reference letters identify corresponding elements throughout. Other features, aspects, and advantages of the subject matter will become apparent from this specification, the drawings, and the claims. [Modes for carrying out the invention]
[0021] The following is a more detailed description of various concepts, and implementation forms of methods, apparatuses, and systems related to a method, an apparatus, and a system for locating a fault within a utility grid. The various concepts introduced above and discussed in further detail below can be implemented in any of a number of ways.
[0022] A utility grid, or utility distribution system, can distribute electricity. A system managing the utility grid can locate the location or cause of a failure or outage in a metering device (e.g., a meter, adapter, smart grid chip, or other electrical measuring device) within the utility grid, based on measurements from metering devices, such as analog voltage waveforms. Each metering device can determine at least one rate of change when certain conditions are triggered, such as before, during, or after a power outage (PON) is triggered. Each metering device can generate a time series (e.g., from the start to the end of the PON) containing the values of the rate of change during a power outage. In some cases, the system can receive measurements from individual metering devices and calculate the rate of change (e.g., each value associated with each metering device) based on the measurements. The system can plot the calculated rates of change from various metering devices (e.g., at least one value associated with the time series from each metering device) on a map to generate a time series. The time series may include the characteristics of the electricity during the outage (e.g., gradient, pattern, behavior, or waveform). The system may compare a time series (or the characteristics of a time series) with patterns of electrical (e.g., voltage or current) behavior (e.g., determined based on past data of the metering device during a power outage, or based on physically inferred electrical characteristics calculated or determined in relation to the metering device relative to the fault location). Based on comparisons that include similarities with one or more patterns, the system may determine the location of the metering device relative to the fault location (e.g., the location of the power outage), such as upstream, downstream, or relatively close to the fault location. Thus, the system may locate the location of the power outage, such as being located downstream from one or more metering devices associated with a first pattern, or upstream from one or more metering devices associated with a second pattern, thereby reducing the time to restore service (e.g., electric utilities or distribution), lowering the CAIDI score, and improving customer satisfaction with fewer disruptions to distribution services.
[0023] Referring now to FIG. 1, an exemplary utility power distribution environment is shown. The utility power distribution environment may include a utility grid 100. The utility grid 100 may include a power distribution grid having one or more devices, assets, or digital computing devices and systems, such as computing device 700 or data processing system 202 (e.g., in conjunction with FIG. 2). In brief overview, the utility grid 100 may include a power source 101 that may be connected to a voltage regulating transformer 106a via a subsystem power transmission bus 102 and / or via a substation transformer 104. The voltage regulating transformer 106a may be controlled by a voltage controller 108 at a regulator interface 110. The voltage regulating transformer 106a may optionally be coupled to a secondary utilization circuit 116 on a primary distribution circuit 112 and one or more electrical or electronic devices 119 via any distribution transformer 114. The voltage regulating transformer 106a may include a plurality of tap outputs 106b each having a different tap output 106b for supplying electricity at different voltage levels. The utility grid 100 may include monitoring devices 118a - 118n that may be coupled to the secondary utilization circuit 116 via any potential transformers 120a - 120n. The monitoring or metering devices 118a - 118n may detect measurement values of electricity supplied from the power source 101 coupled to the bus 102 to one or more electrical devices 119 connected to the circuit 112 or 116 and continuous voltage signals (e.g., continuously, periodically, based on time intervals, in response to an event or trigger). The voltage controller 108 may receive measurement values obtained by the metering devices 118a - 118n via a communication medium 122, use the measurement values, make determinations regarding voltage tap settings, and provide a display to the regulator interface 110. The regulator interface may communicate with the voltage regulating transformer 106a and adjust the output tap level 106b.
[0024] Referring also to Figure 1, in further detail, the utility grid 100 includes a power source 101. The power source 101 may include a power plant, such as equipment configured to generate electricity for distribution. The power source 101 may include an engine or other device that generates electricity. The power source 101 can generate electricity by converting power or energy from one state to another. In some embodiments, the power source 101 may be called or include a power plant, power station, generating station, powerhouse, or generating plant. In some embodiments, the power source 101 may include a generator, such as a rotating machine that converts mechanical force into electricity by generating relative motion between a magnetic field and a conductor. The power source 101 may use one or more energy sources, including, for example, fossil fuels such as coal, oil, and natural gas, nuclear power, or cleaner renewable resources such as solar, wind, wave, and hydroelectric power, to rotate the generator.
[0025] In some embodiments, the utility grid 100 includes one or more substation transmission buses 102. The substation transmission buses 102 include, or may refer to, transmission towers, such as structures (e.g., steel towers, concrete, wood, etc.) that support overhead transmission lines used to distribute electricity from a power source 101 to a substation 104 or distribution point 114. Transmission towers 102 may be used in high-voltage AC and DC systems and come in a wide variety of shapes and sizes. In one exemplary embodiment, a transmission tower may reach a height of 15–55 meters or more. Transmission towers 102 can be of various types, including, for example, suspension, termination, tension, and displacement. In some embodiments, the utility grid 100 may include underground transmission lines in addition to, or instead of, the transmission towers 102.
[0026] In some embodiments, the utility grid 100 includes a substation 104 or an electrical substation 104 or a substation transformer 104. The substation may be part of an electricity generation, transmission, and distribution system. In some embodiments, the substation 104 converts voltage from high to low or vice versa, or performs any of several other functions to facilitate distribution. In some embodiments, the utility grid 100 may include several substations 104 between the power plant 101 and consumer electrical devices 119, with currents flowing through them at different voltage levels.
[0027] The substation 104 may be operated, monitored, and controlled remotely (for example, via a monitoring, control, and data acquisition system or a data processing system 202). The substation may include one or more transformers that can vary voltage levels between a higher transmission voltage and a lower distribution voltage, or in the interconnection of two different transmission voltages.
[0028] The regulating transformer 106 may include (1) a multi-tap automatic transformer (single-phase or three-phase) used for distribution, or (2) an on-load tap changer (three-phase transformer) integrated into the substation transformer 104 and usable for both transmission and distribution. The systems described herein may be implemented as either a single-phase or three-phase distribution system. The utility grid 100 may include an alternating current (AC) distribution system, and the term voltage may refer to “RMS voltage” in some embodiments.
[0029] The utility grid 100 may include a distribution point 114 or a distribution transformer 114 and may refer to a distribution system. In some embodiments, the distribution point 114 may be the final stage or near the final stage in the power supply. For example, the distribution point 114 may carry electricity from a transmission system (which may include one or more transmission towers 102) to individual consumers 119. In some embodiments, for example, the distribution system may include a substation 104 that is connected to the transmission system and may reduce the transmission voltage to a medium voltage ranging between 2kV and 35kV with the use of a transformer. A primary distribution line or circuit 112 carries this medium-voltage power to a distribution transformer located near the homes 119. The distribution transformer may further reduce the voltage to the voltage used by electrical appliances, and at this voltage may power several customers 119 via a secondary distribution line or circuit 116. Commercial and residential customers 119 may be connected to the secondary distribution line via a service drop. In some embodiments, customers requiring high loads may be connected directly at the primary distribution level or the auxiliary transmission level.
[0030] The utility grid 100 may include or combine one or more consumer sites 119. Consumer sites 119 may include, for example, buildings, houses, shopping malls, factories, office buildings, residential buildings, commercial buildings, stadiums, cinemas, etc. Consumer sites 119 may be configured to receive electricity from distribution points 114 via power lines (above ground or underground). Consumer sites 119 may be coupled to distribution points 114 via power lines. Consumer sites 119 may be further coupled to site metering devices 118a-n or advanced metering infrastructure ("AMI"). Site metering devices 118a-n may be associated with controllable primary circuit segments 112. Associations may be stored as pointers, links, fields, data records, or other indicators in data files in a database.
[0031] The utility grid 100 may include site metering devices 118a-n or AMI. The site metering devices 118a-n may measure, collect, and analyze energy usage and communicate with metering devices such as electricity meters, gas meters, heat meters, and water meters, either on request or on a schedule. The site metering devices 118a-n may include hardware, software, communications, consumer energy displays and controllers, customer-related systems, meter data management (MDM) software, or supplier business systems. In some embodiments, the site metering devices 118a-n may take samples of electricity usage in real time or based on time intervals, and transmit, transmit, or otherwise provide information. In some embodiments, the information collected by the site metering devices 118a-n may be referred to as meter observations or metering observations and may include samples of electricity usage. In some embodiments, site weighing devices 118a-n may transmit weighing observations along with further information such as a unique identifier for the site weighing devices 118a-n, a unique identifier for the consumer, a timestamp, a date stamp, temperature readings, humidity readings, and ambient temperature readings. In some embodiments, each consumer site 119 (or electronic device) may include, or be combined with, a corresponding site weighing device or monitoring device 118a-118n.
[0032] Monitoring devices 118a-118n may be coupled to the voltage controller 108 via communication media 122a-122n. The voltage controller 108 may calculate (e.g., discretely, continuously, based on time intervals, or in response to conditions / events) values of electricity that facilitate the adjustment or control of electricity supplied or provided through the utility grid. For example, the voltage controller 108 may calculate an estimated deviation voltage level at which the supplied electricity (e.g., supplied from power supply 101) does not fall below or above as a result of fluctuating electricity consumption by one or more electrical devices 119. The deviation voltage level may be calculated based on a predetermined confidence level and detected measurements. The voltage controller 108 may include a voltage signal processing circuit 126 that receives sampled signals from metering devices 118a-118n. The weighing devices 118a-118n may process and sample voltage signals so that the sampled voltage signals are sampled as time series (e.g., a uniform time series without spectral aliasing or a non-uniform time series).
[0033] The voltage signal processing circuit 126 may receive signals from metering devices 118a-n via communication media 122a-n, process the signals, and supply them to the voltage adjustment decision processing circuit 128. While the term “circuit” is used herein, the term is not intended to limit this disclosure to any particular type of hardware or design. Other generally known terms, such as “element,” “hardware,” “device,” or “apparatus,” may be used synonymously with or in place of the term “circuit” and may perform the same function. For example, in some embodiments, functionality may be implemented using one or more digital processors, for example, one or more digital signal processing algorithms. The adjustment decision processing circuit 128 may determine voltage positions relative to defined decision boundaries and set tap positions and settings in response to the determined positions. For example, the adjustment decision processing circuit 128 of a voltage controller 108 may calculate deviation voltage levels used to adjust the voltage level output of electricity supplied to an electrical device. Therefore, one of the multiple tap settings of the regulating transformer 106 can be successively selected by the voltage controller 108 via the regulator interface 110 to supply electricity to one or more electrical devices based on the calculated deviation voltage level. The voltage controller 108 can also receive information about the voltage regulating transformer 106a or output tap setting 106b via the regulator interface 110. The regulator interface 110 may include a processor control circuit for selecting one of the multiple tap settings of the voltage regulating transformer 106 in response to instruction signals from the voltage controller 108. When the calculated deviation voltage level changes, another tap setting 106b (or setting) of the regulating transformer 106a is selected by the voltage controller 108 to change the voltage level of the electricity supplied to one or more electrical devices 119.
[0034] Network 140 may be connected via wired or wireless links. Wired links may include digital subscriber lines (DSL), coaxial cable lines, or fiber optic lines. Wireless links may include Bluetooth®, Wi-Fi, Worldwide Interoperability for Microwave Access (WiMAX), infrared channels, or satellite bands. Wireless links may also include any cellular network standard used for communication between mobile devices, including standards considered to be 1G, 2G, 3G, or 4G. Network standards may be considered one or more generations of mobile telecommunications standards by meeting specifications or standards such as those maintained by the International Telecommunication Union. For example, a 3G standard may correspond to the Next Generation Mobile Communications-2000 (IMT-2000) specification, and a 4G standard may correspond to the Next Generation Mobile Communications Advanced (IMT-Advanced) specification. Examples of cellular network standards include AMPS, GSM, GPRS, UMTS, LTE, LTE Advanced, Mobile WiMAX, and WiMAX-Advanced. Cellular network standards can use various channel access methods, such as FDMA, TDMA, CDMA, or SDMA. In some embodiments, different types of data may be transmitted over different links and standards. In other embodiments, the same type of data may be transmitted over different links and standards.
[0035] Network 140 can be any type and / or form of network. The geographical reach of Network 140 can vary widely, and Network 140 can be a Body Area Network (BAN), Personal Area Network (PAN), Local Area Network (LAN), e.g., an intranet, Metropolitan Area Network (MAN), Wide Area Network (WAN), or the Internet. The topology of Network 140 can be any form, and may include, for example, any of the following: point-to-point, bus, star, ring, mesh, or tree. Network 140 may be virtual and be an overlay network located on one or more layers of other Network 140. Network 140 can be any such network topology known to those skilled in the art that can support the operations described herein. Network 140 may utilize different techniques and layers or stacks of protocols, including, for example, the Ethernet protocol, Internet Protocol Suite (TCP / IP), ATM (Asynchronous Transfer Mode) technology, SONET (Synchronous Optical Networking) protocol, or SDH (Synchronous Digital Hierarchy) protocol. The TCP / IP Internet Protocol Suite may include an application layer, a transport layer, an internet layer (including, for example, IPv6), or a link layer. Network 140 may be a type of broadcast network, telecommunications network, data communication network, or computer network.
[0036] One or more components, assets, or devices of the utility grid 100 may communicate via network 140. The utility grid 100 may use one or more networks, such as a public network or a private network. The utility grid 100 may communicate with or interface with a data processing system 202 designed and built to communicate with, interface with, or control the utility grid 100 via network 140. Each asset, device, or component of the utility grid 100 may include the functionality of one or more computing devices 700, or a part of computing device 700, or some or all of computing device 700.
[0037] Referring to Figure 2, a block diagram is shown illustrating an exemplary system for locating failures within a utility grid. System 200 includes, interfaces with, accesses, or otherwise communicates with at least one utility grid 100, at least one data processing system 202, or at least one server 204. The data processing system 202 may include one or more components (e.g., one or more processors, memory, databases, interfaces, etc.) configured to perform the features or functionalities discussed herein for managing the utility grid 100 or locating the location of one or more failures or outages within the utility grid 100. The data processing system 202 may correspond to metric devices located within the utility grid 100. In some cases, the data processing system 202 may be a computing device located away from the utility grid 100 or server 204. In some other cases, the data processing system 202 may be a different server from server 204 that performs the features and functionalities and is configured to manage the utility grid 100. The data processing system 202 may send or receive data to or from other components of system 200 (e.g., the utility grid 100 or the server 204) via the network 140. The utility grid 100 and the network 140 may be referenced in conjunction with Figure 1. One or more devices, components, or systems of the utility grid 100 or system 200 (e.g., the data processing system 202, the server 204, the weighing device 118, etc.) may consist of hardware, software, or a combination of hardware and software components.
[0038] Server 204 may be implemented as hardware, software, or a combination of hardware and software components. Server 204 may be a remote computing device or remote processing component from the data processing system 202 and the utility grid 100. In some cases, Server 204 may include, or be, a cloud storage device, such as one configured to store data from the data processing system 202. For example, Server 204 may receive data from the data processing system 202, such as measured or processed data from the utility grid 100. Server 204 may store this data for retrieval by the data processing system 202. In some cases, Server 204 may include one or more processing logics or components and perform one or more tasks in accordance with instructions received from the data processing system 202. For example, Server 204 may receive delegated tasks or objectives from the data processing system 202. Server 204 may process the data received from the data processing system 202 and send the processed data back to the data processing system 202. In some cases, the server 204 may perform other features or functionalities of the data processing system 202.
[0039] Network 140 may connect devices, components, or systems for communication, such as the utility grid 100, the data processing system 202, and the server 204. For example, devices or systems within system 200 (e.g., the data processing system 202, the server 204, the utility grid 100, etc.) may communicate or exchange information via network 140.
[0040] The data processing system 202 may include or correspond to at least one weighing device 118, such as one of the weighing devices 118 configured to perform one or more functions (e.g., collect and process electrical characteristics) and triangulate the location of faults in the utility grid 100. The data processing system 202 may reside on weighing devices or computing devices of the utility grid 100. In some cases, the data processing system 202 may reside on computing devices or servers outside of or away from the utility grid 100. For example, the data processing system 202 may reside in or run in a cloud computing environment or a distributed computing environment. The data processing system 202 may reside in or run on multiple local computing devices located throughout the utility grid 100. For example, the utility grid 100 may include multiple local computing devices, each composed of one or more components or functionalities of the data processing system 202.
[0041] The data processing system 202 may include one or more components for locating or determining the location of faults on the utility grid 100 (e.g., a power distribution grid), such as at least one interface 206, at least one electrical detector 208, at least one time series generator 210, at least one meter locator 212, and at least one database 214. Each component of the data processing system 202 (e.g., interface 206, electrical detector 208, time series generator 210, meter locator 212, or database 214) may be implemented using hardware or a combination of software and hardware. Each component of the data processing system 202 may include logic circuits (e.g., a central processing unit or CPU) that respond to and process instructions fetched from a memory unit (e.g., memory 715 or storage device 725). Each component of the data processing system 202 may include or use a microprocessor or a multicore processor. A multicore processor may include two or more processing units on a single computing component. Each component of the data processing system 202 may be based on any of these processors, or any other processor capable of operating as described herein. Each processor may utilize instruction-level parallelism, thread-level parallelism, different levels of caching, and so on. For example, the data processing system 202 may include at least one logical device, such as a computing device or server, having at least one processor that communicates over the network 140.
[0042] The components and elements of the data processing system 202 (e.g., interface 206, electrodetector 208, time series generator 210, meter locator 212, or database 214) may be separate components, single components, or parts of the data processing system 202. For example, individual components or elements of the data processing system 202 may operate simultaneously and perform at least one feature or function discussed herein. In another embodiment, the components of the data processing system 202 may perform individual instructions or tasks. In yet another embodiment, the components of the data processing system 202 may be single components performing one or more features or functions discussed herein. The components of the data processing system 202 may be connected to one another, or coupled to one another in a communicative manner, such as via interface 206. The connections between the various components of the data processing system 202 may be wired, wireless, or any combination thereof. The corresponding systems or components may be hosted on other computing devices.
[0043] Interface 206 may interface with network 140, devices within system 200 (e.g., server 204 or utility grid 100), or components of data processing system 202. Interface 206 may interface with the aforementioned components, including features and functionality similar to the communication interface of one or more weighing devices 118, as shown in Figure 1. For example, interface 206 may include standard telephone line LAN or WAN links (e.g., 802.11, T1, T3, Gigabit Ethernet, InfiniBand), broadband connections (e.g., optical fiber including ISDN, Frame Relay, ATM, Gigabit Ethernet, Ethernet-over-SONET, ADSL, VDSL, BPON, GPON, FiOS), wireless connections, or any combination of any or all of the above. The connection can be established using various communication protocols (e.g., TCP / IP, Ethernet, ARCNET, SONET, SDH, Fiber Distributed Data Interface (FDDI), IEEE 802.11a / b / g / n / ac CDMA, GSM, WiMAX, and direct asynchronous connection). Interface 206 may include at least an internal network adapter, a network interface card, a PCMCIA network card, an EXPRESSCARD network card, a CardBus network adapter, a wireless network adapter, a USB network adapter, a modem, or any other device suitable for interfaceting one or more devices in System 200 to any type of network capable of communication. Interface 206 may communicate with one or more of the aforementioned components and receive data from at least one of Server 204 or the utility grid 100, such as data representing the distribution of power to individual metering devices 118 in the utility grid 100.
[0044] The data processing system 202 may acquire measurements from two or more weighing devices within the utility grid 100. The weighing devices may include or refer to at least two of the weighing devices 118. The data processing system 202 may acquire measurements from the server 204. For example, a weighing device 118 may transmit measurements or data to the server 204 for storage or processing. In this case, the data processing system 202 may access or acquire measured or processed data collected from one or more weighing devices 118 from the server 204. In some cases, the data processing system 202 may correspond to at least one of the weighing devices 118. For example, at least one component of the data processing system 202 (e.g., an electrical detector 208) may receive an electrical signal or power from the substation 104 (or distribution point 114) and perform a measurement (e.g., one or more features of the measuring circuit of weighing device 118).
[0045] The electrical detector 208 may measure or detect analog voltage waveforms at high sampling rates (e.g., 0.5 kHz, 1 kHz, 2 kHz, 3 kHz, 6 kHz or higher) for accurate resolution in digitized samples. In some cases, the electrical detector 208 may measure analog current waveforms at sampling rates (e.g., 1 kHz or higher). The electrical detector 208 may measure analog waveforms (e.g., voltage or current waveforms) at specific locations on the utility grid 100 (e.g., at the locations of each metering device 118 or data processing system 202). The analog waveforms may represent voltage, current, or power supplied by at least one of the power supply 101 or substation 104. Other data processing systems or metering devices 118 may perform similar features or functionalities discussed herein, such as triangulation of the location of faults on the utility grid 100 with respect to various metering devices 118 experiencing power outages.
[0046] The electrical detector 208 can determine a root mean square (RMS) signal from an analog waveform, such as an RMS voltage signal, an RMS current signal, or an RMS power signal. For the purpose of providing embodiments, a voltage waveform or RMS voltage signal may be used to detect a power outage and locate a fault, but other electrical waveforms or signals (e.g., current, power, etc.) may be measured and used to perform similar functions. For example, the electrical detector 208 may determine an RMS voltage signal based on at least one of the peak, peak-to-peak, or mean of a voltage waveform. The electrical detector 208 may determine half a cycle of the RMS signal from the measured waveform (e.g., the RMS signal may have a half-cycle delay over the waveform). In some cases, the electrical detector 208 may calculate an RMS signal that is larger or smaller than half a cycle of the corresponding waveform.
[0047] Based on the measurements, the electrical detector 208 can determine the electrical characteristics in the utility grid 100. For example, an RMS signal may correspond to or represent electrical characteristics measured, detected, determined, or otherwise characterized by the electrical detector 208. In some cases, an analog waveform may correspond to or represent electrical characteristics detected by the electrical detector 208. Electrical characteristics may include at least one of stable (e.g., constant Vrms), fluctuating, increasing, decreasing, dropping, or other patterns or behaviors. Electrical characteristics may change based on the electricity distributed from the substation 104, or due to interruptions in one or more metering devices 118 (or data processing systems), or due to interruptions between one or more metering devices 118 (or data processing systems). In some cases, electrical characteristics may be based on whether or not a circuit breaker trips at the substation 104.
[0048] The electrical detector 208 can detect a decrease in electrical characteristics (e.g., RMS signal) below a threshold, based on a comparison between the signal (e.g., Vrms, Irms, Prms, etc.) and the threshold. The threshold may include, correspond to, or be called a decrease threshold, characteristic threshold, or minimum electrical threshold. The threshold is configured or can be set by the administrator of the data processing system 202 or the manufacturer of the metering device 118. The threshold may be a percentage or value relating to the average, maximum, or expected amplitude (e.g., quantity) of the electricity supplied to the metering device 118 or an entity (e.g., a building, etc.). For example, the threshold may be set to 90%, 85%, 80%, etc. In another embodiment, if the average or expected electricity supplied to the metering device 118 is 120 Vrms, the threshold may be set to 108 Vrms, 102 Vrms, 96 Vrms, etc. In this case, the threshold may also relate to the electricity supplied to individual metering devices 118. In some cases, different metering devices 118 may be supplied with different amplitudes (e.g., 170 Vrms, 150 Vrms, etc.).
[0049] The electrical detector 208 can continuously determine an RMS signal (e.g., at a sample rate) in response to measuring, detecting, or acquiring a waveform to determine an electrical drop (e.g., electrical characteristics). In some cases, the electrical detector 208 can use the waveform to calculate RMS in response to a voltage drop below a threshold. For example, the electrical detector 208 can determine that at least one of the peak, peak-to-peak, or average voltage drops below a predetermined threshold (e.g., amplitude, percentage, minimum, etc.). The electrical detector 208 can determine the Vrms of the corresponding waveform in response to the electrical drop. The electrical detector 208 can determine Vrms, for example, before the period in which the waveform voltage drops below the threshold, during the period in which it drops below the threshold, or after the period in which it drops below the threshold.
[0050] The electrical detector 208 may set or trigger a power outage notification (PON) timer in response to an electrical drop below a threshold (e.g., a drop in electricity or an electrical characteristic). The PON timer may count down or start a timer from the time it takes for the electricity to drop below the threshold. For example, the PON timer may be set or pre-configured to 0.2ms, 0.1ms, 0.05ms, 0.025ms, etc. The PON timer may be stopped or reset in response to electricity (e.g., voltage) recovering above the threshold. If the electrical signal does not recover above the threshold or does not increase (e.g., maintains or persists an RMS below the threshold), the electrical detector 208 may detect a timeout based on or from the PON timer. The PON timer may be pre-configured by the manufacturer of the weighing device or by the administrator of the data processing system 202 based on a standard (e.g., PON standard, meter standard, etc.).
[0051] In response to a timeout, the electrical detector 208 may trigger a PON transmission process. For example, in response to a PON timer timeout, the electrical detector 208 may transmit a PON to the server 204, a computing device in the utility grid 100, a second data processing system, at least one other weighing device, or another device connected to the network 140. In some cases, the electrical detector 208 may receive PONs from various other weighing devices, such as a subset of weighing devices located in the utility grid 100 experiencing a power outage. A PON may include at least an identifier for each weighing device (e.g., a weighing device ID) and one or more timestamps. The timestamps may be associated with at least one of the following: PON start (e.g., PON timer start), PON end (e.g., PON timer timeout), or a trigger for the PON transmission process. The weighing device ID may be used to obtain information associated with each weighing device, such as location, measured waveform, calculated RMS signal, and generated time series. For example, an electrical detector 208 (or, for example, a time-series generator 210 or a meter locator 212) may access a table containing a list of measuring devices (e.g., measuring device IDs) that stores associated measuring device information, such as the location associated with the measuring device ID and electrical measurement data. Thus, the electrical detector 208, or other components of the data processing system 202 (e.g., a time-series generator 210 or a meter locator 212), may retrieve or obtain electrical characteristics measured or calculated by various measuring devices located in the utility grid 100 experiencing a power outage. In some cases, the table containing the list of measuring devices and the list of associated information may be stored in a server 204. In some cases, the table may be stored in a database 214, such as locally in the data processing system 202 or locally in each individual measuring device 118. In some cases, one or more measuring devices may transmit information containing electrical characteristics with or as part of the PON.
[0052] In some cases, the detected or measured waveforms may change in characteristics, such as before or during a power outage, or based on the type of power. For example, the electrical detector 208 may measure or detect waveforms of single-phase, three-phase power (e.g., phase A, phase B, and phase C). Power lines connecting metering devices within a zone (e.g., the area or location of the metering device) or under the same substation 104 may supply similar types of power (e.g., single-phase or three-phase power). In some cases, a particular metering device may receive a different type of power than other metering devices. For example, a first metering device may measure a waveform of single-phase power, and a second metering device may measure a different waveform of three-phase power. With respect to single-phase power, the electrical detector 208 may measure a single waveform over time. With respect to three-phase power, the electrical detector 208 may measure or detect three waveforms associated with the three phases. The electrical detector 208, the time series generator 210, or the meter locator 212 may analyze one or more phases as discussed herein.
[0053] For example, based on pre-configuration by the administrator or operator of the weighing device, utility grid 100, or data processing system 202, the electrical detector 208 may determine the RMS signals of one or more phases of a waveform measured by the weighing device for generating a time series. The electrical detector 208 may determine which phase to analyze based on which phase is faulty, for example, the phase that causes a drop in power and thereby triggers the PON transmission process. In some cases, the electrical detector 208 may determine to analyze multiple faulty phases. Thus, the electrical detector 208 may determine the RMS signals of one or more phases of the measured waveform and provide a time series generator 210 for generating at least one time series.
[0054] The time series generator 210 can generate a time series of the rate of change of electrical characteristics for a predetermined number of cycles following the detection of a decrease. The time series generator 210 can generate a time series in response to the detection of a decrease in the electrical characteristics of one or more weighing devices (e.g., an RMS signal below a threshold). In some cases, the time series generator 210 may generate a time series in response to receiving a PON from a weighing device in the utility grid 100. Receiving a PON may correspond to or include accumulating or obtaining, at least the RMS signal, timestamp (e.g., PON start, PON end, etc.), weighing device ID, and the location of the weighing device sending the PON from a subset of weighing devices. For example, the time series generator 210 may monitor the number of active weighing devices and the count of PONs received in response to a power outage. The time series generator 210 may proceed to generate a time series in response to obtaining a predetermined portion of the PON (e.g., including the RMS signal and at least the timestamp of the PON start) from metering devices experiencing power outages, such as 50%, 70%, 85%, 90%, and 95% of the total number of meters.
[0055] In some cases, the time series generator 210 may initiate the time series generation process in response to receiving at least a predetermined number of PONs, such as 10, 20, or 50, with each individual PON being associated with its respective meter. In some cases, at least one metering device may transmit multiple PONs, such as when electricity causes a threshold to fluctuate above or below, following the triggering of the PON transmission process. In another embodiment, the time series generator 210 may generate a time series upon receiving a notification or being triggered by the electricity detector 208, following the triggering of a PON (e.g., the PON transmission process).
[0056] In some cases, the time series generator 210 may start the time series generation process at a predetermined time following the reception or detection of a PON (e.g., a first PON). For example, the predetermined time may be any length of time, such as 0.1 seconds, 0.05 seconds, etc., that provides various measuring devices (e.g., 80%, 90%, etc., of the total number of measuring devices) that are experiencing a power outage and transmitting a PON. Thus, the time series generator 210 may wait for a predetermined time after receiving the first PON (e.g., the electrical characteristics of one or more measuring devices do not rise above a threshold) and collect data for generating a time series.
[0057] To generate a time series, the time series generator 210 can determine the time derivative (e.g., dV / dt, dI / dt, etc.) of an RMS signal (e.g., an RMS voltage signal, an RMS current signal, etc.). The derivative of the signal can represent the rate of change of the RMS signal at a particular point in time. For example, a higher dV / dt corresponds to a larger rate of change, and a lower dV / dt corresponds to a lower rate of change of electricity (e.g., the rate of decrease of electricity in a particular weighing device). The time series generator 210 can calculate or determine the derivative of the RMS signal during a period of electricity depletion (e.g., at the time of the signal). The time for determining the derivative can be preconfigured by the manager of the weighing device or data processing system 202 based on an event (e.g., PON start, in particular), such as at the start of PON, before the start of PON, or after the start of PON. The PON start time can vary between weighing devices at different rates of change. For the purposes of the embodiment, the time series generator 210 can determine the derivatives herein of one or more metering devices at the PON start timestamp associated with each meter. In some other cases, the time series generator 210 can determine the derivatives at a different point in time during the electrical deceleration (e.g., before or after the start of the PON).
[0058] The time series generator 210 can generate derivatives of various weighing devices that have transmitted PON. In some cases, individual weighing devices may include one or more features or functionalities of the data processing system 202 so that the time series generator 210 can receive at least one of the calculated derivatives or generated time series from other weighing devices (for example, to update an existing time series).
[0059] The time series generator 210 can generate a time series of values based on the derivative of the RMS signal from the metering device 118 that detects a drop in electricity or transmits a PON. The time series can be used to generate a plot of the metering device and the dV / dt (or dI / dt, etc.) associated with each meter. The time series generator 210 may include the metering device and the dV / dt value on one of the axes of the plot, such as the metering device on the x-axis and dV / dt on the y-axis, or vice versa. The time series generator 210 may arrange the metering devices based on their location (e.g., obtained from the server 204 or the database 214). For example, the time series generator 210 may arrange a list of metering devices in a time series from the closest to the power source 101, substation 104, to the furthest, as discussed in the embodiments herein. In some cases, the time series generator 210 may arrange the metering devices from the furthest to the closest to substation 104. Therefore, based on the position of the weighing device and the determined derivative, the time series generator 210 can generate a time series for comparing the calculated metrics (e.g., dV / dt) between weighing devices that transmitted the PON, and can determine or estimate the distance to failure.
[0060] In some cases, the time series generator 210 may generate time series of one or more phases, such as three-phase power. For example, the time series generator 210 may identify at least one faulty phase that triggered the PON. The time series generator 210 may calculate the derivative (e.g., metric) of the RMS signal associated with at least one faulty phase of various meters. Thus, the time series generator 210 may generate time series based on the derivative of at least one phase measured by the meters. In some cases, the time series generator 210 may generate multiple time series of various phases measured by individual meters.
[0061] The time series generator 210 can normalize the time series to, for example, 100, among other values. The normalization of the time series may correspond to the position of each meter, or represent the likelihood percentage of a fault location near the position of each meter. For example, the first metering device, the second metering device, and the third metering device may be located on a power distribution grid. The time series generator 210 can determine and plot the dV / dt of the three metering devices in the time series. For example, the first dV / dt of the first metering device may be 10 Vrms / μs, the second dV / dt of the second metering device may be 5 Vrms / μs, and the third dV / dt of the third metering device may be 2 Vrms / μs. When normalizing to 100, for example, the time series generator 210 may determine the multiplier (e.g., normalization coefficient or scaling value) for all derivatives by dividing 100 by the calculated highest-order derivative (e.g., 10 in this case). In this embodiment, the time series generator 210 may determine that the multiplier is 100 / 10=10 for normalizing the derivatives. Thus, the dV / dt of the first metric device is normalized to 100, the second metric device to 50, and the third metric device to 20. The time series generator 210 may perform other features, functionalities, or techniques to normalize the time series (e.g., the values of the time series). In some cases, the time series generator 210 may use the normalized derivatives to generate the time series.
[0062] The meter locator 212 may determine the location of one or more metering devices relative to a fault on the utility grid 100 based on a time series. The meter locator 212 may use the generated time series to compare metrics (e.g., dV / dt) between metering devices to determine the location of a metering device relative to a fault. The comparison between metering devices may refer to, or include, comparing the magnitude of the calculated derivatives between metering devices to determine one or more metering devices having the highest rate of change (e.g., dV / dt) of electrical characteristics during the PON start period, or between the PON start time frame and the PON end time frame.
[0063] In some cases, the comparison may involve or correspond to comparing a time series with one or more predetermined patterns. For example, the meter locator 212 may compare a time series with at least one predetermined pattern stored in the database 214 or obtained from an external device (e.g., server 204 or a computing device of the utility grid 100). The meter locator 212 may compare or match the time series with one or more patterns to determine the relative location of a fault. The patterns may represent or include historical derivative data of various metering devices measured, calculated, or recorded during a power outage or fault. One or more patterns may be associated with at least one of the following, among others: A-phase fault, B-phase fault, C-phase fault, combination of multiple fault phases, single-line-to-ground (SLG) fault, double SLG fault, line-to-line-to-ground fault, bolted line-to-line fault, or three-phase bolted fault. One or more patterns may be associated with whether or not a circuit breaker located at substation 104 is tripped. For example, the meter locator 212 may compare a sequence to a specific pattern based on the type of fault indicated in the PON (e.g., a metering device that detects the type of fault) or whether or not a breaker was tripped at substation 104. The meter locator 212 may obtain information on the type of fault and breaker tripping from at least one of the following other devices: individual metering devices that transmit the PON, computing devices in the utility grid 100, or computing devices associated with substation 104 (e.g., monitoring electrical or equipment events), or server 204.
[0064] In some cases, the meter locator 212 may compare the time series with one or more patterns and identify at least one pattern with the highest similarity. For example, the meter locator 212 may identify at least one pattern that has at least one of the following similar characteristics to the time series: incline rate, decline rate, or duration rate. The pattern may include relative ups and relative downs, or other subsets of the pattern. Once a pattern corresponding to the time series is identified, the meter locator 212 may identify or determine the relative position of the failure in the time series (e.g., relative to the data processing system 202 or at least one weighing device 118) based on the representation of past failures identified in the pattern.
[0065] For example, the pattern may indicate the location of a fault based on the characteristics of the electrical degradation (e.g., the pattern of the voltage waveform degradation, as shown in Figure 3). The pattern may be based on historical metering data from various metering devices within the grid 100 during past power outages. The pattern may be managed, edited, or configured, for example, by the administrator of the data processing system 202. In some cases, the pattern may indicate the location of a fault at a peak (e.g., the highest point or maximum value) in a normalized time series. The peak may be a transition point between inclination (e.g., an upward slope) and declination (e.g., a downward slope). The pattern may be based on historical data, such as one or more past generated or normalized time series during a power outage. The pattern may be generated in the past by other devices, including the data processing system 202, one or more metering devices within the utility grid 100, other data processing systems, and the server 204 (e.g., a cloud computing device). One or more embodiments of the fault location may be shown in at least Figures 4–5C. In some cases, patterns may be generated based on physically inferred characteristics of the electricity (e.g., voltage or current) during a power outage. For example, the electrical characteristics of each metering device during a power outage, such as the rate of change of electricity, may differ based on at least one of the following: the distance from the fault location, or whether the metering device is upstream or downstream of the fault location. According to the physics of electricity, the server 204 (or other devices in the network 140) may determine the expected electrical characteristics (e.g., rate of change or measurement variation) associated with various locations upstream or downstream of the fault location. Thus, patterns may be generated, for example, based on the expected physically inferred electrical characteristics of the meter locator 212, and measurements from the metering devices may be compared to the patterns.
[0066] The meter locator 212 may determine that the time series exhibits similar behavior to one or more patterns representing a metering device located upstream of the fault location. The meter locator 212 may determine that the time series exhibits similar behavior to one or more patterns representing a metering device located downstream of the fault location. If the time series matches or is similar to at least one pattern, the meter locator 212 may use the fault location from similar (e.g., comparable) patterns for mapping to the fault location associated with the metering device in the time series (e.g., a normalized time series). For example, a pattern may indicate that the fault location is at a peak (e.g., the highest derivative value or a normalized value), near a peak (e.g., before or after a peak), or, if the pattern and time series contain multiple peaks, at least one peak, among other parts of the time series. In some cases, the meter locator 212 may compare multiple phases with multiple patterns to determine a set of patterns that match or are similar to the time series. For example, the meter locator 212 may identify a set of patterns (e.g., three patterns associated with phases A-C) that exhibit behavior during a power outage, similar to a time series. The meter locator 212 may compare the first, second, and third patterns in the set of patterns with the calculated derivatives associated with phases A-C, respectively. The patterns or behavior of individual phases may be shown, for example, in at least Figure 5B. The patterns may include variations, inclination or declination severity, number of peaks, and upward or downward intervals, among other types of patterns compared with a time series or a normalized time series.
[0067] If the time series does not resemble at least one pattern, the meter locator 212 may be pre-configured to transmit the time series to, for example, the administrator of the data processing system 202 or a computing device in the utility grid 100. In some cases, if the time series does not match at least one pattern, the meter locator 212 may select or identify the location associated with one or more metering devices that have the largest voltage change during or around the PON onset period as the metering device closest to the fault location. For example, the meter locator 212 may identify one or more metering devices in a normalized time series that represents the highest likelihood of the fault location. Thus, the meter locator 212 may identify the location of one or more metering devices (e.g., one that fits a pattern, or one that is near the fault location, or one that is associated with the highest likelihood of being at the fault location) and estimate or determine the approximate or relative location of the fault with respect to one or more metering devices.
[0068] In response to identifying one or more metering devices closest to or at the fault location, the meter locator 212 may provide the location of the metering devices for display or as a warning. For example, the meter locator 212 may identify and provide the location of at least one metering device to a display device or external device (e.g., a computing device in the utility grid 100) operated by a manager or operator. The manager may restore power to the metering devices 118 or entities (e.g., a building) by accessing, viewing, or otherwise obtaining the location of one or more metering devices associated with at least one fault location, repairing them, or performing maintenance on the power lines, etc. Thus, by providing fault locations in response to a deterioration in electrical characteristics, the data processing system 202 (e.g., its components) may improve the Customer Mean Time Outage Indicator (CAIDI) score or increase customer satisfaction with electricity from the utility grid 100.
[0069] The data processing system 202 may include a database 214 that stores information or data collected, measured, acquired, or otherwise received, as discussed herein. The database 214 may be referred to as data storage, data repository, memory device, etc. The database 214 may include at least characteristic storage 216, time-series storage 218, pattern storage 220, and metering device location storage 222. The database 214 may include other types of storage that store information for locating faults in the power distribution grid. In some cases, the information stored in the database 214 may be uploaded to a server 204, among other cloud storage devices, and downloaded back to the database 214 for processing. In some other cases, the information stored in the database 214 may be local to the data processing system 202. The database 214 can be accessed by one or more components of the data processing system 202 (e.g., an electrical detector 208, a time series generator 210, or a meter locator 212), or by at least one external device such as other weighing devices in the utility grid 100, or a server 204.
[0070] The characteristic storage 216 may include, store, or maintain electrical characteristics measured by the electrical detector 208 or a meter. The characteristic storage 216 may store electrical characteristics from other meters. The characteristic storage 216 may include timestamps associated with the measured electricity. For example, the characteristic storage 216 may sequentially store measurements from the electrical detector 208 or one or more metering devices in the grid. The characteristic storage 216 may include timestamps such as ms or μs associated with the measurements. The electrical characteristics may include or correspond to at least one of the measured waveform or the calculated RMS signal.
[0071] The time series storage 218 may contain, store, or maintain time series associated with various meters. Time series may be generated by the time series generator 210. For example, in response to generating a time series, the time series storage 218 may receive a time series from the time series generator 210 for storage. The time series storage 218 may store the derivatives of the RMS signals associated with each meter (e.g., dV / dt, dI / dt, etc.). For example, the time series generator 210 may calculate the derivatives of the RMS signals and store the calculation results in the time series storage 218. The time series generator 210 may use the derivatives to generate time series. The time series storage 218 may also store normalized time series, such as normalizing the derivatives to 100. The time series storage 218 may store time series or plots of the likelihood of failure locations that may correspond to the normalized time series.
[0072] The pattern storage 220 may include, store, or maintain past patterns (e.g., time series or normalized time series) of the characteristics of electricity during a power outage. Patterns may be associated with single-phase power, three-phase power, individual phases of three-phase power, etc. Patterns may be past patterns measured, analyzed, or constructed during a power outage of at least one phase. The pattern storage 220 may store fault locations associated with each pattern. For example, the pattern storage 220 may store or indicate fault locations at peaks in the time series, before the peak, or after the peak. Among other types of patterns, the pattern storage 220 may include inclination rate, declination rate, number of peaks, and variation rate. Patterns may be associated with whether or not a circuit breaker at substation 104 tripped due to the power outage. The pattern storage 220 may be accessed by the meter locator 212 to compare patterns with time series (or normalized time series). For example, by comparing patterns with a time series, the meter locator 212 may identify the fault location relative to the location of the metering device based on the mapping of the fault location indicated in the pattern. One or more patterns may be updated, for example, by the administrator of the utility grid 100 or a component of the data processing system 202, in response to the actual location of a fault for one or more metering devices (e.g., determined by an electrician repairing a power line). In some cases, one or more patterns may be generated, for example, by a machine learning engine trained using historical time series and reported fault locations for metering devices.
[0073] The weighing device location storage 222 may include, store, or maintain the location of a meter. The weighing device location storage 222 may store the location of weighing devices provided by a computing device in the utility grid 100 (e.g., or a location provided by an administrator) or by the server 204. The weighing device location storage 222 may update the location of one or more weighing devices based on the availability or changes in weighing devices at locations reported by a computing device in the utility grid 100 or by the server 204. The weighing device location storage 222 may include a weighing device ID associated with the location of a weighing device. In some cases, in response to determining the location of a fault, the weighing device location storage 222 may store or include the location of the fault relative to the location of an individual weighing device. For example, an operator or electrician may retrieve the location of at least one weighing device and determine the distance, direction, or location from the fault. The metering device location storage 222 may update the location of metering devices when it receives information such as the identification of new metering devices added to the power distribution grid or the removal of existing metering devices.
[0074] Referring here to Figure 3, an exemplary simulated fault characteristic 300 in waveform and RMS signal graphs is depicted. The simulated fault characteristic 300 may include a waveform graph 302 and an RMS signal graph 304. One or more features or functionalities discussed herein for generating or calculating graphs 302 and 304 (e.g., subplots) may be performed by at least one or more devices, components, or systems of system 200 (e.g., a data processing system 202, a server 204, a network 140, a metering device 118, or a computing device of the utility grid 100), in conjunction with Figure 2. For example, the data processing system 202 may measure electrical characteristics (e.g., voltage, current, power, etc.) associated with one or more metering devices located in the distribution grid and generate or construct a waveform graph 302. In some cases, the data processing system 202 may acquire data from various metering devices and generate or present a waveform graph 302. In another embodiment, the data processing system 202 may use the measured waveform to calculate or determine a corresponding RMS value or signal. The data processing system 202 may generate and present an RMS signal, for example, as shown in the RMS signal graph 304.
[0075] In further embodiments, by utilizing digitized waveforms (e.g., Graph 302) at a high sampling rate or high resolution, the data processing system 202 may perform calculations regarding the metering point experiencing a power outage and determine the characteristics of the outage (e.g., degradation of electrical characteristics). For example, the data processing system 202 may calculate characteristics of voltage behavior during the power outage (e.g., fluctuation, increase, decrease, among other patterns). In other embodiments, the data processing system 202 may calculate characteristics of current or power behavior during the power outage. Based on these characteristics, the data processing system 202 may determine the relative distance to failure by comparing it with other metering devices also experiencing a power outage (e.g., the same power outage as the metering device). The relative distance may refer to the distance of one or more metering devices experiencing a power outage relative to the location of the failure.
[0076] Referring to Figure 3, the data processing system 202 may calculate and identify fault characteristics, such as simulated fault characteristics in voltage and current waveforms. For example, the voltage waveform and the corresponding root mean square ("RMS") signal as a function of time, which can be measured by a metering device of the utility grid 100. The data processing system 202 may include, for example, a metering device that measures the waveform or RMS signal, be part of, or correspond to a metering device that measures the waveform or RMS signal. The voltage waveform may be shown in Graph 302.
[0077] The data processing system 202 may measure voltage waveforms in graph 302 from various metering devices, such as metering devices located upstream of, at, or downstream of the fault. In this case, the fault may be a simulated single-line-to-ground fault ("SLG") fault. For example, waveform or signal 306 may correspond to at least one metering device upstream of the fault. Waveform or signal 308 may correspond to at least one metering device at the fault. Waveform or signal 310 may correspond to at least one metering device downstream of the fault. A downstream metering device may refer to a metering device further away from substation 104. An upstream metering device may refer to a metering device closer to substation 104.
[0078] The data processing system 202 (or server 204) may calculate the RMS signal in graph 304 corresponding to the waveform in graph 302. The RMS signal may lag the waveform by half a cycle, for example, due to the RMS value calculated every half cycle. In some cases, the data processing system 202 may calculate the RMS signal in other cycles, such as more or less than half a cycle. The subplot or graph 304, which represents the RMS signal as a function of time, may include an indication of the point in time when the RMS voltage falls below its nominal threshold (e.g., 80%, 0.8 / unit ("pu"), 120Vrms, among other predetermined thresholds set by the administrator or operator of the data processing system 202 or the utility grid 100). This point in time when the RMS voltage falls below the threshold may be called the start of a power outage notification ("PON") and may be presented as point 312. Point 312 or the start of the PON may be the same Vrms value. In some cases, the start of the PON may be a different period. Furthermore, the subplot may include a representation of a predetermined time (configurable, for example, by the administrator or operator of the data processing system 202) after the voltage has remained below 0.8 pu, triggered by the PON and transmitted to the data processing system 202. The point after the predetermined time may be called, or labeled, PON termination and presented as point 314. The subplots or graphs 302 and 304 in Figure 3 are embodiments of simulated fault characteristics. Thus, the voltage waveform characteristics may differ depending on the location of the metering device to the fault.
[0079] Referring to Figure 4, Graph 400 depicts the behavior of an exemplary RMS voltage time derivative (e.g., an RMS voltage signal) in the presence of a three-phase fault. In a further embodiment from the above, using an RMS voltage signal between 0.8pu and PON, the data processing system 202 may determine or calculate various statistical parameters (e.g., minimum, maximum, standard deviation, mean, etc.) from the first time derivative (e.g., denoted as dV / dt) of the RMS voltage signal over a data window ranging from the length of one sample to the entire data clip, such as from the start to the end of PON. Graph 400 may include one embodiment of the general behavior of the first derivative (e.g., an RMS signal), such as with respect to a three-phase fault that does not trip the upstream circuit breaker. The RMS signal for a single-phase fault, or other faults that may or may not trip the upstream circuit breaker, may provide similar or varying signal behavior. The data processing system 202 can determine the fault location for at least one of the metering devices by applying or performing one or more operations or features discussed herein with respect to any type of failure, whether the breaker is tripped or not.
[0080] For example, the data processing system 202 may calculate the relative distance to the failure of a metering device by comparing the calculated metrics (e.g., the first time derivative of the RMS voltage signal) with other metering devices in the utility grid 100 that are experiencing a power outage, or with a metering device that has transmitted a PON to the data processing system 202 (or headend system), etc. The calculated relative distance may be shown in graph 400. Graph 400 may include exemplary patterns or derived behaviors of various metering devices upstream or downstream of the failure location 406. Line 402 may represent metering devices upstream of the failure location 406, and line 404 may represent metering devices downstream of the failure location 406. Upstream metering devices may be closer to the substation 104, and downstream metering devices may be further away from the substation 104. For example, based on the derivative calculated at or around the PON start time of the weighing device, the data processing system 202 may identify that the derivative of the upstream weighing device has a shallow slope that does not slope towards zero. The data processing system 202 may identify that the derivative of the downstream weighing device has a steeper slope that slopes towards zero, for example, based on a comparison of line 404 with line 402. Exemplary plots of comparisons between the metric and other weighing devices using a simulation of an SLG failure on the B phase of a three-phase, unbalanced circuit can be shown in at least Figure 5A. Other patterns in addition to the pattern in graph 400 can be shown in at least Figures 5A–5C.
[0081] Referring to Figure 5A, Graph 500A is depicted showing the positioning of an exemplary, precise single-line-to-ground fault ("SLG") on the faulty phase. Each element along the x-axis (sometimes called a step, increment, or position) may represent a metering device on phase B that reported PON to the data processing system 202 during a power outage. Graph 500A (for example, or other graphs 500B-C) may represent a normalized time series representing the likelihood of the fault location. The calculated normalized derivative of Graph 500A may represent phase B of the three-phase power line reporting PON. In this case, at least for illustrative purposes, the placement of the metering devices may be presented from left to right, from closest to furthest from substation 104, respectively. In some cases, along the x-axis, denoted L and M may represent a metering device and a sample, respectively. In some other cases, denoted L and M may represent a location, area, or general location, and a metering device at a location, respectively. For example, at L1, M1 (e.g., metering device 1 or the first metering device at L1) may be closer to substation 104 than M2 (e.g., metering device 2 or the second metering device at L1). In another embodiment, L1-L11 in graph 500A-C may represent the positions from the closest to the furthest from substation 104.
[0082] In this embodiment, the fault may occur between metering devices L6.M1 and L6.M2 (e.g., at fault location 502), as indicated by the vertical lines in graphs 500A-C. A circuit breaker located at substation 104 may trip with a realistic time delay after the fault (e.g., removing power from all three phases). Metering devices L1.M1-L6.M1 may be upstream of fault location 502 (e.g., upstream metering device 504). Metering devices L6.M2-L11.M2 may be downstream of fault location 502 (e.g., downstream metering device 506). Similar to the pattern in graph 400, the derivative of upstream metering device 504 (e.g., located close to the fault location 502 from substation 104) may exhibit a shallow upward behavior that does not slope towards zero. Furthermore, the derivative of the downstream metering device 506 (for example, forward from the fault location 502) may exhibit a steeper downward behavior, sloping towards zero (compared to, for example, the upstream metering device 504).
[0083] For each metering device in the utility grid 100, the data processing system 202 can calculate its respective metric from the first time derivative of the RMS voltage signal recorded during the fault (e.g., from 0.8pu to the PON trigger, as in a previous embodiment). The data processing system 202 can normalize the calculated metrics to 100, for example, as plotted in Figures 5A-5C. Thus, using the above techniques or algorithms, the data processing system 202 can locate the metering devices, or the two metering devices closest to the fault (e.g., L6.M1 and L6.M2). As illustrated in the exemplary Figure 5A, the asymmetric behavior between the upstream metering device 504 and the downstream metering device 506 may be due to latent voltages on the A and C phases, which may decrease more slowly if the metering device is further downstream from the substation 104 after the three-phase circuit breaker has tripped. In some cases, the data processing system 202 may compare the patterns shown in at least one of graphs such as graph 400 and graph 500A with the generated time series, for example, to determine the location of a fault for one or more weighing devices. In this embodiment, graph 500A may show the locations L1.M1–L11.M2 of the weighing devices relative to the fault location 502.
[0084] Referring to Figure 5B, an exemplary graph 500B of the exact SLG fault location across all three phases is shown. The faults depicted in graph 500B may be similar to the faults in graph 500A. In this embodiment, the data processing system 202 may generate and normalize time series of all phases of the three powers (e.g., phase A, phase B, and phase C). Referring to a previous embodiment of graph 500A, phase B may be shown without the non-fault phases (e.g., phases A and C). For example, graph 500B may include a phase B line 510 similar to the time series operation of graph 500A. The calculated time series of phases A and C may correspond to lines 508 and 512, respectively. As shown in this embodiment, the magnitude of the determined metric (e.g., phase B) at fault location 502 is higher on the fault phase (e.g., showing approximately 90%-95% likelihood of the fault location) compared to the non-fault phases, such as phase A or C.
[0085] Non-fault phases (e.g., phases A and C in this case) may exhibit different behavior or patterns. For example, lines 508 and 512 in graph 500B may represent the behavior of phase A and phase C power, respectively, during a power outage (e.g., at or around the time of PON onset). In an embodiment of graph 500B, the phase A pattern (e.g., line 508) may include or represent a slight upward slope from L1.M1 to L5.M2 and a steep downward slope from L6.M2 to L9.M1. In another embodiment of graph 500B, the phase B pattern (e.g., line 512) may represent a gradual increment (e.g., a small increase) from the upstream metering device 504 to the downstream metering device 506. Other patterns may be represented by non-fault phases.
[0086] The data processing system 202 may compare a normalized time series of at least one faulty phase with a predetermined pattern. In this embodiment, the data processing system 202 may compare phase B with a pattern such as the pattern shown in at least one of graphs 400, 500A, and 500B. In some cases, the data processing system 202 may compare one or more other phases (e.g., faulty or non-faulty phases) with at least one further pattern. For example, in an SLG fault, the data processing system 202 may compare three phases, such as those shown in graph 500B, with three patterns associated with each individual phase. The predetermined pattern may indicate the past location of the fault. In some cases, the data processing system 202 may determine or identify the fault location based on the similarity between one or more phases of the time series compared with each of the one or more patterns.
[0087] Referring here to Figure 5C, the exemplary graph 500C shows that the calculated metrics can be used by the data processing system 202 to successfully distinguish fault behavior as a function of fault type and upstream circuit breaker operation. In particular, the data processing system 202 can distinguish fault behavior using the calculated metrics compared with other metering devices, as discussed herein. The data processing system 202 can calculate three lines (e.g., lines 510, 514, and 516) on the B-phase signal in each metering device. The SLG fault line with a breaker trip in Figure 5C (e.g., represented as line 510) may correspond to the B-phase lines in Figures 5A-5B, etc.
[0088] The SLG fault line without a breaker trip in Figure 5C (represented, for example, as line 516) can be under the same conditions as the SLG fault line with a breaker trip (e.g., a similar fault location 502 or a similar type of fault), except that the upstream circuit breaker does not trip. In this case, the pattern of the SLG fault B phase without a breaker trip may include, or represent, a steeper rise that does not slope to 0 upstream of the fault location and a shallower drop that slopes to 0 downstream of the fault location. In the case of the B phase without a breaker trip, the voltage may be maintained on one or more (or all three) phases upstream of the fault location 502 (e.g., maintained with respect to the upstream metering device 504). Therefore, a metering device downstream of fault location 502 (e.g., downstream metering device 506) may appear to have a higher score (e.g., a higher percentage likelihood or rate of change) because it has lost power, while an upstream one remains connected to substation 104 and is supplied with power because the breaker did not trip in the case of line 516.
[0089] Furthermore, a three-phase fault line without a breaker trip in Figure 5C (represented, for example, as line 514) may exhibit the same conditions (e.g., no upstream breaker trip, similar fault location 502), but with respect to the three-phase fault. In this embodiment, as seen in the line without a breaker trip for an SLG fault (e.g., line 516), the score associated with the downstream metering device 506 of line 514 may be higher than that of line 516, for example, because the voltage of the metering device drops more rapidly, due to the loss of voltage support from the non-fault phase. The various fault scenarios in Graph 500C may be a subset of patterns previously generated or captured by one or more metering devices or data processing system 202. Thus, the data processing system 202 may identify the fault location 502 by associating or comparing the generated time series or normalized time series with at least one pattern (e.g., indicating a past location of a fault).
[0090] As shown in Figures 5A-5C, the data processing system 202 may determine the fault location by comparing the generated time series with one or more patterns (e.g., representing different types of faults). In some cases, the data processing system 202 may determine that the fault location 502 is on a metering device or between two metering devices. In some cases, the data processing system 202 may determine that the fault location 502 is at the peak of the time series or a normalized time series. In some other cases, the data processing system 202 may determine that the fault location 502 is not at the peak of the generated time series. For example, based on at least one of the following other metrics, such as the duration of the RMS signal used to calculate the derivative, the type of fault, and the number of faulty phases, a given pattern may indicate the behavior of the phases during a power outage and the determined location of the fault. Thus, the data processing system 202 may determine the fault location 502 for various metering devices in the distribution grid by comparing the generated time series with one or more patterns.
[0091] Therefore, by using the aforementioned technology, the data processing system 202 can locate the location of the power outage among the metering devices that have lost power or experienced a power outage. Thus, for example, in the case of a power outage affecting metering devices over a large geographical area, the data processing system 202 can locate the fault and reduce the time it takes to restore utility services to customers, thereby increasing customer satisfaction with the service and improving the CAIDI score of the utility grid 100. In some cases, if the metering devices affected by the power outage are accurate and have high-resolution timestamp capabilities, the data processing system 202 can receive a timestamp from the metering device when the voltage first fell below a threshold (e.g., 0.8 pu) and determine the proximity to the fault indicated by the oldest timestamp received from the metering device.
[0092] Referring to Figure 6, an exemplary flow diagram of Method 600 for locating a fault in a utility grid is shown. The exemplary Method 600 may be executed, performed, or otherwise implemented by one or more components of the utility grid 100 (e.g., computing devices, metering devices 118, etc.), System 200 (e.g., data processing system 202, server 204, etc.), or computing devices 700. In ACT 602, Method 600 may include monitoring electrical characteristics. In ACT 604, Method 600 may include determining whether a degradation of electrical characteristics is below a threshold. In ACT 606, Method 600 may include generating a time series. In ACT 608, Method 600 may include comparing the time series to a predetermined pattern. In ACT 610, Method 600 may include determining whether the time series matches a pattern. In ACT612, method 600 may include determining the location of a weighing device relative to the location of a fault.
[0093] Referring further to Figure 6 for more details, in ACT602, metering devices (e.g., data processing systems) located on the distribution grid may monitor electrical characteristics. Electrical characteristics may include or refer to waveforms or RMS signals. Electrical characteristics may correspond to at least one of the characteristics measured by the metering device, such as voltage, current, or power. Other metering devices in the distribution grid may perform one or more similar features, functions, or operations as discussed herein. Metering devices in the distribution grid may communicate or share information with each other, thereby enabling triangulation of the location of individual metering devices relative to a fault location (e.g., determining the location of a metering device relative to a fault).
[0094] ACT604 allows a metering device to determine, based on the monitored electrical characteristics, whether an electrical characteristic (e.g., signal or waveform behavior) falls below a threshold. The threshold may be determined, for example, by the metering device, a data processing system, or by an electrician, operator, or manager of the distribution grid. In some cases, if the metering device does not detect a decrease, it may continue to monitor the electrical characteristics (e.g., return to ACT602).
[0095] A metering device can detect a decrease in electrical characteristics below a threshold. This decrease may indicate a fault in the power grid. For example, a metering device may determine that the RMS signal decreases and persists below a threshold for a predetermined time frame (e.g., 0.5 μs, 0.25 μs, etc.). The metering device may detect a decrease in response to a sustained signal below a threshold for a predetermined time frame.
[0096] For example, in response to detecting a signal drop below a threshold, the metering device may start a PON timer (e.g., at the PON start time). Following a predetermined time frame, the metering device may terminate the timer (e.g., at the PON end time). In this embodiment, the metering device may detect a decrease in electrical characteristics in response to the PON termination. In some other cases, the metering device may detect a decrease in electrical characteristics in response to a signal drop below a threshold.
[0097] A metering device may trigger a PON (e.g., a PON transmission process) in response to detecting a decrease in electrical characteristics. A PON may include at least a metering device ID and a timestamp. A metering device (or other metering device) may use the metering device ID to obtain information associated with its respective metering device ID, among other things, such as the measured waveform (e.g., voltage, current, etc.) and RMS signal. The timestamp may include at least the time at which the electrical characteristics decrease below a threshold, the PON start time, and the PON end time. A metering device may transmit a PON to at least one other metering device to analyze the decreasing electrical characteristics. In some cases, a metering device may receive one or more PONs from other metering devices and process the behavior of the decreasing signals. In some cases, a metering device may simultaneously send and receive PONs to and from other metering devices.
[0098] In ACT606, a metering device may generate a time series in response to, or following, the detection of a voltage drop below a threshold. To generate a time series, the metering device may determine or calculate the rate of change of an electrical characteristic (e.g., a metric) based, for example, on the time derivative of the RMS of one of the voltage or current signals (e.g., an RMS signal). The metering device may determine the RMS derivatives of various other metering devices. The metering device may generate a time series of the rate of change of an electrical characteristic for a predetermined number of cycles following the detection of the drop. The predetermined number of cycles may be predetermined or pre-configured, for example, by the distribution grid or the operator of the metering device. In some cases, the predetermined number of cycles may refer to the total number of metering devices affected by the power outage. For example, the metering device may determine the derivatives of various metering devices at the time of the drop, or before and after the time of the drop, and generate a time series.
[0099] In some cases, a predetermined number of cycles may refer to the period or waveform cycle count after detecting a decrease (e.g., at the start of the PON). For example, a metering device may collect signal behavior or calculated rate of change from various metering devices affected by the failure over a predetermined period (e.g., until the end of each PON). The metering device may update the time series with the rate of change of metering devices in the distribution grid. Thus, in response to a predetermined number of cycles, the metering device may aggregate and generate a time series that represents the rate of change of electrical behavior of metering devices in the distribution grid during a power outage (e.g., at the start of the PON, or around the start of the PON).
[0100] In some cases, a metering device may generate a time series of a predetermined number of cycles in response to a triggered PON. For example, a metering device may trigger a PON in response to a PON timer timeout (e.g., electricity sustained below a threshold). A metering device may receive PONs from one or more other metering devices for a predetermined number of cycles, including, among other things, at least one of the measured RMS and rate of change. In response to receiving a PON, a metering device may generate and update data from other metering devices. In some cases, a metering device may transmit information to at least one other metering device to generate a time series.
[0101] The time series may include a list or array of metering devices based on their location relative to the substation. For example, the metering devices may be listed on the x-axis of the time series from closest to furthest from the substation. In this embodiment, the y-axis of the time series may include or show electrical characteristics or the magnitude of the rate of change of RMS. In some other cases, the locations of the metering devices may be listed from furthest to closest from the substation.
[0102] ACT608 allows a metering device to compare a time series to at least one predetermined pattern, which may include, among other things, at least one of an uphill slope, a downhill slope, or a zero slope. In some cases, the decline of a downhill slope may be greater than the inclination of an uphill slope. In some other cases, the decline may be less than the inclination. In some other cases, the decline and inclination may increase or decrease at similar rates. The pattern may indicate the rate of change (or lack thereof) of uphill or downhill slopes at different locations in the time series. The metering device may retrieve or obtain the predetermined pattern from local data storage, remote data storage, or cloud storage. The pattern may be based on past time series generated by the metering device or other metering devices. The pattern may indicate past fault locations relative to the location of the metering device in the time series, such as being marked, confirmed, or approved by an electrician fixing a power line or locating a fault.
[0103] In ACT610, a metering device can determine whether a time series matches at least one of the patterns. For example, a metering device may identify a portion of a time series having a first gradient that does not slope toward zero and a second gradient that slopes toward zero. The metering device can compare the inclination rate (e.g., of the first gradient) and the declination rate (e.g., of the second gradient) with the rate of change of the gradient in the pattern. In some cases, the inclination rate may be greater than the declination rate from the metering device closest to the substation to the metering device furthest away. In some other cases, the inclination rate may be less than the declination rate. The pattern may indicate the type of failure experienced by the metering device. In some cases, the pattern may indicate one or more phases (e.g., of three-phase power) that have a failure. Thus, the metering device can compare the behavior of the rate of change of the generated time series with the pattern and determine whether the two match.
[0104] If the patterns do not match, the metering device may, for example, continue monitoring the electrical characteristics (e.g., returning to step 602), acquire further electrical characteristics, or generate another time series. In some cases, the metering device may acquire additional patterns from the cloud storage or local storage of another metering device for further comparison. If the patterns match the behavior of the rate of change of the time series, the metering device may proceed to step 612 to determine the location of the fault.
[0105] In step 612, the metering device may determine its position on the distribution grid relative to the location of a fault on the distribution grid (e.g., fault location). The metering device may determine its relative position to the fault based on a comparison of a time series of rate of change with a predetermined pattern. For example, the metering device may determine, based on a predetermined pattern, that the position of the metering device (e.g., the metering device performing the determination) is downstream of a first subset of metering devices and upstream of a second subset of metering devices. In this embodiment, the upward slope of the time series or pattern may be associated with the first subset of metering devices upstream of the metering device's position. Furthermore, the downward slope of the time series or pattern may be associated with the second subset of metering devices downstream of the metering device's position.
[0106] Based on the pattern, the weighing device may detect that the fault location is at or near the weighing device's location. For example, the pattern may indicate a fault location downstream of a first subset of weighing devices and upstream of a second subset of weighing devices. In another embodiment, the pattern may indicate the fault location at a peak in the time series or around a peak in the time series. The pattern is obtained by indicating the fault location at another point in the time series behavior (e.g., the location of another weighing device). In some cases, the fault location may be between two weighing devices. For example, the weighing device may identify a second weighing device having similar rate of change or RMS behavior, located downstream of a first subset of weighing devices and upstream of a second subset of weighing devices. Based on comparison with the pattern, the weighing device may determine that the fault location is between the weighing device's location and the location of the second weighing device.
[0107] A metering device may, via a network, provide a computing system including one or more processors coupled to memory with an indication of the location of at least one of a second metering device or fault location on the power distribution grid. In some cases, the metering device may provide the computing system with an indication of the location of the metering device relative to the fault. The computing system may be operated by an electrician, operator, or administrator. For example, in response to receiving the indication, the operator may move to the determined fault location and restore electricity to the metering device (or a metering device downstream of the fault). In some cases, the metering device may provide the location of the metering device relative to the fault. In some other cases, based on a generated time series compared with a predetermined pattern, the metering device may determine that the fault is located at or near a second metering device (e.g., a second metering device). Thus, the metering device may provide the operator's computing system with an indication of the location of the second metering device (e.g., corresponding to the determined fault location).
[0108] In some cases, if the fault is located between a first and a second metering device, the metering device may provide the computing system with an indication of the location of the first metering device, the location of the second metering device, or the location of both. When providing the location of one metering device, such as the first or second metering device, the metering device may indicate whether the fault is determined to be downstream or upstream of each metering device. For example, if the first metering device is closer to the substation than the second metering device, and the fault is located between the two metering devices, the metering device may indicate that the fault is downstream of the first metering device or upstream of the second metering device.
[0109] From the above embodiment, the computing system may further receive various time series of rates of change generated by metering devices located on the power distribution grid. The computing system may receive time series in response to degradations of electrical characteristics, such as those experienced or detected by individual metering devices. In response to receiving time series, the computing system may normalize the values of the time series (e.g., normalize the rate of change). Based on the normalized values of multiple time series, the computing system may determine the likelihood of a fault location at each of the metering devices (e.g., the location of each metering device). For example, the normalized rates of change of various metering devices may correspond to, or represent, the likelihood of a fault location expressed as a percentage, value, characteristic, or grade (e.g., AF), among other evaluations. Based on the likelihood, the computing system may determine that the fault is located at least upstream of the first metering device and at least downstream of the second metering device.
[0110] In some cases, the computing system may determine, based on likelihood, that the fault is located next to a substation (e.g., upstream of a metering device on the distribution grid). In some other cases, the computing system may determine that the fault is located near a power line or at the end of a power line (e.g., a downstream metering device on the distribution grid, upstream of the metering device furthest from the substation). In some cases, the computing system may correspond to, include, or be part of a data processing system.
[0111] In some cases, the distribution grid may include a second metering device located at a different location from the first metering device. The second metering device may perform one or more features or functions similar to the first metering device or data processing system, and may determine the location of the second metering device relative to the fault location. For example, the second metering device may detect a second degrade in electrical characteristics below a threshold indicating a fault on the distribution grid (e.g., the same fault detected by the first metering device). In response to the second degrade in electrical characteristics below the threshold, the second metering device may generate a second time series of the second rate of change of the electrical characteristics. The second metering device may generate a second time series for a predetermined number of cycles following the detection of the second degrade. The second metering device may compare the second time series to a predetermined pattern (or another predetermined pattern). Based on the comparison of the second time series of the second rate of change with the predetermined pattern (e.g., the second comparison), the second metering device may determine the location of the second metering device on the distribution grid relative to the fault location on the distribution grid. Therefore, the second weighing device may provide a computing system with an indication of the location or fault location of the second weighing device.
[0112] Figure 7 is a block diagram of an exemplary computer system 700. The computer system or computing device 700 may include or be used to implement a data processing system 202, or a component thereof such as the data processing system 202. The computing system 700 includes at least one bus 705 or other communication component for communicating information, and at least one processor 710 or processing circuit coupled to the bus 705 for processing information. The computing system 700 may also include one or more processors 710 or processing circuits coupled to the bus for processing information. The computing system 700 also includes at least one main memory 715, such as random access memory (RAM) or other dynamic storage device coupled to the bus 705, for storing information and instructions executed by the processor 710. The main memory 715 may also be used to store location information, utility grid data, command instructions, device status information, environmental information inside and outside the utility grid, information about electrical characteristics, or other information during the execution of instructions by the processor 710. The computing system 700 may further include at least one read-on memory (ROM) 720 or other static storage device coupled to the bus 705 for storing static information and instructions for the processor 710. A storage device 725, such as a solid-state device, magnetic disk, or optical disk, may be coupled to the bus 705 and permanently store information and instructions.
[0113] The computing system 700 may be coupled via bus 705 to a display 765, such as a liquid crystal display or an active-matrix display, for displaying information to users, such as administrators of a data processing system or utility grid. An input device 760, such as a keyboard or voice interface, may be coupled to bus 705 to communicate information and commands to the processor 710. The input device 760 may include a touchscreen display 765. The input device 760 may also include cursor control, such as a mouse, trackball, or cursor directional keys, for communicating directional information and command selections to the processor 710 and for controlling cursor movement on the display 765. The display 765 may be part of the data processing system 202 or other components of Figure 1 or Figure 2.
[0114] The processes, systems, and methods described herein may be implemented by a computing system 700 in response to a processor 710 that executes the arrangement of instructions contained in main memory 715. Such instructions may be read into main memory 715 from another computer-readable medium, such as a storage device 725. The execution of the arrangement of instructions contained in main memory 715 causes the computing system 700 to execute the exemplary processes described herein. One or more processors in a multiprocessing arrangement may be employed to execute the instructions contained in main memory 715. Hardwired circuitry may be used in place of or in combination with software instructions, along with the systems and methods described herein. The systems and methods described herein are not limited to any particular combination of hardware circuitry and software.
[0115] An exemplary computing system is illustrated in Figure 7, but the subject matter, including the operations described herein, may be implemented in other types of digital electronic circuits, or in computer software, firmware, or hardware, or in one or more combinations thereof, including the structures disclosed herein and their structural equivalents.
[0116] Some of the descriptions herein emphasize the structural independence of the configurations of system components (e.g., arbitration components) and illustrate one grouping of the operations and responsibilities of these system components. Other groupings that perform similar overall operations are understood to be within the scope of this application. Modules may be implemented in hardware or as computer instructions on non-temporary computer-readable storage media, and modules may be distributed across various hardware-based or computer-based components.
[0117] The systems described above may provide any or more of these components, which may be provided on a standalone system or on multiple instances in a distributed system. Furthermore, the systems and methods described above may be provided as one or more computer-readable programs or executable instructions embodied on or within one or more manufactured articles. Manufactured articles may be cloud storage, hard disks, CD-ROMs, flash memory cards, PROMs, RAMs, ROMs, or magnetic tapes. Generally, computer-readable programs may be implemented in any programming language such as LISP, PERL, C, C++, C#, PROLOG, or in any bytecode language such as JAVA. Software programs or executable instructions may be stored as object code on or within one or more manufactured articles.
[0118] Exemplary and non-limiting module implementation elements include: sensors that provide any value determined herein; sensors that provide any value that precedes the value determined herein; data link or network hardware including communication chips, oscillator crystals, communication links, cables, twisted pair wiring, coaxial wiring, shielded wiring, transmitters, receivers, or transceivers; logic circuits; hardwired logic circuits; reconfigurable logic circuits in certain non-transient states configured according to module specifications; any actuators including at least electrical, hydraulic, or pneumatic actuators; solenoids; operational amplifiers; analog control elements (springs, filters, integrators, adders, dividers, gain elements); or digital control elements.
[0119] The subjects and operations described herein may be implemented in digital electronic circuits, or in computer software, firmware, or hardware including the structures disclosed herein and their structural equivalents, or in one or more combinations thereof. The subjects described herein may be implemented as one or more computer programs, e.g., one or more circuits of computer program instructions encoded on one or more computer storage media for execution by a data processing device or for controlling the operation of a data processing device. Alternatively or additionally, program instructions may be encoded on artificially generated propagating signals, e.g., mechanically generated electrical, optical, or electromagnetic signals generated to encode information about transmission to a suitable receiving device for execution by a data processing device. Computer storage media may be, or include, computer-readable storage devices, computer-readable storage boards, random or serial access memory arrays or devices, or one or more combinations thereof. Computer storage media are not propagating signals, but computer storage media may be the source or destination of computer program instructions encoded on artificially generated propagating signals. Computer storage media may also consist of, or include, one or more separate components or media (e.g., multiple CDs, disks, or other storage devices, including cloud storage). The operations described herein may be implemented as operations performed by a data processing device with respect to data stored in or received from one or more computer-readable storage devices.
[0120] The terms “computing device,” “component,” or “data processing device” encompass a wide range of devices, machines, and equipment for processing data, including, for example, programmable processors, computers, systems on a chip, or a combination thereof. A device may include specialized logic circuits, such as FPGAs (Field-Programmable Gate Arrays) or ASICs (Application-Specific Integrated Circuits). In addition to hardware, a device may also include code that generates the execution environment for the computer program, such as processor firmware, protocol stacks, database management systems, operating systems, cross-platform runtime environments, virtual machines, or code comprising one or more of these. Devices and execution environments can realize a variety of different computing model infrastructures, such as web services, distributed computing, and grid computing infrastructure.
[0121] Computer programs (also known as programs, software, software applications, apps, scripts, or code) can be written in any form of programming language, including compiled or interpreted languages, declarative or procedural languages, and can be deployed in any form, including as standalone programs or as modules, components, subroutines, objects, or other units suitable for use in a computing environment. Computer programs can correspond to files in a file system. Computer programs can be stored in a single file dedicated to the program, in a part of a file that holds other programs or data (e.g., one or more scripts stored in a markup language document), or in a set of coordinated files (e.g., a file that stores one or more modules, subprograms, or parts of code). Computer programs can be deployed to run on one computer, or on multiple computers located in one site, or distributed across multiple sites and interconnected by a communication network.
[0122] The processes and logic flows described herein may be executed by one or more programmable processors running one or more computer programs, performing their operations by operating on input data and producing outputs. Processes and logic flows may also be executed by special-purpose logic circuits, such as FPGAs (Field-Programmable Gate Arrays) or ASICs (Application-Specific Integrated Circuits), and devices may also be implemented as special-purpose logic circuits, such as FPGAs (Field-Programmable Gate Arrays) or ASICs (Application-Specific Integrated Circuits). Devices suitable for storing computer program instructions and data may include non-volatile memory, media, and memory devices, such as semiconductor memory devices like EPROMs, EEPROMs, and flash memory devices, magnetic disks such as internal hard disks or removable disks, magneto-optical disks, and CD-ROMs and DVD-ROM disks, for example. Processors and memory may be supplemented or incorporated by special-purpose logic circuits.
[0123] The subjects described herein may be implemented, for example, as a computing system including a backend component as a data server, or a computing system including a middleware component, for example, an application server, or a computing system including a frontend component, for example, a client computer having a graphical user interface or web browser on which a user can interact with one implementation of the subject described herein, or in a combination of one or more such backend, middleware, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication, for example, a communication network. Embodiments of communication networks include local area networks ("LANs") and wide area networks ("WANs"), internetworks (e.g., the Internet), and peer-to-peer networks (e.g., ad-hoc peer-to-peer networks).
[0124] While the operations are depicted in the drawings in a specific order, such operations are not required to be performed in the specific order shown or in a sequential order, and not all shown operations are required to be performed. The operations described herein may be performed in different orders.
[0125] While several exemplary implementations have been described here, it is clear that these are illustrative, not limiting, and are presented as examples only. In particular, many of the embodiments presented herein involve specific combinations of method actions or system elements, but these actions and elements may be combined in other ways to achieve the same objective. Actions, elements, and features discussed in relation to one implementation are not intended to be excluded from other implementations or similar roles in other implementations.
[0126] The words and terms used herein are for illustrative purposes only and should not be considered limiting. The use herein of “including,” “comprising,” “having,” “containing,” “involving,” “characterized by,” “characterized in that,” and their variations is intended to encompass the items listed thereafter, their equivalents, and additional items, as well as alternative embodiments consisting only of the items listed thereafter. In one implementation, the systems and methods described herein consist of one, any combination of two or more, or all of the elements, actions, or components described.
[0127] Any singular reference to an implementation, element, or act of a system or method herein may also encompass implementations containing multiple such elements, and any plural reference to any implementation, element, or act herein may also encompass implementations containing only a single element. Singular or plural references are not intended to limit the systems or methods, their components, acts, or elements currently disclosed to one or more configurations. Any reference to an act or element based on any information, act, or element may include implementations in which the act or element is at least partially based on any information, act, or element.
[0128] Any implementation disclosed herein may be combined with any other implementation or embodiment. References such as “an implementation,” “several implementations,” and “one implementation” are not necessarily mutually exclusive and are intended to indicate that certain features, structures, or characteristics described in relation to an implementation may be included in at least one implementation or embodiment. Not all such terms used herein necessarily refer to the same implementation. Any implementation may be combined with any other implementation, comprehensively or exclusively, in any manner consistent with the aspects and implementations disclosed herein.
[0129] References to “or” can be interpreted as comprehensive, so that any term described using “or” may refer to one, two or more, or any of all the terms described. For example, a reference to “at least one of “A” and “B” may include “A” only, “B” only, and both “A” and “B.” Such references, used in conjunction with “comprising” or other open terms, may include further items.
[0130] Where reference numerals follow drawings, detailed descriptions, or technical features in any claim, they are included to enhance the clarity of the drawings, detailed descriptions, and claims. Therefore, neither the presence nor absence of reference numerals has a limiting effect on the scope of the elements of any claim.
[0131] Without substantially departing from the teachings and benefits of the subject matter disclosed herein, modifications to the described elements and actions may occur, including variations in size, dimensions, structure, shape and proportions, parameter values, mounting arrangements, use of materials, color, and orientation of various elements. For example, elements shown as integrally formed may consist of multiple parts or elements, the positions of elements may be reversed or otherwise altered, and the properties or number of discrete elements or positions may be changed or altered. Other substitutions, modifications, alterations, and omissions may also be made in the design, operating conditions, and arrangement of the disclosed elements and actions without departing from the scope of this disclosure.
[0132] The systems and methods described herein may be embodied in other specific forms without departing from their characteristics. Therefore, the scope of the systems and methods described herein is indicated more by the appended claims than by the foregoing description, and any modifications that fall within the meaning and equivalence of the claims are included therein.
[0133] This specification includes details of many specific implementations, which should not be interpreted as limitations on the scope of the invention or what can be claimed, but rather as descriptions of features specific to particular embodiments of a particular aspect. Specific features described herein in the context of separate embodiments may also be implemented in combination in a single embodiment. Conversely, various features described in the context of a single embodiment may also be implemented individually or in any suitable subcombination in multiple embodiments. Furthermore, features may be described above as operating in a particular combination, and may even be initially claimed as such; however, in some cases, one or more features from a claimed combination may be removed from the combination, and the claimed combination may cover subcombinations or variations of subcombinations.
[0134] Similarly, although the operations are depicted in a specific order in the drawings, this should not be understood as requiring that such operations be performed in a specific or sequential order, or that all shown operations be performed, in order to achieve the desired result. Under certain circumstances, multitasking and parallel processing may be advantageous. Furthermore, the separation of various system components in the embodiments described above should not be understood as requiring such separation in all embodiments, and it should be understood that, generally, the described program components and systems can be integrated into a single software product or packaged into multiple software products.
[0135] Accordingly, specific embodiments of the subject matter have been described. In some cases, the operations described in the claims may be performed in a different order to achieve the desired results. Furthermore, the processes depicted in the accompanying figures do not necessarily require the specific order or sequence shown to achieve the desired results.
Claims
1. A metering device positioned on the power distribution grid detects a decrease in electrical characteristics below a threshold indicating a fault on the power distribution grid, The metering device generates a time series of the rate of change of the electrical characteristics for a predetermined number of cycles following the detection of the decrease, in response to the decrease in the electrical characteristics falling below the threshold. The position of the metering device on the power distribution grid relative to the location of the fault on the power distribution grid is determined by the metering device, or at least one of one or more processors communicating with the metering device, based on a comparison of the time series of the rate of change with a predetermined pattern. Methods that include...
2. The method according to claim 1, wherein the electrical characteristics correspond to the voltage characteristics measured by the metering device.
3. The method according to claim 1, wherein the electrical characteristics correspond to the characteristics of the current measured by the metering device.
4. The aforementioned metering device triggers a power outage notification (PON) in response to the detected decrease in the electrical characteristics, The metering device generates the time series of the rate of change of the electrical characteristics for a predetermined number of cycles in response to the triggered PON. The method according to claim 1, including the method described in claim 1.
5. The method according to claim 1, further comprising determining the rate of change of the electrical characteristic based on the time derivative of the root mean square (RMS) of one of the voltage signal or current signal using the metering device.
6. The method according to claim 1, wherein the predetermined pattern includes at least an uphill slope and a downhill slope, and the declination of the downhill slope is greater than the inclination of the uphill slope.
7. The method according to claim 6, comprising determining by the weighing device that the position of the weighing device is located downstream of a first subset of weighing devices and upstream of a second subset of weighing devices, based on the predetermined pattern, wherein the uphill slope is associated with the first subset of weighing devices upstream of the position of the weighing device, and the downhill slope is associated with the second subset of weighing devices downstream of the position of the weighing device.
8. The distribution grid includes a second metering device located at a different position from the metering device, The second metering device detects a second decrease in the electrical characteristics that falls below the threshold indicating a fault on the power distribution grid, The second measuring device generates a second time series of the second rate of change of the electrical characteristic for a predetermined number of cycles following the detection of the second decrease in the electrical characteristic, in response to the second decrease in the electrical characteristic below the threshold. The second measuring device determines the position of the second measuring device on the power distribution grid relative to the location of the fault on the power distribution grid, based on a second comparison of the second time series of the second rate of change with the predetermined pattern. The method according to claim 1, including the method described in claim 1.
9. The method according to claim 1, wherein the metering device provides, via a network, a computing system including one or more processors coupled to memory, with an indication of the location of at least one of the second metering devices or faults on the power distribution grid.
10. The computing system receives multiple time series of rate of change generated by multiple metering devices located on the distribution grid in response to a decrease in electrical characteristics, The computing system normalizes the values of the multiple time series, The computing system determines the likelihood of the failure location in each of the multiple measuring devices based on the normalized values of the multiple time series, The computing system determines, based on the likelihood, that the failure is located upstream of the first measuring device and downstream of the second measuring device. The method according to claim 1, including the method described in claim 1.
11. A metering device located on a power distribution grid, comprising one or more processors and memory, To detect a decrease in electrical characteristics below a threshold indicating a fault on the aforementioned power distribution grid, In response to the decrease in the electrical characteristics below the threshold, a time series of the rate of change of the electrical characteristics for a predetermined number of cycles following the detection of the decrease is generated. Based on a comparison of the time series of the rate of change with a predetermined pattern, the position of the metering device on the power distribution grid relative to the location of the fault on the power distribution grid is determined. The weighing device is configured to perform the following: A system that includes this.
12. The system according to claim 11, wherein the electrical characteristics correspond to the voltage characteristics measured by the metering device.
13. The system according to claim 11, wherein the electrical characteristics correspond to the current characteristics measured by the metering device.
14. The aforementioned metrology device is, In response to the detected decrease in the electrical characteristics, a power outage notification (PON) is triggered. In response to the triggered PON, the time series of the rate of change of the electrical characteristics for a predetermined number of cycles is generated. The system according to claim 11, configured to perform the following:
15. The system according to claim 11, wherein the measuring device determines the rate of change of the electrical characteristic based on the time derivative of the root mean square (RMS) of one of the voltage signal or current signal.
16. The system according to claim 11, wherein the predetermined pattern includes at least an uphill slope and a downhill slope, and the declination of the downhill slope is greater than the inclination of the uphill slope.
17. The weighing device is configured to determine, based on a predetermined pattern, that the position of the weighing device is downstream of a first subset of weighing devices and upstream of a second subset of weighing devices, wherein the uphill slope is associated with the first subset of weighing devices upstream of the position of the weighing device, and the downhill slope is associated with the second weighing device downstream of the position of the weighing device, according to claim 16.
18. The distribution grid includes a second metering device located at a different position from the metering device, and the second metering device is To detect a second decrease in the electrical characteristics that falls below the threshold indicating a fault on the distribution grid, In response to the second decrease in the electrical characteristics falling below the threshold, a second time series of the second rate of change of the electrical characteristics for a predetermined number of cycles following the detection of the second decrease is generated. Based on a second comparison of the second time series of the second rate of change with the predetermined pattern, the position of the second metering device on the power distribution grid relative to the position of the fault on the power distribution grid is determined. The system according to claim 11, configured to perform the following:
19. When executed by one or more processors in a computing system, one or more processors, In response to a decrease in electrical characteristics, the system receives multiple time series of rate of change generated by multiple metering devices located on the power distribution grid, Normalizing the values of the aforementioned multiple time series, Based on the normalized values of the plurality of time series, the likelihood of the failure location in each of the plurality of measuring devices is determined. The method involves determining, based on the likelihood, whether the failure is located upstream of the first measuring device or downstream of the second measuring device. In response to the determination, the location of the fault upstream of the first weighing device and downstream of the second weighing device is to be displayed. A non-temporary, computer-readable storage medium that stores instructions for performing a certain action.
20. The non-temporary computer-readable storage medium according to claim 19, wherein providing the indication includes an instruction to provide the indication of the location of the fault to a device located away from the computing system in order to facilitate the repair of the fault.
Citation Information
Patent Citations
Short-circuit point locating device, short-circuit point locating method, and program
JP2012220383A
Method and system for locating the source of events in power distribution systems using distribution-level PMU data
US20190379209A1