Power scheduling method and apparatus, and computer readable storage medium

By obtaining and processing the channel's transmit power upper limit and estimated transmit power, combined with the base station's scheduling strategy and demodulation capabilities, the appropriate total transmit power is calculated, solving the problem of transmit power calculation in a single radio frequency multi-UE scenario and ensuring The base station demodulates correctly and avoids power oversaturation.

WO2024212504A1PCT designated stage expired Publication Date: 2024-10-17ZTE CORP
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2023/131101
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-12
Filing Date
2023-11-10
Publication Date
2024-10-17

AI Technical Summary

Technical Problem

In a single radio frequency multi-UE scenario, the existing technology cannot effectively calculate the transmit power of each UE, resulting in the total transmit power being unable to meet the needs of each UE, and there is a near-point power oversaturation problem.

Method used

By obtaining the upper limit of transmit power and estimated transmit power of multiple channels, combined with the scheduling strategy and demodulation capabilities of the base station, the actual transmit power of each channel is determined, and the test equipment is calculated based on the scheduling situation within the transmission time interval of the base station. The total transmit power ensures that the appropriate total transmit power meets the base station demodulation requirements and avoids power oversaturation.

Benefits of technology

It realizes the calculation of the total transmit power of an appropriate size in a single radio frequency multi-UE scenario, meeting the requirements of correct demodulation of the base station, while avoiding the problem of near-point power oversaturation and meeting the needs of remote services.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023131101_17102024_PF_FP_ABST
    Figure CN2023131101_17102024_PF_FP_ABST
Patent Text Reader

Abstract

The present application provides a power scheduling method and apparatus, and a computer readable storage medium. The power scheduling method comprises: acquiring a transmission power upper limit value and estimated transmission power of each channel in a plurality of channels; determining actual transmission power of each channel in the plurality of channels according to the transmission power upper limit value and the estimated transmission power of each channel in the plurality of channels; and determining total transmission power of a test device within a transmission time interval according to a scheduling condition of each channel in the plurality of channels by a base station within the transmission time interval and the actual transmission power of each channel in the plurality of channels.
Need to check novelty before this filing date? Find Prior Art

Description

Power scheduling method and device, and computer-readable storage medium

[0001] This disclosure claims priority to Chinese patent application No. 202310440578.8, filed on April 12, 2023, the entire contents of which are incorporated herein by reference. Technical Field

[0002] The present disclosure relates to the field of communications, and in particular to a power scheduling method and apparatus, and a computer-readable storage medium. Background Art

[0003] Related communication protocols describe methods for calculating transmit power on the user equipment (UE) side when sending data to a base station. This method effectively improves transmit power calculation accuracy. Furthermore, these protocols incorporate a certain amount of power redundancy when calculating UE transmit power.

[0004] Summary of the Invention

[0005] In one aspect, an embodiment of the present disclosure provides a power scheduling method. The power scheduling method includes: obtaining a transmit power upper limit value and an estimated transmit power of each channel among a plurality of channels;

[0006] determining an actual transmit power for each of the plurality of channels based on a transmit power upper limit value and an estimated transmit power for each of the plurality of channels; and

[0007] The total transmission power of the test device within the transmission time interval is determined according to the scheduling status of each of the multiple channels by the base station within the transmission time interval and the actual transmission power of each of the multiple channels.

[0008] In another aspect, an embodiment of the present disclosure provides a power scheduling device, which includes an acquisition unit and a processing unit.

[0009] an acquisition unit, configured to acquire a transmit power upper limit value and an estimated transmit power of each of the plurality of channels;

[0010] a processing unit, configured to determine an actual transmit power for each of the plurality of channels based on a transmit power upper limit value and an estimated transmit power for each of the plurality of channels; and

[0011] The processing unit is further configured to determine the total transmission power of the test device within the transmission time interval according to the scheduling of each of the multiple channels by the base station within the transmission time interval and the actual transmission power of each of the multiple channels.

[0012] On the other hand, an embodiment of the present disclosure provides a communication device, including: a memory and a processor; the memory and the processor are coupled; the memory is used to store a computer program; and the processor implements the power scheduling method of any of the above aspects when executing the computer program.

[0013] In another aspect, a computer-readable storage medium is provided, wherein computer program instructions are stored on the computer-readable storage medium, and when the computer program instructions are executed by a processor, the power scheduling method according to any one of the above aspects is implemented.

[0014] In another aspect, a computer program product is provided, which includes computer program instructions, and when the computer program instructions are executed by a processor, the power scheduling method according to any one of the above aspects is implemented. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the technical solutions in the present disclosure, the following briefly introduces the drawings required for use in some embodiments of the present disclosure. Obviously, the drawings described below are only drawings of some embodiments of the present disclosure. For those of ordinary skill in the art, other drawings can also be obtained based on these drawings. In addition, the drawings described below can be regarded as schematic diagrams and are not intended to limit the actual size of the products involved in the embodiments of the present disclosure, the actual process of the method, the actual timing of the signals, etc.

[0016] FIG1 is a schematic diagram of the architecture of a communication system according to some embodiments.

[0017] FIG2 is a schematic flow chart of a power scheduling method according to some embodiments.

[0018] FIG3 is a flowchart of yet another power scheduling method according to some embodiments.

[0019] FIG4 is a schematic flow chart of yet another power scheduling method according to some embodiments.

[0020] FIG5 is a schematic structural diagram of a power scheduling device according to some embodiments.

[0021] FIG6 is a schematic structural diagram of yet another power scheduling device according to some embodiments. DETAILED DESCRIPTION

[0022] To help those skilled in the art better understand the technical solutions of the embodiments of the present disclosure, the technical solutions in some embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings in the present disclosure. Obviously, the described embodiments are only some of the embodiments of the present disclosure, not all of them. Based on the embodiments provided by the present disclosure, all other embodiments obtained by those skilled in the art are within the scope of protection of the present disclosure.

[0023] Unless the context requires otherwise, throughout the specification and claims, the term "comprise" and other forms, such as the third person singular form "comprises" and the present participle form "comprising", are to be interpreted as open and inclusive, that is, "including, but not limited to". In the description of the specification, the terms "one embodiment", "some embodiments", "exemplary embodiments", "example", "specific example" or "some examples" are intended to indicate that a particular feature, structure, material or characteristic associated with the embodiment or example is included in at least one embodiment or example of the present disclosure. The schematic representation of the above terms does not necessarily refer to the same embodiment or example. In addition, the particular features, structures, materials or characteristics may be included in any one or more embodiments or examples in any appropriate manner.

[0024] In the following, the terms "first" and "second" are used for descriptive purposes only and should not be understood to indicate or imply relative importance or implicitly specify the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of such features. In the description of the embodiments of the present disclosure, unless otherwise specified, "plurality" means two or more.

[0025] “At least one of A, B and C” has the same meaning as “at least one of A, B or C” and both include the following combinations of A, B and C: A only, B only, C only, A and B, A and C, B and C, and A, B and C.

[0026] "A and / or B" includes the following three combinations: A only, B only, and A and B.

[0027] The use of "adapted to" or "configured to" herein is intended to be open and inclusive language that does not exclude being adapted to or configured to perform additional tasks or steps.

[0028] Additionally, the use of “based on” is meant to be open and inclusive, as a process, step, calculation, or other action “based on” one or more stated conditions or values ​​may, in practice, be based on additional conditions or values ​​beyond those stated.

[0029] In some technical communication protocols, when a user equipment (UE) sends data to a base station, a method for calculating the UE transmit power on the UE side is described, which can effectively improve the accuracy of the transmit power calculation.

[0030] At the same time, the protocols in these technologies actually have a certain amount of power redundancy when calculating UE transmit power. In a single-frequency, single-UE scenario, the aforementioned redundant power is a reliable guarantee. However, in a single-radio, multiple-UE scenario, for example, a test device uses a single radio to send data from different sources to a base station, such as data from multiple UEs. At this time, if there is redundancy in the transmit power for each UE, the actual total transmit power of the device cannot meet the transmit power calculated by the communication protocols in these technologies for each UE. Therefore, in a single-radio, multiple-UE scenario, the protocols in these technologies cannot be directly used to calculate the transmit power of each UE.

[0031] To address the shortcomings of some of the aforementioned technologies, the present disclosure provides a power scheduling method and apparatus that enables test equipment to calculate the appropriate total transmit power for multiple UEs using a single radio frequency, ensuring accurate demodulation at the base station. Furthermore, because the total transmit power is adjusted based on the base station's needs, this eliminates the problem of near-point power oversaturation while also meeting the requirements of long-range services.

[0032] The power scheduling method and apparatus provided by the present disclosure are described in detail below in conjunction with the accompanying drawings. It should be noted that the various embodiments of the present disclosure can refer to or be mutually referenced. For example, the same or similar steps, method embodiments, system embodiments, and apparatus embodiments can all refer to each other without limitation.

[0033] The technical solutions provided by the embodiments of the present disclosure can be applied to various communication systems, for example, new radio (NR) communication systems using fifth-generation mobile communication technology (5G), future evolution systems, or multiple communication convergence systems.

[0034] For example, as shown in FIG1 , FIG1 is a schematic diagram of the architecture of a communication system 10 according to some embodiments. The communication system 10 may include one or more test devices 101 and one or more base stations 102. The test devices 101 may be communicatively connected to the base stations 102. FIG1 shows only one test device 101 and one base station 102.

[0035] The test device 101 is used to: obtain the transmission power upper limit value and the estimated transmission power of each channel in the multiple channels; determine the actual transmission power of each channel in the multiple channels based on the transmission power upper limit value and the estimated transmission power of each channel in the multiple channels; determine the total transmission power of the test device in the transmission time interval based on the scheduling of each channel in the multiple channels by the base station in the transmission time interval and the actual transmission power of each channel in the multiple channels.

[0036] It should be understood that the transmission time interval mentioned here is the Transport Time Interval (TTI). Furthermore, the test device 101 mentioned above is merely a designation for a device used in some embodiments of the present disclosure to transmit data to multiple UEs using a single radio frequency, and does not imply that the test device can only be used for testing. The test device manages or includes multiple UEs.

[0037] In some embodiments, the test device 101 can be a large-capacity device with wireless communication capabilities (e.g., a server integrating a large number of boards). The test device 101 can be deployed on land, including indoors or outdoors, and can be handheld or vehicle-mounted. The test device 101 can also be deployed on water (e.g., a ship). The test device 101 can also be deployed in the air (e.g., an airplane, a balloon, or a satellite).

[0038] In some embodiments, base station 102 may be a device with wireless transceiver functionality or a chip or chip system that may be provided in the device. Base station 102 includes, but is not limited to, a small base station, a wireless access point, a transmission receive point (TRP), a transmission point (TP), a macro base station, a relay base station, and any other access node.

[0039] It should be noted that Figure 1 is only an exemplary framework diagram. The number of nodes and the names of the devices included in Figure 1 are not restricted. In addition to the functional nodes shown in Figure 1, the communication system 10 can also include other nodes, such as core network devices. This disclosure does not impose any restrictions on this.

[0040] The application scenarios of the embodiments of the present disclosure are not limited. The system architecture and business scenarios described in the embodiments of the present disclosure are intended to more clearly illustrate the technical solutions of the embodiments of the present disclosure and do not constitute a limitation on the technical solutions provided by the embodiments of the present application. It is known to those skilled in the art that with the evolution of network architecture and the emergence of new business scenarios, the technical solutions provided by the embodiments of the present disclosure are also applicable to similar technical problems.

[0041] It should be noted that the power scheduling method provided in some embodiments of the present disclosure is performed by a test device. The test device can be an electronic device (e.g., a computer terminal, a server), a processor in an electronic device, a control module for power scheduling in an electronic device, or a client for power scheduling in an electronic device.

[0042] For example, as shown in FIG2 , FIG2 is a flow chart of a power scheduling method according to some embodiments, including S201 - S203 .

[0043] S201: The test device obtains a transmit power upper limit value and an estimated transmit power of each of a plurality of channels.

[0044] In some embodiments, the multiple channels include at least one of a physical uplink control channel (PUCCH), a physical uplink shared channel (PUSCH), a sounding reference signal (SRS) channel, and a physical random access channel (PRACH).

[0045] It can be understood that the upper limit of the transmit power of each of the above-mentioned multiple channels is the maximum transmit power that can be scheduled on each channel when the test equipment uses a single radio frequency to send multi-UE data.

[0046] Similarly, the estimated transmit power of each of the multiple channels is the transmit power calculated by the test equipment on each channel according to the current channel protocol in a scenario where a single radio frequency is used to transmit data to multiple UEs.

[0047] In some embodiments, the test device determines a transmit power upper limit for each of the multiple channels based on at least one of a scheduling policy of the base station, a maximum transmit power supported by the test device, and a demodulation capability of the base station. The scheduling policy of the base station indicates a maximum number of resource blocks that each of the multiple channels may occupy within a preset bandwidth within a transmission time interval.

[0048] It should be noted that the detailed process of the test device determining the upper limit value of the transmission power of each channel in the multiple channels can be found in S301 below, which will not be repeated here.

[0049] In some embodiments, the test device determines an estimated transmit power for each of the multiple channels based on power configuration parameters for each of the multiple channels. The power configuration parameters are parameters configured by the base station based on the current channel protocol and used to calculate the transmit power for each channel. Exemplarily, the power configuration parameters may include: a base station's basic expected power, a base station closed-loop control amount, a power compensation amount for a modulation and coding scheme (MCS) for a single stream, and path loss.

[0050] It should be noted that the detailed process of the test device determining the estimated transmit power of each of the multiple channels can be found in S302 below, which will not be repeated here.

[0051] S202: The testing device determines the actual transmit power of each of the multiple channels according to the transmit power upper limit value and the estimated transmit power of each of the multiple channels.

[0052] In some embodiments, for each of the multiple channels, the test device uses a minimum value between the channel's transmit power upper limit and the estimated transmit power as the channel's actual transmit power.

[0053] It can be understood that, in this embodiment, after the execution of this step, the actual transmission power of each channel is the minimum value determined after comparing the transmission power upper limit value of the channel with the actual transmission power, thereby ensuring that the actual transmission power of each channel will not exceed the transmission power upper limit value determined in S201, thereby avoiding the total transmission power of the test equipment being too large and failing to meet the transmission power requirements of some UEs.

[0054] In addition, based on actual application scenarios, the actual channel transmit power must not be less than the channel's minimum transmit power. That is, if the channel's estimated transmit power is smaller than the channel's transmit power ceiling and estimated transmit power, and the estimated transmit power is less than the test equipment's minimum RF transmit power for that channel, then the channel's actual transmit power equals the test equipment's minimum RF transmit power for that channel.

[0055] S203: The test device determines the total transmit power of the test device within the transmission time interval according to the scheduling of each of the multiple channels by the base station within the transmission time interval and the actual transmit power of each of the multiple channels.

[0056] The scheduling situation of each channel in the multiple channels by the base station in the transmission time interval includes the scheduling situation of each channel in the multiple channels by the base station in the transmission time interval.

[0057] Generally speaking, the downlink control information (DCI) carried in the Physical Downlink Shared Channel (PDSCH) contains the base station's scheduling information for each channel. Accordingly, the test equipment can determine the base station's scheduling information for each channel by obtaining the DCI in the PDSCH.

[0058] In some embodiments, the test device determines the total transmission power of each channel in multiple channels based on the scheduling status of the channel and the actual transmission power of the channel; thereafter, the test device determines the total transmission power of the test device within the transmission time interval based on the total transmission power of each channel in the multiple channels.

[0059] It should be noted that the detailed process of the test device determining the total transmission power of the test device within the transmission time interval can be found in the following S401-S402, which will not be repeated here.

[0060] In the technical solution provided by the embodiment of the present disclosure, the test equipment first calculates the upper limit of the test equipment's transmit power for each channel, and calculates the estimated transmit power of the test equipment for each channel based on the current communication protocol, and determines the actual transmit power of the channel based on the transmit power upper limit and the estimated transmit power of each channel, thereby deriving a suitable total transmit power for the test equipment. After that, the test equipment combines the base station's scheduling of the test equipment on each channel and the actual transmit power of each channel to comprehensively calculate a total transmit power of the test equipment of a suitable size to meet the base station's requirements for correct demodulation. In addition, since the total transmit power takes into account the base station's scheduling, it can meet the requirements of long-distance services while avoiding the problem of near-point power oversaturation.

[0061] For example, as shown in FIG3 , FIG3 is a flow chart of another power scheduling method according to some embodiments. In S201 , the test device obtains the transmission power upper limit value and the estimated transmission power of each channel in multiple channels, which may include S301 and S302 .

[0062] S301. The test device determines a transmit power upper limit value of each of a plurality of channels according to at least one of a scheduling policy, a maximum transmit power supported by the test device, and a demodulation capability of a base station.

[0063] The scheduling policy of the base station is used to indicate the maximum number of resource blocks occupied by each of the multiple channels on the preset bandwidth within the transmission time interval. Acquisition of the scheduling policy of the base station is a mature technology in this field and will not be described in detail here.

[0064] In some embodiments, the test device determines the minimum received power of a signal transmitted by a base station to a terminal device at a predetermined distance, based on the base station's demodulation capability. The test device also determines the upper limit of the PUCCH transmit power based on the minimum received power and the path loss between the base station and the terminal device at the predetermined distance. The minimum received power is used to ensure that the base station can demodulate the signal.

[0065] The following describes a method for determining the upper limit of the transmit power of each of the multiple channels.

[0066] (1) Calculation of the upper limit of the PUCCH transmission power.

[0067] 1.1. The test equipment determines the minimum received power of a signal sent by a terminal device at a preset distance from the base station based on the base station's demodulation capability. The minimum received power is used to ensure signal demodulation.

[0068] In some embodiments, the predetermined distance point is selected as a point where the reference signal receiving power (RSRP) is -108 dBm. It is understood that determining the minimum received power of a signal transmitted by a base station to a terminal device at a predetermined distance point is a mature technology in the art and will not be further described here.

[0069] 1.2. The test equipment determines the upper limit of the PUCCH transmit power based on the minimum received power and the path loss between the base station and the terminal device at the preset distance point. It should be noted that the upper limit of the PUCCH transmit power calculated by the test equipment here is at the resource block level.

[0070] (2) Calculation of the upper limit of the PUSCH transmission power.

[0071] 2.1. The test device determines a first power according to the upper limit of the PUCCH transmit power and the maximum number of resource blocks occupied by the PUCCH.

[0072] The test equipment determines that the first power satisfies the following formula 1 based on the upper limit of the PUCCH transmit power and the maximum number of resource blocks occupied by the PUCCH:

[0073] In formula 1, P1 represents the first power, Indicates the upper limit of the PUCCH transmission power, N pucch Indicates the maximum number of resource blocks occupied by PUCCH.

[0074] 2.2. The test device determines the second power according to the maximum transmit power of the test device and the first power.

[0075] The test device determines that the second power satisfies the following formula 2 based on the maximum transmit power of the test device and the first power: P2=P max -P1 Formula 2

[0076] In formula 2, P2 represents the second power, P max Indicates the maximum transmit power of the test device, and P1 indicates the first power.

[0077] It is understood that the second power represents the remaining power for PUSCH in the test device's maximum transmit power after scheduling transmit power for PUCCH. The reason why the PUSCH transmit power upper limit is not directly obtained in this step is that the power required by the base station varies depending on the MCS and modulation order. Therefore, all the remaining power in the test device's maximum transmit power can be allocated to PUSCH.

[0078] 2.3. The test equipment determines the upper limit of the PUSCH transmit power based on the second power and the maximum number of resource blocks occupied by the PUSCH.

[0079] The test equipment determines that the upper limit of the PUSCH transmit power satisfies the following formula 3 based on the second power and the maximum number of resource blocks occupied by the PUSCH:

[0080] In formula 3, Indicates the upper limit of the PUSCH transmission power, P2 indicates the second power, N pusch Indicates the maximum number of resource blocks occupied by PUSCH.

[0081] (3) Calculation of the upper limit of PRACH transmission power.

[0082] 3.1. The test equipment determines the upper limit of the transmit power of the SRS channel based on the maximum transmit power of the test equipment and the maximum number of resource blocks occupied by the SRS channel.

[0083] The test equipment determines that the upper limit of the transmit power of the SRS channel satisfies the following formula 4 based on the maximum transmit power of the test equipment and the maximum number of resource blocks occupied by the SRS channel: srs =P max / N max Formula 4

[0084] In formula 4, P srs Indicates the upper limit of the transmission power of the SRS channel, P max Indicates the maximum transmit power of the test equipment, N max Indicates the maximum number of resource blocks occupied by the SRS channel.

[0085] In one embodiment, S301 may be executed by a data processing module included in the test device described above, so that the test device determines the upper limit of the transmission power of the SRS channel based on the maximum transmission power of the test device and the maximum number of resource blocks occupied by the SRS channel.

[0086] 3.2. The test equipment determines the upper limit of the PRACH transmit power based on the upper limit of the SRS channel transmit power and the maximum number of resource blocks occupied by the PRACH.

[0087] The test equipment determines that the upper limit of the PRACH transmit power satisfies the following formula 5 based on the maximum transmit power of the test equipment, the total number of resource blocks included in the preset bandwidth, and the maximum number of resource blocks occupied by the PRACH:

[0088] In formula 5, Indicates the upper limit of PRACH transmission power, P srs Indicates the upper limit of the transmission power of the SRS channel, N prach Indicates the maximum number of resource blocks occupied by PRACH.

[0089] In one embodiment, S301 may be executed by a data processing module included in the test device described above, so that the test device determines the upper limit of the transmit power of the PRACH based on the upper limit of the transmit power of the SRS channel and the maximum number of resource blocks occupied by the PRACH.

[0090] It should be noted that, similar to the description of the estimated transmit power of the PRACH in S302 below, the transmit power upper limit of the PRACH calculated here is also at the UE level.

[0091] In some embodiments, the test device determines the minimum received power of a signal transmitted by the base station to a terminal device at a predetermined distance, based on the base station's demodulation capability. The test device also determines the upper limit of the PUCCH transmit power based on the minimum received power and the path loss between the base station and the terminal device at the predetermined distance. The minimum received power is used to ensure that the base station can demodulate the signal.

[0092] It is understandable that the maximum number of resource blocks occupied by each channel can be determined according to the scheduling policy of the base station.

[0093] S302: The testing device determines an estimated transmit power of each of the multiple channels according to a power configuration parameter of each of the multiple channels.

[0094] In some embodiments, power configuration parameters may include one or more of the following: base station basic expected power, base station closed-loop control amount, power compensation for MCS under single-stream conditions, and path loss. It is understood that these parameters can be obtained based on the current channel protocol. Obtaining power configuration parameters is a mature technology in the art and will not be further elaborated in this disclosure.

[0095] In some embodiments, the estimated transmit power of the PUCCH satisfies the following formula 6: pucch =P0+Fi+Δ+PL+10*log(2 u *RBNum) Formula 6

[0096] In Formula 6, P pucch represents the estimated transmit power of PUCCH, P0 represents the basic expected power of the base station, Fi represents the closed-loop control value of the base station, Δ represents the power compensation amount of MCS under single stream, PL represents the path loss, u represents the current subcarrier spacing, and RBNum represents the number of resource blocks in the current scheduling unit.

[0097] It should be understood that the path loss PL is estimated based on the downlink power configured by the base station and the actual downlink measurement report of the UE.

[0098] In some embodiments, the estimated transmit power of the PUSCH satisfies the following formula 7: pusch =P0+Fi+Δ+PL+10*log(2 u *RBNum) Formula 7

[0099] In Formula 7, P pusch It represents the estimated transmit power of PUSCH, P0 represents the basic expected power of the base station, Fi represents the closed-loop control value of the base station, Δ represents the power compensation of MCS under single stream, PL represents the path loss, u represents the current subcarrier spacing, and RBNum represents the number of resource blocks in the current scheduling unit.

[0100] In some embodiments, the estimated transmit power of PRACH satisfies the following formula 8: prach =P target +PL Formula 8

[0101] In formula 8, P prach Indicates the estimated transmit power of PRACH, P target It represents the base station configuration parameters of the gateway, and PL represents the path loss.

[0102] It should be noted that the current PRACH channel protocol measures PRACH transmit power at the UE level, not the resource block level. Therefore, the PRACH transmit power should be at the UE level. Furthermore, according to Formulas 1 and 2, the estimated PUCCH and PUSCH transmit powers calculated in this step are both at the resource block level.

[0103] In one embodiment, S302 may be executed by a data processing module included in the test device described above, so that the test device determines the estimated transmit power of each of the multiple channels according to the power configuration parameters of each of the multiple channels.

[0104] In the technical solution provided by the embodiments of the present disclosure, the test equipment can calculate the transmission power upper limit and estimated transmission power of each channel in multiple channels based on the scheduling strategy of the base station, the maximum transmission power supported by the test equipment, the demodulation capability of the base station, and the power configuration parameters of each channel in the multiple channels, so as to facilitate the subsequent smooth calculation of the actual transmission power of each channel in the multiple channels.

[0105] For example, as shown in FIG4 , which is a flow chart of another power scheduling method according to some embodiments, in S203 , the test device determines the total transmission power of the test device within the transmission time interval, including S401 and S402 .

[0106] S401. The test device determines the total transmission power of each of the multiple channels according to the scheduling status of the channel and the actual transmission power of the channel.

[0107] In conjunction with the possible examples of multiple channels in S201, the scheduling status of the base station includes the scheduling status of PUCCH, the scheduling status of PUSCH, the scheduling status of SRS channel, and the scheduling status of PRACH. The scheduling status of each channel is indicated as follows.

[0108] The PUCCH scheduling status is used to indicate the number of resource blocks occupied by the PUCCH on the preset bandwidth within the transmission time interval;

[0109] The PUSCH scheduling status is used to indicate the number of resource blocks occupied by the PUSCH on the preset bandwidth within the transmission time interval;

[0110] The scheduling status of the SRS channel is used to indicate the number of devices that need to transmit the SRS channel within the transmission time interval;

[0111] The PRACH scheduling status is used to indicate the number of devices that need to transmit PRACH within a transmission time interval.

[0112] Therefore, the total transmit power of the PUCCH satisfies the following formula 9: P3 = M1 * Pwr1 Formula 9

[0113] In Formula 9, P3 represents the total transmit power of the PUCCH, M1 represents the number of resource blocks occupied by the PUCCH on the preset bandwidth within the transmission time interval, and Pwr1 represents the actual transmit power of the PUCCH.

[0114] The total transmit power of PUSCH satisfies the following formula 10: P4=M2*Pwr2 Formula 10

[0115] In formula 10, P4 represents the total transmit power of the PUSCH, M2 represents the number of resource blocks occupied by the PUSCH on the preset bandwidth within the transmission time interval, and Pwr2 represents the actual transmit power of the PUSCH.

[0116] The total transmit power of PRACH satisfies the following formula 11: P5 = M3 * Pwr3 Formula 11

[0117] In formula 11, P5 represents the total transmit power of PRACH, M3 represents the number of devices that need to transmit PRACH within the transmission time interval, and Pwr3 represents the actual transmit power of PRACH.

[0118] S402: The test device determines the total transmission power of the test device within the transmission time interval according to the total transmission power of each channel in the multiple channels.

[0119] In some embodiments, in combination with formulas 9-11 in S401, the test device determines that the total transmission power of the test device in the transmission time interval satisfies the following formula 12 based on the total transmission power of each channel in the multiple channels: sum =P3+P4+P5 Formula 12

[0120] P sum Indicates the total transmit power of the test device within the transmission time interval. P3 indicates the total transmit power of PUCCH, P4 indicates the total transmit power of PUSCH, and P5 indicates the total transmit power of PRACH.

[0121] It is understandable that the test device can also combine the above S401 and S402 to directly determine the total transmission power of the test device within the transmission time interval based on the scheduling status and actual transmission power of each channel in the multiple channels. In this case, the following formula 13 is satisfied: sum =M1*Pwr1+M2*Pwr2+M3*Pwr3 Formula 13

[0122] P sum Indicates the total transmit power of the test device during the transmission time interval. M1 indicates the number of resource blocks occupied by PUCCH on the preset bandwidth during the transmission time interval. Pwr1 indicates the actual transmit power of PUCCH. M2 indicates the number of resource blocks occupied by PUSCH on the preset bandwidth during the transmission time interval. Pwr2 indicates the actual transmit power of PUSCH. M3 indicates the number of devices that need to transmit PRACH during the transmission time interval. Pwr3 indicates the actual transmit power of PRACH.

[0123] In the technical solution provided by the embodiments of the present disclosure, the test equipment can calculate the total transmission power of the test equipment in combination with the scheduling situation of the base station after determining the actual transmission power of each channel in multiple channels.

[0124] It should be noted that among the 13 formulas above, the power unit used in formulas 6-8 is dBm, while the power values ​​involved in the remaining formulas are all linear power values, not dBm. Therefore, unit conversion is required during the actual calculation of formulas 1-3, 9-13.

[0125] The embodiments of the present disclosure can divide the power dispatching device that executes the above-mentioned method example into functional modules or functional units. For example, each functional module or functional unit can be divided according to each function, or two or more functions can be integrated into one processing module. The above-mentioned integrated module can be implemented in the form of hardware or in the form of software functional modules or functional units. The division of modules or units in the embodiments of the present disclosure is schematic and is only a logical functional division. There may be other division methods in actual implementation.

[0126] 5 is a schematic structural diagram of a power scheduling device according to some embodiments. The power scheduling device 500 includes: an acquisition unit 501 and a processing unit 502.

[0127] The acquisition unit 501 is configured to acquire a transmit power upper limit and an estimated transmit power for each of the multiple channels. The processing unit 502 is configured to determine an actual transmit power for each of the multiple channels based on the transmit power upper limit and the estimated transmit power for each of the multiple channels. The processing unit 502 is further configured to determine a total transmit power of the test device within the transmission time interval based on the base station's scheduling of each of the multiple channels within the transmission time interval and the actual transmit power of each of the multiple channels.

[0128] In some embodiments, the processing unit 502 is further configured to, for each of the multiple channels, use a minimum value between a transmit power upper limit value and an estimated transmit power of each channel as the actual transmit power of the channel.

[0129] In some embodiments, the processing unit 502 is also used to determine the transmission power upper limit value of each channel in the multiple channels based on at least one of the scheduling strategy, the maximum transmission power supported by the test equipment, and the demodulation capability of the base station. The scheduling strategy is used to indicate the maximum number of resource blocks occupied by each channel in the multiple channels on the preset bandwidth within the transmission time interval.

[0130] In some embodiments, the processing unit 502 is further configured to determine an estimated transmit power for each of the multiple channels based on a power configuration parameter for each of the multiple channels.

[0131] In some embodiments, the processing unit 502 is further used to determine the minimum receiving power of a signal sent by the base station to a terminal device at a preset distance point based on the demodulation capability of the base station, and the minimum receiving power is used to ensure demodulation of the signal.

[0132] In some embodiments, the processing unit 502 is further configured to determine an upper limit value of the transmission power of the PUCCH based on the minimum receiving power and the path loss between the base station and the terminal device at a preset distance point.

[0133] In some embodiments, the processing unit 502 is further configured to determine the first power according to a transmit power upper limit value of the PUCCH and a maximum number of resource blocks occupied by the PUCCH.

[0134] In some embodiments, the processing unit 502 is further configured to determine the second power according to the maximum transmit power of the test device and the first power.

[0135] In some embodiments, the processing unit 502 is further configured to determine an upper limit value of the transmit power of the PUSCH according to the second power and the maximum number of resource blocks occupied by the PUSCH.

[0136] In some embodiments, the processing unit 502 is further configured to determine an upper limit value of the transmit power of the SRS channel according to the maximum transmit power of the test device and the maximum number of resource blocks occupied by the SRS channel.

[0137] In some embodiments, the processing unit 502 is further configured to determine the upper limit of the transmit power of the PRACH according to the upper limit of the transmit power of the SRS channel and the maximum number of resource blocks occupied by the PRACH.

[0138] In some embodiments, the processing unit 502 is further configured to determine, for each of the multiple channels, the total transmit power of the channel based on the channel's scheduling status and the channel's actual transmit power. The PUCCH scheduling status is used to indicate the number of resource blocks occupied by the PUCCH on a preset bandwidth within a transmission time interval. The PUSCH scheduling status is used to indicate the number of resource blocks occupied by the PUSCH on a preset bandwidth within a transmission time interval. The SRS channel scheduling status is used to indicate the number of devices that need to transmit the SRS channel within a transmission time interval. The PRACH scheduling status is used to indicate the number of devices that need to transmit the PRACH within a transmission time interval.

[0139] In some embodiments, the processing unit 502 is further configured to determine the total transmission power of the test device within the transmission time interval according to the total transmission power of each channel in the plurality of channels.

[0140] In some embodiments, the resource allocation device 500 may also include a storage unit (shown as a dotted box in Figure 5), which stores a program or instruction. When the acquisition unit 501 and the processing unit 502 execute the program or instruction, the power scheduling device can execute the power scheduling method described in the above method embodiment.

[0141] In addition, the technical effects of the power scheduling device described in FIG5 can refer to the technical effects of the power scheduling method described in the above embodiment, and will not be repeated here.

[0142] For example, FIG6 is another structural diagram of the power dispatching device involved in the above embodiment. As shown in FIG6 , the power dispatching device 600 includes: a processor 602 , a communication interface 603 , a memory 601 and a bus 604 .

[0143] The processor 602 is used to control and manage the actions of the power scheduling device, for example, to execute the steps performed by the above-mentioned acquisition unit 501 and processing unit 502, and / or to execute other processes of the technical solution described in this document.

[0144] The processor 602 may implement or execute the various exemplary logic blocks, modules, and circuits described in conjunction with the present disclosure. The processor may be a central processing unit, a general-purpose processor, a digital signal processor, an application-specific integrated circuit, a field-programmable gate array, or other programmable logic device, a transistor logic device, a hardware component, or any combination thereof. It may implement or execute the various exemplary logic blocks, modules, and circuits described in conjunction with the present disclosure. The processor may also be a combination that implements computing functions, such as a combination of one or more microprocessors, or a combination of a DSP and a microprocessor.

[0145] In some embodiments, the communication interface 603 is used to support communication between the power scheduling apparatus 600 and other network entities. The memory 601 is used to store program codes and data of the power scheduling apparatus.

[0146] Memory 601 can be a memory in a power scheduling device, which can include a volatile memory, such as a random access memory; the memory can also include a non-volatile memory, such as a read-only memory, a flash memory, a hard disk or a solid-state drive; the memory can also include a combination of the above types of memory.

[0147] Bus 604 may be an Extended Industry Standard Architecture (EISA) bus, etc. Bus 604 may be divided into an address bus, a data bus, a control bus, etc. For ease of illustration, FIG6 shows only one thick solid line, but this does not mean that there is only one bus or only one type of bus.

[0148] Through the description of the above embodiments, those skilled in the art will clearly understand that for the sake of convenience and brevity, only the division of the above functional modules is used as an example. In actual applications, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the device can be divided into different functional modules to complete all or part of the functions described above. The specific working processes of the above-described systems, devices, and modules can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0149] An embodiment of the present disclosure provides a computer program product containing instructions. When the computer program product is run on an electronic device of the present disclosure, the computer is enabled to execute the power scheduling method described in the above method embodiment.

[0150] An embodiment of the present disclosure further provides a computer-readable storage medium having instructions stored therein. When a computer executes the instructions, the electronic device of the present disclosure executes each step executed by the power scheduling device in the method flow shown in the above method embodiment.

[0151] Computer-readable storage media may be, for example, but not limited to, electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices, or components, or any combination thereof. More specific examples (a non-exhaustive list) of computer-readable storage media include: an electrical connection having one or more wires, a portable computer disk, a hard disk. Random Access Memory (RAM), Read-Only Memory (ROM), Erasable Programmable Read Only Memory (EPROM), registers, hard disks, optical fibers, portable compact disc read-only memory (CD-ROM), optical storage devices, magnetic storage devices, or any other form of computer-readable storage media known in the art in a suitable combination of the foregoing. An exemplary storage medium is coupled to a processor so that the processor can read information from the storage medium and write information to the storage medium. Of course, the storage medium may also be an integral part of the processor. The processor and the storage medium may be located in an application-specific integrated circuit (ASIC). In the embodiments of the present disclosure, a computer-readable storage medium may be any tangible medium that contains or stores a program that can be used by or in conjunction with an instruction execution system, apparatus, or device. The computer-readable storage medium includes a non-transitory computer-readable storage medium.

[0152] The above is only a specific embodiment of the present disclosure, but the scope of protection of the present disclosure is not limited thereto. Any changes or replacements within the technical scope disclosed in the present disclosure should be included in the scope of protection of the present disclosure. Therefore, the scope of protection of the present disclosure should be based on the scope of protection of the claims.

Claims

1. A power scheduling method for testing equipment, include: Obtaining a transmit power upper limit value and an estimated transmit power of each of the multiple channels; Determining an actual transmit power of each of the multiple channels according to a transmit power upper limit value and an estimated transmit power of each of the multiple channels; as well as The total transmission power of the test device in the transmission time interval is determined according to the scheduling of each of the multiple channels by the base station in the transmission time interval and the actual transmission power of each of the multiple channels.

2. The method according to claim 1, in, The determining, according to the transmit power upper limit value and the estimated transmit power of each channel in the multiple channels, the actual transmit power of each channel in the multiple channels comprises: For each of the multiple channels, a minimum value between an upper limit value of the transmission power of each channel and an estimated transmission power is used as the actual transmission power of the channel.

3. The method according to claim 1, in, The obtaining of the transmit power upper limit value and the estimated transmit power of each channel in the plurality of channels includes: determining a transmit power upper limit value of each of the multiple channels according to at least one of a scheduling strategy, a maximum transmit power supported by the test device, and a demodulation capability of the base station, wherein the scheduling strategy is used to indicate a maximum number of resource blocks occupied by each of the multiple channels on a preset bandwidth within the transmission time interval; and An estimated transmit power of each of the multiple channels is determined according to a power configuration parameter of each of the multiple channels.

4. The method according to claim 3, in, The multiple channels include at least one of a physical uplink control channel PUCCH, a physical uplink shared channel PUSCH, a sounding reference signal SRS channel, and a physical random access channel PRACH.

5. The method according to claim 4, in, The upper limit of the transmit power of the PUCCH is determined by the following method: Determine, according to the demodulation capability of the base station, the minimum receiving power of the base station for a signal sent by a terminal device at a preset distance point, wherein the minimum receiving power is used to ensure demodulation of the signal; as well as The transmission power upper limit of the PUCCH is determined based on the minimum receiving power and the path loss between the base station and the terminal device at the preset distance point.

6. The method according to claim 5, in, The upper limit of the transmit power of the PUSCH is determined by the following method: Determine a first power according to an upper limit value of a transmit power of the PUCCH and a maximum number of resource blocks occupied by the PUCCH; Determining a second power according to the maximum transmit power of the test device and the first power; as well as An upper limit value of the transmit power of the PUSCH is determined according to the second power and the maximum number of resource blocks occupied by the PUSCH.

7. The method according to claim 4, in, The upper limit of the transmission power of the SRS channel is determined by the following method: An upper limit value of the transmit power of the SRS channel is determined according to the maximum transmit power of the test device and the maximum number of resource blocks occupied by the SRS channel.

8. The method according to claim 7, It is characterized in that The upper limit of the transmit power of the PRACH is determined by the following method: The transmit power upper limit value of the PRACH is determined according to the transmit power upper limit value of the SRS channel and the maximum number of resource blocks occupied by the PRACH.

9. The method according to claim 4, It is characterized in that The determining, according to the scheduling of each of the multiple channels by the base station in the transmission time interval and the actual transmission power of each of the multiple channels, the total transmission power of the test device in the transmission time interval includes: For each of the multiple channels, determining a total transmit power of each channel according to a scheduling condition of the channel and an actual transmit power of the channel; and Determine the transmission power of the test device within the transmission time interval according to the total transmission power of each channel in the multiple channels Total power.

10. The method according to claim 9, It is characterized in that The scheduling status of the PUCCH is used to indicate the number of resource blocks occupied by the PUCCH on the preset bandwidth within the transmission time interval; The scheduling status of the PUSCH is used to indicate the number of resource blocks occupied by the PUSCH on the preset bandwidth within the transmission time interval; The scheduling status of the SRS channel is used to indicate the number of devices that need to transmit the SRS channel within the transmission time interval; The PRACH scheduling status is used to indicate the number of devices that need to transmit the PRACH within the transmission time interval.

11. A communication device, include: a processor and a memory for storing instructions executable by the processor; The processor is configured to execute the instruction so that the communication device performs the power scheduling method according to any one of claims 1-10.

12. A computer-readable storage medium, in, The computer-readable storage medium stores computer instructions, and when the computer instructions are executed on a computer, the computer is enabled to execute the power scheduling method according to any one of claims 1 to 10.

Citation Information

Patent Citations

  • Method and apparatus for controlling signal transmission power

    CN102301801A

  • Power distribution method and device and storage medium

    CN113766622A

  • Power control method and device for terminal

    CN114449637A

  • Wireless comnmunication terminal and power control method

    US20130272257A1