A construction technology and frame column technology, applied in the processing of building materials, construction, building structure, etc., can solve the problems of uneven surface of beam body, high construction cost, long construction time, etc. High, reduce construction difficulty and cost effect
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2012-01-18
- Estimated Expiration
- Not applicable · inactive patent
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention relates to the field of construction, and in particular relates to a modelless construction technology for frame columns and beams based on straw walls. Background technique
[0002] When using reinforced concrete frame columns and beams in straw buildings, the usual construction technology is to use spliced formwork to pour on site, then remove the formwork, and finally plaster the outer surface for painting or decoration. Its disadvantages are: it needs to use and consume a large amount of wooden or steel formwork, supports, iron nails and other auxiliary building materials; Long, high construction costs and serious environmental pollution. In view of this, it is imperative to reform the original construction technology. Contents of the invention
[0003] A non-model construction technology for frame columns and beams based on straw walls, in which prefabricated straw walls are integrated with frame columns and beams poured on sit...
Examples
Embodiment Construction
[0039] Referring to the attached drawings, taking the construction of straw houses as an example, the construction steps are as follows:
[0040] 1. Make prefabricated exterior walls. The prefabricated exterior walls are pre-installed with hooked steel bars.
[0041] 2. Construction foundation. The reinforced concrete foundation ring beam is poured according to the design requirements, and the frame column steel head and waterproof structure are reserved on the cast-in-place foundation ring beam according to the design requirements.
[0042] 3. Welding frame column reinforcement. Welding of lapped steel bars is used to connect the reinforced head of the frame column reserved for the foundation with the steel bar of the frame column, and reserve the steel bar head connected to the frame beam and the steel bar head of the frame column on the upper layer.
[0043] 4. Put the wall in place. According to the design requirements, the outer wall is placed on the designated positi...