Device for testing comprehensive sealing performance of combined structure of gas storage
By designing a comprehensive sealing performance test device for the combined structure of the gas storage, using the poured concrete lining layer and steel pipe to simulate complex loads, combined with gas permeation measurement and confining pressure control, the problem of inability to evaluate the sealing performance of the combined structure of the gas storage in the existing technology is solved. , realizes a comprehensive evaluation of the sealing performance of the gas storage and mechanical response simulation.
Patent Information
- Application Number
- CN202411113720.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-11-22
AI Technical Summary
The existing gas storage sealing performance testing equipment cannot effectively evaluate the sealing performance under the combined structure, especially under complex loads, and cannot simulate the airtightness changes and mechanical response of the real gas storage.
A comprehensive sealing performance testing device for combined gas storage structures was designed, including a simulated operation structure of the gas storage, a gas permeation measurement system and a confining control system. The complex load of the gas storage is simulated by pouring concrete lining layers and steel pipes, combining gas Permeability measurement and confining pressure control to test the permeability and airtightness of the sealing layer.
A comprehensive evaluation of the sealing performance of the combined structure of the gas storage is achieved, which can simulate the changes in the sealing performance and mechanical response of the real gas storage, reduce the processing accuracy of the equipment, improve the accuracy and safety of the test, and is suitable for high-pressure conditions. sealing layer performance test.
Smart Images

Figure CN118999934A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of underground gas storage, and in particular to a comprehensive sealing performance testing device for a combined structure of a gas storage. Background Art
[0002] With the development of industrialization, the extensive use of non-renewable fossil energy has become the main cause of global warming, environmental degradation and energy crisis. Energy storage can break through the time and space limitations of traditional energy models. Therefore, in recent years, major economies around the world have been promoting the development of energy storage technology and developing it into a strategic emerging industry. Among various chemical and physical energy storage fields, pumped storage and underground gas storage can achieve large-scale energy storage and are an important part of ensuring energy security.
[0003] Underground gas storage can provide energy storage capacity of terawatt hours, which can be applied to compressed gas energy storage and gaseous hydrogen storage. At the same time, underground gas storage has the advantages of low storage cost and long storage period, which is a promising development direction. However, since the development of underground gas storage technology, ensuring the sealing stability of gas storage and preventing the internal high-pressure gas from leaking into the rock mass has always been a key problem that is difficult to solve. At present, in order to solve the sealing problem, water-sealed unlined hard rock caverns and lined caverns are generally used at home and abroad to improve the sealing of gas storage. Underground water-sealed cavern storage technology uses groundwater pressure to seal high-pressure gas. It needs to be built in rock mass with good lithology below the stable groundwater level and is more dependent on water resources. At the same time, the stored high-pressure gas is in direct contact with water, which increases the subsequent gas drying process. Lined caverns use linings such as lining steel plates, lining flexible composite sealing layers, and impermeable concrete to achieve sealing of high-pressure gas.
[0004] As an early choice for underground gas storage sealing layers, lining steel plates have engineering applications in natural gas storage and compressed gas energy storage. However, lining steel plates are expensive, and are prone to damage at the welds. They are prone to corrosion when storing active gases, especially hydrogen embrittlement when storing hydrogen, which reduces the toughness and strength of the steel plates. The impermeable concrete lining is suitable for compressed air energy storage power stations that allow a certain amount of leakage. The existing impermeable concrete can ensure that the daily leakage of cavern gas is less than 1%, meeting the operating requirements of the power station. The hydrogen storage sealing requirements are higher, and it is necessary to find impermeable concrete with better properties. In recent years, many researchers have been trying to use polymer composite materials instead of steel plates as sealing layers. Unlike steel plates, polymer materials are breathable materials, and composite polymer materials with special nanofillers can effectively reduce the permeability of the sealing layer.
[0005] The leakage of high-pressure gas in a gas storage reservoir will not only bring economic losses, but may also cause safety accidents. How to evaluate the sealing performance of the lining cavern has always been one of the key issues of underground gas storage. Therefore, studying the sealing performance of different liners of gas storage combined structures is of great significance to reducing losses, safe operation and efficient energy storage of gas storage. The existing gas storage sealing performance test still has the following defects:
[0006] 1. Most existing sealing layer testing equipment adopts a form similar to a sealing box, using two air chambers to surround the sealing layer sample to be tested. The crack propagation of the sealing layer and the gas permeability are usually carried out separately. When measuring the permeability, the sample needs to be unloaded, and most of the time the cracks are closed. It is difficult to load the sample and measure the permeability at the same time, so it is difficult to reproduce the changes in the airtightness of the gas storage when it is subjected to internal pressure load.
[0007] 2. When the sealing layer material of the laminate structure is subjected to load, cracks will expand radially, forming transverse cracks on the contact surface of the layers, and micro-stratification will appear at the crack tip. Therefore, when using a sealed box-type device to measure the permeability, the cracks will expand to the edge of the sample, and the sealing layer will have interface leakage caused by transverse cracks outside the restricted area, so it is impossible to reasonably evaluate the permeability of the sealing layer of the laminate structure.
[0008] 3. Most of the existing sealing layer permeability test equipment is used to test thin sheets. However, when the actual gas storage reservoir stores high-pressure gas, the sealing layer is constrained by the deformation of the concrete lining and the surrounding rock. At the same time, the concrete lining and the surrounding rock will also yield and produce cracks due to the internal load. The cracks will cause local strain concentration in the sealing layer, affecting the sealing performance of the sealing layer. Therefore, most of the current testing equipment cannot test the sealing performance of the sealing layer in the composite structure that is subject to complex loads.
[0009] 4. Most of the existing physical simulation equipment for gas storage reservoirs only simulates the mechanical response of surrounding rocks and concrete linings, and the internal loads are often generated by pressurizing liquids such as water and hydraulic oil, making it impossible to simulate the air tightness of the gas storage reservoir.
[0010] 5. The existing gas pressure permeability test equipment that can be used for pipeline-style sealing layers generally has a low gas injection pressure. For gas storage, in order to achieve a considerable energy storage efficiency, the ideal gas pressure should be 15-30MPa. Therefore, there is no equipment suitable for simulating the physical model of gas storage. Summary of the invention
[0011] In order to solve the above problems, the present application provides a comprehensive sealing performance test device for a gas storage combined structure, which is intended to be used for sealing performance tests of gas storages under different combined structures, and overcome the defects of current sealing performance tests of gas storages. The technical solution is as follows:
[0012] The present application provides a comprehensive sealing performance test device for a gas storage reservoir composite structure, comprising a gas storage reservoir simulation operation structure, a gas permeation measurement system and a confining pressure control system, wherein the gas storage reservoir simulation operation structure is used to load a composite pipe to be tested, and a cast concrete lining layer and a steel pipe are sequentially sleeved on the periphery of the composite pipe to be tested, and the internal load of the composite pipe to be tested is transmitted through the cast concrete lining layer; the gas permeation measurement system is used to capture the gas that penetrates into the cast concrete lining layer through the composite pipe to be tested and passes through the cast concrete lining layer, and records the gas leakage; the confining pressure control system is used to load the gas storage reservoir simulation operation structure and provide confining pressure, simulate the confining pressure load of the surrounding rock of the gas storage reservoir and control the displacement of the cast concrete lining layer, so as to realize the simulation test of the sealing performance of the composite pipe to be tested in the gas storage reservoir simulation operation structure when it is subjected to complex loads.
[0013] For example, in the comprehensive sealing performance testing device for the gas storage reservoir combination structure provided in one embodiment, the gas storage reservoir simulation operation structure also includes a first plug and a second plug, the first plug and the second plug both include a sealing plate and a boss located at the center of the sealing plate and protruding from one side of the sealing plate, the two ends of the composite pipe to be tested are sleeved on the periphery of the boss, a step surface is formed between the boss and the sealing plate, and the cast concrete lining layer and the steel pipe are located on the step surface.
[0014] For example, in the comprehensive sealing performance testing device for the gas storage reservoir combination structure provided in one embodiment, the gas storage reservoir simulation operation structure also includes a sealing assembly, and the sealing assembly includes a wedge-shaped bushing and a sealing ring, the wedge-shaped bushing is located between the boss and the inner wall of the composite pipe to be tested, and is sleeved on the periphery of the boss; the sealing ring is located on the step surface and is sleeved on the outer wall of the composite pipe to be tested.
[0015] For example, in the comprehensive sealing performance testing device for the gas storage combined structure provided in one embodiment, the sealing ring includes an annular sealing gasket and a sleeve body protruding from one side of the annular sealing gasket, the annular sealing gasket and the sleeve body are integrally formed and the centers correspond to each other, the annular sealing gasket is located on the step surface and abuts against the cast concrete lining layer and the end of the steel pipe, and the sleeve body is sleeved on the outer wall surface of the end of the composite pipe to be tested.
[0016] For example, in the comprehensive sealing performance testing device for the gas storage combination structure provided in one embodiment, a first annular groove is provided on the annular sealing gasket, a first sealing ring is embedded in the first annular groove, a second annular groove is provided on the sleeve, and a second sealing ring is embedded in the second annular groove.
[0017] For example, in the comprehensive sealing performance testing device for the gas storage combined structure provided in one embodiment, an elastic cushion layer is provided on the inner wall of the steel pipe, and the displacement of the cast concrete lining layer toward the inner wall of the steel pipe is controlled by the elastic cushion layer.
[0018] For example, in the comprehensive sealing performance testing device for the gas storage composite structure provided in one embodiment, a plurality of air holes are provided on the outer wall of the steel pipe, and the gas that penetrates into the cast concrete lining layer through the composite pipe to be tested and passes through the cast concrete lining layer is discharged from the air holes, and the air holes are connected to the gas permeation measurement system to record the gas leakage amount.
[0019] For example, in the comprehensive sealing performance testing device for the gas storage combination structure provided in one embodiment, a first flange protruding from the outer wall of the steel pipe is provided at both ends of the steel pipe, and a second flange corresponding to the first flange is provided on the outer circle of the sealing plate of the first plug and the second plug, and the first flange is butt-jointed with the second flange and fixedly connected by a clamp.
[0020] For example, in the comprehensive sealing performance testing device for the gas storage reservoir combination structure provided in one embodiment, the confining pressure boosting system includes a high-pressure barrel, a sealing cover is provided on the top of the high-pressure barrel, an oil inlet and an oil outlet are provided on the side wall of the high-pressure barrel, and a spherical base is provided in the cavity of the high-pressure barrel, and the gas storage reservoir simulation operation structure is located in the cavity of the high-pressure barrel and installed on the spherical base.
[0021] For example, in the comprehensive sealing performance testing device for the gas storage combination structure provided in one embodiment, the gas storage simulation operation structure also includes a gas injection system, through which high-pressure gas is injected into the lumen of the composite pipe to be tested, and a solid PVC cylinder or a temperature control system is filled in the lumen of the composite pipe to be tested, and the temperature control system is a cylinder with a heating device and a temperature monitor.
[0022] The beneficial effects of a comprehensive sealing performance testing device for a gas storage combined structure provided in some embodiments of the present application are as follows: a pipeline-style composite pipe to be tested is used as a sealing layer sample for measurement. As a solution to loading samples and evaluating permeability at the same time, samples can be loaded and sealing tests can be performed, which can solve the interface leakage caused by transverse cracks in the sealing layer of the laminate structure at a low cost; in combination with a gas permeability measurement system, the permeability of the sealing layer, i.e., the composite pipe to be tested, can be tested more reasonably to reflect the sealing performance of the gas storage under the action of internal gas load; the cast concrete lining layer can transfer the internal load, and the use of cast concrete to make a gas storage model can avoid the generation of interlayer gaps as much as possible; the steel pipe cooperates with the peripheral hydraulic servo-controlled confining pressure control system to provide confining pressure, which can simulate the confining pressure load of the surrounding rock of the gas storage, and realize the simulation test of the sealing performance of the sealing layer in the gas storage combined structure when it is subjected to complex loads; the present application can better simulate the changes in the sealing performance of the real gas storage injection and production process, and can also be used to analyze the mechanical response of the gas storage. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the embodiments of this specification or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0024] Figure 1 This is a schematic diagram of the overall structure of the comprehensive sealing performance testing device for the gas storage combined structure of the present application;
[0025] Figure 2 for Figure 1 A magnified view of part A;
[0026] Figure 3 This is a schematic diagram of the steel pipe structure of this application;
[0027] Figure 4 A top view of the clamp structure of the present application;
[0028] Figure 5 This is a schematic diagram of the structure of the confining pressure control system of this application. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0030] Unless otherwise defined, the technical terms or scientific terms used in the present disclosure should be understood by people with ordinary skills in the field to which the present disclosure belongs. The "first", "second" and similar words used in the present disclosure do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word cover the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but can include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0031] The present application provides a comprehensive sealing performance testing device for a gas storage combined structure, such as Figure 1 As shown, it includes a gas storage reservoir simulation operation structure 100, a gas permeability measurement system 200 and a confining pressure control system 300. The gas storage reservoir simulation operation structure 100 is used to load the composite pipe 110 to be tested, and a cast concrete lining layer 120 and a steel pipe 130 are sequentially sleeved on the periphery of the composite pipe 110 to be tested, and the internal load of the composite pipe 110 to be tested is transmitted through the cast concrete lining layer 120; the gas permeability measurement system 200 is used to capture the gas that penetrates into the cast concrete lining layer 120 through the composite pipe 110 to be tested and passes through the cast concrete lining layer 120, and records the gas leakage; the confining pressure control system 300 is used to load the gas storage reservoir simulation operation structure 100 and provide confining pressure, simulate the confining pressure load of the surrounding rock of the gas storage reservoir and control the displacement of the cast concrete lining layer 120, so as to realize the simulation test of the sealing performance of the composite pipe 110 to be tested in the gas storage reservoir simulation operation structure 100 when subjected to complex loads.
[0032] The comprehensive sealing performance testing device of the combined structure of the gas storage reservoir of the present application adopts the composite pipe 110 to be tested in the pipeline style as the sealing layer sample for measurement. As a solution to loading samples and evaluating permeability at the same time, the sample can be loaded and the sealing performance test can be performed. The composite pipe 110 to be tested in the pipeline sample and the self-developed upper and lower sealing plugs of the present application can solve the interface leakage caused by the transverse cracks in the sealing layer of the laminate structure at a low cost; with the gas permeation measurement system 200, the permeability of the sealing layer, i.e., the composite pipe 110 to be tested, can be tested more reasonably to reflect the sealing performance of the gas storage reservoir under the action of the internal gas load; in the sealing layer, i.e., the composite pipe 110 to be tested A cement ring lining, i.e. a cast concrete lining layer 120, is used on the periphery to transfer the internal load. The gas storage reservoir model is made in the form of cast concrete, which can avoid the generation of interlayer gaps as much as possible, can greatly reduce the processing accuracy of the equipment, and is convenient for model production; a steel pipe 130 is sleeved on the periphery of the cast concrete lining layer 120, and the surrounding hydraulic servo-controlled confining pressure control system 300 provides confining pressure, which can simulate the confining pressure load of the surrounding rock of the gas storage reservoir, and realize the simulation test of the sealing performance of the sealing layer in the combined structure of the gas storage reservoir when it is subjected to complex loads; the present application can better simulate the changes in the sealing performance of the injection and production process of a real gas storage reservoir, and can also be used to analyze the mechanical response of the gas storage reservoir.
[0033] For example, in the comprehensive sealing performance testing device for the gas storage combined structure provided in one embodiment, Figure 1-2 As shown, the gas storage simulation operation structure 100 also includes a first plug 140 and a second plug 150. The first plug 140 and the second plug 150 both include a sealing plate 141 and a boss 142 located at the center of the sealing plate 141 and protruding from one side of the sealing plate 141. The two ends of the composite pipe 110 to be tested are sleeved on the periphery of the boss 142. A step surface 143 is formed between the boss 142 and the sealing plate 141. The cast concrete lining layer 120 and the steel pipe 130 are located on the step surface 143.
[0034] For ease of understanding and description, the first plug 140 is defined as a lower plug, and the second plug 150 is defined as an upper plug. According to the above embodiment, the present application uses the pipeline sample composite pipe 110 to be tested and the self-developed upper and lower sealing plugs, which can solve the interface leakage caused by transverse cracks in the sealing layer of the laminate structure at a low cost. With the gas permeation measurement system 200, the permeability of the sealing layer, i.e. the composite pipe 110 to be tested, can be tested more reasonably to reflect the sealing performance of the gas storage under the internal gas load.
[0035] For example, in the comprehensive sealing performance testing device for the gas storage combined structure provided in one embodiment, Figure 2As shown, the gas storage simulation operation structure 100 also includes a sealing component 160, and the sealing component 160 includes a wedge-shaped bushing 161 and a sealing ring 162. The wedge-shaped bushing 161 is located between the boss 142 and the inner wall of the composite pipe 110 to be tested, and is sleeved on the periphery of the boss 142; the sealing ring 162 is located on the step surface 143 and is sleeved on the outer wall of the composite pipe 110 to be tested.
[0036] For example, in the comprehensive sealing performance testing device for the gas storage combined structure provided in one embodiment, Figure 2 As shown, the sealing ring 162 includes an annular sealing gasket 1621 and a sleeve body 1622 protruding from one side of the annular sealing gasket 1621, the annular sealing gasket 1621 and the sleeve body 1622 are integrally formed and the centers correspond, the annular sealing gasket 1621 is located on the step surface 143 and abuts against the ends of the cast concrete lining layer 120 and the steel pipe 130, and the sleeve body 1622 is sleeved on the outer wall surface of the end of the composite pipe 110 to be tested.
[0037] For example, in the comprehensive sealing performance testing device for the gas storage combined structure provided in one embodiment, Figure 2 As shown, a first annular groove is provided on the annular sealing gasket 1621, a first sealing ring M is embedded in the first annular groove, a second annular groove is provided on the sleeve body 1622, and a second sealing ring N is embedded in the second annular groove.
[0038] According to the above embodiment, the sealing assembly 160 ensures the sealing of the gas storage reservoir and reduces the possibility of gas interface leakage. The first sealing ring M and the second sealing ring N are O-rings. In order to achieve a better self-sealing effect, the first sealing ring M and the second sealing ring N need to be subjected to a 20% to 30% pre-compression deformation before gas injection. The pre-compression deformation is applied to the first plug 140, the second plug 150 and the steel pipe 130 by tightening the clamp 133 at the connection between the upper and lower plugs and the steel pipe 130 to reduce the vertical distance between the upper and lower plugs and the steel pipe 130, thereby allowing the first sealing ring M embedded in the annular sealing gasket 1621 to achieve pre-compression deformation. Since a wedge-shaped bushing 161 is sleeved on the bosses 142 of the first plug 140 and the second plug 150, when the vertical distance between the upper and lower plugs and the steel pipe 130 is reduced, the wedge-shaped bushing 161 will squeeze the composite pipe 110 to be tested outward, so that the second sealing ring N on the sleeve body 1622 is pre-compressed and deformed. In combination with the sealing ring 162, the gas storage simulation operation structure 100 of the present application can achieve better sealing performance, and gas leakage is mainly composed of infiltration leakage of the composite pipe 110 to be tested.
[0039] For example, in the comprehensive sealing performance testing device for the gas storage combined structure provided in one embodiment, Figure 1-2As shown, an elastic cushion layer 170 is provided on the inner wall of the steel pipe 130 , and the elastic cushion layer 170 is used to control the displacement of the cast concrete lining layer 120 toward the inner wall side of the steel pipe 130 .
[0040] According to the above embodiment, the main function of the elastic cushion layer 170 is to control the displacement of the outer circumference of the cast concrete lining layer 120. The displacement and stress are obtained according to numerical simulation or theoretical analysis, and then the elastic cushion layer 170 with a suitable modulus is selected to control the displacement during the test, so as to achieve the purpose of simulating the constraint effect of the surrounding rock. At the same time, the cast concrete lining layer 120 is not only a part of the gas storage structure, but also plays the role of a breathable layer. The high-pressure gas inside the composite pipe 110 to be tested penetrates into the concrete layer through the sealing layer, and is collected by the gas capture and collection system through the concrete layer, and the gas leakage of the combined structure as a whole is recorded.
[0041] For example, in the comprehensive sealing performance testing device for the gas storage combined structure provided in one embodiment, Figure 3 As shown, a plurality of air holes 131 are provided on the outer wall of the steel pipe 130, and the gas that penetrates into the cast concrete lining layer 120 through the composite pipe 110 to be tested and passes through the cast concrete lining layer 120 is discharged from the air holes 131, and the air holes 131 are connected to the gas permeation measurement system 200 to record the gas leakage amount.
[0042] Among them, Figure 1 As shown, the gas permeation measurement system 200 includes an air pressure monitoring system 210 and a gas capture and collection system 220. The air pressure monitoring system 210 is mainly composed of an air pressure monitor and a data acquisition system in the air pressure chamber. The gas capture and collection system 220 collects gas through the pores 131 on the outer wall of the steel pipe 130 and measures the amount of permeated gas. The steel pipe 130 is made of steel and has a very small permeability coefficient, which can be considered as an airtight material. The gas inside the gas storage model penetrates the sealing layer (i.e., the composite pipe 110 to be tested) and the cast concrete lining layer 120, and leaks out through the pores 131 on the side wall of the steel pipe 130. The pores 131 are connected to the gas pipeline and the gas collection device, and the gas leakage of the pores can be counted; the present application can solve the problem of interface gas leakage by setting up a gas permeation measurement system 200, and realize the complete capture of gas during the simulation process.
[0043] For example, in the comprehensive sealing performance testing device for the gas storage combined structure provided in one embodiment, Figure 1-2As shown, a first flange 132 protruding from the outer wall of the steel pipe 130 is provided at both ends of the steel pipe 130, and a second flange 1411 corresponding to the first flange 132 is provided on the outer circle of the sealing plate 141 of the first plug 140 and the second plug 150, and the first flange 132 is docked with the second flange 1411 and fixedly connected by a clamp 133.
[0044] Figure 4 The figure shows a top view of the clamp 133 structure. In the present application, the first plug 140 and the second plug 150 are tightened and connected to the steel pipe 130 using the clamp 133. Compared with the bolt connection, the clamp has a larger axial force area, which can ensure that the connection does not fail under high internal pressure.
[0045] For example, in the comprehensive sealing performance testing device for the gas storage combined structure provided in one embodiment, Figure 5 As shown, the confining pressure boosting system 300 includes a high-pressure barrel 310, the cavity of the high-pressure barrel 310 is a confining pressure chamber, a sealing cover 320 is provided on the top of the high-pressure barrel 310, a sealing structure 360 is provided between the sealing cover 320 and the high-pressure barrel 310, an oil inlet 330 and an oil outlet 340 are provided on the side wall of the high-pressure barrel 310, a spherical base 350 is provided in the cavity of the high-pressure barrel 310, and the gas storage reservoir simulation operation structure 100 is located in the cavity of the high-pressure barrel 310 and is mounted on the spherical base 350.
[0046] Among them, the confining pressure boosting system 300 adopts the hydraulic control system of the conventional triaxial test. After the gas storage reservoir simulation operation structure 100 is assembled, it is placed in the confining pressure chamber for servo boosting. The confining pressure boosting system 300 can apply confining pressure to the outer wall of the steel pipe 130 to limit its deformation, thereby preventing the steel pipe 130 from yielding and breaking due to the increase in strain caused by the internal air pressure, and then causing a gas explosion. The existence of confining pressure can make the operation of the test device safer; the present application uses an oil pressure servo control system to apply confining pressure on the periphery of the gas storage reservoir simulation operation structure 100 instead of allowing the steel pipe 130 to directly contact the atmosphere, thereby improving the safety of the test equipment, and at the same time being able to apply a higher internal air pressure to achieve a gas pressure permeability test of the sealing layer under high air pressure, which is safer and can perform a sealing layer pressure permeability test under high air pressure (15-30MPa).
[0047] For example, in the comprehensive sealing performance testing device for the gas storage combined structure provided in one embodiment, Figure 1As shown, the gas storage simulation operation structure 100 also includes a gas injection system 180, and the gas injection pipeline of the gas injection system 180 passes through the upper plug (the second plug 150) to inject high-pressure gas into the lumen of the composite pipe to be tested 110, and a solid PVC cylinder 400 or a temperature control system is filled in the lumen of the composite pipe to be tested 110, and the temperature control system is a cylinder with a heating device and a temperature monitor.
[0048] Among them, for safety reasons, a solid PVC cylinder is set inside the lumen of the composite pipe 110 to be tested to reduce the internal volume so as to limit the energy stored in the compressed gas; at the same time, if there is a gas storage operation simulation with gas-heat-solid multi-field coupling, the solid PVC cylinder can be replaced with a temperature control system, which is a cylinder with a heating device and a temperature monitor to achieve temperature control and monitoring.
[0049] When the gas storage combined structure comprehensive sealing performance test device of the present application is used, the specific steps are as follows:
[0050] 1. Through numerical simulation or theoretical calculation, the displacement deformation and stress distribution of the sealing layer (composite pipe 110 to be tested) and the cast concrete lining layer 120 of the gas storage combined structure under the operating condition are obtained, and the elastic cushion layer 170 with appropriate modulus is selected according to the displacement deformation and the stress on the outer side of the concrete;
[0051] 2. Take out the lower plug (first plug 140), put the wedge-shaped bushing 161 on the boss 142 of the lower plug and apply oil;
[0052] 3. Insert the prepared inner lining model of the composite pipe 110 to be tested into the lower plug with the wedge-shaped bushing 161;
[0053] 4. Put the sealing ring 162 embedded with the first sealing ring M and the second sealing ring N on the outer side of the inner lining model of the composite pipe 110 to be tested;
[0054] 5. Install the elastic cushion layer 170 on the inner wall of the steel pipe 130 and apply oil on the inner surface of the elastic cushion layer 170;
[0055] 6. Brush oil on the surface of the sealing ring 162, and then insert the steel pipe 130 and the elastic cushion layer 170 assembled in step 5 onto the lower plug (the first plug 140);
[0056] 7. Install the clamp 133 at the overlapping contact position between the second flange 1411 of the lower plug and the first flange 132 of the steel pipe 130, and then tighten the bolts to tighten the clamp 133, thus completing the combined installation of the lower plug and the steel pipe 130;
[0057] 8. Place a cylindrical mold around the composite pipe 110 to reduce lateral flow extrusion during concrete pouring, pour concrete from bottom to top between the assembled elastic cushion layer 13 and the composite pipe 110 to be tested to form a poured concrete lining layer 120, and at the end of pouring, brush oil on the sealing collar 162 of the upper plug (second plug 150) and put it on the composite pipe 110 to be tested, and place the manufactured gas storage reservoir simulation operation structure 100 under appropriate conditions for concrete curing;
[0058] 9. After the concrete curing is completed, the cylindrical mold used for pouring is taken out, and the solid PVC cylinder 400 or the temperature control system is assembled into the interior of the composite pipe 110 to be tested;
[0059] 10. Install an air pressure sensor at the bottom of the upper plug (second plug 150) and connect it to the air pressure monitoring system 210;
[0060] 11. Tighten the clamp 133 at the connection between the upper plug and the steel pipe 130 to complete the installation of the upper plug and assemble the gas storage simulation operation structure 100;
[0061] 12. The assembled gas storage simulation operation structure 100 is transported into the confining pressure chamber, and the gas capture and collection system 220 is connected to the air hole 131 of the steel pipe 130;
[0062] 13. Connect the air supply system 180 to the air supply valve of the upper plug;
[0063] 14. Hydraulic oil is injected into the confining pressure chamber, the confining pressure servo control system is started, and the gas supply system 180 is started at the same time to inject gas into the gas storage model to reach a preset gas pressure value P;
[0064] 15. Start the gas capture and collection system 220 to collect gas leakage data at all times;
[0065] 16. Analyze the collected gas leakage data to obtain the comprehensive permeability parameters of the simulated operation structure 100 of the gas storage reservoir under the set working conditions;
[0066] 17. After the test is completed, perform pressure relief operations, deal with the test gas inside the model, remove the gas storage model from the confining pressure chamber, and dismantle the equipment in turn.
[0067] The comprehensive sealing performance testing device for the combined structure of a gas storage reservoir of the present application can load samples and perform sealing tests, can simulate the actual injection and production conditions of the gas storage reservoir, realize the performance test of the sealing layer under complex loads, and can simultaneously take into account the mechanical response simulation of the gas storage reservoir.
[0068] Although the implementation scheme of the present application has been disclosed as above, it is not limited to the applications listed in the specification and implementation modes, and it can be fully applicable to various fields suitable for the present application. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present application is not limited to the specific details and the illustrations shown and described herein.
Claims
1. A gas storage combined structure comprehensive sealing performance testing device, characterized in that: include: The simulated operation structure of the gas storage reservoir is used to load the composite pipe to be tested, and a cast concrete lining layer and a steel pipe are sequentially sleeved on the periphery of the composite pipe to be tested, and the internal load of the composite pipe to be tested is transmitted through the cast concrete lining layer; A gas permeation measurement system, used to capture the gas that penetrates into the cast concrete lining layer through the composite pipe to be tested and permeates the cast concrete lining layer, and record the gas leakage; The confining pressure control system is used to load the simulated operation structure of the gas storage reservoir and provide confining pressure, simulate the confining pressure load of the surrounding rock of the gas storage reservoir and control the displacement of the cast concrete lining layer, so as to realize the simulation test of the sealing performance of the composite pipe to be tested in the simulated operation structure of the gas storage reservoir when it is subjected to complex loads.
2. The comprehensive sealing performance testing device for the gas storage combined structure according to claim 1 is characterized in that: The gas storage reservoir simulation operation structure also includes a first plug and a second plug, each of which includes a sealing plate and a boss located at the center of the sealing plate and protruding from one side of the sealing plate, both ends of the composite pipe to be tested are sleeved on the periphery of the boss, a step surface is formed between the boss and the sealing plate, and the cast concrete lining layer and the steel pipe are located on the step surface.
3. The comprehensive sealing performance testing device for the gas storage combined structure according to claim 2 is characterized in that: The gas storage simulation operation structure further includes a sealing component, which includes: A wedge-shaped bushing is located between the boss and the inner wall of the composite pipe to be tested, and is sleeved around the outer periphery of the boss; The sealing ring is located on the step surface and sleeved on the outer wall of the composite pipe to be tested.
4. The comprehensive sealing performance testing device for the gas storage combined structure according to claim 3 is characterized in that: The sealing ring includes an annular sealing gasket and a sleeve body protruding from one side of the annular sealing gasket. The annular sealing gasket and the sleeve body are integrally formed and their centers correspond to each other. The annular sealing gasket is located on the step surface and abuts against the cast concrete lining layer and the end of the steel pipe. The sleeve body is sleeved on the outer wall surface of the end of the composite pipe to be tested.
5. The comprehensive sealing performance testing device for the gas storage combined structure according to claim 4 is characterized in that: A first annular groove is provided on the annular sealing gasket, a first sealing ring is embedded in the first annular groove, a second annular groove is provided on the sleeve body, a second sealing ring is embedded in the second annular groove.
6. The comprehensive sealing performance testing device for gas storage combined structure according to claim 1 is characterized in that: An elastic cushion layer is provided on the inner wall of the steel pipe, and the displacement of the poured concrete lining layer toward the inner wall of the steel pipe is controlled by the elastic cushion layer.
7. The comprehensive sealing performance testing device for gas storage combined structure according to claim 1 is characterized in that: A plurality of pores are provided on the outer wall of the steel pipe, and the gas that penetrates into the cast concrete lining layer through the composite pipe to be tested and passes through the cast concrete lining layer is discharged from the pores. The pores are connected to the gas permeation measurement system to record the gas leakage amount.
8. The comprehensive sealing performance testing device for gas storage combined structure according to claim 2 is characterized in that: A first flange protruding from the outer wall of the steel pipe is provided at both ends of the steel pipe, and a second flange corresponding to the first flange is provided on the outer circle of the sealing plate of the first plug and the second plug. The first flange is butted against the second flange and fixedly connected by a clamp.
9. The comprehensive sealing performance testing device for gas storage combined structure according to claim 1 is characterized in that: The confining pressure boosting system includes a high-pressure barrel, a sealing cover is provided on the top of the high-pressure barrel, an oil inlet and an oil outlet are provided on the side wall of the high-pressure barrel, a spherical base is provided in the cavity of the high-pressure barrel, and the gas storage reservoir simulation operation structure is located in the cavity of the high-pressure barrel and installed on the spherical base.
10. The comprehensive sealing performance testing device for gas storage combined structure according to claim 1 is characterized in that: The gas storage simulation operation structure also includes a gas injection system, through which high-pressure gas is injected into the lumen of the composite pipe to be tested. A solid PVC cylinder or a temperature control system is filled in the lumen of the composite pipe to be tested, and the temperature control system is a cylinder with a heating device and a temperature monitor.
Citation Information
Cited By
Simulation test device and system for working condition of gas storage chamber
CN119845734A
High-pressure gas storage leakage point under-pressure detection device and method based on digital image
CN119901415A
Device and method for testing air tightness of sealing material of underground high-pressure gas storage
CN120176933A
An airtightness testing device and testing method for an underground high-pressure gas storage seal material
CN120176933B