Terminal, base station, and communication method

By configuring muting resources to isolate uplink interference, the method effectively measures and mitigates cross-link interference in 5G NR systems, enhancing communication quality and resource efficiency.

WO2024219190A1PCT designated stage expired Publication Date: 2024-10-24PANASONIC INTELLECTUAL PROPERTY CORP OF AMERICA
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
PCT/JP2024/012857
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-17
Filing Date
2024-03-28
Publication Date
2024-10-24

AI Technical Summary

Technical Problem

Current 5G NR systems face challenges in accurately measuring interference between base stations, particularly due to cross-link interference (CLI) which degrades reception characteristics, and existing methods for CLI measurement are inefficient.

Method used

A method is introduced where a victim base station configures 'muting resources' that do not perform uplink transmission, allowing for accurate measurement of CLI by isolating the influence of uplink signals, using notification information to set these resources, and employing schemes like subband non-overlapping full duplex (SBFD) and dynamic/flexible time division duplex (TDD) operations.

Benefits of technology

This approach enables precise measurement and reduction of CLI between base stations, improving resource utilization efficiency and communication quality by allowing for effective scheduling and interference mitigation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure JP2024012857_24102024_PF_FP_ABST
    Figure JP2024012857_24102024_PF_FP_ABST
Patent Text Reader

Abstract

This terminal is comprises: a control circuit that, among first frequency resources allocated to uplink transmission in a certain time resource, configures a second frequency resource in which no uplink transmission is performed on the basis of notification information; and a transmission circuit that performs uplink transmission on the basis of the second frequency resource.
Need to check novelty before this filing date? Find Prior Art

Description

Terminal, base station, and communication method

[0001] The present disclosure relates to a terminal, a base station, and a communication method.

[0002] The 3rd Generation Partnership Project (3GPP) has completed the physical layer specifications for Release 17 NR (New Radio access technology) as a functional extension of 5th Generation mobile communication systems (5G). NR supports enhanced mobile broadband (eMBB) to meet the requirements of high speed and large capacity, as well as ultra-reliable and low latency communication (URLLC) (see, for example, Non-Patent Documents 1-6).

[0003] 3GPP TS 38.211 V17.4.0, "NR; Physical channels and modulation (Release 17)," Jan. 20233GPP TS 38.212 V17.5.0, "NR; Multiplexing and channel coding (Release 17)," Mar. 20233GPP TS 38.213 V17.5.0, "NR; Physical layer procedure for control (Release 17)," Mar. 20233GPP TS 38.214 V17.5.0, "NR; Physical layer procedures for data (Release 17)," Mar. 20233GPP TS 38.215 V17.3.0, "NR; Physical layer measurements (Release 17)," Mar. 20233GPP TS 38.331 V17.4.0, "NR; Radio Resource Control (RRC) protocol specification (Release 17)", Mar. 2023

[0004] However, there is room for discussion on how to measure interference between base stations.

[0005] Non-limiting examples of the present disclosure contribute to providing a terminal, a base station, and a communication method that can appropriately measure interference between base stations.

[0006] A terminal according to one embodiment of the present disclosure includes a control circuit that sets, based on notification information, a second frequency resource from among first frequency resources allocated to uplink transmission in a certain time resource, which second frequency resource is not used for the uplink transmission, and a transmission circuit that performs the uplink transmission based on the second frequency resource.

[0007] These comprehensive or specific aspects may be realized as a system, an apparatus, a method, an integrated circuit, a computer program, or a recording medium, or may be realized as any combination of a system, an apparatus, a method, an integrated circuit, a computer program, and a recording medium.

[0008] According to an embodiment of the present disclosure, interference between base stations can be appropriately measured.

[0009] Further advantages and benefits of one embodiment of the present disclosure will become apparent from the specification and drawings. Such advantages and / or benefits may be provided by some embodiments and features described in the specification and drawings, respectively, but not necessarily all of them may be provided to obtain one or more identical features.

[0010] Diagram showing an example of subband non-overlapping full duplex (SBFD) operationDiagram showing an example of Dynamic / flexible time division duplex (TDD) operationDiagram showing an example of cross-link interference (CLI) between base stationsDiagram showing an example of muting resource configuration in CLI measurement between base stationsDiagram showing an example of muting resource configurationBlock diagram showing an example of a partial configuration of a base stationBlock diagram showing an example of a partial configuration of a terminalBlock diagram showing an example configuration of a base stationBlock diagram showing an example configuration of a terminalSequence diagram showing an example of operation of a base station and a terminalDiagram showing an example of muting resource configurationDiagram showing an example of muting resource configurationDiagram showing an example of muting resource configurationDiagram showing an example of muting resource configurationDiagram showing an example of muting resource configurationDiagram showing an example of muting resource configurationDiagram showing an example of muting resource configurationDiagram showing an example of transmit power control of Physical Uplink Shared Channel (PUSCH)Diagram showing an example of Demodulation Reference Signal (DMRS) allocation in Uplink Multi-User-Multiple Input Multiple Output (UL MU-MIMO)Diagram showing an example of Xn interface between base stationsDiagram of an exemplary architecture of a 3GPP NR systemNG-RAN (Next Generation - Radio Access Network) and 5GC (5th Generation A schematic diagram showing the functional separation between the 5G Mobile Broadband (MBR) and the 5G Mobile Radio Core. A sequence diagram of the Radio Resource Control (RRC) connection setup / reconfiguration procedure. A schematic diagram showing the usage scenarios of enhanced Mobile Broadband (eMBB), massive Machine Type Communications (mMTC), and Ultra Reliable and Low Latency Communications (URLLC). A block diagram showing an example 5G system architecture for a non-roaming scenario.

[0011] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the drawings.

[0012] [Subband non-overlapping full duplex (SBFD) and dynamic / flexible time division duplex (TDD)] Subband non-overlapping full duplex (SBFD) and dynamic / flexible TDD are discussed in Release 18. Figure 1 shows an example of SBFD, and Figure 2 shows an example of dynamic / flexible TDD.

[0013] 1(a) shows an example of the operation of a base station (also referred to as gNB) and a terminal (UE: User Equipment) (e.g., UE #1 and UE #2) in the same cell in SBFD operation. In SBFD operation, the base station performs SBFD operation, and the terminal performs half-duplex operation.

[0014] Figure 1(b) shows an example of resource allocation in SBFD operation. In Figure 1(b), the vertical axis represents frequency and the horizontal axis represents time. Also, in Figure 1(b), "UL" represents uplink transmission and "DL" represents downlink transmission. Also, resources unused by each device (e.g., gNB, UE#1, and UE#2) are indicated by dotted lines.

[0015] As shown in FIG. 1(b), in SBFD, a frequency resource (frequency band) is divided into multiple subbands (also referred to as bands, RB sets, subbands, or sub-BWPs (Bandwidth Parts)), and transmission in different directions is supported on a subband-by-subband basis. As shown in FIG. 1(b), a base station can simultaneously transmit and receive on the uplink and downlink (e.g., SBFD operation), and a terminal can transmit and receive on either the uplink or downlink in a given time resource (e.g., half-duplex operation). For example, in the example of FIG. 1(b), in the same time resource (e.g., slot or symbol), UE#1 communicates with the base station on the uplink, and UE#2 communicates with the base station on the downlink.

[0016] 2(a) shows an example of the operation of different base stations (e.g., gNB1 and gNB2) and terminals (e.g., UE#1 and UE#2) in dynamic / flexible TDD operation. In dynamic / flexible TDD operation, the base stations and terminals perform half-duplex operation, and the transmission directions at different base stations may differ.

[0017] Figure 2(b) shows an example of resource allocation in dynamic / flexible TDD. In the example of Figure 2(b), gNG1 performs DL transmission to UE#1 and gNB2 performs UL reception from UE#2 in the same time resource (e.g., the same time slot or symbol).

[0018] [About Interference] In dynamic / flexible TDD operation, various types of interference can occur. For example, cross-link interference (CLI) can occur between terminals (UE-to-UE) and between base stations (gNB-to-gNB). CLI between terminals and between base stations significantly degrades reception performance, so countermeasures are required.

[0019] In the following, with regard to CLI between base stations, the base station that causes interference will be referred to as the "aggressor gNB" and the base station that is subject to interference will be referred to as the "victim gNB."

[0020] For example, in dynamic / flexible TDD operation, different base stations may communicate in different directions at the same time, as shown in Figure 3. In this case, the base station performing UL reception (victim gNB in ​​Figure 3) may receive CLI from the base station performing DL transmission (aggressor gNB in ​​Figure 3), which may degrade the UL reception performance of the base station performing UL reception.

[0021] One way to avoid such interference is for the victim gNB to measure the CLI between base stations, share the measurement results between base stations (e.g., between the aggressor gNB and the victim gNB), and avoid CLI between base stations through scheduling, etc.

[0022] [CLI Measurement Method] The method for measuring CLI between base stations will be described.

[0023] For example, the aggressor gNB transmits a DL channel or signal for measurement, and the victim gNB receives the DL channel or signal and performs CLI measurement. In this case, for example, information regarding the DL channel or signal for measurement may be shared in advance between base stations so that the victim gNB knows (or receives) the configuration of the DL channel or signal for measurement of the aggressor gNB.

[0024] The victim gNB may also receive an UL channel or signal from a terminal belonging to the victim gNB while receiving and measuring the DL channel or signal for measurement. In this case, the measured value of the CLI between base stations will include the UL channel or signal, and the victim gNB may not be able to accurately measure the CLI between base stations.

[0025] One method for improving the accuracy of CLI measurements between base stations is, for example, the application of "UL muting resources" (also simply referred to as muting resources) that do not perform UL communication. For example, the victim gNB configures UL muting resources for terminals (e.g., terminals belonging to the victim gNB) on the same resources as the time resources and / or frequency resources (hereinafter referred to as time-frequency resources) on which the measurement DL channel or signal is allocated. Terminals belonging to the victim gNB, for example, do not perform UL transmission on the configured UL muting resources. This enables the victim gNB to accurately measure CLI measurements between base stations, excluding the influence of UL, using the measurement DL channel or signal.

[0026] FIG. 4 is a diagram showing an example of the use of UL muting resources. In FIG. 4, the aggressor gNB transmits a measurement DL channel or signal at symbols #9 and #10. Also, as shown in FIG. 4, a terminal belonging to the victim gNB is assigned a UL muting resource on the same resource as the measurement resource at the aggressor gNB. A terminal belonging to the victim gNB does not transmit uplink data (e.g., PUSCH: Physical Uplink Shared Channel) on the muting resource at symbols #9 and #10. Also, as shown in FIG. 4, the victim gNB receives a measurement DL channel or signal on the muting resource and measures the CLI between the base stations. This allows the victim gNB to measure the CLI value between the base stations, which does not include the influence of the UL signal from the UE, using the measurement DL channel or signal.

[0027] Here, a transparent scheme and a non-transparent scheme are assumed for the UL muting resource.

[0028] In the transparent scheme, the muting resources are implicitly configured by the base station scheduling. For example, the base station schedules UL resources for the terminal, avoiding the muting resources. Therefore, the terminal is not notified of information about the muting resources.

[0029] In the non-transparent scheme, the base station notifies the terminal of information (e.g., configuration) about muting resources. The terminal configures (or identifies) the muting resources based on the notified information and does not allocate UL channels or signals to the muting resources.

[0030] For example, a method for setting and notifying a muting resource in a non-transparent scheme has not been fully considered. In a non-limiting embodiment of the present disclosure, a method for setting and notifying a muting resource in a non-transparent scheme will be described.

[0031] [Allocation of Muting Resources] As an example, allocation of muting resources on a subcarrier basis will be described.

[0032] FIG. 5 is a diagram showing an example of measuring inter-base station CLI using muting resources.

[0033] FIG. 5(a) shows an example of resource allocation (e.g., measurement resources) for DL ​​channels or signals (e.g., DL channels or signals for measurement) in an aggressor gNB. The DL channels or signals may be, for example, Channel State Information - Reference Signals (CSI-RS). The left side of FIG. 5(a) shows allocation in units of resource blocks (RBs), and the right side of FIG. 5(a) shows allocation in units of resource elements (REs). For example, the right side of FIG. 5(a) shows allocation in units of subcarriers in the frequency domain.

[0034] Figure 5(b) shows an example of RB-based allocation of UL resources (e.g., PUSCH resources) and muting resources in the victim gNB, and Figure 5(c) shows an example of subcarrier-based (or RE-based) allocation of UL resources (e.g., PUSCH resources) and muting resources in the victim gNB.

[0035] As shown in Figures 5(b) and (c), the RB-based and subcarrier-based muting resources mute the measurement resource area of ​​the aggressor gNB (e.g., do not use it for UL communication (PUSCH transmission)), so that the victim gNB can accurately measure the CLI between base stations using the measurement resource signals.

[0036] For example, as shown in Fig. 5(b), in the allocation of muting resources in RB units, resources including resource elements unrelated to the measurement resources shown in Fig. 5(a) are included in the muting resources. Therefore, UL communication may be muted even in resource elements unrelated to the measurement resources, which may reduce resource utilization efficiency.

[0037] On the other hand, for example, as shown in Fig. 5(c), in the allocation of muting resources in units of subcarriers, resource elements related to the measurement resources shown in Fig. 5(a) are included in the muting resources, and resource elements unrelated to the measurement resources are not included in the muting resources. Therefore, resource elements unrelated to the measurement resources can be allocated to UL communications, thereby improving resource utilization efficiency in units of resource elements.

[0038] Thus, in order to improve the resource utilization efficiency and allocate it to the PUSCH, a method of reporting muting resources on a subcarrier basis is expected.

[0039] (Embodiment 1) [Overview of communication system] A communication system according to one aspect of the present disclosure may include, for example, a base station 100 (e.g., gNB) shown in Figures 6 and 8, and a terminal 200 (e.g., UE) shown in Figures 7 and 9. A plurality of base stations 100 and a plurality of terminals 200 may exist in the communication system.

[0040] 6 is a block diagram illustrating a configuration example of a portion of a base station 100 according to an aspect of the present disclosure. In the base station 100 illustrated in FIG. 6, a control unit (e.g., corresponding to a control circuit) sets a second frequency resource (e.g., a muting resource) that does not perform uplink transmission among first frequency resources allocated to uplink transmission in a certain time resource. A receiving unit (e.g., corresponding to a receiving circuit) performs uplink reception based on the second frequency resource.

[0041] 7 is a block diagram illustrating a configuration example of a portion of terminal 200 according to one aspect of the present disclosure. In terminal 200 illustrated in FIG. 7 , a control unit (e.g., corresponding to a control circuit) sets, based on notification information, second frequency resources (e.g., muting resources) that do not perform uplink transmission among first frequency resources allocated to uplink transmission in a certain time resource. A transmission unit (e.g., corresponding to a transmission circuit) performs uplink transmission based on the second frequency resources.

[0042] [Configuration of Base Station] Fig. 8 is a block diagram showing an example configuration of a base station 100 according to one aspect of the present disclosure. In Fig. 8, the base station 100 includes a receiving unit 101, a demodulating / decoding unit 102, a muting resource setting unit 103, a scheduling unit 104, a control information holding unit 105, a data / control information generating unit 106, an encoding / modulating unit 107, and a transmitting unit 108.

[0043] For example, at least one of the demodulation / decoding unit 102, the muting resource setting unit 103, the scheduling unit 104, the control information holding unit 105, the data / control information generating unit 106, and the encoding / modulation unit 107 may be included in the control unit shown in Figure 6, and the receiving unit 101 may be included in the receiving unit shown in Figure 6.

[0044] The receiving unit 101 performs reception processing such as down-conversion or A / D conversion on a signal received via an antenna, and outputs the processed received signal to the demodulation and decoding unit 102 .

[0045] The demodulation and decoding unit 102 demodulates and decodes the received signal input from the receiving unit 101 , for example, and outputs the decoded result to the scheduling unit 104 .

[0046] The muting resource setting unit 103 sets muting resources. For example, the muting resource setting unit 103 may set muting resources based on information from other base stations. For example, the muting resource setting unit 103 may set muting resources based on control information (e.g., configuration related to resources for inter-base station CLI measurement) input from the control information holding unit 105. The muting resource setting unit 103 outputs information related to the set muting resources (e.g., a muting resource allocation pattern) to the scheduling unit 104.

[0047] The scheduling unit 104 may, for example, perform scheduling for the terminals 200. The scheduling unit 104 schedules transmission and reception for each terminal 200 based on, for example, at least one of the decoding result input from the demodulation and decoding unit 102, information on muting resource setting input from the muting resource setting unit 103, and control information input from the control information holding unit 105, and instructs the data and control information generating unit 106 to generate at least one of data and control information.

[0048] The control information holding unit 105 holds, for example, control information relating to the configuration of measurement resources between base stations (for example, allocation resources, etc.) and the configuration of muting resources (for example, allocation patterns, notification methods, etc.). The control information holding unit 105 may, for example, output the held information to each component of the base station 100 (for example, the muting resource setting unit 103 and the scheduling unit 104) as necessary.

[0049] The data and control information generating unit 106 generates at least one of data and control information, for example, in accordance with an instruction from the scheduling unit 104, and outputs a signal including the generated data or control information to the coding and modulation unit 107. Note that the generated data and control information may include, for example, at least one of upper layer signaling information and downlink control information.

[0050] The coding / modulation section 107 codes and modulates the signal input from the data / control information generation section 106, for example, and outputs the modulated signal to the transmission section .

[0051] The transmitting unit 108 performs transmission processing such as D / A conversion, up-conversion, or amplification on the signal input from the encoding / modulating unit 107, and transmits the radio signal obtained by the transmission processing from an antenna to the terminal 200.

[0052] [Terminal Configuration] Fig. 9 is a block diagram showing an example configuration of terminal 200 according to one aspect of the present disclosure. In Fig. 9, terminal 200 includes receiving section 201, demodulation and decoding section 202, muting resource setting section 203, transmission control section 204, control information holding section 205, data and control information generation section 206, coding and modulation section 207, and transmission section 208.

[0053] For example, at least one of the demodulation / decoding unit 202, muting resource setting unit 203, transmission control unit 204, control information holding unit 205, data / control information generation unit 206, and encoding / modulation unit 207 may be included in the control unit shown in Figure 7, and the transmission unit 208 may be included in the transmission unit shown in Figure 7.

[0054] The receiving unit 201 performs reception processing such as down-conversion or A / D conversion on a received signal received via an antenna, and outputs the processed received signal to the demodulation and decoding unit 202 .

[0055] The demodulation and decoding unit 202 demodulates and decodes the received signal input from the receiving unit 201 , for example, and outputs the decoded result to the transmission control unit 204 .

[0056] The muting resource setting unit 203 sets muting resources based on control information (e.g., information on the configuration of muting resources) input from the control information holding unit 205. The muting resource setting unit 203 outputs information on the set muting resources to the transmission control unit 204, for example.

[0057] The transmission control unit 204 outputs signaling information included in the decoding result input from the demodulation and decoding unit 202 to the control information holding unit 205. Furthermore, the transmission control unit 204 may instruct the data and control information generating unit 206 to generate at least one of data and control information, based on, for example, setting information related to the muting resource input from the muting resource setting unit 103, control information input from the control information holding unit 205, or the decoding result input from the demodulation and decoding unit 202 (for example, downlink control information).

[0058] The control information holding unit 205 holds, for example, control information (for example, information regarding the configuration of muting resources) input from the transmission control unit 204, and outputs the held information to each component unit (for example, the muting resource setting unit 203 and the transmission control unit 204) as necessary.

[0059] The data and control information generating unit 206 generates data or control information, for example, in accordance with instructions from the transmission control unit 204. The data and control information generating unit 206 outputs a signal including the generated data or control information to the encoding and modulation unit 207.

[0060] The coding and modulation section 207 codes and modulates the signal input from the data and control information generation section 206 , for example, and outputs the modulated transmission signal to the transmission section 208 .

[0061] The transmitting unit 208 performs transmission processing such as D / A conversion, up-conversion, or amplification on the signal input from the encoding / modulating unit 207, and transmits the radio signal obtained by the transmission processing from the antenna to the base station 100.

[0062] [Operations of Base Station 100 and Terminal 200] An example of operations in the base station 100 and terminal 200 having the above configuration will be described.

[0063] FIG. 10 is a sequence diagram showing an example of the operation of base station 100 and terminal 200.

[0064] 10 , the base station 100 determines the configuration of the muting resource and the UL channel or signal (e.g., PUSCH) (S101). Note that the base station 100 may share the configuration of the measurement DL channel or signal of the aggressor gNB with, for example, another base station (an example will be described later).

[0065] The base station 100 transmits higher layer signaling information including the determined configuration to the terminal 200 (S102).

[0066] The terminal 200 sets muting resources and PUSCH (for example, UL resources) based on the configuration from the base station 100 (S103).

[0067] The base station 100 transmits, for example, control information related to the PUSCH to the terminal 200 (S104). The control information may be transmitted using, for example, a downlink control channel (for example, a Physical Downlink Control Channel (PDCCH)).

[0068] Terminal 200 receives the PDCCH and identifies allocation of muting resources and PUSCH resources based on the muting resource configuration, the PUSCH configuration, and the control information included in the received PDCCH (S105).

[0069] For example, based on notification information from base station 100 (for example, at least one of upper layer signaling information and downlink control information), terminal 200 sets a muting resource that does not perform UL transmission among resources allocated to UL transmission (PUSCH) in a certain time resource.

[0070] Based on the identified allocation of muting resources and PUSCH resources, terminal 200 transmits PUSCH to base station 100 (S106). For example, terminal 200 does not transmit PUSCH in muting resources among the allocated PUSCH resources.

[0071] Base station 100 receives a PUSCH transmitted from terminal 200, for example, based on the configuration of muting resources and PUSCH resources. Furthermore, base station 100 (for example, victim gNB) may measure inter-base station CLI using a signal from an aggressor gNB, based on the configuration of muting resources. The measurement result of the inter-base station CLI may be shared by, for example, multiple base stations 100, and scheduling for terminal 200 may be performed based on the measurement result of the inter-base station CLI.

[0072] [Muting Resource Setting Method and Notification Method] Next, an example of a muting resource setting method and notification method according to one non-limiting embodiment of the present disclosure will be described.

[0073] For example, the configuration and notification method of muting resources by base station 100 (e.g., muting resource setting section 103 and scheduling section 104), and an example of the operation of terminal 200 (e.g., muting resource setting section 203 and transmission control section 204) will be described.

[0074] In this embodiment, as examples of muting resource configuration methods, a bitmap format (configuration method 1 described later) and a method of reusing the resource configuration of a reference signal (configuration method 2 described later) will be described. In this embodiment, the notification information used for muting resource configuration may be, for example, information on resources in subcarrier units.

[0075] In addition, in one embodiment of the present disclosure, the configuration of muting resources (e.g., the configuration of muting resource patterns) and the activation of muting resources (e.g., the enabling of muting resource configuration) may be notified (or instructed, configured) to terminal 200 using the following channels or signals:

[0076] As a configuration of a muting resource pattern, for example, a plurality of muting resource patterns (for example, a plurality of pattern candidates) may be set in the terminal 200. In activation of a muting resource, for example, when a muting resource setting is activated, the setting may be enabled a specified number of times (for example, once), or may be set repeatedly until it is disabled.

[0077] <Configuration by Radio Resource Control (RRC) / Medium access control (MAC) Signaling> Using RRC signaling or MAC signaling, the base station 100 sets (configures) multiple muting resource patterns (e.g., pattern candidates) in the terminal 200. For example, each of the multiple muting resource patterns may be managed by identifiable information (e.g., an ID).

[0078] Terminal 200 receives RRC signaling or MAC signaling, and determines allocation of muting resources based on the configuration of muting resources included in the RRC signaling or MAC signaling.

[0079] In this way, by configuring the muting resources using RRC signaling or MAC signaling, it becomes possible to set multiple muting resource patterns that are suited to various measurement DL channels or signals.

[0080] Furthermore, for example, in addition to the configuration of the muting resource pattern, dynamic activation using a PDCCH (for example, a Group common PDCCH or a UE specific PDCCH) may be applied. For example, the base station 100 may activate a specific muting resource pattern from among multiple muting resource patterns (pattern candidates) configured by RRC signaling or MAC signaling by notifying an ID of the muting resource pattern using a channel such as the PDCCH.

[0081] For example, when a muting resource pattern is activated using a Group common PDCCH, multiple terminals 200 share the same PDCCH, so base station 100 can simultaneously activate the muting resource pattern for multiple terminals 200. This allows PDCCH resources to be saved.

[0082] Furthermore, for example, when activating a muting resource pattern using a UE-specific PDCCH, base station 100 can notify terminal 200 of the activation of the muting resource pattern together with PUSCH scheduling (e.g., PDCCH). Therefore, when there are few terminals 200 to notify of muting resources, it is possible to improve resource utilization efficiency of PDCCH.

[0083] <Configuration Using Group Common PDCCH> Base station 100 configures terminal 200 with a muting resource pattern using the Group common PDCCH.

[0084] The Group common PDCCH allows for setting a larger number of bits than the UE specific PDCCH, and therefore, it is possible to directly set the muting resource configuration (for example, a bitmap format or a reference signal resource configuration, which will be described later) using the Group common PDCCH.

[0085] Terminal 200 identifies allocation of muting resources based on the muting resource configuration included in the received Group common PDCCH.

[0086] Since the Group common PDCCH allows direct allocation of muting resources, dynamic configuration of muting resources is possible regardless of the muting resource pattern to be configured, compared to other configuration methods (e.g., methods using RRC signaling or MAC signaling).

[0087] In addition, the base station 100 can set multiple muting resource patterns (pattern candidates) using, for example, a Group common PDCCH, and activate a specific muting resource pattern from among the multiple muting resource patterns using a UE specific PDCCH.

[0088] <Configuration Using UE-Specific PDCCH> The base station 100 configures the terminal 200 with a muting resource pattern using the UE-specific PDCCH.

[0089] It is difficult to set a large number of bits for muting resources in the UE-specific PDCCH compared to the Group common PDCCH. Therefore, for example, multiple muting resource patterns (e.g., a bitmap format, etc., described later) may be defined (or specified or set) in advance. The base station 100 allocates muting resources to the terminal 200 by notifying the terminal 200 of the IDs of the defined muting resources via the UE-specific PDCCH. This is effective, for example, when the time-frequency resources for measuring the inter-base station CLI are defined to some extent (e.g., when they are defined in the specifications).

[0090] Examples of channels or signals used for setting muting resources and notifying activation of muting resources have been described above.

[0091] Next, examples of muting resource setting method 1 (bitmap format) and setting method 2 (method of reusing the resource configuration of the reference signal) will be described.

[0092] <Setting Method 1> In setting method 1, the muting resource pattern is configured in a bitmap format.

[0093] The base station 100 sets, for example, a "subcarrier bitmap" representing a subcarrier-by-subcarrier allocation pattern of muting resources in the terminal 200. For example, the information notified from the base station 100 to the terminal 200 is information in a bitmap format indicating whether each of multiple subcarriers included in the transmission bandwidth of the terminal 200 is a muting resource. The terminal 200 identifies the subcarriers to which the muting resources are allocated, for example, based on the set subcarrier bitmap.

[0094] For example, the subcarrier bitmap may be an array consisting of two values ​​("0" or "1") corresponding to subcarriers. For example, a subcarrier corresponding to a value "1" in the subcarrier bitmap may be assigned as a muting resource, and a subcarrier corresponding to a value "0" in the subcarrier bitmap may not be assigned as a muting resource. Note that the meanings of "0" and "1" (relationship to muting resources) may be reversed.

[0095] FIG. 11 shows an example of setting a muting resource pattern.

[0096] In Figure 11, the subcarrier bitmap corresponds to the subcarriers in one resource block. In the example of Figure 11, the number of bits in the subcarrier bitmap (e.g., 12 bits) corresponds to the number of subcarriers in one resource block (e.g., 12 subcarriers).

[0097] Furthermore, as shown in FIG. 11, an allocation bandwidth may be set for the terminal 200 .

[0098] 11, a "symbol bitmap" representing a symbol-by-symbol allocation pattern of muting resources may be set for terminal 200. The number of bits of the symbol bitmap (e.g., 14 bits) may correspond to the number of symbols in one slot (e.g., 14 symbols), or may correspond to the number of symbols in a time resource unit different from a slot.

[0099] 11, when a subcarrier bitmap, a symbol bitmap, and an allocated bandwidth are set in terminal 200, terminal 200 sets (or identifies) muting resources based on these. In the example of Fig. 11, terminal 200 sets, as muting resources, six subcarriers corresponding to a value of "1" in the subcarrier bitmap in each resource block included in the allocated bandwidth of symbol #10.

[0100] 11, terminal 200 does not set subcarriers corresponding to a value of "0" in the subcarrier bitmap as muting resources in each resource block included in the allocated bandwidth of symbol #10. Terminal 200 may set these subcarriers corresponding to a value of "0" in the subcarrier bitmap as PUSCH resources.

[0101] 11 , by configuring muting resources using a subcarrier bitmap (e.g., notification of unavailable resources on a subcarrier basis), it is possible to allocate muting resources in subcarrier (or resource element) units within a band (e.g., PUSCH resources) allocated to terminal 200. This allows terminal 200 to use subcarriers corresponding to value "0" in the subcarrier bitmap for PUSCH transmission, for example, and makes it possible to simultaneously allocate PUSCH and muting resources in a certain symbol, thereby improving the utilization efficiency of frequency resources.

[0102] Furthermore, as shown in FIG. 11, by setting muting resources using a symbol bitmap, it becomes possible to set muting resources in units of symbols (or resource elements), thereby improving the efficiency of using time resources.

[0103] Furthermore, in addition to the subcarrier bitmap, the base station 100 may set, for example, a "resource block bitmap (RB bitmap)" representing an allocation pattern of muting resources in resource block (RB) units to the terminal 200.

[0104] Terminal 200 identifies subcarriers to which muting resources are allocated based on the configured RB bitmap and subcarrier bitmap, for example.

[0105] For example, the RB bitmap may be an array consisting of two values ​​("0" or "1") corresponding to RBs. For example, an RB corresponding to a value "1" in the RB bitmap may be allocated as a muting resource, and an RB corresponding to a value "0" in the RB bitmap may not be allocated as a muting resource. Note that the meanings of "0" and "1" (relationship to muting resources) may be reversed.

[0106] Furthermore, for example, a subcarrier bitmap may be applied to an RB whose RB bitmap value is "1." For example, terminal 200 may set a subcarrier whose subcarrier bitmap value is "1" as a muting resource in an RB whose RB bitmap value is "1."

[0107] FIG. 12 shows an example of setting a muting resource pattern.

[0108] In FIG. 12, the RB bitmap corresponds to resource blocks within a certain bandwidth (eg, allocated bandwidth).

[0109] Also, in Fig. 12, the subcarrier bitmap corresponds to the subcarriers in one resource block. In the example of Fig. 12, the number of bits in the subcarrier bitmap (e.g., 12 bits) corresponds to the number of subcarriers in one resource block (e.g., 12 subcarriers).

[0110] Also, in FIG. 12, a symbol bitmap is set.

[0111] 12, when an RB bitmap, a subcarrier bitmap, and a symbol bitmap are configured in terminal 200, terminal 200 configures (or identifies) muting resources based on these. In the example of Fig. 12, terminal 200 configures, as muting resources, six subcarriers corresponding to a value "1" in the subcarrier bitmap in each of the RBs corresponding to a value "1" in the RB bitmap among the RBs of symbol #10.

[0112] 12, terminal 200 does not set, as muting resources, RBs among the RBs of symbol #10 that correspond to a value of "1" in the RB bitmap and subcarriers among the RBs of symbol #10 that correspond to a value of "0" in the subcarrier bitmap. Terminal 200 may set these RBs and subcarriers as PUSCH resources.

[0113] 12 , by configuring muting resources using an RB bitmap and a subcarrier bitmap, it is possible to allocate muting resources in RB units and in subcarrier (or resource element) units within a band (e.g., PUSCH resources) allocated to terminal 200. This allows terminal 200 to use resources corresponding to values ​​"0" in the RB bitmap and subcarrier bitmap for PUSCH transmission, for example, and it becomes possible to simultaneously allocate a PUSCH and a muting resource in a certain symbol, thereby improving the utilization efficiency of frequency resources.

[0114] Furthermore, as shown in FIG. 12, by setting muting resources using a symbol bitmap, it becomes possible to set muting resources in units of symbols (or resource elements), thereby improving the efficiency of using time resources.

[0115] As described above, according to setting method 1, notification of muting resources in bitmap format enables flexible setting of various patterns of muting resources in both the frequency direction and the time direction, thereby improving the efficiency of allocation of PUSCH resources.

[0116] 11 and 12, the number of bits of the subcarrier bitmap does not have to correspond to the number of subcarriers in one resource block. For example, the number of bits of the subcarrier bitmap may correspond to the number of subcarriers included in multiple RBs. For example, a muting resource may be set by a 120-bit subcarrier bitmap representing a muting resource pattern for 10 RBs (e.g., 120 subcarriers).

[0117] 11 and 12, a case has been described in which one bit in the subcarrier bitmap corresponds to one subcarrier, but this is not limiting, and one bit may correspond to multiple subcarriers. Similarly, one bit in the RB bitmap of FIG. 12 may correspond to one or multiple RBs. Furthermore, one bit in the symbol bitmap of FIG. 11 and 12 may correspond to one or multiple symbols.

[0118] Although the setting of muting resources in bitmap format has been described in the setting method 1, the notification of muting resources is not limited to the notification in bitmap format. For example, the notification of muting resources may include the start position of the resource (e.g., at least one of subcarriers, resource blocks, and symbols) and the resource size (e.g., the number, size, or length of subcarriers, resource blocks, or symbols).

[0119] In addition, in the setting method 1, the setting using a subcarrier bitmap (e.g., FIG. 11 ) and the setting using a subcarrier bitmap and a resource block bitmap (e.g., FIG. 12 ) have been described, but the setting method is not limited to this. For example, the muting resource may be set using a resource block bitmap, or may be set using a bitmap of a frequency resource unit different from the subcarriers and resource blocks.

[0120] Furthermore, in configuration method 1, muting resources may be configured based on a bitmap format and other parameters. For example, muting resources may be configured using a resource block offset. Base station 100 notifies (or configures) terminal 200, for example, of resource block offset values ​​and bitmap format information (e.g., bitmaps for at least one of subcarriers, RBs, and symbols). For example, the offset value and bitmap format information may be notified to terminal 200 via a group common PDCCH (e.g., DCI format 2-4). Terminal 200 may, for example, configure muting resources to a band excluding the range from a reference RB position to an RB position offset based on the offset value, within the allocated band. For example, the RB bitmap may be configured for RBs corresponding to the band in which muting resources are configured.

[0121] <Setting Method 2> In setting method 2, the muting resource is configured by reusing the resource configuration of the reference signal.

[0122] The base station 100 sets, for example, a resource allocation configuration (e.g., allocated symbols or allocated bands) of the reference signal to the terminal 200. For example, the information notified from the base station 100 to the terminal 200 is information indicating the allocated resource configuration of the reference signal. The terminal 200 sets, for example, a muting resource based on the set resource allocation configuration of the reference signal.

[0123] The reference signal may be, for example, a Sounding Reference Signal (SRS), a Channel State Information Reference Signal (CSI-RS), or a Demodulation Reference Signal (DMRS).

[0124] The resource configuration of an existing reference signal can be flexibly configured on a subcarrier-by-subcarrier basis using multiple parameters. For example, in the case of SRS, parameters such as comb and frequency hopping can be configured. Therefore, in the configuration of muting resources that reuse the resource configuration of reference signals, flexible configuration of muting resources on a subcarrier-by-subcarrier basis is possible. Furthermore, in configuration method 2, the resource configuration or signaling (e.g., trigger of SRS or CSI-RS) of existing reference signals is reused, thereby reducing the overhead of RRC signaling and DCI for muting resources.

[0125] Hereinafter, a method for configuring muting resources when reusing the resource configuration of each reference signal (SRS, CSI-RS, and DMRS) in configuration method 2 will be described.

[0126] <Setting Method 2-1> In setting method 2-1, the muting resource settings are configured by reusing the resource configuration of the SRS.

[0127] Base station 100 sets the resource configuration of the SRS in terminal 200. Terminal 200 identifies allocation of muting resources based on the resource configuration of the SRS that has been set.

[0128] For example, the use of a muting resource (e.g., "muting resource") may be set (e.g., newly added) to "usage" (a parameter that defines the use of an SRS resource) in the SRS configuration. The SRS resource whose "usage" is "muting resource" is used as a muting resource allocation.

[0129] Terminal 200 specifies allocation of muting resources, for example, by using an SRS resource configuration in which “usage” of the set SRS resource configuration is “muting resource.” For example, when “usage” is “muting resource,” terminal 200 sets the allocated SRS resource as a muting resource and does not transmit SRS (mutes UL transmission).

[0130] Also, for example, SRS resource allocation parameters (e.g., comb and frequency hopping), resource type (e.g., resource behavior in the time domain, such as periodic, quasi-periodic, or aperiodic), and trigger method (e.g., aperiodic SRS resources are triggered by DCI) can be reused for allocating muting resources.

[0131] Fig. 13 shows an example of setting a muting resource pattern that reuses the SRS resource configuration in setting method 2-1. As shown in Fig. 13, the muting resource is allocated using the SRS resource configuration.

[0132] In the configuration method 2-1, since the resource configuration or signaling of the existing SRS is reused, it is not necessary to define many new RRC parameters for the configuration of the muting resources. Also, for example, since the trigger method of the SRS can be reused for the activation of the muting resources by the DCI, it is not necessary to add a new field to the DCI.

[0133] <Configuration Method 2-2> In configuration method 2-2, the muting resource configuration is configured by reusing the resource configuration of the CSI-RS.

[0134] Base station 100 configures a CSI-RS resource configuration in terminal 200. Terminal 200 identifies allocation of muting resources based on resource allocation of the configured CSI-RS resource configuration.

[0135] FIG. 14 shows an example of configuring a muting resource pattern that reuses the CSI-RS resource configuration in configuration method 2-2.

[0136] The CSI-RS resource configuration includes Code Division Multiplexing (CDM) patterns such as "no CDM," "CDM2," "FD-CDM2," "CDM4," and "CDM8." In the example of FIG. 14, the CDM pattern is "CDM4" (for example, time multiplexing of two symbols (symbols #9 and #10 in FIG. 14) and frequency multiplexing of two subcarriers), and muting resource allocation is configured by reusing CSI-RS resource allocation that is periodically allocated in the frequency direction. For example, terminal 200 sets the allocated CSI-RS resources as muting resources, and does not perform UL transmission (mutes) in the muting resources.

[0137] The CDM pattern reused for setting the muting resources is not limited to "CDM4" and may be another CDM pattern.

[0138] For example, in muting resource configuration that reuses SRS resource allocation, it is difficult to collectively configure multiple resource elements such as "CDM4" shown in Fig. 14 as a muting resource, whereas in muting resource configuration that reuses CSI-RS resource allocation, it is possible to collectively configure multiple resource elements as a muting resource using multiple CDM patterns. As a result, in configuration method 2-2, muting resources can be configured more flexibly than in muting resource configuration that reuses SRS resource allocation.

[0139] In addition, there are two methods for configuring and triggering muting resources that reuse the CSI-RS configuration:

[0140] In the first method, a CSI-RS configuration for muting resources is configured in terminal 200, and the muting resources are configured using an existing CSI-RS triggering method. For example, CSI-RS resource allocation parameters (e.g., CDM pattern, etc.), resource type (e.g., resource behavior in the time domain, such as periodic, quasi-periodic, or aperiodic), and triggering method (e.g., aperiodic CSI-RS resources are triggered by DCI) can be reused for allocating muting resources. This method reuses the existing CSI-RS resource configuration and signaling, and therefore does not require defining many new RRC parameters for muting resources.

[0141] In the second method, a CSI-RS configuration for muting resources is configured in an SRS resource configuration, and the SRS resource configuration is configured in terminal 200. In this case, for example, "muting resource" may be configured as "usage" of the SRS resource configuration. This makes it possible to reuse the SRS triggering method and allocate muting resources using the CSI-RS resource configuration. This method reuses the existing CSI-RS resource configuration and signaling, so there is no need to define many new RRC parameters for muting resources. Furthermore, because the SRS triggering method can be reused for activating muting resources using DCI, there is no need to add a new field to DCI.

[0142] <Setting Method 2-3> In setting method 2-3, muting resources are configured by reusing the resource configuration of the DMRS.

[0143] Base station 100 configures a DMRS resource configuration in terminal 200. For example, base station 100 configures at least some of the resources configured by the DMRS resource configuration as muting resources. Terminal 200 determines allocation of muting resources based on the configured DMRS resource configuration.

[0144] FIG. 15 shows an example of configuring a muting resource pattern that reuses the DMRS resource configuration in configuration method 2-3. In FIG. 15, the DMRS resource configuration is a configuration in which DMRS is allocated to symbols #2, #7, and #11 in a single-symbol DMRS. Also in FIG. 15, a configuration in which the DMRS of symbol #7 is configured as a muting resource is defined within the DMRS configuration. In this case, as shown in FIG. 15, the DMRS resource of symbol #7 is allocated as a muting resource. Therefore, in FIG. 15, no DMRS is allocated to symbol #7. For example, terminal 200 configures the resource of symbol #7 of the allocated DMRS resources as a muting resource and does not transmit DMRS in the muting resource (for example, mutes UL transmission).

[0145] In the configuration method 2-3, since the resource configuration and signaling of the existing DMRS are reused, it is not necessary to define many new RRC parameters for the muting resource.

[0146] Note that the resource configuration of the DMRS is not limited to the example shown in Fig. 15, and for example, the number of symbols, symbol positions, number of subcarriers, and subcarrier positions where the DMRS are arranged may be other values. Also, Fig. 15 has described a case where a muting resource is set to one symbol among the symbols set by the resource configuration of the DMRS, but this is not limiting, and the muting resource may be set to multiple symbols where the DMRS is set.

[0147] Furthermore, the configuration defined in the DMRS resource configuration for setting DMRS as muting resources is not limited to the example shown in Fig. 15. For example, Fig. 15 describes a case where all subcarriers allocated to DMRS are allocated as muting resources in some symbols among a plurality of symbols in which DMRS are allocated, but the allocation of muting resources is not limited to this. For example, some subcarriers to which DMRS are allocated may be allocated as muting resources in some symbols among a plurality of symbols in which DMRS are allocated. Alternatively, some subcarriers to which DMRS are allocated may be allocated as muting resources in some subcarriers among a plurality of subcarriers to which DMRS are allocated.

[0148] The muting resource setting method 1 and setting method 2 have been described above.

[0149] As described above, in the present embodiment, terminal 200 configures a muting resource in a PUSCH resource in a certain symbol based on notification information (e.g., resource information on a subcarrier-by-subcarrier basis) from base station 100, and performs UL transmission based on the muting resource. In the present embodiment, the muting resource is allocated together with the PUSCH by, for example, at least one of semi-static notification and dynamic notification. This makes it possible to allocate the muting resource and the PUSCH resource simultaneously, and to allocate the muting resource while avoiding resource collision. Therefore, according to the present embodiment, it is possible to configure the muting resource with improved resource utilization efficiency, and to appropriately measure interference between base stations.

[0150] (Embodiment 2) In this embodiment, the configurations of base station 100 and terminal 200 may be the same as those in Embodiment 1. Furthermore, the configuration and activation of muting resource patterns in this embodiment may be the same as those in Embodiment 1. In this embodiment, the method of setting muting resources is different from that in Embodiment 1.

[0151] [Method of Configuring Muting Resources] A method of configuring muting resources according to the present embodiment is a method of configuring PUSCH resources on a contraction (or reduction) or shift basis.

[0152] In this embodiment, muting resources are set by, for example, reducing the PUSCH allocation resources (for example, resource blocks or symbols) or shifting the PUSCH allocation resources.

[0153] Base station 100 sets, for example, parameters of resource blocks or symbols to be reduced or shifted in terminal 200. Terminal 200 changes (reduces or shifts) the allocation of PUSCH based on, for example, the set parameters, and sets resources vacated by the reduction or shift of the allocation of PUSCH as muting resources.

[0154] As an example, a case will be described where the resource block shift parameter is set to 2 RBs. In this case, the transmission bandwidth of the PUSCH is reduced or shifted by two resource blocks. Due to the reduction or shift of the PUSCH resources, no resources are allocated to the two resource blocks. These free resources are set (or reserved) as muting resources.

[0155] FIG. 16 shows an example of configuring shrinkage and shift-based muting resources for PUSCH in the frequency domain.

[0156] 16(a) shows an example of setting muting resources by reducing the transmission bandwidth of the PUSCH. For example, in FIG. 16(a), the transmission bandwidth of the PUSCH is reduced by two resource blocks (for example, two resource blocks of RB#0 and RB#1), and muting resources are set in the two resource blocks that become vacant due to the reduction in the transmission bandwidth of the PUSCH.

[0157] 16(b) shows an example of setting muting resources by shifting the transmission bandwidth of the PUSCH. For example, in FIG. 16(b), the transmission bandwidth of the PUSCH is shifted by two resource blocks, and muting resources are set in two resource blocks (for example, RB#0 and RB#1) that are vacant due to the shift of the transmission bandwidth of the PUSCH.

[0158] In this way, muting resources are secured by narrowing or shifting the transmission band of the PUSCH.

[0159] 16(a) and 16(b), some or all of the symbols (e.g., 14 symbols) allocated to the PUSCH (symbols #8 to #11 in the examples of FIGS. 16(a) and 16(b)) may be set as muting resources. Parameters of the symbols set as muting resources (e.g., parameters related to the number of symbols and symbol positions) may be reported to terminal 200.

[0160] As described above, in this embodiment, terminal 200 configures a muting resource in a PUSCH resource in a certain symbol based on notification information from base station 100 (e.g., parameters of a resource block or symbol to be reduced or shifted), and performs UL transmission based on the muting resource. In this embodiment, the muting resource is allocated together with the PUSCH by, for example, at least one of semi-static notification and dynamic notification. This makes it possible to allocate the muting resource and the PUSCH resource simultaneously, and to allocate the muting resource while avoiding resource collision. Therefore, according to this embodiment, it is possible to configure the muting resource with improved resource utilization efficiency, and to appropriately measure interference between base stations.

[0161] Furthermore, in the muting resource configuration method according to the present embodiment, for example, PUSCH resources are reduced or shifted in the frequency direction (or frequency resources are changed in the same way across multiple symbols), so that the transmission power (e.g., total power or power spectral density (PSD) in the symbols) between symbols to which muting resources are configured (e.g., symbols #8 to #11 in FIG. 16 ) and symbols to which muting resources are not configured (e.g., symbols different from symbols #8 to #11 in FIG. 16 ) does not change. Therefore, terminal 200 does not need to perform new PUSCH transmission power control (e.g., PUSCH transmission power boost, etc.) for allocating muting resources, which makes it possible to suppress the design of terminal 200 from becoming complicated.

[0162] Furthermore, in the configuration method according to the present embodiment, muting resources can be allocated to configured grant (CG) PUSCHs without dynamic grant (DG) PUSCHs. For example, when base station 100 configures a CG PUSCH for terminal 200 and configures muting resources for the CG PUSCH at a certain time (for example, when CLI measurement and CG PUSCH transmission by base station 100 occur at the same time), it can change the allocation of the CG PUSCH that overlaps with the CLI measurement by base station 100 by using parameters related to shrinking or shifting resource blocks and symbols. This can also be achieved by changing the allocation of PUSCHs using DG PUSCHs, but in this embodiment, muting resources and CG PUSCHs can be allocated without dynamic grant scheduling.

[0163] Furthermore, in this embodiment, the muting resource may be set by applying both a reduction and a shift of the PUSCH resource (transmission band).

[0164] Furthermore, in this embodiment, as shown in Figure 16 (a), the case where PUSCH resources are reduced across all symbols to which PUSCH is allocated has been described, but the present invention is not limited to this. For example, among multiple symbols to which PUSCH is allocated, PUSCH resources (e.g., RBs) may be reduced in symbols set as muting resources, and PUSCH resources may not be reduced in symbols not set as muting resources. This makes it possible to reduce PUSCH resource reduction and improve resource utilization efficiency.

[0165] (Other embodiments) [PUSCH transmission power between symbols] In the configuration of muting resources according to embodiment 1, the transmission power between symbols (for example, the total power or PSD in the symbols) varies between symbols to which muting resources are assigned and symbols to which no muting resources are assigned.

[0166] Figure 17(a) shows an example of muting resource allocation according to embodiment 1. In Figure 17(a), base station 100 allocates muting resources to symbol #10. Figures 17(b), 17(c), and 17(d) are diagrams comparing PSDs for the muting resource configuration shown in Figure 17(a). Figure 17(b) shows an example of the PSD of a symbol to which no muting resources are allocated, and Figures 17(c) and 17(d) show examples of the PSD of a symbol to which a muting resource is allocated (e.g., symbol #10 shown in Figure 17(a)).

[0167] In muting resource configuration, for example, the following two power control methods are applicable.

[0168] <Method 1: Method of Matching Transmission Power Between Symbols> In method 1, the transmission power between symbols is matched between symbols to which no muting resources are assigned and symbols to which muting resources are assigned. For example, in symbols to which muting resources are assigned, PUSCH is not transmitted in some resources (e.g., subcarriers), so the transmission power of the PUSCH may be boosted. For example, as shown in Figure 17(c), boosting the transmission power of the PUSCH makes the total transmission power the same as that of symbols to which no muting resources are assigned, as shown in Figure 17(b). In method 1, since the transmission power between symbols is the same, a transit period (e.g., an adjustment period for transmission power fluctuations) does not need to be set.

[0169] <Method 2: Matching PSD Between Symbols> In method 2, the PSD between symbols is matched between symbols to which muting resources are not assigned and symbols to which muting resources are assigned. For example, in method 2, the transmission power of the PUSCH is not boosted. For example, as shown in Figure 17(d), the PSD of symbols to which muting resources are assigned is the same as the PSD of symbols to which muting resources are not assigned, as shown in Figure 17(b). In method 2, the PSD between symbols is the same during PUSCH transmission, so the PAPR (Peak-to-Average Power Ratio) requirement does not increase.

[0170] Methods 1 and 2 have been described above.

[0171] Furthermore, the transmission power control (transmission power boost) of the PUSCH in Method 1 can reuse the power boost of the DMRS in UL Multi-User-Multiple Input Multiple Output (MU-MIMO).

[0172] Figure 18(a) shows an example of DMRS allocation in UL MU-MIMO, and Figure 18(b) shows an example of DMRS allocation as seen from each terminal 200 (e.g., UE#1, UE#2, and UE#3). In Figure 18(a), CDM group {0,1,2} is configured, with the DMRS port of CDM group {0} assigned to UE#1, the DMRS port of CDM group {1} assigned to UE#2, and the DMRS port of CDM group {2} assigned to UE#3.

[0173] In this case, as shown in Figure 18(b), UE#1 is assigned a DMRS port for CDM group {0}, and the other CDM groups {1, 2} are assigned to other terminals (UE#2 and UE#3). Therefore, UE#1 does not assign any resources corresponding to CDM group {1, 2} (e.g., does not assign PUSCH, DMRS, etc.). UE#1 may boost the transmission power of the resources corresponding to CDM group {0} to which no DMRS is assigned (e.g., resources corresponding to CDM group {1, 2}). Transmission power control may be performed similarly for UE#2 and UE#3.

[0174] By reusing the power control of DMRS in UL MU-MIMO for the PUSCH to which muting resources are allocated, it becomes possible to allocate muting resources within the PUSCH on a subcarrier-by-subcarrier basis.

[0175] [Information sharing of reference signal configuration between base stations] In CLI measurements between base stations, information sharing between the aggressor gNB and the victim gNB is expected. For example, prior sharing of measurement resources of the aggressor gNB or sharing of CLI measurement values ​​between base stations after measurement can be included. Information sharing between base stations may be performed using the Xn interface, for example, as shown in FIG. 19 .

[0176] In one example of the present disclosure, a muting resource configuration method using a reference signal resource configuration has been described in a UL muting resource notification method. The reference signal (e.g., CSI-RS, SRS, DMRS, etc.) configuration may be shared between an aggressor gNB and a victim gNB using an Xn interface between base stations.

[0177] For example, CSI-RS configurations (e.g., ZP-CSI-RS-Resource, ZP-CSI-RS-ResourceSet, NZP-CSI-RS-Resource, NZP-CSI-RS-ResourceSet, and CSI-RS-ResourceMapping, etc.), SRS configurations (e.g., SRS-ResourceSet and SRS-Resource, etc.), or DMRS configurations (e.g., DMRS-UplinkConfig) may be transmitted and received via the Xn interface.

[0178] Furthermore, both transparent and non-transparent schemes can be applied to the notification of UL muting resources. For example, the CSI-RS configuration used for inter-base station CLI measurement at the aggressor gNB is shared with the victim gNB using the Xn interface, and the victim gNB can configure UL muting resources using the shared CSI-RS configuration (for example, configuration according to configuration method 2-2 of the first embodiment). Sharing the reference signal configuration between base stations 100 via the Xn interface enables the base stations 100 to allocate muting resources using the configuration.

[0179] The above has described the sharing of reference signal configuration information between base stations.

[0180] Note that the parameters used in the above-described embodiment, such as the number, position, and pattern of resources (number of subcarriers, number of RBs, or number of symbols) to which muting resources are set, are merely examples and are not limiting.

[0181] In the above-described embodiments, the units in which muting resources are set in the frequency domain are subcarrier units or resource block units, but the units of frequency resources in which muting resources are set are not limited to these and may be other units.In addition, in the above-described embodiments, the units in which muting resources are set in the time domain are symbol units, but the units of time resources in which muting resources are set are not limited to these and may be other units.

[0182] Furthermore, in each of the above-described embodiments, the setting of muting resources for the uplink has been described, but this is not limiting, and muting resources may be set for other links such as the downlink or sidelink.

[0183] Furthermore, in each of the above-described embodiments, PUSCH transmission has been described as an example of UL transmission, but the UL channel or signal is not limited to PUSCH, and may be another channel or signal.

[0184] Furthermore, the above-mentioned muting may be replaced with other names such as rate matching, blanking, and puncture.

[0185] (Supplementary Note) Information indicating whether the terminal 200 supports the functions, operations, or processes described in the above-described embodiments may be transmitted (or notified) from the terminal 200 to the base station 100, for example, as capability information or capability parameters of the terminal 200.

[0186] The capability information may include an information element (IE) that individually indicates whether or not the terminal 200 supports at least one of the functions, operations, or processes described in the above-described embodiments. Alternatively, the capability information may include an information element that indicates whether or not the terminal 200 supports a combination of any two or more of the functions, operations, or processes described in the above-described embodiments.

[0187] For example, the base station 100 may determine (or decide or assume) the functions, operations, or processes that the terminal 200 that transmitted the capability information supports (or does not support) based on the capability information received from the terminal 200. The base station 100 may perform operations, processes, or controls according to the determination result based on the capability information. For example, the base station 100 may control the configuration of muting resources based on the capability information received from the terminal 200.

[0188] Note that the fact that terminal 200 does not support some of the functions, operations, or processes described in the above-described embodiments may be interpreted as meaning that such some of the functions, operations, or processes are restricted in terminal 200. For example, information or a request regarding such restrictions may be notified to base station 100.

[0189] Information regarding the capabilities or limitations of terminal 200 may, for example, be defined in a standard, or may be implicitly notified to base station 100 in association with information known at base station 100 or information transmitted to base station 100.

[0190] (Control Signal) In the present disclosure, a downlink control signal (or downlink control information) related to an embodiment of the present disclosure may be, for example, a signal (or information) transmitted in a Physical Downlink Control Channel (PDCCH) of a physical layer, or a signal (or information) transmitted in a Medium Access Control Control Element (MAC CE) or Radio Resource Control (RRC) of a higher layer. Furthermore, the signal (or information) is not limited to being notified by a downlink control signal, but may be predefined in a specification (or standard) or preconfigured in a base station and a terminal.

[0191] In the present disclosure, an uplink control signal (or uplink control information) related to an embodiment of the present disclosure may be, for example, a signal (or information) transmitted in a PUCCH of a physical layer, or a signal (or information) transmitted in a MAC CE or RRC of a higher layer. Furthermore, the signal (or information) is not limited to being notified by an uplink control signal, but may be predefined in a specification (or standard) or preconfigured in a base station and a terminal. Furthermore, the uplink control signal may be replaced with, for example, uplink control information (UCI), 1st stage sidelink control information (SCI), or 2nd stage SCI.

[0192] (Base Station) In an embodiment of the present disclosure, the base station may be a Transmission Reception Point (TRP), a cluster head, an access point, a Remote Radio Head (RRH), an eNodeB (eNB), a gNodeB (gNB), a Base Station (BS), a Base Transceiver Station (BTS), a parent device, a gateway, or the like. In sidelink communication, a terminal may play the role of a base station. Instead of a base station, a relay device that relays communication between an upper node and a terminal may be used. Alternatively, a roadside unit may be used.

[0193] (Uplink / Downlink / Sidelink) An embodiment of the present disclosure may be applied to, for example, any of the uplink, downlink, and sidelink. For example, an embodiment of the present disclosure may be applied to a Physical Uplink Shared Channel (PUSCH), a Physical Uplink Control Channel (PUCCH), or a Physical Random Access Channel (PRACH) in the uplink, a Physical Downlink Shared Channel (PDSCH), a PDCCH, or a Physical Broadcast Channel (PBCH) in the downlink, or a Physical Sidelink Shared Channel (PSSCH), a Physical Sidelink Control Channel (PSCCH), or a Physical Sidelink Broadcast Channel (PSBCH) in the sidelink.

[0194] The PDCCH, PDSCH, PUSCH, and PUCCH are examples of a downlink control channel, a downlink data channel, an uplink data channel, and an uplink control channel, respectively. The PSCCH and PSSCH are examples of a sidelink control channel and a sidelink data channel. The PBCH and PSBCH are examples of a broadcast channel, and the PRACH is an example of a random access channel.

[0195] (Data Channel / Control Channel) An embodiment of the present disclosure may be applied to, for example, either a data channel or a control channel. For example, the channel in an embodiment of the present disclosure may be replaced with any of the data channels PDSCH, PUSCH, and PSSCH, or the control channels PDCCH, PUCCH, PBCH, PSCCH, and PSBCH.

[0196] (Reference Signal) In one embodiment of the present disclosure, a reference signal is, for example, a signal known by both a base station and a mobile station, and may also be called a Reference Signal (RS) or a pilot signal. The reference signal may be any of a Demodulation Reference Signal (DMRS), a Channel State Information - Reference Signal (CSI-RS), a Tracking Reference Signal (TRS), a Phase Tracking Reference Signal (PTRS), a Cell-specific Reference Signal (CRS), or a Sounding Reference Signal (SRS).

[0197] (Time Interval) In one embodiment of the present disclosure, the unit of time resource is not limited to one or a combination of slots and symbols, but may be, for example, a time resource unit such as a frame, a superframe, a subframe, a slot, a time slot, a subslot, a minislot, a symbol, an Orthogonal Frequency Division Multiplexing (OFDM) symbol, a Single Carrier-Frequency Division Multiplexing Access (SC-FDMA) symbol, or another time resource unit. Furthermore, the number of symbols included in one slot is not limited to the number of symbols exemplified in the above-mentioned embodiment, and may be another number of symbols.

[0198] (Frequency Band) An embodiment of the present disclosure may be applied to either a licensed band or an unlicensed band.

[0199] (Communication) An embodiment of the present disclosure may be applied to communication between a base station and a terminal (Uu link communication), communication between terminals (Sidelink communication), or Vehicle to Everything (V2X) communication. For example, the channel in an embodiment of the present disclosure may be replaced with any of PSCCH, PSSCH, Physical Sidelink Feedback Channel (PSFCH), PSBCH, PDCCH, PUCCH, PDSCH, PUSCH, or PBCH.

[0200] An embodiment of the present disclosure may be applied to a terrestrial network, a non-terrestrial network (NTN) using a satellite or a high altitude pseudo satellite (HAPS), or a terrestrial network in which transmission delay is large compared to the symbol length or slot length, such as a network with a large cell size or an ultra-wideband transmission network.

[0201] (Antenna Port) In one embodiment of the present disclosure, an antenna port refers to a logical antenna (antenna group) consisting of one or more physical antennas. For example, an antenna port does not necessarily refer to a single physical antenna, but may refer to an array antenna consisting of multiple antennas. For example, the number of physical antennas that an antenna port is composed of is not specified, and the antenna port may be specified as the smallest unit by which a terminal station can transmit a reference signal. Furthermore, an antenna port may also be specified as the smallest unit by which a weighting of a precoding vector is multiplied.

[0202] 5G NR System Architecture and Protocol Stack 3GPP continues work on the next release of fifth-generation cellular technology (also referred to simply as "5G"), which includes the development of new radio access technology (NR) operating in the frequency range up to 100 GHz. The first version of the 5G standard was completed at the end of 2017, allowing for the prototyping and commercial deployment of 5G NR-compliant devices (e.g., smartphones).

[0203] For example, the system architecture generally assumes a Next Generation - Radio Access Network (NG-RAN) comprising gNBs. The gNBs provide UE-side termination of NG radio access user plane (SDAP / PDCP / RLC / MAC / PHY) and control plane (RRC) protocols. The gNBs are connected to each other via an Xn interface. The gNBs are also connected to a Next Generation Core (NGC) via a Next Generation (NG) interface, more specifically to an Access and Mobility Management Function (AMF) (e.g., a specific core entity performing AMF) via an NG-C interface, and to a User Plane Function (UPF) (e.g., a specific core entity performing UPF) via an NG-U interface. The NG-RAN architecture is shown in Figure 20 (see, for example, 3GPP TS 38.300 v15.6.0, section 4).

[0204] The NR user plane protocol stack (see, for example, 3GPP TS 38.300, section 4.4.1) includes a PDCP (Packet Data Convergence Protocol (see, for example, TS 38.300, section 6.4)) sublayer, a RLC (Radio Link Control (see, for example, TS 38.300, section 6.3)) sublayer, and a MAC (Medium Access Control (see, for example, TS 38.300, section 6.2)) sublayer, which are terminated on the network side in the gNB. A new access stratum (AS) sublayer (SDAP: Service Data Adaptation Protocol) has also been introduced above PDCP (see, for example, 3GPP TS 38.300, section 6.5). A control plane protocol stack has also been defined for the NR (see, for example, TS 38.300, section 4.4.2). An overview of Layer 2 functions is described in Section 6 of TS 38.300. The functions of the PDCP sublayer, RLC sublayer, and MAC sublayer are listed in clauses 6.4, 6.3, and 6.2 of TS 38.300, respectively. The functions of the RRC layer are listed in clause 7 of TS 38.300.

[0205] For example, the Medium-Access-Control layer handles logical channel multiplexing and scheduling and scheduling-related functions, including handling various numerologies.

[0206] For example, the physical layer (PHY) is responsible for coding, PHY HARQ processing, modulation, multi-antenna processing, and mapping of signals to appropriate physical time-frequency resources. The physical layer also handles mapping of transport channels to physical channels. The physical layer provides services to the MAC layer in the form of transport channels. A physical channel corresponds to a set of time-frequency resources used for transmitting a specific transport channel, and each transport channel is mapped to a corresponding physical channel. For example, physical channels include the Physical Random Access Channel (PRACH), the Physical Uplink Shared Channel (PUSCH), and the Physical Uplink Control Channel (PUCCH) as uplink physical channels, and the Physical Downlink Shared Channel (PDSCH), the Physical Downlink Control Channel (PDCCH), and the Physical Broadcast Channel (PBCH) as downlink physical channels.

[0207] NR use cases / deployment scenarios may include enhanced mobile broadband (eMBB), ultra-reliable low-latency communications (URLLC), and massive machine-type communication (mMTC), which have diverse requirements in terms of data rate, latency, and coverage. For example, eMBB is expected to support peak data rates (20 Gbps in the downlink and 10 Gbps in the uplink) and effective (user-experienced) data rates approximately three times higher than those offered by IMT-Advanced. On the other hand, URLLC imposes stricter requirements on ultra-low latency (0.5 ms for user plane latency in both UL and DL) and high reliability (1-10-5 within 1 ms). Finally, mMTC preferably requires high connection density (1,000,000 devices / km in urban environments).2 ), wide coverage in adverse environments, and extremely long battery life (15 years) for a low-cost device may be desired.

[0208] Therefore, OFDM numerology (e.g., subcarrier spacing, OFDM symbol length, cyclic prefix (CP) length, number of symbols per scheduling interval) suitable for one use case may not be valid for another use case. For example, low-latency services may preferably require a shorter symbol length (and therefore a larger subcarrier spacing) and / or fewer symbols per scheduling interval (also referred to as TTI) than mMTC services. Furthermore, deployment scenarios with large channel delay spreads may preferably require a longer CP length than scenarios with short delay spreads. The subcarrier spacing may be optimized accordingly to maintain similar CP overhead. NR may support one or more subcarrier spacing values. Correspondingly, subcarrier spacings of 15 kHz, 30 kHz, 60 kHz, etc. are currently considered. The symbol length Tu and subcarrier spacing Δf are directly related by the formula Δf = 1 / Tu. Similar to LTE systems, the term "resource element" can be used to mean the smallest resource unit consisting of one subcarrier for the length of one OFDM / SC-FDMA symbol.

[0209] In the new radio system 5G-NR, for each numerology and each carrier, a resource grid of subcarriers and OFDM symbols is defined for each uplink and downlink. Each element of the resource grid is called a resource element and is specified based on a frequency index in the frequency domain and a symbol position in the time domain (see 3GPP TS 38.211 v15.6.0).

[0210] <Functional Separation Between NG-RAN and 5GC in 5G NR> Figure 21 shows the functional separation between NG-RAN and 5GC. The logical node of NG-RAN is gNB or ng-eNB. 5GC has logical nodes AMF, UPF, and SMF.

[0211] For example, gNB and ng-eNB host the following main functions: - Radio Resource Management functions such as Radio Bearer Control, Radio Admission Control, Connection Mobility Control, dynamic allocation (scheduling) of resources to UEs in both uplink and downlink; - IP header compression, ciphering and integrity protection of data; - AMF selection at UE attach time if routing to the AMF cannot be determined from the information provided by the UE; - Routing of user plane data towards the UPF; - Routing of control plane information towards the AMF; - Connection setup and release; - Scheduling and transmission of paging messages; - Scheduling and transmission of system broadcast information (sourced from the AMF or Operation, Admission, Maintenance (OAM)); - Configuration of measurements and measurement reports for mobility and scheduling; - Transport level packet marking in the uplink; - Session management; Support for network slicing; - QoS flow management and mapping to data radio bearers; - Support for UEs in RRC_INACTIVE state; - NAS message delivery function; - Radio access network sharing; - Dual connectivity; - Close coordination between NR and E-UTRA.

[0212] The Access and Mobility Management Function (AMF) hosts the following main functions: - Termination of Non-Access Stratum (NAS) signaling; - Security of NAS signaling; - Security control of Access Stratum (AS); - Signaling between Core Network (CN) nodes for mobility between 3GPP access networks; - Reachability to idle mode UEs (including control and execution of paging retransmissions); - Registration area management; - Support for intra-system and inter-system mobility; - Access authentication; - Access authorization including checking of roaming rights; - Mobility management control (subscription and policy); - Support for network slicing; - Selection of Session Management Function (SMF).

[0213] Furthermore, the User Plane Function (UPF) hosts the following main functions: - anchor point for intra-RAT / inter-RAT mobility (if applicable); - external PDU (Protocol Data Unit) session point for interconnection with data networks; - packet routing and forwarding; - packet inspection and policy rule enforcement for the user plane part; - traffic usage reporting; - uplink classifier to support routing of traffic flows to the data network; - branching point to support multi-homed PDU sessions; - QoS processing for the user plane (e.g. packet filtering, gating, UL / DL rate enforcement); - uplink traffic validation (mapping of SDF to QoS flows); - downlink packet buffering and triggering of downlink data notifications.

[0214] Finally, the Session Management Function (SMF) hosts the following main functions: session management; allocation and management of IP addresses for UEs; selection and control of UPF; configuration of traffic steering in the User Plane Function (UPF) to route traffic to the appropriate destination; policy enforcement and QoS of the control part; downlink data notification.

[0215] <RRC connection setup and reconfiguration procedure> Figure 22 shows some of the interactions between the UE, gNB, and AMF (5GC entities) when the UE transitions from RRC_IDLE to RRC_CONNECTED in the NAS part (see TS 38.300 v15.6.0).

[0216] RRC is a higher layer signaling (protocol) used to configure the UE and gNB. With this transition, the AMF prepares UE context data (including, for example, PDU session context, security keys, UE radio capabilities, UE security capabilities, etc.) and sends it to the gNB along with an INITIAL CONTEXT SETUP REQUEST. The gNB then activates AS security together with the UE. This is done by the gNB sending a SecurityModeCommand message to the UE, and the UE responding with a SecurityModeComplete message to the gNB. The gNB then sends an RRCReconfiguration message to the UE, and upon receiving an RRCReconfigurationComplete from the UE, the gNB performs reconfiguration to set up Signaling Radio Bearer 2 (SRB2) and Data Radio Bearer (DRB). For signaling-only connections, the steps related to RRCReconfiguration are omitted because SRB2 and DRB are not set up. Finally, the gNB notifies the AMF that the setup procedure is complete with an INITIAL CONTEXT SETUP RESPONSE.

[0217] Accordingly, the present disclosure provides a 5th Generation Core (5GC) entity (e.g., AMF, SMF, etc.) that includes: a control circuit that, upon operation, establishes a Next Generation (NG) connection with a gNodeB; and a transmitter that, upon operation, transmits an initial context setup message to the gNodeB via the NG connection so that a signaling radio bearer between the gNodeB and a user equipment (UE) is set up. Specifically, the gNodeB transmits Radio Resource Control (RRC) signaling, including a resource allocation configuration information element (IE), to the UE via the signaling radio bearer. The UE then transmits in uplink or receives in downlink based on the resource allocation configuration.

[0218] <IMT Usage Scenarios Beyond 2020> Figure 23 shows some use cases for 5G NR. The 3rd Generation Partnership Project New Radio (3GPP NR) is considering three use cases envisioned by IMT-2020 to support a wide variety of services and applications. The first phase of specifications for enhanced mobile broadband (eMBB) has been completed. Current and future work includes standardization for ultra-reliable and low-latency communications (URLLC) and massive machine-type communications (mMTC), in addition to expanding support for eMBB. Figure 23 shows some examples of envisioned usage scenarios for IMT beyond 2020 (see, for example, ITU-R M.2083 Figure 2).

[0219] The URLLC use case has stringent performance requirements for throughput, latency, and availability. It is envisioned as one of the enabling technologies for future applications such as wireless control of industrial production or manufacturing processes, remote medical surgery, automated power transmission and distribution in smart grids, and road safety. URLLC's ultra-high reliability is supported by identifying technologies that meet the requirements set by TR 38.913. Key requirements for NR URLLC in Release 15 include a target user plane latency of 0.5 ms on the uplink (UL) and 0.5 ms on the downlink (DL). The overall URLLC requirement for a single packet transmission is a block error rate (BLER) of 1E-5 for a 32-byte packet size with a user plane latency of 1 ms.

[0220] From a physical layer perspective, reliability can be improved in many possible ways. Current room for reliability improvement includes defining a separate CQI table for URLLC, more compact DCI formats, PDCCH repetition, etc. However, this room can be expanded to achieve ultra-high reliability as NR (with respect to the key requirements of NR URLLC) becomes more stable and developed. Specific use cases for NR URLLC in Release 15 include Augmented Reality / Virtual Reality (AR / VR), e-health, e-safety, and mission-critical applications.

[0221] Additionally, the technology enhancements targeted by NR URLLC aim to improve latency and reliability. Technology enhancements for latency improvement include configurable numerology, non-slot-based scheduling with flexible mapping, grant-free (configured grant) uplink, slot-level repetition in the data channel, and preemption in the downlink. Preemption means that a transmission with already allocated resources is stopped and the already allocated resources are used for another transmission with a later requested lower latency / higher priority. Therefore, a previously allowed transmission is preempted by a later transmission. Preemption is applicable regardless of the specific service type. For example, a transmission of service type A (URLLC) may be preempted by a transmission of service type B (eMBB, etc.). Technology enhancements for reliability improvement include a dedicated CQI / MCS table for a target BLER of 1E-5.

[0222] The use case of mMTC (massive machine type communication) is characterized by a very large number of connected devices that typically transmit relatively small amounts of data that are not sensitive to delays. These devices are required to be low-cost and have very long battery life. From the NR perspective, utilizing very narrow bandwidth portions is one solution that saves power and extends battery life from the UE's perspective.

[0223] As mentioned above, the scope of reliability improvement in NR is expected to be broader. One of the key requirements for all cases, for example, URLLC and mMTC, is high or ultra-high reliability. Several mechanisms can improve reliability from a radio perspective and a network perspective. Generally, there are two to three key areas that can help improve reliability. These areas include compact control channel information, repetition of data channels / control channels, and diversity in the frequency, time, and / or spatial domains. These areas are generally applicable to reliability improvement regardless of the specific communication scenario.

[0224] For NR URLLC, further use cases with more stringent requirements are envisioned, such as factory automation, transportation, and power distribution. -6 level reliability), high availability, packet size up to 256 bytes, time synchronization down to a few μs (depending on the use case, the value can be 1 μs or a few μs depending on the frequency range and low latency in the order of 0.5 ms to 1 ms (e.g., targeted user plane latency of 0.5 ms)).

[0225] Furthermore, for NR URLLC, there may be several technical enhancements from the physical layer perspective. These technical enhancements include PDCCH (Physical Downlink Control Channel) enhancements for compact DCI, PDCCH repetition, and increased PDCCH monitoring. Also, UCI (Uplink Control Information) enhancements relate to enhanced Hybrid Automatic Repeat Request (HARQ) and CSI feedback enhancements. There may also be PUSCH enhancements related to minislot-level hopping and retransmission / repetition enhancements. The term "minislot" refers to a Transmission Time Interval (TTI) that contains fewer symbols than a slot (a slot comprises 14 symbols).

[0226] <QoS Control> The 5G Quality of Service (QoS) model is based on QoS flows and supports both QoS flows that require a guaranteed flow bit rate (Guaranteed Bit Rate QoS flows (GBR)) and QoS flows that do not require a guaranteed flow bit rate (non-GBR QoS flows). Thus, at the NAS level, a QoS flow is the finest granularity of QoS classification in a PDU session. A QoS flow is identified within a PDU session by a QoS Flow ID (QFI) carried in an encapsulation header over the NG-U interface.

[0227] For each UE, 5GC establishes one or more PDU sessions. For each UE, the NG-RAN establishes at least one Data Radio Bearer (DRB) for each PDU session, e.g., as shown above with reference to Figure 22. Additional DRBs for the QoS flows of that PDU session can be configured later (when this is up to the NG-RAN). The NG-RAN maps packets belonging to different PDU sessions to different DRBs. NAS-level packet filters in the UE and 5GC associate UL and DL packets with QoS flows, while AS-level mapping rules in the UE and NG-RAN associate UL and DL QoS flows with DRBs.

[0228] Figure 24 shows the non-roaming reference architecture for 5G NR (see TS 23.501 v16.1.0, section 4.23). An Application Function (AF) (e.g., an external application server hosting 5G services, as illustrated in Figure 23) interacts with the 3GPP core network to provide services. For example, it may access a Network Exposure Function (NEF) to support applications that affect traffic routing, or interact with a policy framework for policy control (e.g., QoS control) (see Policy Control Function (PCF)). Based on operator deployment, Application Functions considered trusted by the operator can interact directly with associated Network Functions. Application Functions not permitted by the operator to directly access Network Functions interact with associated Network Functions using an external exposure framework via the NEF.

[0229] Figure 24 further illustrates further functional units of the 5G architecture, namely, Network Slice Selection Function (NSSF), Network Repository Function (NRF), Unified Data Management (UDM), Authentication Server Function (AUSF), Access and Mobility Management Function (AMF), Session Management Function (SMF), and Data Network (DN, e.g., operator-provided services, Internet access, or third-party services). All or part of the core network functions and application services may be deployed and run in a cloud computing environment.

[0230] Therefore, the present disclosure provides an application server (e.g., an AF in a 5G architecture) comprising: a transmitter that, in operation, sends a request including QoS requirements for at least one of a URLLC service, an eMMB service, and an mMTC service to at least one of 5GC functions (e.g., an NEF, an AMF, an SMF, a PCF, an UPF, etc.) to establish a PDU session including a radio bearer between a gNodeB and a UE according to the QoS requirements; and a control circuit that, in operation, performs a service using the established PDU session.

[0231] The present disclosure can be realized by software, hardware, or software in conjunction with hardware. Each functional block used in the description of the above embodiments may be partially or entirely realized as an LSI, which is an integrated circuit, and each process described in the above embodiments may be partially or entirely controlled by a single LSI or a combination of LSIs. The LSI may be composed of individual chips, or may be composed of a single chip that includes some or all of the functional blocks. The LSI may have data input and output. Depending on the degree of integration, the LSI may also be called an IC, system LSI, super LSI, or ultra LSI.

[0232] The integrated circuit method is not limited to LSI, and may be realized by a dedicated circuit, a general-purpose processor, or a dedicated processor. Also, a field programmable gate array (FPGA) that can be programmed after LSI manufacturing, or a reconfigurable processor that can reconfigure the connections and settings of circuit cells within the LSI, may be used. The present disclosure may be realized as digital processing or analog processing.

[0233] Furthermore, if an integrated circuit technology that can replace LSI emerges due to advances in semiconductor technology or other derivative technologies, it is natural that such technology may be used to integrate functional blocks. The application of biotechnology, etc. is also a possibility.

[0234] The present disclosure may be implemented in any type of apparatus, device, or system (collectively referred to as a communications apparatus) that has a communications function. The communications apparatus may include a radio transceiver and processing / control circuitry. The radio transceiver may include a receiver and a transmitter, or both functions. The radio transceiver (transmitter and receiver) may include a radio frequency (RF) module and one or more antennas. The RF module may include an amplifier, an RF modulator / demodulator, or the like. Non-limiting examples of communication devices include telephones (e.g., cell phones, smartphones), tablets, personal computers (PCs) (e.g., laptops, desktops, notebooks), cameras (e.g., digital still / video cameras), digital players (e.g., digital audio / video players), wearable devices (e.g., wearable cameras, smartwatches, tracking devices), game consoles, digital book readers, telehealth / telemedicine devices, communication-enabled vehicles or mobile transportation (e.g., cars, airplanes, ships), and combinations of the above devices.

[0235] The communication devices are not limited to portable or mobile devices, but also include any kind of non-portable or fixed equipment, devices, and systems, such as smart home devices (such as home appliances, lighting equipment, smart meters or measuring devices, control panels, etc.), vending machines, and any other "things" that may exist on an IoT (Internet of Things) network.

[0236] Communications include data communications via cellular systems, wireless LAN systems, communication satellite systems, and the like, as well as data communications via combinations of these.

[0237] A communications apparatus also includes devices such as controllers and sensors connected or coupled to a communications device that performs the communications functions described in this disclosure, such as controllers and sensors that generate control and data signals used by the communications device to perform the communications functions of the communications apparatus.

[0238] The communication apparatus also includes infrastructure facilities, such as base stations, access points, and any other apparatus, device, or system that communicates with or controls the various apparatuses listed above, but are not limited to these.

[0239] A terminal according to one embodiment of the present disclosure includes a control circuit that sets, based on notification information, a second frequency resource from among first frequency resources allocated to uplink transmission in a certain time resource, which second frequency resource is not used for the uplink transmission, and a transmission circuit that performs the uplink transmission based on the second frequency resource.

[0240] In one embodiment of the present disclosure, the notification information is information about resources in subcarrier units.

[0241] In one embodiment of the present disclosure, the notification information is information in a bitmap format indicating whether each of a plurality of subcarriers included in the first frequency resource is the second frequency resource.

[0242] In an embodiment of the present disclosure, the notification information is information indicating a resource allocation configuration for a reference signal.

[0243] In one embodiment of the present disclosure, the control circuit sets the second frequency resource by reducing or shifting the first frequency resource.

[0244] A base station according to one embodiment of the present disclosure includes a control circuit that sets a second frequency resource, among first frequency resources allocated to uplink transmission in a certain time resource, that is not used for the uplink transmission, and a receiving circuit that performs uplink reception based on the second frequency resource.

[0245] In a communication method according to one embodiment of the present disclosure, a terminal sets, based on notification information, a second frequency resource from among first frequency resources allocated to uplink transmission in a certain time resource, which second frequency resource is not used for the uplink transmission, and performs the uplink transmission based on the second frequency resource.

[0246] In a communication method according to one embodiment of the present disclosure, a base station sets a second frequency resource, among first frequency resources allocated to uplink transmission in a certain time resource, that is not used for the uplink transmission, and performs uplink reception based on the second frequency resource.

[0247] The disclosures of the specification, drawings and abstract contained in Japanese Patent Application No. 2023-067127, filed on April 17, 2023, are incorporated herein by reference in their entirety.

[0248] One embodiment of the present disclosure is useful in wireless communication systems.

[0249] 100 Base station 101, 201 Receiving unit 102, 202 Demodulation and decoding unit 103, 203 Muting resource setting unit 104 Scheduling unit 105, 205 Control information holding unit 106, 206 Data and control information generating unit 107, 207 Encoding and modulation unit 108, 208 Transmitting unit 200 Terminal 204 Transmission control unit

Claims

1. A terminal comprising: a control circuit that sets a second frequency resource that does not perform uplink transmission among first frequency resources allocated to uplink transmission in a certain time resource based on notification information; and a transmission circuit that performs the uplink transmission based on the second frequency resource.

2. The terminal according to claim 1, wherein the notification information is information relating to resources on a subcarrier basis.

3. The terminal according to claim 2, wherein the notification information is information in a bitmap format indicating whether each of a plurality of subcarriers included in the first frequency resource is the second frequency resource.

4. The terminal according to claim 2, wherein the notification information is information indicating a resource allocation setting for a reference signal.

5. The terminal according to claim 1, wherein the control circuit sets the second frequency resource by reducing or shifting the first frequency resource.

6. A base station comprising: a control circuit that sets a second frequency resource that is not used for uplink transmission among first frequency resources allocated to uplink transmission in a certain time resource; and a receiving circuit that performs uplink reception based on the second frequency resource.

7. A communication method in which a terminal sets a second frequency resource that is not used for uplink transmission among first frequency resources allocated to uplink transmission in a certain time resource based on notification information, and performs the uplink transmission based on the second frequency resource.

8. A communication method comprising: a base station setting a second frequency resource that is not used for uplink transmission among first frequency resources allocated to uplink transmission in a certain time resource; and performing uplink reception based on the second frequency resource.

Citation Information

Patent Citations

  • Optical signal processing device

    JP2023067127A

  • Base station, mobile terminal, and communication control method

    WO2012086734A1