Downward drainage and exhaust check valve for roof and drainage and exhaust method
By setting downward drainage and exhaust check valve and secondary drainage exhaust branch on the roof, the combined structure of stainless steel float ball and glass bead screws is used to solve the problem of roof moisture discharge and seepage, and the effectiveness of waterproofing for the whole life of the roof is achieved and improve construction efficiency.
Patent Information
- Application Number
- CN202411253326.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-11-22
AI Technical Summary
The roof cannot discharge water during construction, and local water seeps after completion and water accumulation in the insulation layer cannot be discharged. The existing upward exhaust pipe method has hidden dangers of leakage, resulting in the gradual failure of exhaust function and lack of a reliable drainage and exhaust construction with a full life Craft.
Roof downward drainage and exhaust check valve is adopted, including steel bar truss floor bearing plate, SBS waterproof coil, extruded polystyrene plate insulation layer and metal siphon rainwater outlet, and new downward drainage and exhaust branch pipes and roof secondary drainage are installed. The exhaust check valve uses a combination structure of stainless steel float balls and glass bead screws to prevent backflow, ensuring that rainwater does not enter the insulation layer.
It effectively reduces the chance of roof exhaust facilities being artificially damaged, ensures waterproofing effectiveness during the entire life of the roof, prevents backflow, and improves construction progress and social and economic value.
Smart Images

Figure CN118997406A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of secondary exhaust and drainage of building roofs, and in particular to a roof downward drainage and exhaust check valve and a drainage and exhaust method. Background Art
[0002] Ultra-low energy buildings and public buildings with waterproof grade I generally have three waterproof layers, two of which are membrane waterproof layers and one of which is paint waterproof layer. The key factor for the roof waterproof layer to achieve waterproof effectiveness throughout its life is that the drainage and exhaust functions of the roof insulation layer are always reliable and effective.
[0003] However, the following problems exist in actual projects: 1. Before the topmost waterproofing membrane of the roof is fully constructed, if it rains, the water on the roof cannot be drained; 2. After the house is handed over, if there is local water seepage on the roof, the water in the roof insulation layer cannot be drained, and the water vapor cannot be discharged at the same time; 3. If the method of setting an upward exhaust pipe on the roof is used to solve the above problems, the junction between the exhaust pipe and the membrane layer is itself a potential leakage point, and the exhaust function will eventually be lost, resulting in water accumulation in the roof insulation layer. The above functions will gradually fail with the damage of the roof exhaust pipe and the accidental damage of the waterproof layer. The engineering field urgently needs a reliable, full-life drainage and exhaust construction process. To this end, we propose a roof downward drainage and exhaust check valve and a drainage and exhaust method. Summary of the invention
[0004] The object of the present invention is to provide a roof downward drainage and exhaust check valve and a drainage and exhaust method to solve the problems raised in the above background technology.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] A roof downward drainage and exhaust check valve comprises a steel truss floor deck, an upper surface of the steel truss floor deck is paved with an SBS waterproofing membrane, and an extruded polystyrene board insulation layer is provided on the top of the SBS waterproofing membrane, a metal siphon rainwater outlet is provided through the steel truss floor deck, the SBS waterproofing membrane and the extruded polystyrene board insulation layer, and a siphon rainwater main pipe is vertically installed in the metal siphon rainwater outlet, the bottom end of the siphon rainwater main pipe penetrates the steel truss floor deck, and a leaf stopper is connected to the top of the metal siphon rainwater outlet;
[0007] An opening is also provided on the steel truss floor decking, and the top of the opening is connected to the extruded polystyrene board insulation layer, a newly added downward drainage and exhaust branch pipe is vertically connected in the opening, and the top of the newly added downward drainage and exhaust branch pipe is also connected to a leaf stopper, the bottom end of the newly added downward drainage and exhaust branch pipe is connected to the siphon rainwater main pipe, the inner cavity of the newly added downward drainage and exhaust branch pipe is provided with a roof secondary drainage and exhaust check valve, the roof secondary drainage and exhaust check valve includes an acrylic tube, and the inner cavity of the acrylic tube is provided with a HDPE drainage pipe, a valve component is installed in the acrylic tube, a moving component is connected to the valve component, and a stainless steel float is provided under the moving component.
[0008] Preferably, the movable member comprises an acrylic circular plate, the acrylic circular plate is connected to the valve member, an acrylic rod is installed at the bottom of the acrylic circular plate, a glass ball screw is arranged in the acrylic rod, and a nylon ball is connected to the bottom of the glass ball screw.
[0009] Preferably, two groups of HDPE drainage pipes are provided, the bottom end of the upper HDPE drainage pipe is connected to the valve member, and the top end of the lower HDPE drainage pipe is connected to the bottom of the stainless steel float.
[0010] Preferably, the outer wall of the siphon rainwater main pipe and the newly added downward drainage and exhaust branch pipe near one end of the steel truss floor deck is covered with a thick glass wool insulation layer, the thickness of the thick glass wool insulation layer is 50mm, and a 1mm aluminum plate is provided on the outside of the thick glass wool insulation layer.
[0011] Preferably, a water receiving pan is installed at one end of the newly added downward drainage and exhaust branch pipe close to the steel truss floor deck, a second non-curing waterproof coating is provided between the steel truss floor deck and the opening, and a first non-curing waterproof coating is provided between the steel truss floor deck and the SBS waterproof membrane.
[0012] Preferably, the upper surface of the extruded polystyrene board insulation layer is paved with PVC waterproofing membrane, the thickness of the PVC waterproofing membrane is 1.5 mm, the thickness of the SBS waterproofing membrane is 3 mm, and the size of the extruded polystyrene board insulation layer is 3*75 mm.
[0013] Preferably, the valve component is made of acrylic pipes and plates bonded by mortise and tenon joints and acrylic glue, the stainless steel float is cylindrical, and the size of the stainless steel float is 50*40*0.3mm, and the thickness of the non-curing waterproof coating is 2mm.
[0014] S1: First, according to the roof drainage plan, a metal siphon rainwater inlet is reserved on the roof, and a siphon rainwater main pipe is installed in the metal siphon rainwater inlet. A newly added downward drainage and exhaust branch pipe is added next to the siphon rainwater main pipe. One newly added downward drainage and exhaust branch pipe can be added to one siphon rainwater main pipe, or two newly added downward drainage and exhaust branch pipes can be added to connect the newly added downward drainage and exhaust branch pipe with the roof siphon rainwater main pipe;
[0015] S2: Before the first waterproofing of the roof, install a water receiving pan near one end of the newly added downward drainage and exhaust branch pipe, install a roof secondary drainage and exhaust check valve in the newly added downward drainage and exhaust branch pipe, and deal with the waterproofing around the water receiving pan;
[0016] S3: Then, leaf baffles are installed at the top of the metal siphon rainwater outlet and the top of the newly added downward drainage and exhaust branch pipe to prevent debris from entering. At the same time, the leaf baffles can also support a certain space for the water receiving tray to ensure smooth discharge of accumulated water;
[0017] S4: Finally, install SBS waterproof membrane on the steel truss floor deck through non-curing waterproof coating, lay extruded polystyrene insulation layer on the SBS waterproof membrane, and finally lay PVC waterproof membrane on the top extruded polystyrene insulation layer.
[0018] Compared with the prior art, the present invention has the following beneficial effects:
[0019] The present invention adds a water accumulation tray, a downward drainage and exhaust branch pipe and a roof secondary drainage and exhaust check valve to the roof structure layer. Due to the downward drainage and exhaust, the probability of human damage is greatly reduced, the roof exhaust pipe is eliminated, and the drainage and exhaust facilities are more effective during the entire life of the building; when rainwater fills the main pipe of the roof secondary drainage and exhaust check valve and flows back into the branch pipe, the stainless steel float moves upward to push the check piston upward to block the upper opening, and rainwater cannot flow back into the insulation layer. The moving component converts the unstable buoyancy of the stainless steel float into a vertical upward thrust, and the spring in the ball screw can ensure that when the buoyancy changes, the check valve The return piston can fit tightly against the upper mouth of the valve, and has the function of preventing backflow during heavy rain; the roof secondary drainage and exhaust check valves are mainly made of acrylic materials. The acrylic material is transparent, and the components inside can be seen. The valve is installed under the floor and can be seen indoors, and the function of the drainage and exhaust facilities can be visually inspected; the roof secondary drainage and exhaust technology solves the pain points of roof waterproofing construction for ultra-low energy consumption buildings with high requirements for roof waterproofing and public buildings with waterproofing grade I, ensures the effectiveness of roof waterproofing during the entire life cycle of the building, speeds up the construction progress, and has high social and economic value. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a front structural cross-sectional schematic diagram of the present invention;
[0021] Figure 2 It is a schematic diagram of the structure of the roof secondary drainage and exhaust check valve of the present invention;
[0022] Figure 3 It is a schematic diagram of the structure of the roof secondary drainage and exhaust check valve of the present invention during drainage and exhaust;
[0023] Figure 4It is a schematic diagram of the structure of the roof secondary drainage and exhaust check valve of the present invention to prevent rainwater from flowing back;
[0024] Figure 5 It is a schematic diagram of the structure of the mobile component of the present invention.
[0025] In the figure: 1. Steel truss floor deck; 2. Extruded polystyrene board insulation layer; 4. Metal siphon rainwater inlet; 5. SBS waterproof membrane; 6. Leaf stopper; 7. PVC waterproof membrane; 8. Non-curing waterproof coating 1; 9. Drain tray; 10. Non-curing waterproof coating 2; 11. Thick glass wool insulation layer; 12. Siphon rainwater main pipe; 13. Roof secondary drainage and exhaust check valve; 131. Acrylic tube; 132. HDPE drainage pipe; 133. Valve component; 134. Moving component; 1341. Acrylic round plate; 1342. Acrylic rod; 1343. Glass bead screw; 1344. Nylon ball; 135. Stainless steel float; 14. Added downward drainage and exhaust branch pipe. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] Example:
[0028] See also Figure 1-5 The present invention provides a technical solution: a roof downward drainage and exhaust check valve, comprising a steel truss floor deck 1, an SBS waterproofing membrane 5 is laid on the upper surface of the steel truss floor deck 1, and an extruded polystyrene board insulation layer 2 is provided on the top of the SBS waterproofing membrane 5, a metal siphon rainwater outlet 4 is provided through the steel truss floor deck 1, the SBS waterproofing membrane 5 and the extruded polystyrene board insulation layer 2, and a siphon rainwater main pipe 12 is vertically installed in the metal siphon rainwater outlet 4, the bottom end of the siphon rainwater main pipe 12 penetrates the steel truss floor deck 1, and a leaf stopper 6 is connected to the top of the metal siphon rainwater outlet 4;
[0029] An opening is also provided on the steel truss floor decking plate 1, and the top of the opening is connected to the extruded polystyrene board insulation layer 2, a newly added downward drainage and exhaust branch pipe 14 is vertically connected in the opening, and the top of the newly added downward drainage and exhaust branch pipe 14 is also connected to a leaf baffle 6, the bottom end of the newly added downward drainage and exhaust branch pipe 14 is connected to the siphon rainwater main pipe 12, the inner cavity of the newly added downward drainage and exhaust branch pipe 14 is provided with a roof secondary drainage and exhaust check valve 13, the roof secondary drainage and exhaust check valve 13 includes an acrylic tube 131, and the inner cavity of the acrylic tube 131 is provided with a HDPE drainage pipe 132, a valve component 133 is installed in the acrylic tube 131, a movable component 134 is connected to the valve component 133, and a stainless steel float 135 is provided under the movable component 134.
[0030] Add a water accumulation tray 9, a downward drainage exhaust branch pipe and a roof secondary drainage exhaust check valve 13 to the roof structure layer. The installation method is as follows: Figure 1 As shown, due to the downward drainage and exhaust, the probability of human damage is greatly reduced. The roof exhaust pipe is eliminated and replaced with downward drainage and exhaust. The drainage and exhaust facilities are effective throughout the life of the building.
[0031] The structure of the roof secondary drainage exhaust check valve 13 is as follows Figure 2 As shown, the core component is a check piston with a ball screw 1343 installed on the top, and its structure is as follows Figure 5 As shown in the figure, the function of the check piston is: when rainwater fills the main pipe and flows back into the branch pipe, the stainless steel float 135 moves upward to push the check piston upward to block the upper opening, and the rainwater will not flow back into the insulation layer. The function of the ball screw 1343 is: to convert the unstable buoyancy of the stainless steel float 135 into a vertical upward thrust; the spring in the ball screw 1343 can ensure that when the buoyancy changes, the check piston can be close to the upper opening of the valve; the drainage and exhaust conditions and the rainwater backflow prevention conditions are as follows Figure 3 , Figure 4 As shown, it can drain rainwater from the roof insulation layer during construction and water intrusion into the roof insulation layer caused by unexpected factors after the house is completed. The air in the insulation layer can be drained downward when it expands due to heat, and discharged to the outside from the top of the siphon rainwater main pipe. It also has the function of preventing backflow when it rains heavily.
[0032] The roof secondary drainage and exhaust check valve 13 is mainly made of acrylic material. The acrylic material is transparent, and the components inside can be seen. The valve is installed under the floor and can be seen indoors, so its function can be visually checked. The function of the drainage and exhaust facilities can be visually checked.
[0033] Among them, the movable member 134 includes an acrylic circular plate 1341, the acrylic circular plate 1341 is connected to the valve member 133, and an acrylic rod 1342 is installed at the bottom of the acrylic circular plate 1341, a glass bead screw 1343 is arranged in the acrylic rod 1342, and a nylon ball 1344 is connected to the bottom of the glass bead screw 1343; the thickness of the acrylic circular plate 1341 is 5mm, the size of the acrylic rod 1342 is 8mm, the size of the glass bead screw 1343 is 16*6*3*3, and the size of the nylon ball 1344 is 3mm.
[0034] There are two groups of HDPE drainage pipes 132. The bottom end of the upper HDPE drainage pipe 132 is connected to the valve component 133, and the top end of the lower HDPE drainage pipe 132 is connected to the bottom of the stainless steel float 135; the size of the HDPE drainage pipe 132 is 75mm, and the size of the acrylic tube 131 is 85*5. When the moving component 134 falls normally, the water and air in the roof insulation layer can be discharged through the valve. When the rainfall is heavy, the valve is lifted up by the float to prevent rainwater from flowing back into the insulation layers on the steel truss floor deck 1.
[0035] The outer wall of the siphonic rainwater main pipe 12 and the newly added downward drainage and exhaust branch pipe 14 near the end of the steel truss floor decking 1 is covered with a thick glass wool insulation layer 11, the thickness of the thick glass wool insulation layer 11 is 50mm, and a 1mm aluminum plate is provided on the outside of the thick glass wool insulation layer 11; the thick glass wool insulation layer 11 has an insulation effect on the siphonic rainwater main pipe 12 and the newly added downward drainage and exhaust branch pipe 14, avoiding the siphonic rainwater main pipe 12 and the newly added downward drainage and exhaust branch pipe 14 in cold weather, and the 1mm aluminum plate on the outside of the thick glass wool insulation layer 11 protects the siphonic rainwater main pipe 12 and the newly added downward drainage and exhaust branch pipe 14, thereby extending the service life of the thick glass wool insulation layer 11.
[0036] A water receiving pan 9 is installed at one end of the newly added downward drainage and exhaust branch pipe 14 close to the steel truss floor deck 1, a non-curing waterproof coating 2 10 is provided between the steel truss floor deck 1 and the opening, and a non-curing waterproof coating 1 8 is provided between the steel truss floor deck 1 and the SBS waterproof membrane 5; the water receiving pan 9 plays a role in collecting water, and the non-curing waterproof coating 10 and the non-curing waterproof coating 1 8 further improve the waterproof performance of the roof insulation layer.
[0037] The upper surface of the extruded polystyrene board insulation layer 2 is paved with a PVC waterproof membrane 7, the thickness of the PVC waterproof membrane 7 is 1.5 mm, the thickness of the SBS waterproof membrane 5 is 3 mm, and the size of the extruded polystyrene board insulation layer 2 is 3*75 mm; the PVC waterproof membrane 7 and the SBS waterproof membrane 5 play a waterproof role.
[0038] The valve component 133 is made of acrylic pipes and plates bonded by mortise and tenon joints and acrylic glue. The stainless steel float 135 is cylindrical, and the size of the stainless steel float 135 is 50*40*0.3mm, and the thickness of the non-curing waterproof coating 135 is 2mm. The valve component 133, which is made of acrylic pipes and plates bonded by mortise and tenon joints and acrylic glue, is easy to make, and the acrylic material is transparent, the parts inside can be seen, and the valve is installed under the floor and can be seen indoors, so its function can be visually checked, and the function of the drainage and exhaust facilities can be visually checked.
[0039] A roof downward drainage and exhaust check valve and a drainage and exhaust method include the following steps:
[0040] S1: First, according to the roof drainage plan, a metal siphon rainwater inlet 4 is reserved on the roof, and a siphon rainwater main pipe 12 is installed in the metal siphon rainwater inlet 4, and a newly added downward drainage and exhaust branch pipe 14 is added next to the siphon rainwater main pipe 12. One newly added downward drainage and exhaust branch pipe 14 can be added to one siphon rainwater main pipe 12, or two newly added downward drainage and exhaust branch pipes 14 can be added, so that the newly added downward drainage and exhaust branch pipe 14 is connected to the roof siphon rainwater main pipe 12;
[0041] S2: Before the first waterproofing of the roof, install a water receiving pan 9 near one end of the newly added downward drainage and exhaust branch pipe 14, and install a roof secondary drainage and exhaust check valve 13 in the newly added downward drainage and exhaust branch pipe 14, and deal with the waterproof closing problem around the water receiving pan 9;
[0042] S3: Then, the top of the metal siphon rainwater outlet 4 and the top of the newly added downward drainage and exhaust branch pipe 14 are both installed with a leaf stopper 6 to prevent debris from entering. At the same time, the leaf stopper 6 can also support a certain space for the water receiving tray 9 to ensure that the accumulated water is discharged smoothly;
[0043] S4: Finally, the SBS waterproof membrane 5 is installed on the steel truss floor deck 1 through a non-curing waterproof coating 8, an extruded polystyrene insulation layer 2 is laid on the SBS waterproof membrane 5, and finally a PVC waterproof membrane 7 is laid on the top extruded polystyrene insulation layer 2.
[0044] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A roof downward drainage and exhaust check valve, comprising a steel truss floor deck (1), characterized in that: The upper surface of the steel truss floor deck (1) is paved with an SBS waterproofing coil (5), and an extruded polystyrene insulation layer (2) is provided on the top of the SBS waterproofing coil (5); a metal siphon rainwater outlet (4) is provided through the steel truss floor deck (1), the SBS waterproofing coil (5) and the extruded polystyrene insulation layer (2); a siphon rainwater main pipe (12) is vertically installed in the metal siphon rainwater outlet (4); the bottom end of the siphon rainwater main pipe (12) passes through the steel truss floor deck (1), and a leaf stopper (6) is connected to the top of the metal siphon rainwater outlet (4); The steel truss floor deck (1) is also provided with an opening, and the top of the opening is connected to the extruded polystyrene board insulation layer (2). A newly added downward drainage and exhaust branch pipe (14) is vertically connected in the opening, and the top of the newly added downward drainage and exhaust branch pipe (14) is also connected to a leaf stopper (6). The bottom end of the newly added downward drainage and exhaust branch pipe (14) is connected to the siphon rainwater main pipe (12). The inner cavity of the newly added downward drainage and exhaust branch pipe (14) is provided with a roof secondary drainage and exhaust check valve (13). The roof secondary drainage and exhaust check valve (13) comprises an acrylic tube (131), and the inner cavity of the acrylic tube (131) is provided with a HDPE drainage pipe (132). A valve component (133) is installed in the acrylic tube (131), and a movable component (134) is connected to the valve component (133), and a stainless steel float (135) is provided below the movable component (134).
2. A roof downward drainage and exhaust check valve according to claim 1, characterized in that: The movable member (134) comprises an acrylic circular plate (1341), the acrylic circular plate (1341) is connected to the valve member (133), and an acrylic rod (1342) is installed at the bottom of the acrylic circular plate (1341), a glass ball screw (1343) is arranged inside the acrylic rod (1342), and a nylon ball (1344) is connected to the bottom of the glass ball screw (1343).
3. A roof downward drainage and exhaust check valve according to claim 1, characterized in that: The HDPE drainage pipe (132) is provided with two groups, the bottom end of the upper HDPE drainage pipe (132) is connected to the valve component (133), and the top end of the lower HDPE drainage pipe (132) is connected to the bottom of the stainless steel float (135).
4. A roof downward drainage and exhaust check valve according to claim 1, characterized in that: The outer wall of the siphon rainwater main pipe (12) and the newly added downward drainage and exhaust branch pipe (14) close to one end of the steel truss floor deck (1) is covered with a thick glass wool insulation layer (11), the thickness of the thick glass wool insulation layer (11) is 50 mm, and a 1 mm aluminum plate is provided on the outer side of the thick glass wool insulation layer (11).
5. The roof downward drainage and exhaust check valve according to claim 1, characterized in that: A water receiving pan (9) is installed at one end of the newly added downward drainage and exhaust branch pipe (14) close to the steel truss floor deck (1), a non-curing waterproof coating (2) (10) is provided between the steel truss floor deck (1) and the opening, and a non-curing waterproof coating (1) is provided between the steel truss floor deck (1) and the SBS waterproof membrane (5).
6. A roof downward drainage and exhaust check valve according to claim 1, characterized in that: The upper surface of the extruded polystyrene board insulation layer (2) is paved with a PVC waterproofing coiled material (7), the thickness of the PVC waterproofing coiled material (7) is 1.5 mm, the thickness of the SBS waterproofing coiled material (5) is 3 mm, and the size of the extruded polystyrene board insulation layer (2) is 3*75 mm.
7. The roof downward drainage and exhaust check valve according to claim 1, characterized in that: The valve component (133) is made of acrylic pipes and plates bonded together by mortise and tenon joints and acrylic glue. The stainless steel float (135) is cylindrical, and the size of the stainless steel float (135) is 50*40*0.3mm. The thickness of the non-curing waterproof coating (8) is 2mm.
8. A drainage and exhaust method for a roof downward drainage and exhaust check valve according to any one of claims 1 to 7, characterized in that: The method comprises the following steps, S1: First, according to the roof drainage plan, a metal siphon rainwater inlet (4) is reserved on the roof, and a siphon rainwater main pipe (12) is installed in the metal siphon rainwater inlet (4), and a newly added downward drainage and exhaust branch pipe (14) is added next to the siphon rainwater main pipe (12). One newly added downward drainage and exhaust branch pipe (14) can be added to one siphon rainwater main pipe (12), and two newly added downward drainage and exhaust branch pipes (14) can be added to make the newly added downward drainage and exhaust branch pipe (14) connected to the roof siphon rainwater main pipe (12); S2: Before the first waterproofing of the roof, a water receiving pan (9) is installed near one end of the newly added downward drainage and exhaust branch pipe (14), and a roof secondary drainage and exhaust check valve (13) is installed in the newly added downward drainage and exhaust branch pipe (14), and the waterproofing around the water receiving pan (9) is processed; S3: Then, a leaf blocker (6) is installed at the top of the metal siphon rainwater outlet (4) and the top of the newly added downward drainage and exhaust branch pipe (14) to prevent debris from entering. At the same time, the leaf blocker (6) can also support a certain space for the water receiving tray (9) to ensure that the accumulated water is discharged smoothly; S4: Finally, an SBS waterproofing membrane (5) is installed on the steel truss floor deck (1) through a non-curing waterproof coating (8), an extruded polystyrene insulation layer (2) is laid on the SBS waterproofing membrane (5), and finally a PVC waterproofing membrane (7) is laid on the top extruded polystyrene insulation layer (2).