Stay cable tensioning process simulation optimization design method and system based on finite element analysis

By establishing a finite element model and optimizing the tensioning sequence, the problem of complex stress during the tensioning process of asymmetric inclined tower cable-stayed bridges was solved, achieving smooth stress behavior and structural stability, and avoiding hard abrupt changes and internal damage.

CN121637904AInactive Publication Date: 2026-03-10ANHUI SHUIAN CONSTR GRP CO LTD +2
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202511823406.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-12-05
Publication Date
2026-03-10
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The structural stress behavior of cable-stayed bridges constructed using the scaffolding method and with asymmetrical inclined towers is complex and difficult to control precisely during the tensioning of the stay cables. This results in large changes in the stress on the tower and beam, making construction monitoring and control difficult, and increasing the risk of sudden changes in stress and internal damage.

Method used

A finite element model is established, and the tensioning sequence is optimized through a multi-point coincidence approximation strategy. Automatic iterative optimization design is carried out to obtain the optimal jump tension sequence, reduce the evolution range of force behavior, improve the smoothness of force behavior, and prevent hard abrupt changes and discontinuities.

Benefits of technology

It achieved precise control over the tensioning process of the stay cables, reduced stress changes in the tower and beam, improved the smoothness of the construction process, avoided internal damage, and ensured the stability and safety of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121637904A_ABST
    Figure CN121637904A_ABST
Patent Text Reader

Abstract

The invention provides a stay cable tensioning process simulation optimization design method and system based on finite element analysis, and the method comprises the steps: building a finite element model of a tower beam structure of a target cable-stayed bridge; the target cable-stayed bridge is a cable-stayed bridge constructed by a support method and provided with asymmetric leaning towers; based on the finite element model, stay cable tension process simulation of the tower beam structure under different jump tension sequences is carried out, and time-varying mechanical response of the tower beam consolidation system is obtained; and according to the time-varying mechanical response, the cable force effectiveness and the tower beam deformation continuity are taken as targets, a tension sequence is optimized through a multi-point coincidence approximation strategy, and simulation design of automatic iterative optimization is carried out. According to the stay cable tensioning process simulation optimization design method and system based on finite element analysis, the optimal jump tension sequence is solved in the simulation model, the evolution amplitude of the stress behavior of the tower beam in the stay cable tensioning bridge forming process is reduced, the evolution smoothness of the stress behavior is improved, and the phenomena of hard sudden change, discontinuity and even internal damage are prevented.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of computer-aided design, and particularly relates to a simulation optimization design method and system for a stay cable tensioning process based on finite element analysis. BACKGROUND

[0002] The stay cables of a conventional cable-stayed bridge are basically symmetrically arranged on both sides of the main tower, the stress form under dead load is symmetrical, and the line shape of the main tower and the main beam is relatively easy to control. For a cable-stayed bridge constructed by the support method and having an asymmetric inclined tower, the main beam and the main tower are completed respectively in priority, the definition of the construction sequence and the analysis of the construction process are relatively complex, and the main beam and the main tower cannot be gradually adapted and coordinated through small segments in the construction process, but the stay cables are tensioned after the main tower and the main beam form an integrated structure to remove the support and jointly form the bridge. Therefore, firstly, the main beam is in contact with the support at multiple nodes, and the structure has a high degree of static indeterminacy. Secondly, the construction process exhibits nonlinear behavior, especially the nonlinear problem of the contact between the support and the main beam. The mechanical model of the main beam completely separated from the support is completely different from the mechanical model of the main beam still partially supported on the support during the tensioning of the stay cables. At the same time, with the tensioning process of the stay cables, the structure is a time-varying structure system that changes with the tensioning of each stay cable, and the stress of the tower, the beam and the cable changes and adjusts itself constantly with the tensioning of each stay cable, and the stress, strain and deformation are difficult to accurately control, which is far from the segment construction.

[0003] For a cable-stayed bridge constructed by the support method, the stay cables are still tensioned in the traditional construction sequence (from the first to the last) according to the segment method, and a few or all of the stay cables are selected and tensioned according to the calculation after the bridge is completed. If the traditional method is used, after the follow-up stay cables are tensioned, the cable force of the stay cables that have been tensioned will shrink with the displacement and deformation changes of the tower and the beam, and a large amount of self-adjustment of the stay cable force will occur, the stress of the tower and the beam will also change constantly, and there may also be a large change amplitude, the stress coordination of the tower and the beam and the system conversion will be extremely complex and nonlinear, especially affecting the internal force of the concrete beam segment and the line shape of the steel box beam segment, the construction monitoring and control are difficult, and it is also difficult to obtain an ideal bridge completion result.

[0004] Therefore, a simulation optimization design method and system for a stay cable tensioning process based on finite element analysis are needed to at least solve the above problems. SUMMARY

[0005] One objective of this invention is to provide a simulation optimization design method and system for the cable tensioning process of a cable-stayed bridge based on finite element analysis. A finite element model of the tower-beam structure of a cable-stayed bridge constructed using the scaffolding method and featuring an asymmetrical inclined tower is established. The time-varying mechanical response of the cable tensioning process under different tensioning sequences is obtained. Based on the time-varying mechanical response, with the goals of cable force effectiveness and tower-beam deformation continuity, the tensioning sequence is optimized through a multi-point coincidence approximation strategy, and an automatic iterative optimization simulation design is performed. This method abandons the traditional sequential tensioning approach, solving for the optimal tensioning sequence in the simulation model. This reduces the amplitude of the stress behavior evolution of the tower-beam during the cable tensioning process, improves the smoothness of the stress behavior evolution, and prevents hard abrupt changes, discontinuities, or even internal damage.

[0006] The simulation optimization design method for the tensioning process of cable-stayed bridges based on finite element analysis provided in this invention includes: Step 1: Establish a finite element model of the tower-beam structure of the target cable-stayed bridge; the target cable-stayed bridge is a cable-stayed bridge constructed using the scaffolding method with asymmetrical inclined towers; Step 2: Simulate the tensioning process of the stay cables of the tower-beam structure under different tensioning sequences based on the finite element model, and obtain the time-varying mechanical response of the tower-beam consolidation system; Step 3: Based on the time-varying mechanical response, with the objectives of cable force effectiveness and tower-beam deformation continuity, optimize the tensioning sequence through a multi-point coincidence approximation strategy and conduct simulation design for automatic iterative optimization.

[0007] Preferably, step 1: establishing a finite element model of the tower-beam structure of the target cable-stayed bridge, including: Based on the design scheme of the target cable-stayed bridge, a three-dimensional geometric model of the tower, beam and cable stays is established, and material parameters are assigned to the three-dimensional geometric model; Define the consolidation of the tower foundation and the constraints of the support points in the three-dimensional geometric model, and apply the initial load; The three-dimensional geometric model is discretized into a mesh, and the rationality of the model is verified by static analysis. After the verification is successful, the finite element model is obtained.

[0008] Preferably, step 2: Simulate the tensioning process of the stay cables of the tower-beam structure under different tensioning sequences based on the finite element model, and obtain the time-varying mechanical response of the tower-beam consolidation system, including: Obtain multiple sets of tensioning sequences; Based on the finite element model, the tensioning process of the stay cables is simulated according to the tensioning sequence to obtain the time-varying mechanical response of the tower-beam consolidation system.

[0009] Preferably, the methods for obtaining multiple sets of tensioning sequences include: providing them by experienced engineers and random generation in Monte Carlo.

[0010] Preferably, step 3: Based on the time-varying mechanical response, with the objectives of cable force effectiveness and tower-beam deformation continuity, the tensioning sequence is optimized using a multi-point coincidence approximation strategy, and an automatic iterative optimization simulation design is performed, including: Based on the time-varying mechanical response, and with the objectives of cable force effectiveness and tower-beam deformation continuity, residual analysis was performed on the tensioning sequence. Based on the residual analysis results and the multi-point coincidence approximation strategy, an iterative sequence is generated; The optimal tensioning sequence is converged based on the iterative sequence.

[0011] Preferably, based on the residual analysis results and the multi-point coincidence approximation strategy, an iterative sequence is generated, including: Based on the residual analysis results and control weights, identify the main control points; The influence coefficient of each cable tension on the control point residual is calculated through finite element parametric analysis. Candidate candidates are obtained based on the residuals and influence coefficients of the main control points; If the acquisition fails, compensation will be provided for the associated points. If successful, perform candidate index sorting to generate a new sequence; The new sequence is subjected to robustness enhancement and perturbation testing, and the iterative sequence is output.

[0012] Preferably, the influence coefficient of each cable tensioning on the control point residual is calculated through finite element parametric analysis, including: A preset percentage of design force is applied to each untensioned cable individually, and transient simulation is run to calculate the rate of change of control point displacement caused by unit cable force. The rate of change of control point displacement is used as the influence coefficient of the corresponding cable on the control point.

[0013] Preferably, candidate indices are obtained based on the residuals of the master control points and the influence coefficients, including: Based on the influence coefficient, untensioned cables whose influence direction is opposite to the residual direction of the master control point residual are identified and used as candidate cables.

[0014] The simulation optimization design method for the tensioning process of cable-stayed bridges based on finite element analysis provided in this embodiment of the invention further includes: With the goals of cable force effectiveness and tower-beam deformation continuity, the optimal support dismantling scheme is determined during the optimization of the tensioning sequence using a multi-point coincidence approximation strategy.

[0015] The simulation and optimization design system for the tensioning process of cable-stayed bridges based on finite element analysis provided in this embodiment of the invention includes: The model building module is used to build a finite element model of the tower-beam structure of the target cable-stayed bridge; the target cable-stayed bridge is a cable-stayed bridge constructed using the scaffolding method with asymmetrical inclined towers. The simulation module is used to simulate the tensioning process of the stay cables of the tower-beam structure under different tensioning sequences based on the finite element model, and to obtain the time-varying mechanical response of the tower-beam consolidation system. The optimization design module is used to perform simulation design with automatic iterative optimization based on time-varying mechanical response, aiming at cable force effectiveness and tower-beam deformation continuity, by optimizing the tensioning sequence through a multi-point coincidence approximation strategy.

[0016] The beneficial effects of this invention are as follows: This invention establishes a finite element model of the tower-beam structure of a cable-stayed bridge constructed using the scaffolding method and featuring an asymmetrical inclined tower. It obtains the time-varying mechanical response of the cable tensioning process under different jump-tension sequences. Based on the time-varying mechanical response, and aiming at cable force effectiveness and tower-beam deformation continuity, the tensioning sequence is optimized through a multi-point coincidence approximation strategy, and an automatic iterative optimization simulation design is performed. This approach abandons the traditional sequential tensioning method, solving for the optimal jump-tension sequence in the simulation model. This reduces the amplitude of the stress behavior evolution of the tower-beam during cable tensioning and bridge completion, improves the smoothness of the stress behavior evolution, and prevents abrupt changes, discontinuities, or even internal damage.

[0017] Other features and advantages of the invention will be set forth in the description which follows, and will be apparent in part from the description, or may be learned by practicing the invention. The objects and other advantages of the invention may be realized and obtained by means of the structures particularly pointed out in this application.

[0018] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description

[0019] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used in conjunction with embodiments of the invention to explain the invention and do not constitute a limitation thereof. In the drawings: Figure 1 This is a schematic diagram of the simulation optimization design method for the tensioning process of cable-stayed bridges based on finite element analysis in an embodiment of the present invention; Figure 2 This is a schematic diagram of a simulation optimization design system for the tensioning process of cable-stayed bridges based on finite element analysis, as described in an embodiment of the present invention. Detailed Implementation

[0020] The preferred embodiments of the present invention will be described below with reference to the accompanying drawings. It should be understood that the preferred embodiments described herein are for illustration and explanation only and are not intended to limit the present invention.

[0021] This invention provides a simulation optimization design method for the tensioning process of cable-stayed bridges based on finite element analysis, such as... Figure 1 As shown, it includes: Step 1: Establish a finite element model of the tower-beam structure of the target cable-stayed bridge; the target cable-stayed bridge is a cable-stayed bridge constructed using the scaffolding method with asymmetrical inclined towers.

[0022] In this embodiment, the tower-beam structure is a fixed system comprising the bridge tower and the main beam. During the scaffolding construction method, the beam is supported by temporary scaffolding, and the tower-beam consolidation directly affects the internal force distribution during the tensioning stage. The finite element model is a computational model that numerically simulates the mechanical behavior of the tower-beam structure using discretized elements (such as beam elements and cable elements). Specifically, step 1 includes: Step 11: Based on the design scheme of the target cable-stayed bridge, establish a three-dimensional geometric model of the tower, beam and cable stays, and assign material parameters to the three-dimensional geometric model.

[0023] In this embodiment, the design scheme refers to the bridge's construction drawings and technical specifications, including the BIM model and material list. The material parameters are constitutive relation input values, such as the elastic modulus of concrete (30GPa-35GPa), Poisson's ratio (0.2), and density (2500kg / m³); and the elastic modulus of steel strand (195GPa) and tensile strength (1860MPa).

[0024] Step 12: Define the tower foundation consolidation and support point constraints in the three-dimensional geometric model, and apply the initial load.

[0025] In this embodiment, the tower foundation consolidation refers to the boundary conditions at the bottom of the tower, where the tower foundation nodes are set to full constraint to simulate the rigid connection between the pile foundation and the ground. The support point constraint refers to the mechanical simplification of the temporary support: vertical spring units (stiffness calculated based on the support steel pipe specifications, e.g., k=500kN / mm) are set at the beam bottom support points and released horizontally (simulating support sliding). The support point constraint needs to be gradually removed during the later stages of tensioning. The initial load is the initial construction load, including: the structure's self-weight, construction equipment load, and prestress.

[0026] Step 13: Discretize the three-dimensional geometric model into a mesh and verify the rationality of the model through static analysis. After successful verification, the finite element model is obtained.

[0027] In this embodiment, mesh discretization refers to the process of dividing a continuous geometry into finite elements. For example, the mesh size for critical regions (tower-beam junction, cable anchor points) is ≤0.3m, and for ordinary regions it is ≤1m. Static analysis includes: linear static solutions (such as displacement calculation under self-weight) for rapid model verification; and non-transient or dynamic analysis, which has low computational cost and can expose fundamental errors (such as missing constraints).

[0028] Step 2: Simulate the tensioning process of the stay cables of the tower-beam structure under different tensioning sequences based on the finite element model, and obtain the time-varying mechanical response of the tower-beam consolidation system.

[0029] In this embodiment, the tower-beam consolidation system refers to the consolidation system consisting of the tower, beam, and cables under different tensioning sequences. Time-varying mechanical response refers to the structural behavior of the tower-beam consolidation system evolving over time, including: cable force time history, tower top displacement time history, beam deflection time history, and stress time history at key sections. Specifically, step 2 includes: Step 21: Obtain multiple sets of tensioning sequences.

[0030] In this embodiment, the tensioning sequence is an ordered list that defines the order in which the stay cables are tensioned, and is set by experts or experienced personnel.

[0031] Step 22: Based on the finite element model, simulate the tensioning process of the stay cables according to the tensioning sequence to obtain the time-varying mechanical response of the tower-beam consolidation system.

[0032] Step 3: Based on the time-varying mechanical response, with the objectives of cable force effectiveness and tower-beam deformation continuity, optimize the tensioning sequence through a multi-point coincidence approximation strategy and conduct simulation design for automatic iterative optimization.

[0033] In this embodiment, cable force effectiveness refers to the degree to which the cable force achieves the design value; aiming for cable force effectiveness means aiming for the cable force to achieve the design value. Tower-beam deformation continuity refers to the smoothness of tower-beam deformation; aiming for tower-beam deformation continuity means aiming for tower-beam deformation to tend towards smoothness. The multi-point coincidence approximation strategy is a physics-driven optimization mechanism. Displacement target curves (e.g., tower top displacement = 0) are set at multiple key locations (e.g., the top of the tower, the bottom of the tower, and 1 / 4 span of the beam). By adjusting the tensioning sequence, the simulation response curve is made to "coincide" with the target curve. The core of the strategy is residual minimization. Automatic iterative optimization means that the optimization process requires no manual intervention. The algorithm automatically generates new sequences, calls step 2 for simulation, evaluates the target, and updates the sequence until convergence. Specifically, step 3 includes: Step 31: Based on the time-varying mechanical response, and with the objectives of cable force effectiveness and tower-beam deformation continuity, perform residual analysis on the tensioning sequence.

[0034] In this embodiment, residual analysis refers to calculating the deviation between the response of key points and the target value, such as calculating displacement residuals and cable force residuals.

[0035] Step 32: Generate an iterative sequence based on the residual analysis results and the multi-point coincidence approximation strategy.

[0036] In this embodiment, the iterative sequence is a newly generated tensioning sequence, which is generated by a multi-point coincidence approximation strategy based on the residual analysis results.

[0037] Step 33: Converge the optimal tension sequence based on the iterative sequence.

[0038] In this embodiment, convergence refers to the optimization process reaching a termination condition, such as: the objective function change is less than 1% for five consecutive generations, indicating that the sequence performance is stable and the calculation stops. The optimal tensioning sequence is the final output tensioning scheme, satisfying the conditions of minimizing the objective function and meeting the response requirements of all control points.

[0039] The working principle and beneficial effects of the above technical solution are as follows: This invention establishes a finite element model of the tower-beam structure of a cable-stayed bridge constructed using the scaffolding method and featuring an asymmetrical inclined tower. It obtains the time-varying mechanical response of the cable tensioning process under different jump-tension sequences. Based on the time-varying mechanical response, and aiming at cable force effectiveness and tower-beam deformation continuity, the tensioning sequence is optimized through a multi-point coincidence approximation strategy, and an automatic iterative optimization simulation design is performed. This approach abandons the traditional sequential tensioning method, solving for the optimal jump-tension sequence in the simulation model. This reduces the amplitude of the stress behavior evolution of the tower-beam during cable tensioning and bridge completion, improves the smoothness of the stress behavior evolution, and prevents abrupt changes, discontinuities, or even internal damage.

[0040] In one embodiment, step 32: Based on the residual analysis results and the multi-point coincidence approximation strategy, generate an iterative sequence, including: Step 321: Identify the master control points based on the residual analysis results and control weights.

[0041] In this embodiment, the control weights are importance coefficients assigned to each control point, for example: 0.45 for the top of the high tower, 0.25 for the top of the low tower, 0.15 for 1 / 4 span of the beam, and 0.15 for 3 / 4 span of the beam. When identifying the master control point, the point with the largest weighted residual is selected as the master control point.

[0042] Step 322: Calculate the influence coefficient of tensioning of each cable on the residual of the control point through finite element parametric analysis.

[0043] In this embodiment, when calculating the influence coefficient, a 10% design force is applied to each untensioned cable individually, transient simulation is run, the rate of change of control point displacement caused by unit cable force is calculated, and the rate of change of control point displacement is used as the influence coefficient of the corresponding cable on the control point.

[0044] Step 323: Obtain candidate cables based on the residuals and influence coefficients of the master control points.

[0045] In this embodiment, when obtaining candidate cables, cables whose influence direction is opposite to the residual direction of the master control point residual are selected as candidate cables. At the same time, cables with larger absolute values ​​of influence coefficients have higher priority.

[0046] Step 324: If the acquisition fails, perform associated point compensation.

[0047] In this embodiment, if there are no candidate cables, the system adjusts the associated points strongly coupled with the main control point to indirectly correct the main control point. For example, if the high tower is deviated north by +18.3mm, but the influence coefficients of the remaining cables are all greater than 0, then through parametric analysis, the coupling coefficient is obtained: the displacement of the high tower top is -0.75 times the displacement of the low tower top. Therefore, the system can actively induce the low tower to deviate south (negative displacement) to pull the high tower back to deviate north, with the low tower top as the new main control point (target displacement = -18.3 / 0.75 = -24.4mm). Then, the candidate cables for the new main control point are recalculated, causing the low tower to deviate south (negative displacement) to pull the high tower back to deviate north.

[0048] Step 325: If successful, sort the candidate indexes to generate a new sequence.

[0049] In this embodiment, candidate lines are sorted to generate a new sequence: the best candidate line is inserted into the position with the smallest prediction residual.

[0050] Step 326: Perform robustness enhancement and perturbation tests on the new sequence, and output the iterative sequence.

[0051] In this embodiment, robustness is enhanced by inserting virtual balancing cables / splitting high-stress cables to meet construction constraints. Disturbance testing involves applying ±5% random cable stress error to verify the pass rate. The output iterative sequence is the validated sequence used as the iterative input.

[0052] The working principle and beneficial effects of the above technical solution are as follows: This invention identifies master control points based on residual analysis results and control weights. Simultaneously, it calculates the influence coefficient of each cable tension on the control point residuals through finite element parametric analysis, enabling residual-sensitivity-driven directional adjustments. When no direct solution exists for the master control point, it automatically switches associated control points to address the complex coupling of asymmetric structures. This invention encodes engineer experience into computable strategies, achieving human-machine collaborative optimization.

[0053] The simulation optimization design method for the tensioning process of cable-stayed bridges based on finite element analysis provided in this embodiment of the invention further includes: Step 4: With the goals of cable force effectiveness and tower-beam deformation continuity, the optimal support dismantling scheme is determined during the optimization of the tensioning sequence using a multi-point coincidence approximation strategy.

[0054] In this embodiment, the optimal support removal scheme is: a support removal scheme based on active control methods for support removal, which guides the structure to approach the target state along the optimal path through controllable stiffness degradation. Specifically, step 4 includes: During the optimization of the tensioning sequence using a multi-point overlap approximation strategy, the state of the main control point is determined when the tower eccentric load index, cable force balance, support load ratio, stiffness conversion rate, and cumulative number of tensioned cables all meet the corresponding intervention trigger conditions.

[0055] In this embodiment, the tower eccentricity index is the proportion of tower eccentricity to the allowable value. Cable force balance is the proportion of the cable force difference between high and low towers. Support load ratio is the proportion of beam weight borne by the support. Stiffness conversion rate is the proportion of stay cable stiffness. The intervention trigger conditions corresponding to the tower eccentricity index, cable force balance, support load ratio, stiffness conversion rate, and cumulative number of tensioned cables are preset manually, for example: 0.4≤tower eccentricity index≤0.6, cable force balance≤0.3, 0.6≤support load ratio≤0.8, stiffness conversion rate≥0.3, and cumulative number of tensioned cables≥2.

[0056] Feature extraction is performed on the state of the master control point to extract the state feature set.

[0057] In this embodiment, feature extraction refers to extracting key parameters from the finite element simulation model that have discriminative power for the decision of support dismantling. State features include location name (e.g., top of tower), offset parameter type (e.g., displacement), and target difference (e.g., displacement direction and displacement amount).

[0058] The demolition area determination model is trained based on the process records of manual determination of historical priority demolition areas according to the status of historical control points.

[0059] In this embodiment, the historical control point status refers to the displacement, velocity, and other status data of the control points recorded during historical construction. The historical priority demolition area refers to the area where engineers manually decide to demolish the supports based on the control point status during historical construction, and the process records are all successful cases. During training, the machine learning model learns the mapping relationship between historical status features and demolition areas and intervention timing for automatic decision-making. Table 1 is an example mapping relationship table between historical status features and historical priority demolition areas: Table 1. Mapping Relationship between Historical Status Characteristics and Historical Priority Demolition Areas The model is determined based on the state feature set and the demolition area, and the demolition area and intervention timing are determined.

[0060] By summarizing the timing of intervention and the corresponding removal area, a stent removal plan is obtained.

[0061] The working principle and beneficial effects of the above technical solution are as follows: For cable-stayed bridges constructed using the scaffolding method and featuring asymmetrical inclined towers, due to the unique characteristics of their structural mechanics, it is impossible to simultaneously dismantle all scaffolding areas in the same proportion. Manual, asynchronous dismantling in sections often relies heavily on personal experience, leading to unsuitable stiffness degradation guidance. Therefore, this invention optimizes the tensioning sequence using a multi-point coincidence approximation strategy by determining the intervention trigger conditions for scaffolding dismantling. When intervention is deemed permissible, a set of state features that discriminates against scaffolding dismantling decisions is extracted from the finite element simulation model. Based on the dismantling area determination model and the state feature set, the dismantling area and intervention timing are determined, resulting in a comprehensive scaffolding dismantling scheme. This improves the suitability of asynchronous, section-based scaffolding dismantling.

[0062] In one embodiment, the method for obtaining process records of manually determining historical priority demolition areas based on historical control point status includes: Obtain the pre-selection process record.

[0063] In this embodiment, the pre-selection process record is a record of all historically available processes for determining historical priority demolition areas based on the status of historical control points, including: when which cable was tensioned, which area was demolished, and the time-varying mechanical response (displacement, stress, stiffness changes). The pre-selection process record needs to be screened to obtain the final process record used for machine learning training.

[0064] Based on the pre-selection process records, a historical simulation demolition twin model was built.

[0065] In this embodiment, the historical simulation demolition twin model is a digital twin model based on the pre-selected process record of the simulated support demolition process. It can predict the structural response (displacement, stiffness) with high accuracy according to the input demolition parameters (region, scale, timing).

[0066] Based on historical simulations of the demolition of the twin model, the structural stiffness-displacement curves of each model point were determined.

[0067] In this embodiment, the model points are the points on the bridge section in the historical simulated demolition twin model. The structural stiffness-point displacement curve is a function curve describing the mapping relationship between the total system stiffness and the model point displacement. Table 2 is a schematic table illustrating the relationship between structural stiffness and point displacement during the example demolition process: Table 2. Schematic diagram of structural stiffness and point displacement during demolition. Based on the preset optimal path, a template is developed, and the standard optimal path curve of the model point is determined according to the stiffness and displacement parameters of the model point before its removal.

[0068] In this embodiment, the preset optimal path formulation template is a mathematical function framework used to generate an ideal stiffness-displacement trajectory. The standard optimal path curve is a smooth transition trajectory from the current state (before demolition) to the target state (after demolition), representing the ideal response that the point should follow.

[0069] Calculate the difference between the structural stiffness-displacement curve and the standard optimal path curve for each model point.

[0070] In this embodiment, the curve difference is the root mean square error between the structural stiffness-point displacement curve and the standard optimal path curve.

[0071] Based on the curve differences and the preset point weights of the model points, the screening values ​​recorded in the pre-selection process are calculated.

[0072] In this embodiment, the preset weights of the model points represent the importance coefficients of the bridge locations corresponding to the model points to structural safety, and are manually preset. The difference between the screening value and the curve associated with each model point recorded in the pre-selection process is inversely proportional to the weighted sum of the weights of the points.

[0073] Pre-selected processes with filter values ​​greater than the preset filter value threshold are recorded as process records.

[0074] In this embodiment, the preset screening threshold is set manually.

[0075] The working principle and beneficial effects of the above technical solution are as follows: When training a demolition area determination model, training samples need to be selected from historical records. However, not all available records of manual determination of historical priority demolition areas based on the status of historical control points are suitable for training. For example, even if a demolition was successfully completed in a record, but there was a sudden change in bridge stiffness degradation, the logic for determining the historical priority demolition area based on the historical control point status extracted from that record is unsuitable, and the record is not suitable for training. Therefore, this invention constructs a historical simulated demolition twin model based on pre-selected process records and extracts the structural stiffness-displacement curves for each model point. Simultaneously, an optimal path formulation template is introduced, and the standard optimal path curve for each model point is determined based on the stiffness and displacement parameters before demolition. A screening value is calculated based on the difference between the structural stiffness-displacement curve and the standard optimal path curve, and the preset point weights of the model points. Process records with screening values ​​greater than a threshold are used for training subsequent demolition area determination models, further improving the accuracy of subsequent models in determining demolition areas.

[0076] This invention provides a simulation optimization design system for the tensioning process of cable-stayed bridges based on finite element analysis, such as... Figure 2 As shown, it includes: Model building module 1 is used to build a finite element model of the tower-beam structure of the target cable-stayed bridge; the target cable-stayed bridge is a cable-stayed bridge constructed using the scaffolding method with asymmetrical inclined towers. Simulation module 2 is used to simulate the tensioning process of the stay cables of the tower-beam structure under different tensioning sequences based on the finite element model, and to obtain the time-varying mechanical response of the tower-beam consolidation system. The optimization design module 3 is used to optimize the tensioning sequence based on the time-varying mechanical response, with the goals of cable force effectiveness and tower-beam deformation continuity, and to perform automatic iterative optimization simulation design. The optimization design module 3 performs the following operations: Based on the time-varying mechanical response, and with the objectives of cable force effectiveness and tower-beam deformation continuity, residual analysis was performed on the tensioning sequence. Based on the residual analysis results and the multi-point coincidence approximation strategy, an iterative sequence is generated; The optimal tensioning sequence is converged based on the iterative sequence; Based on the residual analysis results and the multi-point coincidence approximation strategy, an iterative sequence is generated, including: Based on the residual analysis results and control weights, identify the main control points; The influence coefficient of each cable tension on the control point residual is calculated through finite element parametric analysis. Candidate candidates are obtained based on the residuals and influence coefficients of the main control points; If the acquisition fails, compensation will be provided for the associated points. If successful, perform candidate index sorting to generate a new sequence; The new sequence is subjected to robustness enhancement and perturbation testing, and the iterative sequence is output. Among them, the influence coefficient of each cable tension on the control point residual is calculated through finite element parametric analysis, including: Apply a preset percentage of design force to each untensioned cable individually, run transient simulation, calculate the rate of change of control point displacement caused by unit cable force, and use the rate of change of control point displacement as the influence coefficient of the corresponding cable on the control point; Among them, candidate search terms are obtained based on the residuals of the main control points and the influence coefficients, including: Based on the influence coefficient, untensioned cables whose influence direction is opposite to the residual direction of the master control point residual are identified and used as candidate cables; The simulation optimization design system for the tensioning process of cable-stayed bridges based on finite element analysis also performs the following operations: With the objectives of cable force effectiveness and tower-beam deformation continuity, the optimal support dismantling scheme was determined during the optimization of the tensioning sequence using a multi-point coincidence approximation strategy, including: During the optimization of the tensioning sequence through a multi-point coincidence approximation strategy, the status of the main control point is determined when the tower eccentric load index, cable force balance, support load ratio, stiffness conversion rate, and cumulative number of tensioned cables all meet the corresponding intervention triggering conditions. Extract features from the state of the master control point to obtain a state feature set; The demolition area determination model was trained based on the process records of manual determination of historical priority demolition areas according to the status of historical control points. The model is determined based on the state feature set and the demolition area, and the demolition area and intervention timing are determined accordingly. By summarizing the intervention timing and its corresponding removal area, a stent removal plan can be obtained; The methods for obtaining records of the process of manually determining historical priority demolition areas based on the status of historical control points include: Obtain the pre-selection process record; Based on the pre-selection process records, a historical simulation demolition twin model was built; Based on historical simulations of demolition twin models, the structural stiffness-displacement curves of each model point were determined. A template is developed based on the preset optimal path, and the standard optimal path curve of the model point is determined based on the stiffness and displacement parameters of the model point before its removal. Calculate the difference between the structural stiffness-displacement curve and the standard optimal path curve for each model point; Based on the curve differences and the preset point weights of the model points, the screening values ​​recorded in the pre-selection process are calculated. Pre-selected processes with filter values ​​greater than the preset filter value threshold are recorded as process records.

[0077] Obviously, those skilled in the art can make various modifications and variations to this invention without departing from its spirit and scope. Therefore, if these modifications and variations fall within the scope of the claims of this invention and their equivalents, this invention also intends to include these modifications and variations.

Claims

1. A method for simulation and optimization design of the tensioning process of a stay cable based on finite element analysis, characterized in that, Comprising: Step 1: Establish a finite element model of the tower-beam structure of the target cable-stayed bridge; the target cable-stayed bridge is a cable-stayed bridge with asymmetric inclined towers constructed by the support method; Step 2: Based on the finite element model, simulate the cable tensioning process of the tower-beam structure under different jump tensioning sequences, and obtain the time-varying mechanical response of the tower-beam fixed system; Step 3: According to the time-varying mechanical response, taking the cable force effectiveness and the deformation continuity of the tower and beam as the target, the tensioning sequence is optimized through the multi-point coincidence approximation strategy, and the simulation design of automatic iterative optimization is carried out.

2. The simulation and optimization design method for the stay cable tensioning process based on finite element analysis according to claim 1, wherein, Step 1: Establish a finite element model of the tower-beam structure of the target cable-stayed bridge, comprising: According to the design scheme of the target cable-stayed bridge, a three-dimensional geometric model of the tower, beam and cable is established, and material parameters are assigned to the three-dimensional geometric model; Define the tower foundation fixation and support point constraints in the three-dimensional geometric model, and apply the initial load; Discretize the three-dimensional geometric model by mesh, and verify the reasonableness of the model by static analysis. After verification, the finite element model is obtained.

3. The simulation and optimization design method for the stay cable tensioning process based on finite element analysis according to claim 1, wherein, Step 2: Based on the finite element model, simulate the cable tensioning process of the tower-beam structure under different jump tensioning sequences, and obtain the time-varying mechanical response of the tower-beam fixed system, comprising: Obtain multiple tensioning sequences; Based on the finite element model, simulate the cable tensioning process according to the tensioning sequence, and obtain the time-varying mechanical response of the tower-beam fixed system.

4. The simulation and optimization design method for the stay cable tensioning process based on finite element analysis according to claim 3, wherein, The way to obtain multiple tensioning sequences includes: provided by engineering experience personnel and Monte Carlo random generation.

5. The simulation and optimization design method for the stay cable tensioning process based on finite element analysis according to claim 1, wherein, Step 3: According to the time-varying mechanical response, taking the cable force effectiveness and the deformation continuity of the tower and beam as the target, the tensioning sequence is optimized through the multi-point coincidence approximation strategy, and the simulation design of automatic iterative optimization is carried out, comprising: According to the time-varying mechanical response, taking the cable force effectiveness and the deformation continuity of the tower and beam as the target, the tensioning sequence is optimized through the multi-point coincidence approximation strategy, and the simulation design of automatic iterative optimization is carried out, comprising: According to the time-varying mechanical response, taking the cable force effectiveness and the deformation continuity of the tower and beam as the target, the tensioning sequence is optimized through the multi-point coincidence approximation strategy, and the simulation design of automatic iterative optimization is carried out, comprising: According to the time-varying mechanical response, taking the cable force effectiveness and the deformation continuity of the tower and beam as the target, the tensioning sequence is optimized through the multi-point coincidence approximation strategy, and the simulation design of automatic iterative optimization is carried out, comprising:

6. The simulation and optimization design method for the stay cable tensioning process based on finite element analysis according to claim 5, wherein, According to the residual analysis result and the multi-point coincidence approximation strategy, an iteration sequence is generated. According to the residual analysis result and the control weight, the main control point is identified. Through finite element parametric analysis, the influence coefficient of tensioning each cable on the control point residual is calculated. According to the main control point residual and the influence coefficient, the candidate cable is obtained. If it fails to obtain, perform associated point compensation. If it succeeds, sort the candidate cable to generate a new sequence. Robustness enhancement and disturbance test are performed on the new sequence, and the iteration sequence is output.

7. The simulation and optimization design method for the stay cable tensioning process based on finite element analysis according to claim 6, wherein, Through finite element parametric analysis, the influence coefficient of tensioning each cable on the control point residual is calculated, comprising: Apply a predetermined percentage of the design force to each un-tensioned cable separately, run transient simulation, calculate the control point displacement rate caused by unit cable force, and take the control point displacement rate as the influence coefficient of the corresponding cable on the control point.

8. The simulation and optimization design method for the stay cable tensioning process based on finite element analysis according to claim 6, wherein, According to the main control point residual and the influence coefficient, the candidate cable is obtained, comprising: According to the influence coefficient, determine the un-tensioned cable whose influence direction is opposite to the residual direction of the main control point residual, and take it as the candidate cable.

9. The simulation and optimization design method for the stay cable tensioning process based on finite element analysis according to claim 1, wherein, Further comprising: During the process of optimizing the tensioning sequence by taking the cable force effectiveness and the deformation continuity of the tower and beam as the target through the multi-point coincidence approximation strategy, the optimal support removal scheme is determined.

10. A simulation and optimization design system for the tensioning process of a cable-stayed cable based on finite element analysis, characterized in that, Comprising: The model construction module is configured to establish a finite element model of a tower-beam structure of the target cable-stayed bridge, the target cable-stayed bridge being a cable-stayed bridge with asymmetric inclined towers and constructed by the support method; The simulation module is configured to simulate a stay cable tensioning process of the tower-beam structure under different jump tensioning sequences based on the finite element model, and obtain time-varying mechanical responses of the tower-beam fixed system. The optimization design module is configured to optimize the tensioning sequence by a multi-point coincidence approximation strategy, and perform automatic iterative optimization simulation design according to the time-varying mechanical responses, with cable force effectiveness and tower-beam deformation continuity as targets.

Citation Information

Cited By

  • Cable-stayed bridge cable force and line shape cooperative control method and system based on finite element analysis

    CN121997439A

  • A multi-objective intelligent decision method for cable force of completed cable-stayed bridge based on balance degree

    CN122133237A