Tunnel hole opening position automatic comparison and selection BIM (building information modeling) design method
A design method and technology for tunnels, which are applied in the fields of calculation, image data processing, special data processing applications, etc., can solve the problems of reducing the design quality of tunnel openings, difficult to accurately reflect the height of the brushed slope, and tedious operation process, so as to improve the design efficiency and Achievement quality, accurate slope brushing effect, and high degree of automation
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2016-12-07
Smart Images
Figure 1
Abstract
Description
technical field
[0001] The invention relates to a method for automatic comparison and selection of tunnel opening positions. Background technique
[0002] Tunnel opening position comparison plays a very important role in the line position selection at the initial stage of the project, the tunnel scheme design and the detailed design of the tunnel. In the traditional two-dimensional design, the selection of the position of the tunnel entrance mainly depends on the horizontal and vertical sections of the terrain. The process is cumbersome, and it is difficult to accurately reflect the brush slope height between sections, especially at the intersection of side slopes, which greatly reduces the quality of tunnel entrance design. In recent years, BIM technology has become the development trend of the civil engineering industry. Therefore, whether it is to comply with the development of the industry or to improve the design accuracy and quality, the BIM design method for automati...
Examples
Embodiment Construction
[0042] The specific technical solutions of the present invention are described with reference to the accompanying drawings. Depend on figure 1 As shown in the flow chart, the steps of the BIM design method for automatic comparison and selection of tunnel entrance positions involved in the present invention include: constructing a digital ground model according to three-dimensional topographical point cloud data, constructing a three-dimensional line position according to a two-dimensional plane longitudinal section of a line, and constructing a three-dimensional line position on a three-dimensional plane Establish key mileage points of the tunnel entrance section on the line, establish points moving along the line direction of the three-dimensional space of the tunnel, establish points moving along the direction perpendicular to the line position of the three-dimensional space of the tunnel, establish the skeleton line of the tunnel entrance, and develop the slope template of t...