A common water supply task assignment method for complex reservoir groups
A technology of task allocation and reservoir group, applied in water conservancy engineering, water conservancy engineering equipment, data processing applications, etc., can solve problems such as unreasonable scheduling to ensure water supply, failure to consider water supply tasks, insufficient compensation, etc., and achieve the effect of improving the ability of optimal allocation
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2019-04-19
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of joint dispatching of reservoir groups, and in particular relates to a method for allocating common water supply tasks of complex reservoir groups. Background technique
[0002] my country's large-scale river basins have formed or are forming an overall layout of joint development and utilization of reservoir groups. Optimal scheduling of joint water supply for reservoir groups is a nonlinear multi-objective optimization problem with complex constraints. is increasing, the difficulty of realizing its optimal scheduling is also increasing. At present, the method of virtualizing reservoir groups as aggregated reservoirs to make water supply decisions is regarded as one of the best methods for joint scheduling of reservoir groups. Although this method can comprehensively consider the water storage status of the reservoir group, accurately locate the water supply capacity of the system, and more objectively de...
Examples
Embodiment Construction
[0025] The technical solutions of the present invention will be further specifically described below through the embodiments and in conjunction with the accompanying drawings.
[0026] A method for assigning common water supply tasks of complex reservoir groups, comprising the following steps:
[0027] In the first step, according to the topological structure of the reservoir group and the distribution of common water supply targets, construct virtual aggregated reservoirs hierarchically, and compile the corresponding joint dispatching diagram.
[0028] as attached figure 1 The water supply diagram of the complex reservoir group shown in the figure shows that there are many water users and the water supply method is relatively complicated. The entire water supply system of the reservoir group is composed of three subsystems: a reservoir and the downstream section of a reservoir are subsystem A, b reservoir, b-c reservoir section, c The downstream section of the reservoir and ...