Pile forming method for jet grouting pile in flowing water sand layer
A technology of rotary jetting and piling, applied in sheet pile wall, construction, infrastructure engineering, etc., can solve the problem of passive water flushing, taking away, leakage of foundation pit, water-stop curtain failing to stop water and interception Groundwater and other issues to achieve the effect of improving the success rate and ensuring quality
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2021-12-03
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1
Abstract
Description
technical field
[0001] The invention relates to a method for forming piles with rotary jetting, in particular to a method for forming piles with rotary jetting in dynamic water sand layers. Background technique
[0002] In construction, transportation and water conservancy projects, it is necessary to build basements or excavate trenches to build foundations; at this time, foundation pit support and water-stop curtains are required. Cast-in-situ piles are usually used for the support piles of deep foundation pits, and the water-stop curtain is usually used as a water stop around the cast-in-place piles with Ф600 mixing piles, large-diameter stirring piles, and three-axis stirring piles, or additional support between the cast-in-place piles. Two single-pipe or double-pipe rotary spraying are used as water stop for rotary spraying piles between piles. After the application, the seepage and impermeability of the cement-soil piles stirred by the stirring piles or the rotary gro...
Examples
Embodiment
[0027] see figure 1 , the present embodiment relates to a pile-forming method of jet-jet piles in dynamic water sand layers, comprising the following steps:
[0028] Construction preparation and technical disclosure: Before construction, the laying of temporary construction, water and electricity, equipment, pipelines, etc. required for construction should be completed. During the construction process, attention should be paid to the following technical requirements: single-pipe jet grouting should be used for jet grouting piles after the foundation pit has been excavated, and double-pipe jet jet jetting can be used for jet grouting piles when the foundation pit has not been excavated. It is 0.7MPa, because when using compressed air, the excavated foundation pit will be flooded with slurry, and the unfavorable factors will affect the safety of the foundation pit. Therefore, the excavated foundation pit should use single-tube rotary grouting piles; Ensure that every employee a...