225 results about "Metro station" patented technology

Metro station digital twinborn monitoring operation and maintenance system

The invention relates to a metro station digital twinborn monitoring operation and maintenance system comprising an existing SCADA subsystem; a sensor collection network comprising a plurality of sensors, wherein the sensors are arranged on facilities to be monitored in a metro station; a network camera monitoring unit comprising a plurality of network cameras distributed in the metro station; a server used for achieving data collection, analysis and storage, wherein the server is connected with the existing SCADA subsystem, the sensor collection network and the network camera monitoring unit;a digital twinborn model, wherein the model is a three-dimensional digital model consistent with an actual physical model of the metro station, and the model performs data exchange with the server and displays an actual state of the metro station. Compared with the prior art, the metro station digital twinborn monitoring operation and maintenance system has the advantages of establishing the digital twinborn model to display real-time data from multiple resources through a visual three-dimensional digital model, the actual operation state of the metro station can be reflected more effectively, and the information sharing and data analysis efficiency can also be improved.
Owner:TONGJI UNIV

Underground excavation construction method for expanded excavation of station on basis of metro regional shield tunnel

The invention relates to an underground excavation construction method for expanded excavation of a station on the basis of a metro regional shield tunnel. The structural form of the station formed through expanded excavation is a simple support framework wall column type double-layer metro station; piles in a row and a water stop heavy curtain or an underground continuous wall are used for blocking soil and water, and the lateral deformation of soil bodies is resisted; soil bodies between openings of parallel shield tunnel duct pieces are excavated, and a transverse passage is constructed; uplift piles, wall columns, a bottom plate, a middle upright post foundation and transverse support beams arranged between the wall columns are constructed in the transverse passage; the bottom plate is connected with the bottom of each wall column; the soil body above the tunnel is subjected to grouting reinforcement; an underground excavation reverse operation method is adopted for constructing the station main body structure; the station main body can be entered through a vertical shaft or the transverse passage built at an entrance and exit; and a small guide holes and the station top structure are constructed. The problem of low use efficiency of shield equipment is solved. The method has the advantages that huge economic benefits, social benefits and environmental benefits are brought; and important engineering application values and development prospects are realized.
Owner:BEIJING UNIV OF TECH

Real-time information-based metro passenger service system

The invention relates to a real-time information-based metro passenger service system. Mobile terminal equipment automatically connects wireless sensors in a metro station and in metro compartments so as to perform data interaction with the servers to acquire relevant information in the metro station in real time, and the relevant information is used for passengers to view in real time; moreover, a heuristic search strategy based on the estimated arrival time of a metro, running time between stations, the current passenger flow information of the metro station and passenger flow information in each metro compartment is proposed, and therefore the optimal proposed ride scheme is obtained, and meanwhile, a time-optimal and distance-optimal scheme is obtained for the passengers to select; after the scheme is determined, according to the position conditions of the current passengers, a prompt of the next route is provided in real time; the passenger flow conditions of the compartments are determined according to the information of the wireless servers of the metro which is about to arrive, and the best waiting position proposal can be given by the system; after the passenger ride, prompt contents, including the time that the metro is about to arrive the next station, the get-off station and the get-off time of the passengers are given in real time, the exit scheme of the metro station and corresponding map information, can be given in real time.
Owner:大连海天兴业科技有限公司

Device for real time monitoring mine roof rock formation or concrete structure stability

The invention relates to a device for monitoring the stability of roof strata of a mine or concrete engineering in real time. The device mainly comprises a microseism signal conduction rod, a microseism signal sensing element and a microseism signal collection and analysis host computer. The microseism signal collection and analysis host computer is provided with a filter circuit for filtering the affection of ambient noise signal, a rapid data sampling circuit and a professional diagnosis and analysis software for analyzing the stability of the roof strata of the mine or the concrete structure in real time by utilizing artificial intelligence technology. The device is suitable for coal mines or other mines, can be used for the stability monitoring of underground construction which adopting concrete bar and concrete as the materials, such as metro stations or tunnels, and can also be used for the stability monitoring of dams, bridges, tall buildings and mountain landslides. Through a set of technology of digital filtering recognition and collection for the microseism signal, the recognition rate for acoustic signal released during rock breaking can be improved above 80 percent, and the purpose of monitoring the stability of the roof strata of the mine or the concrete structure is well completed.
Owner:西安西科测控设备有限责任公司

Supporting structure for six-pilot-holes large-section metro station undercrossing existing line

ActiveCN106640121ALarge excavation sectionHigh section utilizationUnderground chambersHydro energy generationMetro stationPilot hole
Provided is a supporting structure for a six-pilot-holes large-section metro station undercrossing existing line. The invention relates to the field of tunnel and underground engineering construction; two operation wells are symmetrically arranged at the right side and the left side of the existing line, and an advanced reinforcement soil is arranged between the two operation wells and at the lower portion of the existing line, two layers of guiding holes are arranged in the advanced reinforcement soil, the upper guiding holes from left to right are a fourth guiding hole, a third guiding hole, a second guiding hole, a first guiding hole; a fifth guiding hole and a sixth guiding hole are arranged under the third guiding hole and the second guiding hole respectively; beams at pile top are arranged in the first guiding hole and the fourth guiding hole, a lifting jack temporary support mechanism is arranged at a stair part of the upper portion of the beams at the pile top, a lifting jack is arranged at the upper portion of the lifting jack temporary support mechanism, a steel plate is arranged at the upper portion of the lifting jack. The supporting structure can not only control the settlement of the existing line remarkably, which ensures safety operation of the existing line, but also can achieve communication between metro station hall and platform floor, which remarkably improves overall use function and the riding experience of the station.
Owner:CHINA RAILWAY LIUYUAN GRP CO LTD

Mined metro station hole pile construction method

Provided is a mined metro station hole pile construction method. The method comprises the steps of whole support system construction and main body second lining construction; the whole support system construction step comprises the substeps that by utilizing air shafts at the two ends of the station as temporary working wells, four pilot tunnels are transversely dug through a positive step method; upper pilot tunnel side pile and middle column hole digging pile construction is conducted, bored piles are constructed inside an upper layer side pilot tunnel at intervals, and artificial hole digging piles are constructed inside an upper layer middle pilot tunnel at intervals; lower layer pilot tunnel bottom longitudinal beam construction is conducted; upper layer pilot tunnel steel pipe column construction is conducted; side pile crown beam construction is conducted; top longitudinal beam construction is conducted; top arch initial supporting structure construction is conducted; the main body second lining construction step comprises the substeps that soil body excavation is conducted, and station top plate second lining structure construction is conducted; when a soil body is dug to the bottom of a middle plate, middle plate and middle longitudinal beam construction is conducted; when a soil body is dug to the bottom of a base plate, the waterproof base plate is laid, and structure base plate construction is conducted; lower portion side wall construction is conducted when the base plate reaches the set intensity.
Owner:HONGRUN CONSTR GROUP STOCK

System and method for metro passenger flow early warning based on passenger flow density and gate pass time

InactiveCN106651730AThe early warning mechanism is accurateReduce congestionForecastingMetro stationData acquisition
The present invention discloses a system and method for metro passenger flow early warning based on the passenger flow density and the gate pass time. The system comprises a passenger flow data collection unit, a gate pass time calculation unit, a passenger flow dynamic analysis unit and an early warning measure feedback unit. The system and method for the metro passenger flow early warning based on the passenger flow density and the gate pass time are suitable for the passenger flow early warning in the urban subway station in the condition of sudden increasing of the passenger flow. The system provided by the invention comprehensively considers the pedestrian congestion behavior generated at the exit gate and the normal walking behavior of a pedestrian walking area in the metro to overcome the limitation of the simple quantitative method which only takes the video data collection as the basis and takes the density as the assessment index, the early warning mechanism is more scientific, the feedback result is more accurate and practical, and the system provided by the invention only needs to perform detection and analysis of the passenger flow density of the passenger flow density in the metro station and the gate portion so that the calculation is concise.
Owner:SOUTHEAST UNIV

Metro station foundation pit construction method for controlling deformation of neighboring buildings

The invention discloses a metro station foundation pit construction method for controlling deformation of neighboring buildings. The method comprises the following steps: constructing a foundation pit enclosure wall; digging a foundation pit soil body in a manner of retaining a soil body to be closer to the buildings; horizontally placing a first layer of steel struts in a pressing manner below the reserved soil body; digging the reserved soil body; pouring a metro station top plate on the surface of the soil with an upper part excavated to be flat; after concrete of the top plate reaches designed strength, removing a template, laying a top plate waterproof material, and backfilling soil to recover the pavement; continuously and horizontally placing a second layer of steel struts at a designed height below the top plate; digging the soil body continuously according to the designed height; horizontally pressing a third layer of steel struts at the designed height, and applying pre-stress; digging the soil body continuously according to the designed height; horizontally pressing a fourth layer of steel struts at the designed height, and applying press-stress; digging the soil body to the bottom of the foundation pit, flattening the surface of the soil, and pouring a station base plate; constructing edge walls and middle plates of station according to a sequential method, and removing the steel struts in sequence from bottom to top in the process of upwards constructing the edge walls, to complete a civil engineering structure of the station.
Owner:SHANDONG UNIV OF TECH

Mobile-terminal-based method for reminding arriving at station of metro

The invention provides a mobile-terminal-based method for reminding arriving at a station of a metro. The method comprises the following steps of: S1: setting an object station by a plurality of users through respective mobile terminals; S2: periodically obtaining a target station set obtained from target stations in mobile terminals of the other users when the first user is within a preset range by a first mobile terminal of a first user; S3, determining a first current station by the first mobile terminal according to the difference set of the adjacent two target station sets; and S4, according to the corresponding target station, the first current station and the metro running line data, determining whether or not the user arrives at a destination, and reminding when the first user arrives at station. According to embodiment of the invention, the metro station information can be determined and reminded to passengers through the unconscious collaboration among the passengers by the smartphone, and the forecasting and the reminding when the metro arrives at station can be accurately realized by the GSM (global system for mobile communication) and the smartphone, so that the mobile-terminal-based method is greatly convenient for the passengers to go out, and the metro operation quality can be improved.
Owner:TSINGHUA UNIV

High water pressure precipitation well structure in metro station foundation pit and still water grouting blocking method

The invention relates to the field of metro station foundation pit confined aquifer precipitation, in particular to a high water pressure precipitation well structure in a metro station foundation pitand a still water grouting blocking method, and the problem about blocking of a precipitation well under the situation of high water pressure is solved. The high water pressure precipitation well structure comprises a well pipe in the metro station foundation pit, the well pipe is a closed steel pipe, the top elevation of the well pipe is larger than that of the natural water level, the well pipepenetrates a bottom plate and a top plate of a station body, and a water pump is arranged in the well pipe. The still water grouting blocking method for the high water pressure precipitation well inthe metro station foundation pit is provided. A closed space is formed through a body structure and the precipitation well pipe, the water level is automatically elevated after water pumping is stopped, the pressure of the stratum and the water pressure inside and outside the precipitation well are balanced, still water is formed, grouting blocking is conduced, the method is novel, and construction is safe and reliable. The high water pressure precipitation well structure and the still water grouting blocking method are suitable for blocking of all precipitation wells, but the advantages in blocking of large water pressure and high water level shallow water or confined water precipitation wells are obvious, the technology is advanced, the application range is wide, practicability is high,and the popularization prospects are good.
Owner:CHINA RAILWAY 12TH BUREAU GRP +1

Open-cutting and undercutting combined metro station structure avoiding housing demolition and construction method thereof

The invention discloses an open-cutting and undercutting combined metro station structure avoiding housing demolition and a construction method thereof. The structure is composed of an open-cutting area defined by a plurality of open-cutting fender posts and an undercutting area under a building. The open-cutting area is constructed firstly, and then the undercutting area is constructed. Before undercutting structure construction, a transverse advanced large pipe shed is set up in advance, and the pipe shed is supported by undercutting side poles and an open-cutting top plate constructed in advance. The undercutting side poles are constructed through longitudinal side pilot tunnels, and before pilot tunnel construction, pilot tunnel periphery deep hole grouting is performed for reinforcingfirstly. Soil excavation is performed and an undercutting top plate are poured under protection of a pre-supporting system of the large pipe shed, and after the top plate reaches the structural strength, side walls, middle plates, a bottom plate and other structures of the undercutting area are constructed in an inverted construction method. According to the open-cutting and undercutting combinedmetro station structure avoiding housing demolition and the construction method thereof, demolition can be avoided, the work schedule is guaranteed, the coordination difficulty is reduced, the work investment is lowered, an underground box frame system is kept unchanged, and no influence exists on building function and operating management.
Owner:成都市建筑设计研究院有限公司

Shielding door-based urban metro station ventilating method and system

The invention discloses a shielding door-based urban metro station ventilating method and a shielding door-based urban metro station ventilating system. The method comprises the following steps: in the air-conditioner-use season, a station public area is isolated from a running tunnel; the air temperature and humidity of the station public area are guaranteed through a station public area air conditioning system, and ventilation of the running tunnel is guaranteed through a running tunnel ventilating system in the running tunnel; and in the non-air-conditioner-use season, the station public area communicates with the running tunnel as required, and ventilation from the station public area to the running tunnel is realized according to a train piston effect. The system comprises the station public area air conditioning system, the running tunnel ventilating system and a shielding door for isolating the station public area from the running tunnel; hanging plate tuyeres (1) and a control actuation device (2) are arranged on the shielding door; and the control actuation device (2) controls the hanging plate tuyeres (1) to be closed or opened so as to isolate the station public area from the running tunnel or communicate the station public area with the running tunnel.
Owner:朱培根

Rail top air duct building structure of urban rail transit platform layer public area based on BIM

The invention discloses a rail top air duct building structure of an urban rail transit platform layer public area based on BIM. The rail top air duct building structure comprises a rail running areaand the platform layer public area. A shielding door is arranged between the rail running area and the platform layer public area. An upper heat exhausting air duct is arranged above the rail runningarea. An overhaul area is arranged on the side, away from the shielding door, of the upper end of a hung ceiling. A rail top air duct is composed of a metro station middle plate, a left side concretecantilever beam, a right side concrete cantilever beam and an air duct bottom plate. A top box is arranged on the upper portion of the shielding door. The right side concrete cantilever beam extends to the position being flush with the lower end of the top box in the pouring process. The top box is fixed to the right side concrete cantilever beam through a connecting device. According to the railtop air duct building structure of the urban rail transit platform layer public area based on BIM, the cantilever beams of the rail top air duct are retracted by a certain distance towards the side being away from the public area, and the distance of a lengthening connecting piece is increased between the rail top air duct and the shielding door, so that a pipeline installing area at the upper endof the hung ceiling is moved by a certain distance towards the direction of the rail top air duct, accordingly the width of the pipeline overhaul area of the public area is increased, and overhaul ismore convenient.
Owner:北京芘苜工程技术有限公司

Whole station water stop structure and construction method during construction of mined metro station

The invention discloses a whole station water stop structure and construction method during construction of mined metro station. The water stop structure comprises fender piles in a mined station, water stop structures between the fender piles, and a water stop curtain at the bottom of a foundation pit, wherein the water stop structures between the fender piles and the fender piles co-act to forman excavated face side wall water stop structure, the water stop curtain at the bottom of the foundation pit is reinforced by soil body at the bottom of the foundation pit to form a water-resisting layer, and a buffer layer is arranged between water-resisting layer and a station bottom plate witout reinforcemeng. The excavated face side wall water stop structure is combined with the water stop curtain at the bottom of the foundation pit to form a box body, thereby preventing underground water from entering the excavation range. The interlocking pile and rotary jet grouting pile combined construction water stop method is adopted during the construction of the mined metro station to solve the water stopping problem of the whole station during the construction of the mined metro station, thereby avoiding the waste of underground water resources in the dewatering construction process of the subway, saving energy and protecting the environment on the premise of ensuring safety.
Owner:CHINA RAILWAY 18TH BUREAU GRP CO LTD +1

Metro station deep foundation pit combined type support construction method

The invention relates to a metro station deep foundation pit combined type support construction method which comprises the following steps: 1, prefabricating a pile top beam and a support beams I; 2 carrying out support pile construction; 3, laying the pile top beam; 4, laying the support beam I; 5, excavating foundation pit soil mass; 6, laying a support beam II; 7, laying a slant water drain pipe; 8, adding a rib layer and a mortar layer; and 9, laying a wall surface water drain pipe. The metro station deep foundation pit combined type support construction method has the following benefits:the pile top beam and the support beams I are prefabricated according to the design requirements, so that the site construction efficiency is improved, and the project construction period is shortened; in addition, a displacement control body and an expansion filling body are arranged between the connected support beams I to apply jacking pressure to the support beams I and to reduce flexural deflection of the support beams I; and a rib plate and a connecting screw rod I are pre-arranged on the outer side of a support pile reinforcement cage, so that the pulling resistance of the connecting screw rod I is effectively promoted, the construction difficulty of a rear connecting piece is lowered, and the site construction efficiency is improved.
Owner:ANHUI HIGHWAY BRIDGE ENG CO LTD

Wide-span deep buried metro station structure designed through combination of Y-shaped column and anti-pulling pile

InactiveCN106168053ATake advantage ofReasonable distribution of structural forcesArtificial islandsStrutsMetro stationSpandrel
The invention belongs to the field of underground engineering construction, and particularly relates to a wide-span deep buried metro station structure designed through the combination of a Y-shaped column and an anti-pulling pile. The wide-span deep buried metro station structure is characterized in that the bifurcated top of the Y-shaped column is connected to a top board beam, the middle part of the Y-shaped column is connected with a middle board beam, the lower end of the Y-shaped column is connected with a bottom board beam, the top end of the anti-pulling pile is connected with the lower surface of a bottom board, and the anti-pulling pile is arranged in the Y-shaped column span of the bottom board. The top part bifurcated fulcrum of the Y-shaped column is adopted to design the metro deep buried underground structure to reduce the top board span of the underground structure, the bottom board span is reduced by means of the bottom board anti-pulling pile, a design method for the wide-span user space between the top and bottom boards is created, under the condition that the engineering cost is not increased, the structure force bearing of the top board and the bottom board is reasonably solved and the problem of dense columns and nets in the use space of passengers is solved, and thus improving the use comfortableness of the station.
Owner:CHINA RAILWAY TUNNEL SURVEY & DESIGN INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products