Method and system for constructing three-dimensional model of curtain wall unit plate

By combining deep learning and adaptive algorithms with the Internet of Things and augmented reality/virtual reality technology, the problem of identification errors and data errors in the construction of 3D models of curtain wall unit panels is solved, achieving highly accurate and adaptable 3D model construction, and reducing Construction adjustments and rework improve the efficiency and quality of construction management.

CN118840485AInactive Publication Date: 2024-10-25五矿二十三冶建设集团有限公司 +1

Patent Information

Application Number
CN202410879287.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-10-25
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing curtain wall unit panel 3D model construction technology has problems such as node identification errors, data conversion errors, inaccurate material information processing, poor matching of standard plate templates and insufficient consideration of construction variables, resulting in increased adjustments and rework during construction.

Method used

Using deep learning, fully automated 3D modeling, adaptive algorithms, the Internet of Things and augmented reality/virtual reality technology, through real-time data fusion and dynamic adjustment, we build highly accurate and adaptable 3D models to provide precise construction guidance and optimization Construction process.

Benefits of technology

It improves the accuracy and efficiency of node identification, reduces errors in manual drawing and data conversion, ensures that the model matches actual needs, reduces construction adjustments and rework, and improves the accuracy and consistency of construction management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118840485A_ABST
    Figure CN118840485A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building information modeling and intelligent building, in particular to a three-dimensional model construction method and system for a curtain wall unit plate, and the method comprises the steps: collecting and processing multi-dimensional data through a data preprocessing algorithm, and generating a standardized data set; identifying and classifying node and material information by using a deep learning model, and generating node identification result data; generating a three-dimensional facade grid and an initial three-dimensional model through full-automatic modeling software; generating and optimizing a standard plate template according to real-time sensor data and field feedback by using an adaptive algorithm; construction data are monitored in real time through an Internet of Things sensor, and the three-dimensional model is dynamically optimized; on the intelligent synthesis and display platform, AR and VR technologies are used for displaying the three-dimensional model and providing immersive model calibration and construction guidance, and through the technical means, the accuracy and efficiency of three-dimensional model construction are improved, the construction process is optimized, accurate construction guidance is provided, and the construction quality and efficiency are remarkably improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building information modeling and intelligent building, and in particular to a method and system for constructing a three-dimensional model of a curtain wall unit panel. Background Art

[0002] The construction of 3D models of curtain wall unit panels is crucial for their design, manufacture, and installation. Accurate 3D models can improve design accuracy, optimize material usage, reduce manufacturing errors, and provide clear guidance during installation. However, the current construction of 3D models of curtain wall unit panels faces a variety of problems, which are mainly due to deficiencies in technical means and processes.

[0003] The current construction of curtain wall unit panel 3D model mainly has the following problems:

[0004] Traditional node recognition software algorithms and AutoCAD have limited integration performance, and complex node designs and multiple material information may lead to recognition errors or omissions; the process of using plan view polyline stretching to generate a three-dimensional facade mesh may introduce errors, especially when the polyline graph is not accurate enough, and this error will be magnified in subsequent three-dimensional modeling; two-dimensional node configuration tools may not be able to accurately parse all details when processing complex nodes and material information, especially when dealing with special-shaped curtain walls or non-standardized designs; standard plate templates may not be able to fully match the details of the actual construction site during application in different locations; automatically generated data may not fully consider variables in actual construction, such as fluctuations in the material supply chain, on-site adjustment requirements, etc., resulting in adjustments and rework during construction; lightweight platforms may not be able to fully display all details when displaying complex three-dimensional models, especially in highly complex, large-scale projects.

[0005] The existing technology (Chinese invention patent, publication number: CN112149211B, title: A curtain wall modeling method and system based on BIM model) has the following shortcomings or defects when facing the above problems:

[0006] Traditional software does not perform well in complex node design and multi-material information processing; manual drawing and data conversion have large errors, and data conversion compatibility issues between different software may cause data loss or errors; two-dimensional node configuration tools are difficult to accurately parse complex nodes and material information, and the generated model does not meet actual needs; standard plate templates are difficult to fully match the details of the actual construction site during application in different locations; the generated data cannot fully consider the variables in actual construction, resulting in adjustments and rework; it is impossible to fully display all details, affecting the construction management effect. Summary of the invention

[0007] In view of the many problems existing in the above-mentioned prior art, the present invention provides a method and system for constructing a three-dimensional model of curtain wall unit panels. The present invention realizes the three-dimensional model construction and optimization of curtain wall unit panels by integrating deep learning, fully automated three-dimensional modeling, adaptive algorithms, the Internet of Things and augmented reality / virtual reality technologies; through the fusion and dynamic adjustment of real-time data, the accuracy and adaptability of the model are improved, precise construction guidance is provided, the construction process is optimized, and the construction quality and efficiency are improved.

[0008] A method for constructing a three-dimensional model of a curtain wall unit panel comprises the following steps:

[0009] Collect multi-dimensional data including design drawing data, material information data, on-site environment data and historical construction data, and clean, standardize and convert the data format through data preprocessing algorithms to generate standardized data sets;

[0010] The standardized data set is input into the deep learning model, and the complex nodes and various material information are identified and classified by the deep learning algorithm to generate node identification result data;

[0011] Input the node identification result data into the fully automated 3D modeling software, directly generate the 3D facade mesh and the initial 3D model from the node identification result data and the design drawings, and generate the initial 3D model data;

[0012] The initial 3D model data is input into the adaptive plate generation module. The adaptive algorithm dynamically generates and adjusts the standard plate template according to the real-time sensor data and field feedback to generate optimized plate template data.

[0013] Deploy IoT sensors at the construction site to monitor various data during the construction process in real time. Use data fusion algorithms to fuse and optimize the real-time data on site with the initial 3D model data to generate real-time optimized 3D model data.

[0014] The real-time optimized 3D model data is input into the intelligent synthesis and display platform, and the 3D model is displayed using augmented reality and virtual reality technologies. Immersive model calibration and construction guidance are provided, and the final 3D curtain wall unit panel model data is generated based on the display and feedback.

[0015] Preferably, the data preprocessing algorithm includes data cleaning, data standardization and data format conversion, wherein the data cleaning removes invalid or duplicate data, the data standardization unifies the data format, and the data format conversion converts the data into the input format required by the system.

[0016] Preferably, the deep learning algorithm identifies and classifies complex nodes and multiple material information in a standardized data set through a convolutional neural network model, and generates node identification result data of node categories, material information, and environmental information. The convolutional neural network model includes multiple convolutional layers, pooling layers, and fully connected layers, and improves the accuracy and efficiency of recognition through multi-layer feature extraction and nonlinear transformation.

[0017] Preferably, the fully automated 3D modeling software generates a 3D facade mesh based on the node identification result data and the design drawings, and generates initial 3D model data through the 3D facade mesh. The modeling software includes a geometry processing module and a mesh optimization module. The geometry processing module is used to convert the node identification result data into geometric information, and the mesh optimization module is used to optimize the generated 3D facade mesh to ensure the accuracy and details of the mesh.

[0018] Preferably, the adaptive algorithm dynamically adjusts the parameters of the standard plate template, including size, material and connection method, through real-time sensor data and on-site feedback to generate optimized plate template data. The adaptive algorithm is based on genetic algorithm and simulated annealing algorithm, and dynamically adjusts the parameters of the plate template through an iterative optimization process to adapt to changes in real-time environment and construction conditions.

[0019] Preferably, the IoT sensor includes an environmental sensor and a construction process sensor. The environmental sensor collects temperature, humidity and wind speed data, and the construction process sensor collects mechanical data and position data to generate real-time environmental data and real-time construction data. The sensor transmits the data in real time to a central database via a wireless network for storage and management to ensure the integrity and timeliness of the data.

[0020] Preferably, the data fusion algorithm fuses the real-time environmental data and real-time construction data with the initial three-dimensional model data, and generates real-time optimized three-dimensional model data through an optimization algorithm. The optimization algorithm includes Kalman filtering and particle filtering algorithms, and realizes real-time optimization and updating of the three-dimensional model by dynamically adjusting model parameters.

[0021] Preferably, the Kalman filter algorithm performs data fusion according to the following formula:

[0022]

[0023] in, is the updated state estimate; is the predicted state estimate; K k is the Kalman gain; z k is the measurement value; H is the measurement matrix.

[0024] Preferably, the particle filter algorithm performs data fusion according to the following formula:

[0025]

[0026] in, is the weight of the ith particle at time k; is the weight of the ith particle at time k-1; is the observation likelihood function of the ith particle at time k.

[0027] A three-dimensional model building system for a curtain wall unit panel, comprising:

[0028] Data collection module, used to collect multi-dimensional data including design drawing data, material information data, on-site environment data and historical construction data;

[0029] The data preprocessing module is used to clean, standardize and convert the format of the collected data through the data preprocessing algorithm to generate a standardized data set;

[0030] A deep learning module is used to input standardized data sets into a deep learning model, identify and classify complex nodes and multiple material information through a deep learning algorithm, and generate node identification result data;

[0031] A 3D modeling module, which is used to input the node identification result data into the fully automated 3D modeling software, directly generate the 3D facade mesh and the initial 3D model from the node identification result data and the design drawings, and generate the initial 3D model data;

[0032] The adaptive plate generation module is used to input the initial 3D model data into the adaptive plate generation module. The adaptive algorithm dynamically generates and adjusts the standard plate template according to the real-time sensor data and field feedback to generate optimized plate template data.

[0033] IoT sensor module, which is used to deploy IoT sensors at the construction site to monitor various data during the construction process in real time;

[0034] A data fusion module is used to fuse and optimize the on-site real-time data with the initial three-dimensional model data through a data fusion algorithm to generate real-time optimized three-dimensional model data;

[0035] The intelligent synthesis and display platform is used to input real-time optimized 3D model data into the intelligent synthesis and display platform, use augmented reality and virtual reality technology to display the 3D model, provide immersive model calibration and construction guidance, and generate the final 3D curtain wall unit panel model data based on the display and feedback.

[0036] Compared with the prior art, the advantages and beneficial effects of the present invention are:

[0037] The present invention improves the accuracy and efficiency of node identification through a deep learning node identification system, and solves the problems of identification errors and omissions in the prior art;

[0038] The present invention uses fully automated 3D modeling software to directly generate 3D facade grids and initial 3D models from node identification result data and design drawings, eliminating errors in manual drawing and data conversion;

[0039] The present invention uses an adaptive algorithm to dynamically generate and adjust standard plate templates based on real-time sensor data and field feedback to ensure that the model is highly matched with actual needs and environment;

[0040] The present invention ensures the synchronization of the model with the actual construction process through real-time monitoring and data fusion of IoT sensors, thus reducing adjustments and rework;

[0041] The present invention uses an intelligent synthesis and display platform and AR and VR technologies to provide immersive model calibration and construction guidance, thereby improving the accuracy and consistency of construction management. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 It is a schematic diagram of the process of the present invention;

[0043] Figure 2 A schematic diagram of deep learning node identification of the present invention;

[0044] Figure 3 This is a flow chart of the fully automated three-dimensional modeling of the present invention;

[0045] Figure 4 Generating a schematic diagram for the adaptive plate of the present invention;

[0046] Figure 5 It is a structural block diagram of the system of the present invention. DETAILED DESCRIPTION

[0047] Hereinafter, embodiments of the present disclosure will be described with reference to the accompanying drawings. However, it should be understood that these descriptions are exemplary only and are not intended to limit the scope of the present disclosure. In the following detailed description, for ease of explanation, many specific details are set forth to provide a comprehensive understanding of the embodiments of the present disclosure. However, it is obvious that one or more embodiments may also be implemented without these specific details. In addition, in the following description, descriptions of known structures and technologies are omitted to avoid unnecessary confusion of the concepts of the present disclosure.

[0048] The terms used herein are only for describing specific embodiments and are not intended to limit the present disclosure. The terms "comprise", "include", etc. used herein indicate the existence of the features, steps, operations and / or components, but do not exclude the existence or addition of one or more other features, steps, operations or components.

[0049] All terms (including technical and scientific terms) used herein have the meanings commonly understood by those skilled in the art, unless otherwise defined. It should be noted that the terms used herein should be interpreted as having a meaning consistent with the context of this specification, and should not be interpreted in an idealized or overly rigid manner.

[0050] In the case of using expressions such as "at least one of A, B, and C, etc.", it should generally be interpreted in accordance with the meaning of the expression generally understood by those skilled in the art (for example, "a system having at least one of A, B, and C" should include but is not limited to a system having A alone, B alone, C alone, A and B, A and C, B and C, and / or A, B, C, etc.). In the case of using expressions such as "at least one of A, B, or C, etc.", it should generally be interpreted in accordance with the meaning of the expression generally understood by those skilled in the art (for example, "a system having at least one of A, B, or C" should include but is not limited to a system having A alone, B alone, C alone, A and B, A and C, B and C, and / or A, B, C, etc.).

[0051] Some block diagrams and / or flow charts are shown in the accompanying drawings. It should be understood that some boxes or combinations thereof in the block diagrams and / or flow charts can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that these instructions can create a device for implementing the functions / operations described in these block diagrams and / or flow charts when executed by the processor. The technology of the present disclosure can be implemented in the form of hardware and / or software (including firmware, microcode, etc.). In addition, the technology of the present disclosure can take the form of a computer program product on a computer-readable storage medium storing instructions, which can be used by an instruction execution system or used in conjunction with an instruction execution system.

[0052] like Figure 1 As shown, a method for constructing a three-dimensional model of a curtain wall unit panel includes the following steps:

[0053] Collect multi-dimensional data including design drawing data, material information data, on-site environment data and historical construction data, and clean, standardize and convert the data format through data preprocessing algorithms to generate standardized data sets;

[0054] Preferably, the data preprocessing algorithm includes data cleaning, data standardization and data format conversion, wherein the data cleaning removes invalid or duplicate data, the data standardization unifies the data format, and the data format conversion converts the data into the input format required by the system.

[0055] The purpose of data cleaning is to improve the quality and reliability of a data set by identifying and removing invalid or duplicate data. Invalid data may include null values, outliers, format errors, etc., while duplicate data refers to redundant records in a data set. The data cleaning process usually involves the following steps:

[0056] (1) Use predefined rules or algorithms (such as conditional filtering and statistical analysis) to filter out invalid or abnormal data.

[0057] (2) For data that can be repaired (such as format errors and null values), interpolation, average value substitution and other methods are used to repair them.

[0058] (3) Use hash algorithms, sorting comparison and other technical means to detect and remove duplicate records.

[0059] Data cleaning can significantly improve the accuracy and consistency of data sets, reduce data noise, and ensure the reliability and effectiveness of subsequent analysis and modeling. For example, in the process of building a 3D model of a curtain wall unit panel, cleaned design drawing data and material information data can provide more accurate input and avoid model errors.

[0060] The purpose of data standardization is to convert data from different sources and in different formats into a unified standard format for subsequent processing and analysis. The standardization process includes the following steps:

[0061] (1) Convert data from different file formats (such as PDF, Excel, DWG) to a unified format (such as CSV, JSON) to ensure data readability and processability.

[0062] (2) Standardize the units of measurement in the data, for example, standardize temperature to degrees Celsius and length to meters.

[0063] (3) Encode classified data, such as converting material categories, node types, etc. into a unified coding format.

[0064] Data standardization can eliminate differences in data sources and improve data compatibility and operability. For example, standardized design drawing data can be directly input into modeling software without additional format conversion and processing, which improves modeling efficiency.

[0065] The purpose of data format conversion is to convert the standardized data into the specific input format required by the system to facilitate subsequent calculations and processing. The conversion process includes the following steps:

[0066] (1) Define the required input data format (such as XML, SQL database format) based on system requirements.

[0067] (2) Map the standardized data to the target format by writing data conversion scripts or using data conversion tools. For example, convert data in CSV format to database table format.

[0068] (3) Verify and check the converted data to ensure that the data format meets the system requirements and that the data is complete and error-free.

[0069] Data format conversion ensures that the data can be correctly identified and processed by the system, improving the efficiency and accuracy of data input. For example, in the process of building a 3D model of a curtain wall unit panel, the format-converted data can be seamlessly imported into the deep learning model and modeling software, reducing the complexity and error rate of data input.

[0070] In one embodiment:

[0071] Design drawing data may contain some invalid sketches or duplicate designs. Through data screening algorithms, these invalid or duplicate data can be detected and removed. After cleaning, only valid and unique design drafts are retained in the design drawing data, improving the quality and reliability of the data.

[0072] Design drawing data may come from different design software (such as AutoCAD, Revit), and their file formats and units may be different. Through the format conversion tool, all design drawing data can be converted to DWG format and unified in meters. The standardized design drawing data format is consistent and the unit is unified, which is convenient for subsequent processing and analysis.

[0073] Modeling software requires a specific input format (such as geometry information in XML format). By writing a conversion script, the standardized DWG data is converted into XML format and the integrity of the conversion results is checked. The converted design drawing data meets the input requirements of the modeling software and can be directly imported, which improves the efficiency and accuracy of data input.

[0074] Through data cleaning, data standardization and data format conversion, the quality and compatibility of data can be significantly improved, ensuring that the data can be correctly identified and processed by the system, providing high-quality input data for the three-dimensional model construction of curtain wall unit panels, thereby improving the accuracy and efficiency of the entire modeling process.

[0075] like Figure 2 As shown, the standardized data set is input into the deep learning model, and the complex nodes and various material information are identified and classified by the deep learning algorithm to generate node identification result data;

[0076] Preferably, the deep learning algorithm identifies and classifies complex nodes and multiple material information in a standardized data set through a convolutional neural network model, and generates node identification result data of node categories, material information, and environmental information. The convolutional neural network model includes multiple convolutional layers, pooling layers, and fully connected layers, and improves the accuracy and efficiency of recognition through multi-layer feature extraction and nonlinear transformation.

[0077] The convolutional neural network model consists of multiple convolutional layers, pooling layers, and fully connected layers. The convolutional layer is used to extract local features from the input data, the pooling layer is used for downsampling to reduce the amount of calculation and control overfitting, and the fully connected layer is used to integrate feature information and perform final classification.

[0078] Each convolution layer consists of multiple convolution kernels (filters) that slide over the input data and extract features of different scales and directions through convolution operations. The formula is as follows:

[0079]

[0080] in, is the output of the kth convolution kernel at position (i, j); x is the input data; w is the convolution kernel weight; b is the bias term; M and N are the height and width of the convolution kernel respectively.

[0081] The pooling layer reduces the resolution of the feature map through downsampling operations (such as maximum pooling or average pooling), thereby reducing the amount of calculation and model complexity. The formula for the maximum pooling operation is:

[0082]

[0083] ∨m,n∈pooling window

[0084] Among them, y i,j is the output after the pooling operation; x is the input data; pooling window is the size of the pooling window.

[0085] The fully connected layer converts the feature vector output by the pooling layer into a classification result through matrix multiplication. The formula is:

[0086] y=Wx+b

[0087] Among them, y is the output vector; W is the weight matrix; x is the input feature vector; b is the bias term.

[0088] The stacking of convolutional layers and pooling layers constitutes a deep model that can extract local features, combined features, and high-level features of data layer by layer. Through multi-layer feature extraction, the complex characteristics of node and material information can be captured, improving the accuracy of recognition.

[0089] After each convolutional layer and fully connected layer, a nonlinear activation function (such as ReLU, Sigmoid, Tanh) is usually applied to introduce nonlinear transformations so that the model can learn and represent complex nonlinear relationships. The formula for the ReLU activation function is:

[0090] f(x) = max(0, x)

[0091] Among them, f(x) is the output of the activation function and x is the input value.

[0092] Through the convolutional neural network model, the complex node and material information in the input data is extracted and converted layer by layer, and finally classified in the fully connected layer to generate node recognition result data of node category, material information and environmental information.

[0093] The classifier makes predictions based on the feature vector, calculates the probability of each category through the Softmax function, and selects the category corresponding to the maximum probability as the final prediction result. The formula of the Softmax function is:

[0094]

[0095] Where P(y=j|x) is the probability that the input feature x belongs to category j; W j is the weight vector of category j; K is the total number of categories.

[0096] In the present invention, multi-layer feature extraction and nonlinear transformation enable the convolutional neural network to capture complex node and material information characteristics, improving the accuracy of recognition. Compared with the traditional manual feature extraction method, the convolutional neural network can automatically learn and optimize feature representation, reducing human intervention and errors.

[0097] In the present invention, the convolutional neural network can make full use of parallel computing resources such as GPUs to accelerate the model training and prediction process and improve recognition efficiency. In practical applications, this means that a large amount of design drawing data and material information can be quickly processed and recognized.

[0098] In one embodiment, identifying and classifying curtain wall nodes includes:

[0099] (1) Data extracted and standardized from design drawings and material information, including node geometry information and material properties.

[0100] (2) The convolutional neural network model structure includes:

[0101] Convolutional layer: 3 convolutional layers, each layer contains 32 3x3 convolution kernels, and the activation function is ReLU.

[0102] Pooling layer: A 2x2 max pooling layer is added after each convolutional layer.

[0103] Fully connected layers: 2 fully connected layers, the first fully connected layer has 128 neurons, and the second fully connected layer is the output layer, using the Softmax activation function.

[0104] (3) The training process includes:

[0105] The standardized dataset was divided into a training set and a validation set with a ratio of 8:2. The Adam optimization algorithm was used with a learning rate of 0.001 for 50 epochs. The loss function was calculated and the model parameters were updated in each epoch.

[0106] (4) Identification and classification:

[0107] Validated using unseen test data, the model outputs recognition result data of node category, material information, and environmental information with an accuracy of 95%.

[0108] The convolutional neural network model can efficiently and accurately identify and classify complex nodes and multiple material information in standardized data sets. The multi-layer feature extraction of the convolutional layer and the pooling layer, as well as the comprehensive feature representation of the fully connected layer, ensure the high accuracy and efficiency of the model, and significantly improve the data processing capabilities in the process of building the three-dimensional model of the curtain wall unit panel.

[0109] like Figure 3 As shown, the node identification result data is input into the fully automated 3D modeling software, and the 3D facade mesh and the initial 3D model are directly generated from the node identification result data and the design drawings to generate the initial 3D model data;

[0110] Preferably, the fully automated 3D modeling software generates a 3D facade mesh based on the node identification result data and the design drawings, and generates initial 3D model data through the 3D facade mesh. The modeling software includes a geometry processing module and a mesh optimization module. The geometry processing module is used to convert the node identification result data into geometric information, and the mesh optimization module is used to optimize the generated 3D facade mesh to ensure the accuracy and details of the mesh.

[0111] The node recognition result data from the deep learning algorithm includes node category, material information, and environmental information. These data provide detailed characteristics and attribute information of the curtain wall nodes.

[0112] The standardized and pre-processed design drawing data provides the geometric layout and structural design information of the curtain wall unit panels.

[0113] By combining the node identification result data with the design drawing data, the automated modeling software can generate a 3D facade mesh. The 3D facade mesh is the skeleton of the initial 3D model, reflecting the overall layout and shape of the curtain wall unit panels.

[0114] The geometry processing module is responsible for converting the node recognition result data into geometric information. Specifically, it converts the node's position, connection relationship and geometric properties (such as size and shape) into a three-dimensional geometric model. The formula is as follows:

[0115] G ij =f(N ij , D ij )

[0116] Among them, G ij represents the geometric relationship between nodes i and j, N ij represents the position of node i and node j, D ij It represents the geometric properties of nodes i and j, and f is the geometric processing function.

[0117] According to the geometric information generated by the geometry processing module, a three-dimensional facade mesh is constructed. The mesh consists of nodes and edges. Nodes represent key points of the curtain wall, and edges represent the connection relationship between nodes.

[0118] On the basis of generating the 3D facade mesh, the initial 3D model is further constructed, which includes the detailed geometric form and structural information of the curtain wall unit panels.

[0119] The mesh optimization module is used to optimize the generated 3D facade mesh to ensure the accuracy and details of the mesh.

[0120] The initially generated 3D facade mesh is refined and optimized to improve the accuracy and detail of the model. For example, irregularities and discontinuities in the mesh are eliminated through interpolation algorithms and smoothing. The optimization formula is as follows:

[0121] G i ' j =opt(G ij )

[0122] Among them, G i ' j Represents the optimized geometric relationship, opt is the optimization function.

[0123] Through the present invention, the geometry processing module can accurately convert the node identification result data into three-dimensional geometry information, ensuring that the generated three-dimensional facade mesh reflects the actual design and structure; through geometry processing, the basic construction of the model is more accurate, reducing errors in subsequent modeling. From node identification to three-dimensional facade mesh generation and optimization, the whole process is automated, which significantly improves modeling efficiency; reduces the time and cost of manual intervention, and increases the speed of model construction. The mesh optimization module improves the model's detail expression ability by optimizing the three-dimensional facade mesh; the optimized mesh is smoother and more continuous, and can better reflect the complex shape and details of the curtain wall unit panel.

[0124] In one embodiment, the curtain wall unit panel 3D model is constructed:

[0125] Node categories, material information, and environmental information identified by deep learning algorithms. Standardized and pre-processed design drawing data, including the geometric layout and structural design information of the curtain wall.

[0126] The geometry processing module converts the node recognition result data into geometry information and generates a preliminary geometry model. A three-dimensional geometry model is generated based on the node positions, connection relationships, and geometry attributes. For example, the positions and attributes of nodes N1 and N2 are converted into the geometry relationship G 12 .

[0127] Generate a 3D facade mesh based on the geometric information as the skeleton of the initial 3D model. Construct a mesh consisting of nodes and edges, where nodes represent key points and edges represent the connection relationship between nodes.

[0128] The mesh optimization module optimizes the 3D facade mesh to improve the accuracy and details of the model. It uses interpolation algorithms and smoothing to optimize the initially generated 3D facade mesh and generate the optimized geometric relationship G i ' j .

[0129] Based on the optimized 3D facade mesh, the initial 3D model is constructed, which contains the detailed geometric form and structural information of the curtain wall unit panels. The optimized geometric relationship is converted into a complete 3D model, and the initial 3D model data is output.

[0130] In summary, the fully automated 3D modeling software can efficiently and accurately convert the node identification result data and design drawing data into 3D facade meshes, and generate the initial 3D model data through optimization. The synergy of the geometry processing module and the mesh optimization module improves the accuracy, efficiency and detail expression of modeling, and significantly improves the data processing capability and model expression in the process of building the 3D model of the curtain wall unit panel.

[0131] like Figure 4 As shown, the initial three-dimensional model data is input into the adaptive plate generation module, and the adaptive algorithm dynamically generates and adjusts the standard plate template according to the real-time sensor data and field feedback to generate optimized plate template data;

[0132] Preferably, the adaptive algorithm dynamically adjusts the parameters of the standard plate template, including size, material and connection method, through real-time sensor data and on-site feedback to generate optimized plate template data. The adaptive algorithm is based on genetic algorithm and simulated annealing algorithm, and dynamically adjusts the parameters of the plate template through an iterative optimization process to adapt to changes in real-time environment and construction conditions.

[0133] Real-time sensor data and on-site feedback provide real-time information on environmental conditions and construction status. This data includes temperature, humidity, wind speed, construction progress, material deformation, etc. Through sensors and feedback systems deployed at the construction site, this information can be continuously collected. The collected real-time data and feedback information are input into the adaptive algorithm to dynamically adjust the parameters of the standard plate template.

[0134] Genetic algorithm is an optimization algorithm that simulates natural selection and genetic mechanisms. It iteratively searches for the optimal solution among multiple candidate solutions through selection, crossover and mutation operations. The formula is as follows:

[0135] f′=mutate(crossover(select(f)))

[0136] Among them, f is the current candidate solution set; select is the selection operation; crossover is the crossover operation; mutate is the mutation operation; f′ is the new candidate solution set.

[0137] The simulated annealing algorithm is a global optimization algorithm that simulates the annealing process of a substance during cooling, accepts a worse solution with a certain probability to jump out of the local optimal solution, and gradually converges to the global optimal solution. The formula is as follows:

[0138]

[0139] Among them, P(E) is the acceptance probability; ΔE is the energy difference, k is a constant, and T is the temperature.

[0140] The adaptive algorithm dynamically adjusts the parameters of the standard plate template, including size, material and connection method, through genetic algorithm and simulated annealing algorithm. The specific steps are as follows:

[0141] (1) Initial solution generation: Generate an initial standard plate template based on the initial 3D model data as the initial solution of the algorithm.

[0142] (2) Iterative optimization: Genetic algorithms are used to perform selection, crossover, and mutation operations to continuously generate new candidate solutions, and simulated annealing algorithms are used to determine whether to accept these solutions to avoid falling into local optimal solutions.

[0143] (3) Fitness evaluation: Based on real-time sensor data and field feedback, the fitness of each candidate solution is evaluated and the optimal solution is selected for the next round of iteration. The fitness evaluation formula is:

[0144]

[0145] Among them, F(x) is the fitness of candidate solution x, w i is the weight of the i-th evaluation index, f i(x) is the value of the i-th evaluation index.

[0146] After reaching the iteration termination condition (such as the maximum number of iterations or the fitness change is less than the set threshold), the current optimal solution is selected as the final solution to generate the optimized plate template data. The optimized plate template data is output, including the adjusted size, material and connection method.

[0147] In the present invention, the adaptive algorithm can dynamically adjust the plate template parameters according to real-time sensor data and on-site feedback, ensuring that the plate template adapts to the actual construction environment and conditions, and improving the construction accuracy and effect. The combination of genetic algorithm and simulated annealing algorithm can search for the optimal solution in a global range, avoid falling into the local optimal solution, ensure the global optimality of the plate template parameters, and improve the overall performance of the model. Through the iterative optimization process, the adaptive algorithm can gradually approach the optimal solution, continuously improve the fitness of the plate template during the optimization process, and ensure that the plate template data finally generated best meets the actual needs.

[0148] In one embodiment, adaptive optimization of curtain wall panel templates:

[0149] The standard plate template is generated based on the initial 3D model data, including the initial size, material and connection method. The temperature, humidity, wind speed, material deformation and other data collected at the construction site.

[0150] The adaptive algorithm process includes:

[0151] (1) Initial solution generation: Generate an initial standard plate template based on the initial 3D model data as the initial solution of the adaptive algorithm.

[0152] (2) Genetic algorithm operation: select plate templates with high fitness for crossover and mutation to generate new candidate solutions.

[0153] (3) Simulated annealing operation: Through the simulated annealing algorithm, solutions with lower fitness are accepted with a certain probability to escape from the local optimal solution.

[0154] (4) Fitness evaluation: Based on real-time sensor data and field feedback, the fitness of each candidate solution is evaluated, and the solution with the highest fitness is selected for the next round of iteration.

[0155] Perform iterative optimization, repeat the genetic algorithm and simulated annealing operations, and gradually optimize the plate template parameters, including size, material and connection method. Evaluation formula:

[0156]

[0157] Among them, F(x) is the fitness of candidate solution x, w i is the weight of the i-th evaluation index, f i(x) is the value of the i-th evaluation index.

[0158] When the number of iterations reaches the preset upper limit or the fitness change is less than the set threshold, the iteration is stopped; the current optimal solution is selected as the final solution, and the optimized plate template data is generated; the optimized plate template data is output, including the adjusted size, material and connection method.

[0159] In summary, the present invention can efficiently and accurately adjust the parameters of the standard plate template according to real-time sensor data and on-site feedback through an adaptive algorithm. The combination of genetic algorithm and simulated annealing algorithm ensures the global optimality and dynamic adaptability of the plate template parameters, and improves the accuracy and efficiency of the three-dimensional model construction process of the curtain wall unit panel. The optimized plate template data can better adapt to the actual construction environment and conditions, ensuring the accuracy and consistency of the construction effect.

[0160] Deploy IoT sensors at the construction site to monitor various data during the construction process in real time. Use data fusion algorithms to fuse and optimize the real-time data on site with the initial 3D model data to generate real-time optimized 3D model data.

[0161] IoT sensors are deployed at key locations on the construction site to monitor various data during the construction process in real time. The sensors include environmental sensors and construction process sensors. The former monitor environmental factors such as temperature, humidity, and wind speed, while the latter monitor construction-related information such as mechanical data, position data, and equipment status. All sensors are connected through a wireless network to form an IoT system, ensuring that data can be transmitted to the central database in real time for storage and processing.

[0162] Sensors continuously monitor and collect environmental and construction data, and transmit them to the central database in real time via wireless networks. Lightweight transmission protocols such as MQTT (Message Queue Telemetry Transport) or HTTP are used to ensure data transmission efficiency and reliability.

[0163] The initial 3D model data generated by the fully automated 3D modeling software contains the detailed geometric shape and structural information of the curtain wall unit panels.

[0164] The real-time collected field data is integrated with the initial 3D model data to optimize and update the 3D model in real time to reflect the current construction status and environmental conditions. Data fusion and model optimization are achieved by dynamically adjusting model parameters using data fusion algorithms such as Kalman filtering and particle filtering algorithms.

[0165] By deploying IoT sensors at the construction site, real-time monitoring of various data during the construction process, and fusing and optimizing the real-time data on site with the initial 3D model data through data fusion algorithms, real-time optimized 3D model data can be generated, which can significantly improve the real-time, accuracy and adaptability of the 3D model. Real-time optimized 3D model data can not only reflect the current construction status and environmental conditions, but also provide accurate construction guidance for construction personnel, improving construction quality and efficiency.

[0166] Preferably, the IoT sensor includes an environmental sensor and a construction process sensor. The environmental sensor collects temperature, humidity and wind speed data, and the construction process sensor collects mechanical data and position data to generate real-time environmental data and real-time construction data. The sensor transmits the data in real time to a central database via a wireless network for storage and management to ensure the integrity and timeliness of the data.

[0167] Environmental sensors are used to monitor environmental conditions at construction sites, including temperature, humidity, and wind speed. Specific sensor types include temperature sensors, humidity sensors, and wind speed sensors. Specifically:

[0168] Temperature Sensor: Use thermistors or thermocouples to measure the temperature at the construction site.

[0169] Humidity Sensor: Use capacitive or resistive humidity sensors to detect the humidity content in the air.

[0170] Wind speed sensor: Uses ultrasonic or mechanical anemometer to measure wind speed.

[0171] Construction process sensors are used to monitor the status of equipment and structures during the construction process, including mechanical data and position data. Specific sensor types include strain sensors, acceleration sensors, and GPS positioning sensors.

[0172] Specifically:

[0173] Strain sensors: Use resistance strain gauges or fiber optic strain sensors to monitor the deformation and stress of structural components.

[0174] Accelerometers: Use MEMS accelerometers to detect vibration and shock on construction equipment and structures.

[0175] GPS Positioning Sensor: Use GPS modules to precisely locate the location of construction equipment and structures.

[0176] Real-time data collection Environmental sensors and construction process sensors continuously monitor and collect field data. Environmental data include: temperature, humidity and wind speed data. Construction data include: mechanical data (such as stress, strain, acceleration) and position data. The sensor performs preliminary processing on the collected raw data, such as filtering, denoising and data format conversion, to generate real-time environmental data and real-time construction data.

[0177] Use appropriate wireless transmission protocols (such as MQTT, Zigbee, LoRa) to transmit data from sensors to the central database. Specifically:

[0178] MQTT: A lightweight message transmission protocol suitable for low-bandwidth and high-latency network environments.

[0179] Zigbee: A low-power, low-data-rate wireless networking protocol suitable for sensor networks.

[0180] LoRa: A long-distance, low-power wireless transmission technology suitable for large-scale sensor deployment.

[0181] The data transmission process includes: the sensor packages the collected data into data packets and prepares them for wireless transmission; the data packets are transmitted to the central database via the wireless network; the central database receives and unpacks the data packets and stores the data.

[0182] The central database stores the received real-time data to ensure the integrity and traceability of the data. The database management system (such as MySQL, MongoDB) is used to manage the stored data and provide data query, analysis and processing functions. Data encryption, access control and backup mechanisms are used to ensure the security and reliability of the data.

[0183] In summary, the environmental sensors and construction process sensors in the present invention collect the environment and construction data of the construction site in real time to ensure the timeliness and accuracy of the data. Real-time data is transmitted to the central database via a wireless network, and construction management personnel can obtain and analyze the on-site data in real time, and make decisions and adjustments in a timely manner. The sensor transmits the data to the central database in real time via a wireless network to ensure the integrity and traceability of the data. Encryption, access control and backup mechanisms are used to ensure the security of data during transmission and storage. Through real-time monitoring and feedback, construction management personnel can dynamically adjust construction plans and processes based on on-site data to improve construction efficiency and quality. Real-time data provides accurate environmental and construction status information, helping construction management personnel to accurately control and manage, and reduce construction errors and rework rates.

[0184] By deploying IoT sensors at the construction site, the environment and construction data during the construction process are monitored in real time, and the data is transmitted to the central database in real time through the wireless network for storage and management, ensuring the integrity and timeliness of the data. The real-time monitoring and feedback mechanism improves the accuracy and dynamic adaptability of construction management, optimizes the construction process, and significantly improves the data processing capability and construction quality during the construction of the three-dimensional model of the curtain wall unit panel.

[0185] Preferably, the data fusion algorithm fuses the real-time environmental data and real-time construction data with the initial three-dimensional model data, and generates real-time optimized three-dimensional model data through an optimization algorithm. The optimization algorithm includes Kalman filtering and particle filtering algorithms, and realizes real-time optimization and updating of the three-dimensional model by dynamically adjusting model parameters.

[0186] Data fusion is the integration of data from multiple sources to provide more accurate and comprehensive information. In the process of building a 3D model of curtain wall unit panels, the data fusion algorithm integrates real-time environmental data, real-time construction data and initial 3D model data to generate real-time optimized 3D model data.

[0187] Real-time environmental data includes: temperature, humidity, wind speed, etc., which are collected in real time by environmental sensors.

[0188] Real-time construction data includes: mechanical data (such as stress, strain, acceleration) and position data, which are collected in real time by sensors during the construction process.

[0189] Initial 3D model data: The initial 3D model data generated by fully automated 3D modeling software contains the detailed geometric shape and structural information of the curtain wall unit panel.

[0190] Kalman filtering is a recursive least squares estimation method for state estimation of linear systems. By predicting and updating the state of the system, Kalman filtering can provide optimal estimates in a noisy environment. Based on the state estimate of the previous step and the current input, predict the state at the next moment; predict the error covariance at the next moment; calculate the Kalman gain to weigh the predicted value and the observed value; update the state estimate based on the observed value; and update the error covariance.

[0191] Particle filtering is an optimal estimation method for nonlinear and non-Gaussian systems based on the Monte Carlo method. State estimation is achieved by generating and updating a particle swarm, including: generating a set of particles, each particle represents a possible system state; updating the weight of each particle according to the observed value; resampling the particles according to the weight to maintain the diversity and representativeness of the particle swarm.

[0192] Through Kalman filtering and particle filtering algorithms, real-time environmental data, real-time construction data and initial 3D model data are integrated, model parameters are dynamically adjusted, and real-time optimization and updating of 3D models are achieved. Real-time optimized 3D model data is generated, including detailed geometric morphology and structural information of curtain wall unit panels under current construction status and environmental conditions.

[0193] The present invention improves the accuracy and reliability of the model by integrating real-time data with initial model data. Kalman filtering and particle filtering can effectively handle noise and uncertainty and provide optimal estimates. The real-time optimization algorithm can dynamically adjust the model parameters according to the latest field data to ensure that the model always reflects the current construction status and environmental conditions.

[0194] The data fusion algorithm can quickly respond to changes in the environment and construction conditions, dynamically update the 3D model, and improve the adaptability and flexibility of the model. Through the iterative optimization process, the accuracy and detail expression of the model are continuously improved to ensure precise control and management during the construction process.

[0195] Preferably, the Kalman filter algorithm performs data fusion according to the following formula:

[0196]

[0197] in, is the updated state estimate; is the predicted state estimate; K k is the Kalman gain; z k is the measurement value; H is the measurement matrix.

[0198] The Kalman filter algorithm is used for state estimation of linear dynamic systems and can provide optimal estimation in a noisy environment. It dynamically adjusts the system state and improves the estimation accuracy by combining the system's prediction model and measurement data.

[0199] Kalman filtering continuously predicts and updates state estimates, integrates real-time environmental data and real-time construction data with initial 3D model data, and achieves real-time optimization and updating of 3D models. By adjusting the Kalman gain, Kalman filtering can balance the influence of the prediction model and measurement data, and improve the accuracy and robustness of state estimation.

[0200] The present invention uses the prediction and update steps of Kalman filtering, and the model can dynamically adjust parameters according to real-time data to improve the accuracy and reliability of the model; Kalman filtering can effectively process process noise and measurement noise in the system, provide optimal state estimation, and reduce the impact of noise on the model.

[0201] Kalman filtering can respond to changes in the environment and construction conditions in real time, dynamically update the three-dimensional model, and ensure that the model always reflects the current construction status and environmental conditions; the recursive process of Kalman filtering ensures the continuity and stability of model optimization and avoids drastic fluctuations in model parameters.

[0202] Through the Kalman filter algorithm, real-time environmental data and real-time construction data can be effectively integrated with the initial 3D model data, and model parameters can be dynamically adjusted to achieve real-time optimization and updating of the 3D model. The recursive process of Kalman filtering ensures the accuracy and stability of state estimation, can effectively handle noise in the system, and improve the accuracy and adaptability of the model. Real-time optimized 3D model data provides precise guidance and management for the construction process, improving construction quality and efficiency.

[0203] Preferably, the particle filter algorithm performs data fusion according to the following formula:

[0204]

[0205] in, is the weight of the ith particle at time k; is the weight of the ith particle at time k-1; is the observation likelihood function of the ith particle at time k.

[0206] Particle filtering is a recursive Bayesian filter based on the Monte Carlo method, which is used for state estimation of nonlinear and non-Gaussian dynamic systems. It achieves state estimation by generating and updating a set of random samples (particles) to approximate the posterior probability distribution of the system.

[0207] The particle filter integrates the real-time environmental data and real-time construction data with the initial 3D model data through prediction and update steps to achieve real-time optimization and update of the 3D model. By continuously updating the weights and states of particles, the particle filter can adapt to the dynamic changes of environmental and construction conditions and improve the accuracy of state estimation.

[0208] In the present invention, the particle filter can effectively process nonlinear and non-Gaussian systems by generating and updating multiple particles, and improve the accuracy and robustness of state estimation. By updating the state and weight of particles in real time, the dynamic fusion of real-time data is realized, and the real-time and adaptability of the model are improved.

[0209] Through the resampling process, particle filtering can effectively avoid the problem of particle degradation, maintain the diversity of particle sets, and reduce estimation errors and uncertainties; by continuously adjusting the weights and states of particles, it can achieve dynamic optimization of the system state and improve the accuracy of the model.

[0210] Through the particle filter algorithm, real-time environmental data and real-time construction data can be effectively integrated with the initial 3D model data, and model parameters can be dynamically adjusted to achieve real-time optimization and updating of the 3D model. Particle filtering can effectively handle nonlinear and non-Gaussian systems through multi-particle parallel estimation and resampling processes, and improve the accuracy and robustness of state estimation. Real-time optimized 3D model data provides precise guidance and management for the construction process, improving construction quality and efficiency.

[0211] The real-time optimized 3D model data is input into the intelligent synthesis and display platform, and the 3D model is displayed using augmented reality and virtual reality technologies. Immersive model calibration and construction guidance are provided, and the final 3D curtain wall unit panel model data is generated based on the display and feedback.

[0212] Real-time optimized 3D model data generated by data fusion algorithms (such as Kalman filtering and particle filtering). These data reflect the detailed geometric shape and structural information of the curtain wall unit panels under the current construction status and environmental conditions. Real-time optimized 3D model data is usually stored in a standardized 3D format, such as IFC (Industry Foundation Classes), OBJ or STL format, to ensure that the data can be recognized and processed by the intelligent synthesis and display platform.

[0213] The intelligent synthesis and display platform integrates augmented reality (AR) and virtual reality (VR) technologies for the display, calibration and construction guidance of 3D models. The platform usually includes the following modules:

[0214] (1) Data import module: responsible for receiving and parsing the real-time optimized 3D model data and converting it into a format that can be recognized by the platform.

[0215] (2) Rendering engine: Utilizes the graphics processing unit (GPU) for efficient 3D model rendering, supporting real-time lighting, shadow, and material effects.

[0216] (3) AR / VR interface: Provides interfaces with AR / VR devices, supports head-mounted displays (such as HoloLens, Oculus Rift), projection devices, and mobile devices.

[0217] (4) User interaction module: supports users to interact with 3D models through gestures, voice, controllers, etc., providing an immersive experience.

[0218] Augmented reality (AR) superimposes virtual 3D models onto the real world, and uses device cameras and sensors to capture and identify environmental information in real time, aligning the virtual model with the real scene. Common AR devices include Microsoft HoloLens and mobile AR applications.

[0219] Virtual reality (VR) creates a completely virtual environment, and users interact with the virtual environment through head-mounted displays and controllers. Common VR devices include Oculus Rift, HTC Vive, etc.

[0220] Through AR / VR technology, the 3D model is accurately positioned at the actual construction site to ensure the alignment of the virtual model with the actual structure. The calibration process includes: using the device sensor to scan the construction site and generate an environmental map; matching the real-time optimized 3D model with the environmental map to align the position, direction and scale.

[0221] In the AR / VR environment, construction workers can view and operate virtual models to obtain construction steps, precautions and specific operation instructions. Construction guidance includes: gradually showing construction steps and operation methods in a virtual environment; prompting key nodes and potential risks to ensure construction safety and quality; providing instant feedback and suggestions based on actual operations during the construction process to help construction workers adjust and optimize operations.

[0222] The present invention uses the calibration function of AR / VR technology to ensure the precise alignment of the virtual model with the actual structure, reduce construction errors, and improve construction accuracy. It provides real-time operation guidance and feedback during the construction process to help construction personnel accurately perform each step of the operation and improve construction quality.

[0223] Through AR / VR equipment, construction workers can view and operate 3D models in an immersive way, gaining a more intuitive understanding and experience. Users can interact with 3D models through gestures, voice and other methods, increasing the flexibility and convenience of operation.

[0224] Based on the real-time optimized 3D model data, construction personnel can adjust construction plans and operations at any time to adapt to changes in the on-site environment and conditions. Through virtual demonstrations and real-time feedback, potential risks can be identified and avoided in advance to ensure safe and smooth construction.

[0225] like Figure 5 As shown, a three-dimensional model building system for curtain wall unit panels includes:

[0226] The data collection module is used to collect multi-dimensional data, including design drawing data, material information data, on-site environment data, and historical construction data. The data collection module is used to collect multi-dimensional data, including design drawing data, material information data, on-site environment data, and historical construction data. By integrating different data sources, comprehensive information is provided to support the construction of the 3D model. The collected multi-dimensional data ensures the accuracy and comprehensiveness of the 3D model, so that the model can reflect the actual design and construction situation.

[0227] Design drawing data: exported from CAD system, including floor plan, elevation, section, etc.

[0228] Material information data: including material type, specifications, performance parameters, etc., obtained from the material supplier's database.

[0229] On-site environmental data: Use sensors to monitor the temperature, humidity, wind speed and other environmental data of the construction site in real time.

[0230] Historical construction data: extracted from the construction management system, including construction progress, process flow, quality control and other information of previous projects.

[0231] The data preprocessing module is used to clean, standardize and convert the format of the collected data through the data preprocessing algorithm to generate a standardized data set; the data preprocessing module cleans, standardizes and converts the format of the collected data through the data preprocessing algorithm to generate a standardized data set. Data cleaning removes invalid or duplicate data, data standardization unifies the data format, and data format conversion converts the data into the input format required by the system. The preprocessed data set has a unified format, eliminating data inconsistency and redundancy, and improving the efficiency and accuracy of subsequent processing and analysis. Data cleaning uses algorithms to detect and delete duplicate, missing or unreasonable data records. Data standardization converts data from different sources into a unified unit and format, such as unifying material specifications into millimeters and temperatures into degrees Celsius. Data format conversion converts CAD drawing data into a parsable 3D model format, such as IFC or OBJ.

[0232] The deep learning module is used to input standardized data sets into the deep learning model, identify and classify complex nodes and various material information through the deep learning algorithm, and generate node recognition result data; input standardized data sets into the deep learning model, identify and classify complex nodes and various material information through the deep learning algorithm, and generate node recognition result data. Convolutional neural network (CNN) is used for feature extraction to improve the accuracy and efficiency of recognition. The deep learning module greatly improves the accuracy and efficiency of node recognition and can handle complex designs and diverse material information.

[0233] Convolutional Neural Network (CNN) uses multiple layers of convolutional and pooling layers to extract features of nodes and materials.

[0234] The training dataset uses a large amount of labeled data to train the deep learning model, enabling it to accurately identify and classify nodes and materials.

[0235] The recognition results output the type, location and material information of each node to form node recognition result data.

[0236] The 3D modeling module is used to input the node recognition result data into the fully automated 3D modeling software, directly generate the 3D facade mesh and the initial 3D model from the node recognition result data and the design drawings, and generate the initial 3D model data; input the node recognition result data into the fully automated 3D modeling software, directly generate the 3D facade mesh and the initial 3D model from the node recognition result data and the design drawings. The modeling software includes a geometry processing module and a mesh optimization module to ensure that the generated model is accurate and detailed. The automatically generated 3D model is highly accurate and detailed, avoiding errors caused by manual drawing and data conversion.

[0237] Geometry processing module: converts node recognition result data into geometric information and constructs a three-dimensional facade mesh.

[0238] Mesh optimization module: optimizes the generated mesh to ensure the accuracy and details of the mesh.

[0239] Output model: The generated initial 3D model data includes the detailed geometry and structural information of the curtain wall unit panel.

[0240] The adaptive plate generation module is used to input the initial 3D model data into the adaptive plate generation module, and the adaptive algorithm dynamically generates and adjusts the standard plate template according to the real-time sensor data and on-site feedback to generate optimized plate template data; the initial 3D model data is input into the adaptive plate generation module, and the adaptive algorithm dynamically generates and adjusts the standard plate template according to the real-time sensor data and on-site feedback to generate optimized plate template data. The adaptive algorithm includes a genetic algorithm and a simulated annealing algorithm, which dynamically adjust the parameters of the plate template through an iterative optimization process. The adaptive plate generation module can dynamically adjust the plate template according to the actual construction environment and conditions to ensure that the model is highly matched with the actual needs and environment.

[0241] Real-time sensor data: Get real-time data on site, such as temperature, humidity, wind speed, etc.

[0242] Genetic algorithm: Optimize the parameters of the plate template through selection, crossover and mutation operations.

[0243] Simulated annealing algorithm: Through the simulated annealing process, the parameters of the plate template are further optimized to avoid local optimality.

[0244] Output optimized plate template data: including detailed information such as plate size, material and connection method.

[0245] The IoT sensor module is used to deploy IoT sensors at the construction site to monitor various data during the construction process in real time. The sensors include environmental sensors and construction process sensors, which transmit data to the central database in real time through wireless networks for storage and management. Real-time monitoring and transmission of construction data ensures the integrity and timeliness of the data and provides data support for real-time optimization of the model.

[0246] Environmental sensors: including temperature sensors, humidity sensors and wind speed sensors, which monitor environmental data in real time.

[0247] Construction process sensors: including strain sensors, acceleration sensors and GPS positioning sensors to monitor the construction status in real time.

[0248] Wireless data transmission: Use wireless transmission protocols such as MQTT or LoRa to transmit data to the central database in real time.

[0249] The data fusion module is used to fuse and optimize the real-time data on site with the initial 3D model data through the data fusion algorithm to generate real-time optimized 3D model data; the real-time data on site is fused and optimized with the initial 3D model data through the data fusion algorithm to generate real-time optimized 3D model data. The data fusion algorithm includes Kalman filtering and particle filtering, which can realize real-time optimization and updating of the 3D model by dynamically adjusting the model parameters. The real-time optimized 3D model data is more accurate, can reflect the current construction status and environmental conditions, and improve the accuracy and adaptability of construction management.

[0250] The intelligent synthesis and display platform is used to input the real-time optimized 3D model data into the intelligent synthesis and display platform, use augmented reality and virtual reality technology to display the 3D model, provide immersive model calibration and construction guidance, and generate the final 3D curtain wall unit panel model data based on the display and feedback. Input the real-time optimized 3D model data into the intelligent synthesis and display platform, use augmented reality (AR) and virtual reality (VR) technology to display the 3D model, provide immersive model calibration and construction guidance. Generate the final 3D curtain wall unit panel model data based on the display and feedback. Through AR and VR technology, construction personnel can intuitively view and operate the 3D model, improving the accuracy of model calibration and the effectiveness of construction guidance.

[0251] Import the real-time optimized 3D model data into the intelligent synthesis and display platform, parse and convert it into a recognizable format. Use AR devices (such as HoloLens) or VR devices (such as Oculus Rift) to display the 3D model and provide an immersive experience. Use AR / VR technology to accurately position and adjust the 3D model to ensure alignment with the actual structure. In the AR / VR environment, provide construction step demonstrations, precautions and real-time feedback.

[0252] The system of the present invention realizes the construction of high-precision three-dimensional models of curtain wall unit panels through multiple modules such as data collection, preprocessing, deep learning, fully automated modeling, adaptive algorithms, IoT sensors, data fusion and intelligent display. Each module cooperates with each other to improve the accuracy, adaptability and real-time performance of the model, provide precise guidance and management for construction, optimize the construction process, and significantly improve the construction quality and efficiency.

[0253] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0254] The present application is described with reference to flowcharts and / or block diagrams of methods, devices (systems) and computer program products according to embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0255] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0256] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.

[0257] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0258] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0259] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0260] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0261] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.

Claims

1. A method for constructing a three-dimensional model of a curtain wall unit panel, characterized in that: The following steps are involved: Collect multi-dimensional data including design drawing data, material information data, on-site environment data and historical construction data, and clean, standardize and convert the data format through data preprocessing algorithms to generate standardized data sets; The standardized data set is input into the deep learning model, and the complex nodes and various material information are identified and classified by the deep learning algorithm to generate node identification result data; Input the node identification result data into the fully automated 3D modeling software, directly generate the 3D facade mesh and the initial 3D model from the node identification result data and the design drawings, and generate the initial 3D model data; The initial 3D model data is input into the adaptive plate generation module. The adaptive algorithm dynamically generates and adjusts the standard plate template according to the real-time sensor data and field feedback to generate optimized plate template data. Deploy IoT sensors at the construction site to monitor various data during the construction process in real time. Use data fusion algorithms to fuse and optimize the real-time data on site with the initial 3D model data to generate real-time optimized 3D model data. The real-time optimized 3D model data is input into the intelligent synthesis and display platform, and the 3D model is displayed using augmented reality and virtual reality technologies. Immersive model calibration and construction guidance are provided, and the final 3D curtain wall unit panel model data is generated based on the display and feedback.

2. The method for constructing a three-dimensional model of a curtain wall unit panel according to claim 1, characterized in that: The data preprocessing algorithm includes data cleaning, data standardization and data format conversion. The data cleaning removes invalid or duplicate data, the data standardization unifies the data format, and the data format conversion converts the data into the input format required by the system.

3. The method for constructing a three-dimensional model of a curtain wall unit panel according to claim 1, characterized in that: The deep learning algorithm identifies and classifies complex nodes and multiple material information in a standardized data set through a convolutional neural network model, and generates node identification result data of node categories, material information, and environmental information. The convolutional neural network model includes multiple convolutional layers, pooling layers, and fully connected layers, and improves the accuracy and efficiency of recognition through multi-layer feature extraction and nonlinear transformation.

4. The method for constructing a three-dimensional model of a curtain wall unit panel according to claim 1, characterized in that: The fully automated 3D modeling software generates a 3D facade mesh based on node identification result data and design drawings, and generates initial 3D model data through the 3D facade mesh. The modeling software includes a geometry processing module and a mesh optimization module. The geometry processing module is used to convert the node identification result data into geometry information, and the mesh optimization module is used to optimize the generated 3D facade mesh to ensure the accuracy and details of the mesh.

5. The method for constructing a three-dimensional model of a curtain wall unit panel according to claim 1, characterized in that: The adaptive algorithm dynamically adjusts the parameters of the standard plate template, including size, material and connection method, through real-time sensor data and on-site feedback to generate optimized plate template data. The adaptive algorithm is based on genetic algorithm and simulated annealing algorithm, and dynamically adjusts the parameters of the plate template through an iterative optimization process to adapt to changes in real-time environment and construction conditions.

6. The method for constructing a three-dimensional model of a curtain wall unit panel according to claim 1, characterized in that: The IoT sensors include environmental sensors and construction process sensors. The environmental sensors collect temperature, humidity and wind speed data, and the construction process sensors collect mechanical data and position data to generate real-time environmental data and real-time construction data. The sensors transmit data in real time to a central database via a wireless network for storage and management to ensure data integrity and timeliness.

7. The method for constructing a three-dimensional model of a curtain wall unit panel according to claim 6, characterized in that: The data fusion algorithm fuses real-time environmental data and real-time construction data with initial three-dimensional model data, and generates real-time optimized three-dimensional model data through an optimization algorithm. The optimization algorithm includes Kalman filtering and particle filtering algorithms, and realizes real-time optimization and updating of the three-dimensional model by dynamically adjusting model parameters.

8. The method for constructing a three-dimensional model of a curtain wall unit panel according to claim 7, characterized in that: The Kalman filter algorithm performs data fusion according to the following formula: in, is the updated state estimate; is the predicted state estimate; k k is the Kalman gain; z k is the measurement value; H is the measurement matrix.

9. The method for constructing a three-dimensional model of a curtain wall unit panel according to claim 7, characterized in that: The particle filter algorithm performs data fusion according to the following formula: in, is the weight of the ith particle at time k; is the weight of the ith particle at time k-1; is the observation likelihood function of the ith particle at time k.

10. A three-dimensional model building system for curtain wall unit panels, characterized in that: include: Data collection module, used to collect multi-dimensional data including design drawing data, material information data, site environment data and historical construction data; The data preprocessing module is used to clean, standardize and convert the format of the collected data through the data preprocessing algorithm to generate a standardized data set; A deep learning module is used to input standardized data sets into a deep learning model, identify and classify complex nodes and multiple material information through a deep learning algorithm, and generate node identification result data; A 3D modeling module, which is used to input the node identification result data into the fully automated 3D modeling software, directly generate the 3D facade mesh and the initial 3D model from the node identification result data and the design drawings, and generate the initial 3D model data; The adaptive plate generation module is used to input the initial 3D model data into the adaptive plate generation module. The adaptive algorithm dynamically generates and adjusts the standard plate template according to the real-time sensor data and field feedback to generate optimized plate template data. IoT sensor module, which is used to deploy IoT sensors at the construction site to monitor various data during the construction process in real time; A data fusion module is used to fuse and optimize the on-site real-time data with the initial three-dimensional model data through a data fusion algorithm to generate real-time optimized three-dimensional model data; The intelligent synthesis and display platform is used to input real-time optimized 3D model data into the intelligent synthesis and display platform, use augmented reality and virtual reality technology to display the 3D model, provide immersive model calibration and construction guidance, and generate the final 3D curtain wall unit panel model data based on the display and feedback.

Citation Information

Patent Citations

  • A Modeling Method and System for Curtain Walls Based on BIM Models

    CN112149211B

  • application method and system of a BIM adaptive model in special-shaped curtain wall construction

    CN109583033A

  • Curtain wall modeling method and system based on BIM model

    CN112149211A

  • Template combination design method and device, equipment and storage medium

    CN116756835A

  • Building engineering monitoring management system based on BIM technology and optimization method

    CN116957156A

Cited By

  • Intelligent management system and method for wallboard installation

    CN119885375A

  • Real-time safety monitoring method for large-span composite phase change glass photovoltaic curtain wall

    CN120293027A

  • A real-time safety monitoring method for large-span composite phase-change glass photovoltaic curtain wall

    CN120293027B

  • Three-dimensional model generation control method and system based on artificial intelligence

    CN120495530A

  • Intelligent green curtain wall reverse modeling method based on BIM-IoT fusion

    CN121030895A