Separating-type underground excavated double-deck metro station
A subway station, separate technology, applied in underground chambers, mining equipment, earth-moving drilling and other directions, can solve the problems of high geological conditions, high engineering costs, and high construction risks.
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2018-01-09
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of subway stations, in particular to a separate underground excavated double-deck subway station. Background technique
[0002] In urban dense built-up areas, there are many ground and underground structures and pipelines, and the traffic on the road is heavy. Commonly used subway construction, such as the use of open-cut method and combination of light and dark stations, is difficult to implement, and there are construction problems such as uncontrollable construction period and high early-stage engineering costs. At the same time, large The full-underground double-deck station of the section has high requirements on geological conditions and high construction risks. Therefore, a new station form and construction method is needed to adapt to the construction of subways in urban dense built-up areas. Contents of the invention
[0003] The object of the present invention is to aim at the defects and defici...
Examples
Embodiment 1
[0029] see Figure 4-Figure 6 In this embodiment, the separate submerged double-deck subway station is a side-type station, wherein No. 1 line 11 and No. 2 line 12 are adjacently located at the two ends of the connecting passage 4, respectively.
Embodiment 2
[0031] see Figure 7-Figure 9 In this embodiment, the separate underground excavated double-deck subway station is a stacked line station, wherein, the No. 1 underground excavated double-deck tunnel 1 is provided with two station halls 5 and a pair of escalators 7, and the two station halls 5 are respectively It is arranged on both sides of a pair of escalators 7; the No. 1 line 11 and the No. 2 line 12 are all set in the No. 2 underground excavation double-layer tunnel 2, wherein the No. 1 line 11 is set in the upper space of the double-layer space, No. 2 line 12 is arranged in the lower space of the double-layer space, and the top of the platform 6 on the side of No. 1 line 11 is provided with a suspended ceiling 10, and the bottom of the platform 6 on the side of No. 1 line 11 is provided with a pipeline area 8.