Uplink transmission method and device
By using downlink channel information for subband granularity precoding and channel scheduling, the problems of low uplink transmission channel rate and insufficient channel estimation accuracy are solved, and the uplink transmission performance is improved.
Patent Information
- Application Number
- CN201910867153.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-09-12
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2039-09-12
AI Technical Summary
In the prior art, the rate of the terminal uplink transmission channel is generally smaller than the downlink reception rate, and the channel estimation accuracy of the broadband precoded channel is insufficient, which limits the improvement of uplink transmission performance.
By using downlink channel information to perform subband granularity precoding, channel estimation accuracy is improved, downlink channel information is used to generate uplink reference signals, and uplink transmission channels are sent according to downlink control signaling scheduling to realize accurate precoding of uplink transmission channels.
The channel estimation accuracy and performance of the uplink transmission channel are improved, and the uplink transmission capability of the terminal is enhanced.
Smart Images

Figure CN110545168B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to a wireless communication network, for example, to an uplink transmission method and device. Background Art
[0002] With the development of communication technology and application requirements, the rate and coverage of the terminal uplink transmission channel are becoming more and more important. Unlike downlink transmission, which can use large-scale antenna technology and frequency selective precoding, the terminal uplink transmission rate is generally lower than the downlink reception rate due to the limitations of factors such as the terminal space size, hardware cost and hardware implementation complexity.
[0003] Traditional terminals improve the rate and coverage of uplink transmission channels by using technologies such as power control, precoding and beamforming. In particular, precoding technology usually uses broadband precoding for uplink transmission, but broadband precoding usually has insufficient channel estimation accuracy and has limited effect on improving uplink transmission performance. Summary of the invention
[0004] The present application provides an uplink transmission method and device, which enables an uplink transmission channel to use precoding estimated by downlink channel information and indicates precoding information of subband granularity, thereby improving channel estimation accuracy and facilitating enhancement of uplink transmission.
[0005] The embodiment of the present application provides an uplink transmission method, which is applied to a first communication node, including:
[0006] Receive a downlink reference signal sent by the second communication node to obtain downlink channel information;
[0007] Sending an uplink reference signal using the downlink channel information;
[0008] Monitoring downlink control signaling sent by the second communication node, where the downlink control signaling includes a sub-band SRS resource indication;
[0009] The uplink transmission channel is sent according to the scheduling of the downlink control signaling.
[0010] In a possible implementation, the uplink reference signal includes N SRS resource groups, and the i-th SRS resource group includes M i SRS resources, where each SRS resource group is associated with a downlink reference signal, i, N, M i is an integer greater than or equal to 1, 1≤i≤N.
[0011] In a possible implementation, the association relationship between the SRS resource and the PTRS port includes any of the following:
[0012] All SRS resources are not associated with PTRS ports, and each SRS resource is associated with one PTRS port.
[0013] In a possible implementation manner, sending an uplink reference signal by using downlink channel information includes:
[0014] Determine the precoding of each uplink subband of the uplink reference signal according to the downlink channel information;
[0015] An uplink reference signal is generated according to the precoding of each uplink subband of the uplink reference signal and the uplink reference signal is sent.
[0016] In a possible implementation, the uplink subband division method includes at least one of the following methods:
[0017] The uplink transmission channel is divided according to the bandwidth and sub-band granularity of the carrier component;
[0018] Divide according to the frequency domain range of the BWP where the uplink transmission channel is located and the sub-band division granularity size;
[0019] The SRS resources are divided according to the frequency domain range and sub-band division granularity.
[0020] In a possible implementation, the subband division granularity is indicated by at least one of the following methods: high-level signaling, physical layer signaling, bandwidth of the carrier component where the uplink transmission channel is located, frequency domain range of the BWP where the uplink transmission channel is located, and frequency domain range of SRS resources.
[0021] In a possible implementation manner, the downlink control signaling includes any of the following manners:
[0022] A DCI for scheduling uplink transmission channels;
[0023] Two DCIs for independently scheduling uplink transmission channels;
[0024] Two DCIs for jointly scheduling uplink transmission channels.
[0025] In a possible implementation manner, a DCI for scheduling an uplink transmission channel includes a sub-band SRS resource indication.
[0026] In a possible implementation manner, the frequency domain ranges indicated by the DCIs of the two independently scheduled uplink transmission channels do not overlap, and the DCIs of the two independently scheduled uplink transmission channels both include sub-band SRS resource indications.
[0027] In a possible implementation manner, the two DCIs for jointly scheduling an uplink transmission channel include a first DCI and a second DCI, and the first DCI and the second DCI jointly schedule the uplink transmission channel.
[0028] In a possible implementation, the first DCI includes at least one of the following information: carrier indication, BWP indication, frequency domain resource allocation, time domain resource allocation, frequency hopping indication, frequency modulation offset indication, modulation coding mode, redundancy version, process number, SRS resource indication, SRS resource group indication, transmission layer number indication, DMRS port indication, DMRS sequence initialization indication, and second DCI size indication;
[0029] The second DCI includes at least one of the following information: an uplink subband number, multiple subband SRS resource indications, a modulation and coding scheme, a redundancy version, a redundancy version offset, a DMRS sequence initialization indication, and a DMRS sequence initialization offset indication.
[0030] In one possible implementation, the information bit size of the second DCI is determined by at least one of the following methods: a size indication of the second DCI of the first DCI, an association between SRS resources and PTRS ports, the number of SRS resource groups, the number of SRS resources contained in each SRS resource group, the selection of SRS resource groups, the number of SRS resources contained in each uplink subband, a frequency hopping indication of the first DCI, a frequency hopping offset indication of the first DCI, an SRS resource indication of the first DCI, and a frequency domain resource allocation of the first DCI.
[0031] In a possible implementation manner, the number of SRS resources included in each uplink subband is the number of SRS resources existing in the frequency domain occupied by the corresponding uplink subband; the relationship between the number of SRS resources included in each uplink subband and the total number of SRS resources includes at least one of the following manners:
[0032] Configure all SRS resources to occupy the same frequency domain range;
[0033] Different SRS resources occupy different frequency domain ranges, and the uplink subband division method is used to ensure that the number of SRS resources contained in each uplink subband is the same as the total number of SRS resources;
[0034] An uplink subband containing a number of SRS resources that is less than the total number of SRS resources cannot be scheduled for uplink transmission;
[0035] An uplink subband including a number of SRS resources less than the total number of SRS resources does not have a corresponding subband SRS resource indication;
[0036] An uplink subband including a number of SRS resources less than the total number of SRS resources is scheduled for uplink transmission and has a corresponding subband SRS resource indication.
[0037] In a possible implementation manner, the uplink subband number is determined by at least one of the following information: an uplink subband division method, a frequency hopping indication of the first DCI, a frequency hopping offset indication of the first DCI, and a frequency domain resource allocation of the first DCI.
[0038] In one possible implementation, the bit width of each subband SRS resource indication is determined by at least one of the following information: the association between the SRS resource and the PTRS port, the number of SRS resource groups, the number of SRS resources contained in each SRS resource group, the selection of the SRS resource group, the SRS resource indication of the first DCI, and the number of SRS resources contained in each uplink subband.
[0039] In a possible implementation manner, the relationship between the uplink subband number of the second DCI and the multiple subband SRS resource indications includes at least one of the following manners:
[0040] The second DCI includes multiple sub-band SRS resource indications and does not include an uplink sub-band number;
[0041] The second DCI includes an uplink subband number and multiple subband SRS resource indications, wherein one uplink subband number corresponds to one subband SRS resource indication;
[0042] The second DCI includes an uplink subband number and a plurality of subband SRS resource indications, wherein a group of uplink subband numbers corresponds to one subband SRS resource indication.
[0043] In a possible implementation manner, whether the second DCI exists is determined by any one of the following methods: radio resource control RRC signaling, medium access control layer control element MAC CE signaling, and prompt information of the first DCI.
[0044] In a possible implementation, the prompt information of the first DCI includes at least one of the following information: a scrambling code of the first DCI, a redundant version of the first DCI, an SRS resource indication of the first DCI, an SRS resource group indication of the first DCI, and a DMRS sequence initialization indication of the first DCI.
[0045] In a possible implementation, the number of layers of the uplink transmission channel is determined by at least one of the following information: an SRS resource indication of the first DCI, a transmission layer number indication of the first DCI, a DMRS port indication of the first DCI, and a plurality of sub-band SRS resource indications of the second DCI.
[0046] In a possible implementation manner, sending an uplink transmission channel according to scheduling of downlink control signaling includes:
[0047] If the second DCI is not detected, scheduling the uplink transmission channel according to the first DCI;
[0048] If the second DCI is detected, the uplink transmission channel is jointly scheduled according to the first DCI and the second DCI.
[0049] In a possible implementation manner, it is determined that the second DCI is detected according to at least one of the following manners:
[0050] The uplink transmission channel adopts the modulation and coding mode indicated by the second DCI;
[0051] The uplink transmission channel adopts the redundancy version indicated by the second DCI;
[0052] The redundancy version of the uplink transmission channel is determined by the redundancy version indicated by the first DCI and the redundancy version offset indicated by the second DCI;
[0053] The DMRS sequence initialization of the uplink transmission channel adopts the DMRS sequence initialization indication in the second DCI;
[0054] The DMRS sequence initialization of the uplink transmission channel is determined by the DMRS sequence initialization indicated by the first DCI and the DMRS sequence initialization offset indicated by the second DCI.
[0055] In a possible implementation manner, the subband SRS resource indication is used to indicate the precoding of the uplink transmission channel. The precoding used by the uplink transmission channel in each uplink subband is determined by the subband SRS resource indication corresponding to each uplink subband.
[0056] The embodiment of the present application provides an uplink transmission method, which is applied to a second communication node, including:
[0057] Sending a downlink reference signal to the first communication node, where the downlink reference signal is used to obtain downlink channel information;
[0058] Receiving an uplink reference signal sent by the first communication node using downlink channel information;
[0059] Sending a downlink control signaling to the first communication node, where the downlink control signaling includes a sub-band SRS resource indication;
[0060] The receiving first communication node sends an uplink transmission channel according to the scheduling of the downlink control signaling.
[0061] In a possible implementation manner, sending an uplink reference signal by using downlink channel information includes:
[0062] Determine the precoding of each uplink subband of the uplink reference signal according to the downlink channel information;
[0063] An uplink reference signal is generated according to the precoding of each uplink subband of the uplink reference signal and the uplink reference signal is sent.
[0064] In a possible implementation, the uplink subband division method includes at least one of the following methods:
[0065] The uplink transmission channel is divided according to the bandwidth and sub-band granularity of the carrier component;
[0066] Divide according to the frequency domain range of the BWP where the uplink transmission channel is located and the sub-band division granularity size;
[0067] The SRS resources are divided according to the frequency domain range and sub-band division granularity.
[0068] An embodiment of the present application provides an uplink transmission device, including a processor and a memory, wherein the processor is used to run program instructions stored in the memory to execute any possible implementation of the above-mentioned uplink transmission method.
[0069] The embodiment of the present application provides an uplink transmission device, which is arranged at a first communication node, including:
[0070] A reference signal receiving module, configured to receive a downlink reference signal sent by the second communication node and obtain downlink channel information;
[0071] A reference signal sending module, configured to send an uplink reference signal using downlink channel information;
[0072] A monitoring module, configured to monitor downlink control signaling sent by the second communication node, the downlink control signaling including a sub-band SRS resource indication;
[0073] The channel sending module is configured to send an uplink transmission channel according to the scheduling of the downlink control signaling.
[0074] The embodiment of the present application provides an uplink transmission device, which is arranged at a second communication node, including:
[0075] A reference signal sending module, configured to send a downlink reference signal to the first communication node, where the downlink reference signal is used to obtain downlink channel information;
[0076] A reference signal receiving module, configured to receive an uplink reference signal sent by the first communication node using downlink channel information;
[0077] A signaling sending module, configured to send a downlink control signaling to the first communication node, wherein the downlink control signaling includes a sub-band SRS resource indication;
[0078] The channel receiving module is configured to receive an uplink transmission channel sent by the first communication node according to the scheduling of the downlink control signaling.
[0079] An embodiment of the present application provides an uplink transmission system, the uplink transmission system comprising a first communication node and a second communication node;
[0080] The first communication node includes any uplink transmission device arranged in the first communication node;
[0081] The second communication node includes any uplink transmission device arranged in the second communication node. BRIEF DESCRIPTION OF THE DRAWINGS
[0082] Figure 1 A flowchart of an uplink transmission method provided by an embodiment;
[0083] Figure 2 is a schematic diagram of SRS resources for uplink reference signals;
[0084] Figure 3 Schematic diagram of sub-band division of SRS resources;
[0085] Figure 4 It is a schematic diagram of selecting SRS resource group;
[0086] Figure 5 A schematic diagram of the frequency domain range of an uplink transmission channel scheduled by the first DCI;
[0087] Figure 6 A schematic diagram of the frequency domain range of an uplink transmission channel scheduled by the first DCI in the case of frequency hopping;
[0088] Figure 7 A flowchart of another uplink transmission method provided by an embodiment;
[0089] Figure 8 A schematic diagram of the structure of an uplink transmission device provided by an embodiment;
[0090] Fig. 9 A schematic diagram of the structure of another uplink transmission device provided by an embodiment;
[0091] Fig.10 A schematic diagram of the structure of an uplink transmission system provided by an embodiment;
[0092] Fig.11 A schematic diagram of the structure of a terminal provided by an embodiment;
[0093] Fig.12 A schematic diagram of the structure of a base station provided by an embodiment. DETAILED DESCRIPTION
[0094] The embodiments of the present application will be described in detail below with reference to the accompanying drawings.
[0095] In wireless communication, when the uplink channel and the downlink channel are reciprocal, the downlink channel can be estimated and reciprocated to the uplink transmission, reducing the overhead and increasing the accuracy of precoding. However, when the uplink channel and the downlink channel are reciprocal, how to select the subband precoding for the uplink transmission channel is an urgent problem to be solved.
[0096] Figure 1 A flowchart of an uplink transmission method provided by an embodiment is shown in FIG. Figure 1 As shown, the method provided in this embodiment includes the following steps.
[0097] Step S1010: Receive a downlink reference signal sent by a second communication node to obtain downlink channel information.
[0098] The uplink transmission method provided in this embodiment is applied to a first communication node in a wireless communication system, and the first communication node is, for example, a user equipment (UE). The UE uses an uplink transmission channel for uplink transmission in the wireless communication system. The base station sends downlink data and downlink signaling to the UE through a downlink transmission channel. When the uplink channel and the downlink channel between the base station and the UE are reciprocal, that is, the spatial environment experienced by the uplink channel and the downlink channel between the base station and the UE is the same, the UE can use the downlink channel information obtained by the base station sending the downlink reference signal to send the uplink transmission channel. In particular, for the precoding used for the uplink transmission channel, the traditional uplink transmission channel adopts broadband precoding, and the accuracy of broadband precoding is insufficient, and the performance improvement of uplink transmission is limited. When the uplink channel and the downlink channel between the base station and the UE are reciprocal, this embodiment considers using the precoding information calculated by the downlink channel information to apply to the uplink transmission channel.
[0099] First, the UE as the first communication node needs to receive a downlink reference signal sent by the base station as the second communication node, and obtain downlink channel information from the downlink reference signal.
[0100] Step S1020: Send an uplink reference signal using the downlink channel information.
[0101] After acquiring the downlink channel information, the first communication node calculates precoding information of the uplink transmission channel based on the downlink channel information, and caches the precoding information. The precoding is selected from the cached precoding information for generating an uplink reference signal, and the precoding selection information is cached.
[0102] The uplink reference signal is sent using the downlink channel information, including: determining the precoding of each uplink subband of the uplink reference signal according to the downlink channel information; generating the uplink reference signal according to the precoding of each uplink subband of the uplink reference signal and sending the uplink reference signal.
[0103] The uplink reference signal includes N sounding reference signal (SRS) resource groups, where N is an integer greater than or equal to 1. The i-th SRS resource group includes M i SRS resources, M i is an integer greater than or equal to 1. SRS resources from different SRS resource groups can be sent simultaneously. Furthermore, the time domain behaviors of SRS resources from different SRS resource groups can be the same, such as periodic, semi-continuous or non-periodic transmission. Each SRS resource group is associated with a downlink reference signal, and the downlink reference signal is used to obtain downlink channel information. The first communication node sends an uplink reference signal using the downlink channel information, which means determining the precoding of each uplink subband of the uplink reference signal according to the downlink channel information, and then generating an uplink reference signal according to the precoding of each uplink subband of the uplink reference signal and sending the uplink reference signal. For example Figure 2 As shown, Figure 2 is a schematic diagram of the SRS resource of the uplink reference signal. There are the i-th and i+1-th SRS resource groups, and each SRS resource group contains M i and M i+1 The SRS resources and the frequency domain range occupied by each SRS resource are shown in the figure. (k,i,j) represents the precoding of the jth SRS resource in the i-th SRS resource group in the k-th uplink subband. (k,i,j) It is calculated by the UE based on the downlink channel information obtained by the downlink reference signal associated with the i-th SRS resource group.
[0104] The association relationship between the SRS resource and the Phase Tracking Reference Signal (PTRS) port is at least one of the following: all SRS resources are not associated with the PTRS port, and each SRS resource is associated with one PTRS port. PTRS is used to track phase noise.
[0105] Step S1030: monitor the downlink control signaling sent by the second communication node, where the downlink control signaling includes a sub-band SRS resource indication.
[0106] After the first communication node sends an uplink reference signal to the second communication node, the second communication node sends a downlink control signaling to the first communication node, and the downlink control signaling is used to schedule the uplink transmission channel of the first communication node, and the downlink control signaling includes a subband SRS resource indication. The subband SRS resource indication is used to indicate the subband precoding of the uplink transmission channel, and the precoding used by the uplink transmission channel in a certain uplink subband is determined by the subband SRS resource indication corresponding to the uplink subband.
[0107] The uplink subband is divided using at least one of the following methods:
[0108] The uplink transmission channel is divided according to the bandwidth and sub-band granularity of the carrier component where the uplink transmission channel is located.
[0109] The uplink transmission channel is divided according to the frequency domain range of the bandwidth part (Bandwidth Part, BWP) where the uplink transmission channel is located and the sub-band division granularity size.
[0110] The SRS resources are divided according to the frequency domain range and sub-band division granularity.
[0111] The subband division granularity is indicated by one of the following methods: high-level signaling, physical layer signaling, bandwidth of the carrier component where the uplink transmission channel is located, frequency domain range of the BWP where the uplink transmission channel is located, and frequency domain range of the SRS resource. The high-level signaling is, for example, radio resource control (RRC) signaling or media access control layer control element (MAC CE) signaling, and the physical layer signaling is, for example, downlink control information (DCI).
[0112] According to the frequency domain range of the SRS resource and the method of determining the sub-band division granularity, a specific example is as follows: Figure 3 , Figure 3 The following is a schematic diagram of sub-band division of SRS resources. Assuming there are two SRS resource groups, each with three SRS resources, the uplink sub-band can be divided in one of the following ways:
[0113] 1) According to the SRS resource with the largest bandwidth among all SRS resources and the sub-band division granularity.
[0114] 2) Based on the union of the frequency domain ranges of all SRS resources and the sub-band division granularity.
[0115] 3) According to the SRS resource with the smallest bandwidth among all SRS resources and the sub-band division granularity.
[0116] 4) Based on the intersection of the frequency domain ranges of all SRS resources and the sub-band division granularity.
[0117] The downlink control signaling schedules the uplink transmission channel in any of the following ways:
[0118] A DCI for scheduling uplink transmission channels;
[0119] Two DCIs for independently scheduling uplink transmission channels;
[0120] Two DCIs for jointly scheduling uplink transmission channels.
[0121] Step S1040: Send an uplink transmission channel according to the scheduling of the downlink control signaling.
[0122] After monitoring the downlink control signaling, the first communication node can send the uplink transmission channel according to the scheduling of the downlink control signaling. Since the downlink control signaling includes the sub-band SRS resource indication, the first communication node can determine the precoding of the uplink transmission channel to be transmitted according to the sub-band SRS resource indication in the downlink control signaling, and send the uplink transmission channel.
[0123] The uplink transmission method provided in this embodiment is applied to a first communication node. After receiving a downlink reference signal sent by a second communication node, the first communication node obtains downlink channel information, and then uses the downlink channel information to send an uplink reference signal. When monitoring the downlink control signaling sent by the second communication node, the downlink control signaling includes a sub-band SRS resource indication. The uplink transmission channel is sent according to the scheduling of the downlink control signaling, so that when there is reciprocity between the uplink transmission channel and the downlink transmission channel, the uplink transmission channel can use the precoding information calculated by the downlink channel information, thereby improving the channel estimation accuracy and facilitating the enhancement of uplink transmission.
[0124] In one embodiment, the downlink control signaling scheduling uplink transmission channel includes a DCI for scheduling uplink transmission channel, and the DCI for scheduling uplink transmission channel includes a subband SRS resource indication. Specifically, the downlink control signaling includes at least one of the following information: carrier indication, BWP indication, frequency domain resource allocation, time domain resource allocation, frequency hopping indication, frequency hopping offset indication, modulation coding mode, redundancy version, process number, multiple subband SRS resource indications, broadband SRS resource indication, transmission layer number indication, SRS resource group indication, demodulation reference signal (DeModulation Reference Signal, DMRS) port indication, DMRS sequence initialization indication. Multiple subband SRS resource indications are used to indicate the precoding of the uplink transmission channel. The precoding used by the uplink transmission channel in a certain uplink subband is determined by the subband SRS resource indication corresponding to the uplink subband. In the absence of conflict, the implementation method of the downlink control signaling including a DCI can be the same as the implementation method of the downlink control signaling including two DCIs for jointly scheduling uplink transmission channels.
[0125] In one embodiment, the downlink control signaling scheduling uplink transmission channel includes two DCIs for independently scheduling uplink transmission channels, the frequency domain ranges indicated by the DCIs for the two independently scheduling uplink transmission channels do not overlap, and the DCIs for the two independently scheduling uplink transmission channels both include sub-band SRS resource indications. Specifically, each downlink control signaling includes at least one of the following information: carrier indication, BWP indication, frequency domain resource allocation, time domain resource allocation, frequency hopping indication, frequency hopping offset indication, modulation coding mode, redundancy version, process number, multiple sub-band SRS resource indications, broadband SRS resource indication, transmission layer number indication, SRS resource group indication, DMRS port indication, DMRS sequence initialization indication. Multiple sub-band SRS resource indications are used to indicate the precoding of the uplink transmission channel. The precoding used by the uplink transmission channel in a certain uplink sub-band is determined by the sub-band SRS resource indication corresponding to the uplink sub-band. In the absence of conflict, the implementation method of the downlink control signaling including the DCI for two independently scheduling uplink transmission channels can be the same as the implementation method of the downlink control signaling including the DCI for two jointly scheduling uplink transmission channels.
[0126] In one embodiment, the downlink control signaling scheduling the uplink transmission channel includes two DCIs for jointly scheduling the uplink transmission channel. The two DCIs for jointly scheduling the uplink transmission channel include a first DCI and a second DCI, and the first DCI and the second DCI jointly schedule the uplink transmission channel.
[0127] The first DCI includes at least one of the following information: carrier indication, BWP indication, frequency domain resource allocation, time domain resource allocation, frequency hopping indication, frequency hopping offset indication, modulation and coding mode, redundancy version, process number, SRS resource indication, SRS resource group indication, transmission layer number indication, DMRS port indication, DMRS sequence initialization indication, and the size indication of the second DCI. The second DCI includes at least one of the following information: uplink subband number, multiple subband SRS resource indications, modulation and coding mode, redundancy version, redundancy version offset, DMRS sequence initialization indication, and DMRS sequence initialization offset indication. Among them, DMRS is used for demodulation of uplink transmission channels.
[0128] The first communication node determines whether the second DCI exists by at least one of the following methods: RRC signaling configured by the base station, MAC CE signaling configured by the base station, and prompt information of the first DCI. The prompt information of the first DCI includes at least one of the following methods: the scrambling code of the first DCI, the redundant version of the first DCI, the SRS resource indication of the first DCI, the SRS resource group indication of the first DCI, and the DMRS sequence initialization indication of the first DCI. The scrambling code of the first DCI, such as the RNTI of the first DCI, refers to the Cyclic Redundancy Check (CRC) check bits of the first DCI that are scrambled using a specific RNTI to notify the terminal whether the second DCI exists. The DMRS sequence initialization indication of the first DCI refers to the base station notifying the terminal whether the second DCI exists through the DMRS sequence initialization indication.
[0129] The information bit size of the second DCI is determined by at least one of the following methods: the size indication of the second DCI in the first DCI, the association between the SRS resource and the PTRS port, the number of SRS resource groups, the number of SRS resources contained in each SRS resource group, the selection of the SRS resource group, the number of SRS resources contained in each uplink subband, the frequency hopping indication of the first DCI, the frequency hopping offset indication of the first DCI, the SRS resource indication of the first DCI, and the frequency domain resource allocation of the first DCI. Among them, the bit width of the SRS resource indication of each subband is determined by at least one of the following information: the association between the SRS resource and the PTRS port, the number of SRS resource groups, the number of SRS resources contained in each SRS resource group, the selection of the SRS resource group, the SRS resource indication of the first DCI, and the number of SRS resources contained in each uplink subband.
[0130] The number of layers of the uplink transmission channel is determined by at least one of the following information: an SRS resource indication of the first DCI, an indication of the number of transmission layers of the first DCI, an indication of a DMRS port of the first DCI, and an indication of multiple sub-band SRS resources of the second DCI.
[0131] The uplink subband number is determined by at least one of the following information: an uplink subband division method, a frequency hopping indication of the first DCI, a frequency hopping offset indication of the first DCI, and a frequency domain resource allocation of the first DCI.
[0132] The relationship between the uplink subband number of the second DCI and the multiple subband SRS resource indications may be in at least one of the following ways:
[0133] The second DCI does not include an uplink subband number, but only includes multiple subband SRS resource indications;
[0134] The second DCI includes an uplink subband number and multiple subband SRS resource indications, wherein one uplink subband number corresponds to one subband SRS resource indication;
[0135] The second DCI includes an uplink subband number and a plurality of subband SRS resource indications, wherein a group of uplink subband numbers corresponds to one subband SRS resource indication.
[0136] The sub-band SRS resource indication is used to indicate the precoding of the uplink transmission channel. The precoding used by the uplink transmission channel in a certain uplink sub-band is determined by the sub-band SRS resource indication corresponding to the uplink sub-band.
[0137] The number of SRS resources contained in each uplink subband refers to the number of SRS resources existing in the frequency domain occupied by the uplink subband, which is related to the selection of the SRS resource group. The relationship between the number of SRS resources contained in each uplink subband and the total number of SRS resources will affect the SRS resource indication of the first DCI and the subband SRS resource indication of the second DCI. The total number of SRS resources is determined by at least one of the following methods: the total number of SRS resources contained in all SRS resource groups; related to the selection of the SRS resource group, indicating the total number of SRS resources contained in the selected SRS resource group. For example Figure 4 As shown, Figure 4 The following is a schematic diagram of selecting an SRS resource group. Assume that there are two SRS resource groups, the first SRS resource group contains three SRS resources, and the second SRS resource group contains four SRS resources. If the first SRS resource group is selected, the total number of SRS resources is three, and the number of SRS resources contained in the k+1th uplink subband is two; if the second SRS resource group is selected, the total number of SRS resources is four, and the number of SRS resources contained in the k+1th uplink subband is three; if the first SRS resource group and the second SRS resource group are selected, the total number of SRS resources is seven, and the number of SRS resources contained in the k+1th uplink subband is five.
[0138] The number of SRS resources included in each uplink subband is the number of SRS resources existing in the frequency domain occupied by the corresponding uplink subband. The relationship between the number of SRS resources included in each uplink subband and the total number of SRS resources may adopt one of the following restrictions:
[0139] If the frequency domain range occupied by all SRS resources is configured to be the same, the number of SRS resources contained in each uplink subband is the same as the total number of SRS resources; the frequency domain ranges occupied by different SRS resources may be different, and the uplink subbands are divided in a manner to ensure that the number of SRS resources contained in each uplink subband is the same as the total number of SRS resources; an uplink subband containing a smaller number of SRS resources than the total number of SRS resources cannot be scheduled for uplink transmission; an uplink subband containing a smaller number of SRS resources than the total number of SRS resources does not have a corresponding subband SRS resource indication; an uplink subband containing a smaller number of SRS resources than the total number of SRS resources can be scheduled for uplink transmission and has a corresponding subband SRS resource indication.
[0140] The operation of monitoring the control signaling of the second communication node, when the first communication node fails to detect the second DCI, the uplink transmission channel adopts the information indicated by the first DCI; if the second DCI exists and the first communication node detects the second DCI, the uplink transmission channel adopts the information jointly indicated by the two DCIs. The first communication node confirms that both DCIs are successfully monitored by the first communication node in at least one of the following ways:
[0141] The uplink transmission channel adopts the modulation and coding mode indicated by the second DCI; the uplink transmission channel adopts the redundant version indicated by the second DCI; the redundant version of the uplink transmission channel is jointly determined by the redundant version indicated by the first DCI and the redundant version offset indicated by the second DCI; the DMRS sequence initialization of the uplink transmission channel adopts the DMRS sequence initialization indication in the second DCI; the DMRS sequence initialization of the uplink transmission channel is jointly determined by the DMRS sequence initialization indicated by the first DCI and the DMRS sequence initialization offset indicated by the second DCI.
[0142] The downlink control signaling includes DCI of two jointly scheduled uplink transmission channels, including the following specific implementation manner. The DCI of two jointly scheduled uplink transmission channels in different situations will be described in detail with specific embodiments.
[0143] In one embodiment, it is assumed that there is only one SRS resource group, which includes M SRS resources, and all SRS resources are not associated with PTRS ports. In this embodiment, it is assumed that M=4. The first DCI does not indicate frequency hopping, and the partial frequency domain range of the uplink transmission channel scheduled by it, such as Figure 5 The black part shows Figure 5 This is a schematic diagram of the frequency domain range of the uplink transmission channel scheduled by the first DCI. In this embodiment, it is assumed that the granularity of an uplink subband is 4 resource blocks (RBs).
[0144] The SRS resource indication of the first DCI may adopt one of the following methods: bitmap, joint coding.
[0145] A specific example is that the SRS resource indication of the first DCI is 1010, and the number of layers of the uplink transmission channel is determined by the SRS resource indication of the first DCI, which means that the number of layers of the uplink transmission channel is 2, and the first SRS resource and the third SRS resource of the SRS resource group are selected. This embodiment assumes that there is a second DCI, and the indication of multiple sub-band SRS resources in the second DCI, and the number of SRS resources selected by each sub-band SRS resource indication must be the same as the number of SRS resources selected by the SRS resource indication in the first DCI, which can be specifically adopted in one of the following ways:
[0146] Mode 1: The second DCI does not include the uplink subband number, but only includes multiple subband SRS resource indications. Figure 5 As shown in FIG. 1 , if at least one RB in an uplink subband is scheduled for uplink transmission, the uplink subband corresponds to a subband SRS resource indication. The subband SRS resource indication may be in one of the following ways: bitmap, joint coding. A specific example of using a bitmap is that the subband SRS resource indications of the lth uplink subband and the l+1th uplink subband are 0110 and 1001 respectively. The above-mentioned sub-band SRS resource indication indicates that, in the lth uplink sub-band of the first layer of the uplink transmission channel, the precoding adopted by the scheduled frequency domain resources is based on the precoding adopted in the corresponding uplink sub-band when the second SRS resource is sent; in the lth uplink sub-band of the second layer of the uplink transmission channel, the precoding adopted by the scheduled frequency domain resources is based on the precoding adopted in the corresponding uplink sub-band when the third SRS resource is sent; in the l+1th uplink sub-band of the first layer of the uplink transmission channel, the precoding adopted by the scheduled frequency domain resources is based on the precoding adopted in the corresponding uplink sub-band when the first SRS resource is sent; in the l+1th uplink sub-band of the second layer of the uplink transmission channel, the precoding adopted by the scheduled frequency domain resources is based on the precoding adopted in the corresponding uplink sub-band when the fourth SRS resource is sent.
[0147] Another implementation is: at least one RB is used for part of the uplink subband of the uplink transmission channel, which can correspond to the same subband SRS resource indication, thereby reducing the overhead of the second DCI. A specific example is, Figure 5 As shown, the S-1th uplink subband has 3 RBs scheduled, the Sth uplink subband has 1 RB scheduled, and the 4 RBs are continuous. In order to reduce the overhead of the second DCI, the Sth uplink subband and the S-1th uplink subband correspond to the same subband SRS resource indication.
[0148] In addition, at least one RB is used for some uplink subbands of the uplink transmission channel, which may not correspond to any subband SRS resource indication. In this case, these uplink subbands use the SRS resource indication in the first DCI by default, reducing the overhead of the second DCI.
[0149] Mode 2: The second DCI includes an uplink subband number and multiple subband SRS resource indications, where one uplink subband number corresponds to one subband SRS resource indication. The uplink subband number is determined by the uplink subband division method and the frequency domain range of the uplink transmission channel. A specific example is, Figure 5 As shown, the l+1th uplink subband and the S-1th uplink subband contain at least one RB indicated for the uplink transmission channel. The two uplink subbands are renumbered as p and q respectively. The subband SRS resource indication may adopt one of the following methods: bitmap, joint coding. A specific example of using a bitmap is that the subband SRS resource indications numbered p and q are 0110 and 1001 respectively. The above-mentioned subband SRS resource indication indicates that, in the subband numbered p of the first layer of the uplink transmission channel, the precoding adopted by the scheduled frequency domain resources is based on the precoding adopted in the corresponding uplink subband when the second SRS resource is sent; in the subband numbered p of the second layer of the uplink transmission channel, the precoding adopted by the scheduled frequency domain resources is based on the precoding adopted in the corresponding uplink subband when the third SRS resource is sent; in the subband numbered q of the first layer of the uplink transmission channel, the precoding adopted by the scheduled frequency domain resources is based on the precoding adopted in the corresponding uplink subband when the first SRS resource is sent; in the subband numbered q of the second layer of the uplink transmission channel, the precoding adopted by the scheduled frequency domain resources is based on the precoding adopted in the corresponding uplink subband when the fourth SRS resource is sent.
[0150] Another implementation is: at least one RB is used for part of the uplink subband of the uplink transmission channel, which can correspond to the same uplink subband number, thereby reducing the overhead of the second DCI. A specific example is, Figure 5 As shown, the S-1th uplink subband has 3 RBs scheduled, the Sth uplink subband has 1 RB scheduled, and the 4 RBs are continuous. In order to reduce the overhead of the first DCI, the Sth uplink subband and the S-1th uplink subband correspond to the same uplink subband number.
[0151] In addition, not all uplink subband numbers must correspond to a subband SRS resource indication. When some uplink subband numbers do not correspond to any subband SRS resource indication, the SRS resource indication in the first DCI is used by default to reduce the overhead of the second DCI.
[0152] Mode 3: The second DCI includes an uplink subband number and multiple subband SRS resource indications, where a group of uplink subband numbers corresponds to one subband SRS resource indication. The uplink subband number is determined by the uplink subband division method and the frequency domain range of the uplink transmission channel. Figure 5 As shown, the l+1th uplink subband and the S-1th uplink subband contain at least one RB indicated for an uplink transmission channel. The two uplink subbands are renumbered as p and q, respectively. The subband SRS resource indication may be in one of the following ways: bitmap, joint coding. A group of uplink subband numbers corresponds to a subband SRS resource indication. A specific example is that the subband numbers p and q correspond to the same subband SRS resource indication: 0101. The above-mentioned sub-band SRS resource indication indicates that, when the uplink transmission channel is numbered in the sub-band p, the precoding adopted by the frequency domain resources scheduled in the first layer is based on the precoding adopted in the corresponding uplink sub-band when the second SRS resources are sent; when the uplink transmission channel is numbered in the sub-band p, the precoding adopted by the frequency domain resources scheduled in the second layer is based on the precoding adopted in the corresponding uplink sub-band when the fourth SRS resources are sent; when the uplink transmission channel is numbered in the sub-band q, the precoding adopted by the frequency domain resources scheduled in the first layer is based on the precoding adopted in the corresponding uplink sub-band when the second SRS resources are sent; when the uplink transmission channel is numbered in the sub-band q, the precoding adopted by the frequency domain resources scheduled in the second layer is based on the precoding adopted in the corresponding uplink sub-band when the fourth SRS resources are sent.
[0153] In another implementation, at least one RB is used for part of the uplink subband of the uplink transmission channel, and multiple uplink subbands can correspond to the same uplink subband number, thereby reducing the overhead of the second DCI. A specific example is, Figure 5 As shown, the S-1th uplink subband has 3 RBs scheduled, the Sth uplink subband has 1 RB scheduled, and the 4 RBs are continuous. In order to reduce the overhead of the first DCI, the Sth uplink subband and the S-1th uplink subband correspond to the same uplink subband number.
[0154] In addition, not all uplink subband numbers must correspond to a subband SRS resource indication. When some uplink subband numbers do not correspond to any subband SRS resource indication, the SRS resource indication in the first DCI is used by default to reduce the overhead of the second DCI.
[0155] In addition, an example of determining the number of layers of the uplink transmission channel. Assume that the DMRS port indication of the first DCI selects 3 DMRS ports, and the SRS resource indication of the first DCI is 1000. If there is no second DCI or the second DCI is not monitored, the number of layers of the uplink transmission channel is determined by the SRS resource indication of the first DCI, which is 1 layer, and the first SRS resource of the SRS resource group is selected, and the DMRS port used by the uplink transmission channel is one of the DMRS ports indicated by the DMRS port in the first DCI. If the second DCI exists and is monitored, the number of layers of the uplink transmission channel can be determined by one of the following methods: the number of DMRS ports indicated by the first DMRS port; multiple sub-band SRS resource indications of the second DCI. The number of DMRS ports indicated by the first DMRS port determines the number of layers of the uplink transmission channel. The number of transmission layers in the above example is 3, then each sub-band SRS resource indication of the second DCI must indicate 3 SRS resources, and the DMRS ports used by the uplink transmission channel are all DMRS ports indicated by the DMRS port in the first DCI. The multiple sub-band SRS resource indications of the second DCI determine the number of layers of the uplink transmission channel. For example, each sub-band SRS resource indication of the second DCI indicates 2 SRS resources, which means that the number of layers of the uplink transmission channel is 2, and the DMRS ports of each layer of the uplink transmission channel correspond to two DMRS ports indicated by the DMRS port in the first DCI.
[0156] In another embodiment, there is one SRS resource group, and each SRS resource is associated with a PTRS port. The PTRS ports associated with different uplink subbands of the same layer of the uplink transmission channel must be the same. The selection of the PTRS port of the uplink transmission channel can be determined by one of the following methods: the SRS resource indication of the first DCI, the SRS resource indication in the first DCI and the second subband SRS resource indication are jointly determined, and the subband SRS resource indication of the second DCI is determined.
[0157] The selection of the uplink transmission PTRS port is determined by the SRS resource indication of the first DCI. For example: Assume that there are 4 SRS resources in an SRS resource group, the 1st and 2nd SRS resources are associated with PTRS port 0, the 3rd and 4th SRS resources are associated with PTRS port 1, and the number of layers of the uplink transmission channel is determined by the SRS resource indication of the first-level DCI. An example is as follows:
[0158] 1) If the SRS resource indication of the first DCI is 1000, the first layer of the uplink transmission channel is associated with PTRS port 0. Because the PTRS ports associated with different uplink subbands of the same layer of the uplink transmission channel must be the same. Therefore, each subband SRS resource indication can only select one from the first and second SRS resources. At this time, the bit width of each subband SRS resource indication in the second DCI only needs 1 bit.
[0159] 2) If the SRS resource indication of the first DCI is 0011, the first layer and the second layer of the uplink transmission channel are associated with the same PTRS port 1. Because the PTRS ports associated with different uplink subbands of the same layer of the uplink transmission channel must be the same, there is no second DCI at this time.
[0160] 3) If the SRS resource indication of the first DCI is 0110, the first layer and the second layer of the uplink transmission channel are associated with PTRS port 0 and PTRS port 1 respectively. At this time, if there is a second DCI, the sub-band SRS resource indication for uplink transmission layer 1 can only select one from the first SRS resource and the second SRS resource; the sub-band SRS resource indication for uplink transmission layer 2 can only select one from the third SRS resource and the fourth SRS resource. At this time, the bit width of each sub-band SRS resource indication in the second DCI only needs 2 bits.
[0161] 4) If the SRS resource indication of the first DCI is 1110, the first and second layers of the uplink transmission channel are associated with the same PTRS port 0, and the third layer is associated with PTRS port 1. At this time, each sub-band SRS resource indication can only select one from the third SRS resource and the fourth SRS resource for transmission of the third layer. The bit width of each sub-band SRS resource indication in the second DCI only needs 1 bit.
[0162] The selection of the uplink transmission PTRS port is determined by the SRS resource indication in the first DCI and the subband SRS resource indication in the second DCI. A specific example is: assuming that there are 4 SRS resources in an SRS resource group, the 1st and 2nd SRS resources are associated with PTRS port 0, the 3rd and 4th SRS resources are associated with PTRS port 1, and the number of layers of the uplink transmission channel is determined by the SRS resource indication in the first DCI. For example:
[0163] 1) If the SRS resource indication of the first DCI is 1000 / 0100 / 0010 / 0001, it means that the number of layers of the uplink transmission channel is 1, and each sub-band SRS resource indication of the second DCI can only indicate one SRS resource. Specifically, one of the following methods can be selected: all sub-band SRS resource indications can only select one from the first and second SRS resources, and all sub-band SRS resource indications can only select one from the third and fourth SRS resources. A more specific example is that the sub-band SRS resource indication with the lowest uplink sub-band number is 0100, indicating that the first layer of the uplink transmission channel is associated with PTRS port 0, and all other sub-band SRS resource indications can only select one from the first and second SRS resources. At this time, each of the remaining sub-band SRS resource indications only requires 1 bit.
[0164] 2) If the SRS resource indication of the first DCI is 1100 / 0011, it means that the number of layers of the uplink transmission channel is 2. Then each sub-band SRS resource indication of the second DCI can only indicate 2 SRS resources. Each sub-band SRS resource indication can select 2 SRS resources from 4 SRS resources at will, but it is necessary to meet the requirement that the PTRS ports associated with different uplink sub-bands of the same layer of the uplink transmission channel must be the same.
[0165] 3) If the SRS resource indication of the first DCI is 1110 / 1101 / 1011 / 0111, it means that the number of layers of the uplink transmission channel is 3. Then each sub-band SRS resource indication of the second DCI can only indicate 3 SRS resources. Each sub-band SRS resource indication can select 3 SRS resources from 4 SRS resources at will, but it is necessary to meet the requirement that the PTRS ports associated with different uplink sub-bands of the same layer of the uplink transmission channel must be the same.
[0166] 4) If the SRS resource indication of the first DCI is 1111, it means that the number of layers of the uplink transmission channel is 4. At this time, there is no second DCI.
[0167] The remaining implementation methods may adopt the same implementation methods if they do not conflict with other implementation methods.
[0168] In another embodiment, there are N SRS resource groups, where the i-th SRS resource group includes M i SRS resources.
[0169] The subband SRS resource indication of the second DCI may adopt one of the following restrictions:
[0170] The number of SRS resources selected by multiple sub-band SRS resource indications in the same resource group must be the same; the number of SRS resources selected by multiple sub-band SRS resource indications in the same resource group may be different.
[0171] You can determine the selection of the SRS resource group in one of the following ways:
[0172] High-level parameter indication;
[0173] An SRS resource group selection indication of the first DCI;
[0174] The SRS resource indication of the first DCI implicitly notifies the selection of the SRS resource group.
[0175] The high-level parameter indication or the SRS resource group selection indication of the first DCI, and all SRS resources are not associated with the PTRS port, the bit width of the SRS resource indication of the first DCI and the bit width of the SRS resource indication of a subband of the second DCI can adopt one of the following situations:
[0176] 1) Only one SRS resource group can be selected
[0177] A: If the number of SRS resources in different SRS resource groups is the same, that is, M 1 =M 2 =…=M N , then the bit width of the SRS resource indication of the first DCI is Among them, L max Indicates the maximum number of layers that the terminal can support or the maximum number of transmission layers allowed by the base station for the terminal. Assuming that the first DCI indicates RI SRS resources, the bit width of a sub-band SRS resource indicated by the second DCI is one of the following:
[0178] M 1 Bit;
[0179] Bit.
[0180] B: If the number of SRS resources in different SRS resource groups is different, the bit width of the SRS resource indication of the first DCI is one of the following:
[0181] max{M 1 ,M 2 ,...,M N}bit;
[0182] Bit.
[0183] Among them, L max Indicates the maximum number of layers that the terminal can support or the maximum number of transmission layers allowed by the base station for the terminal. Assuming that the first DCI indicates RI SRS resources and the xth (x∈{1,2,...,N})th SRS resource group is selected, the bit width of a subband SRS resource indicated by the second DCI is one of the following:
[0184] M x Bit;
[0185] Bit.
[0186] 2) Multiple SRS resource groups can be selected. Assume that P (P≤N) SRS resource groups are selected, corresponding to the Qth 1 ,Q 2 ,...,Q P SRS resource groups. The bit width of the SRS resource indication of the first DCI is one of the following:
[0187] Bit;
[0188] Bit;
[0189] Bit.
[0190] in, Indicates the maximum number of layers that the terminal can support in the i-th antenna port group or the maximum number of transmission layers allowed by the base station for the terminal in the i-th antenna port group. max Indicates the maximum number of layers that the terminal can support or the maximum number of transmission layers allowed by the base station for the terminal. i SRS resource groups indicate SRS resources, the bit width of a sub-band SRS resource indicated by the second DCI is one of the following:
[0191] Bit;
[0192] Bit;
[0193] Bit.
[0194] The first DCI implicitly notifies the selection of the SRS resource group through the SRS resource indication, which means that whether the SRS resource group is selected is determined according to whether the SRS resource indication of the first DCI indicates at least one SRS resource in a certain SRS resource group. The bit width of the SRS resource indication of the first DCI can be one of the following:
[0195] (M 1 +M 2 +…+M N ) bits;
[0196] Bit;
[0197] Bit.
[0198] Among them, L max,i (i=1,2,…,N) represents the maximum number of layers that the terminal can support in the i-th antenna port group or the maximum number of transmission layers allowed by the base station for the terminal in the i-th antenna port group. max Indicates the maximum number of layers that the terminal can support or the maximum number of transmission layers allowed by the base station for the terminal. Assume that the first DCI indicates a total of RI SRS resources, and the ith SRS resource group indicates RI i (i=1, 2, ..., N) SRS resources, the bit width of one sub-band SRS resource indicated by the second DCI is one of the following:
[0199] (M 1 +M 2 +…+M N ) bits;
[0200] Bit;
[0201] Bit.
[0202] In another embodiment, there are N SRS resource groups, and the SRS resources are associated with PTRS ports. The association between the SRS resources and the PTRS ports will affect the SRS resource indication of each subband in the second DCI. The subband SRS resource indication of the second DCI has the following restrictions: the PTRS ports associated with different uplink subbands on the same layer of the uplink transmission channel must be the same. The association between the SRS resources and the PTRS ports in a resource group has the following two situations:
[0203] Different SRS resources of an SRS resource group may be associated with different PTRS ports;
[0204] All SRS resources in an SRS resource group can only be associated with the same PTRS port.
[0205] The subband SRS resource indication of the second DCI may indicate the SRS resource selection in different SRS resource groups in one of the following ways:
[0206] Multiple sub-band SRS resource indications must have the same number of SRS resources selected in the same resource group;
[0207] Multiple sub-band SRS resources indicate that the number of SRS resources selected in the same resource group may be different.
[0208] Different SRS resources of an SRS resource group may be associated with different PTRS ports, and the number of SRS resources selected by multiple sub-band SRS resource indications in the same resource group must be the same. A specific example is to assume that there are two SRS resource groups, and the PTRS port selection of the uplink transmission channel and the number of layers of the uplink transmission channel are determined by the SRS resource indication of the first DCI. The PTRS ports associated with different uplink subbands of the same layer of the uplink transmission channel must be the same. Each SRS resource group contains 4 SRS resources. The 1st and 2nd SRS resources of the 1st SRS resource group are associated with PTRS port 0; the 3rd and 4th SRS resources of the 1st SRS resource group are associated with PTRS port 1; the 1st and 2nd SRS resources of the 2nd SRS resource group are associated with PTRS port 2; the 3rd and 4th SRS resources of the 2nd SRS resource group are associated with PTRS port 3. Regarding the SRS resource indication of the first DCI and the sub-band SRS resource indication of the second DCI, for example:
[0209] 1) The SRS resource indication of the first DCI is: 10000001, which means that the number of layers of the uplink transmission channel is 2, the first layer uplink transmission is associated with PTRS port 0, and the second layer uplink transmission is associated with PTRS port 3. Because the PTRS ports associated with different uplink subbands of the same layer of the uplink transmission channel must be the same. Therefore, the subband SRS resource indication of the first layer can only select one from the 1st and 2nd SRS resources of the first SRS resource group; the subband SRS resource indication of the second layer can only select one from the 3rd and 4th SRS resources of the second SRS resource group. In this case, the bit width of each subband SRS resource indication is only 2 bits.
[0210] 2) The SRS resource indication of the first DCI is: 11001001, indicating that the number of layers of the uplink transmission channel is 4, the 1st and 2nd layers of uplink transmission are associated with PTRS port 0, the 3rd layer of uplink transmission is associated with PTRS port 2, and the 4th layer of uplink transmission is associated with PTRS port 3. Because. Because the PTRS ports associated with different uplink subbands of the same layer of the uplink transmission channel must be the same. Therefore, the subband SRS no longer includes the selection of the first SRS resource group; the subband SRS resource indication of the third layer can select one from the 1st and 2nd SRS resources of the second SRS resource group; the subband SRS resource indication of the fourth layer can select one from the 3rd and 4th SRS resources of the second SRS resource group. In this case, the bit width of each subband SRS resource indication is only 2 bits.
[0211] 3) The SRS resource indication of the first DCI is: 11111111, indicating that the number of layers of the uplink transmission channel is 8, and all SRS resources are selected, then there is no second DCI.
[0212] 4) The SRS resource indication of the first DCI is: 11000000 / 00110000, indicating that the number of layers of the uplink transmission channel is 2, and the second SRS resource group is not selected. Because the PTRS ports associated with different uplink subbands of the same layer of the uplink transmission channel must be the same, there is no second DCI at this time.
[0213] 5) The SRS resource indication of the first DCI is: 00001100 / 00000011, indicating that the number of layers of the uplink transmission channel is 2, and the first SRS resource group is not selected. Because the PTRS ports associated with different uplink subbands of the same layer of the uplink transmission channel must be the same, there is no second DCI at this time.
[0214] 6) The SRS resource indication of the first DCI is: 11100000, indicating that the number of layers of the uplink transmission channel is 3, and the second SRS resource group is not selected. Because the PTRS ports associated with different uplink subbands of the same layer of the uplink transmission channel must be the same. The subband SRS resource indication of the third layer can only select one from the third and fourth SRS resources of the first SRS resource group. At this time, each subband SRS resource indication only needs 1 bit.
[0215] 7) The SRS resource indication of the first DCI is: 11110000 / 11001100 / 11000011 / 00111100 / 00110011 / 00001111, indicating that the number of layers of the uplink transmission channel is 4, because each sub-band SRS resource indication of the second DCI corresponds to the SRS resource indication of the same layer of the uplink transmission channel, and if they are located in the same SRS resource group, they must be associated with the same PTRS port. At this time, there is no second DCI.
[0216] Different SRS resources of an SRS resource group can only be associated with the same PTRS port, and the number of SRS resources selected by multiple sub-band SRS resource indications in the same resource group must be the same. A specific example is, assuming that there are two SRS resource groups, and the PTRS port selection of the uplink transmission channel and the number of layers of the uplink transmission channel are determined by the SRS resource indication of the first DCI. Each SRS resource group contains 4 SRS resources. The PTRS ports associated with different uplink subbands of the same layer of the uplink transmission channel must be the same. All SRS resources of the first SRS resource group are associated with PTRS port 0; all SRS resources of the second SRS resource group are associated with PTRS port 1. Regarding the SRS resource indication of the first DCI and the sub-band SRS resource indication of the second DCI, for example:
[0217] 1) The SRS resource indication of the first DCI is: 10000001, indicating that the number of layers of the uplink transmission channel is 2, the first layer uplink transmission is associated with PTRS port 0, and the second layer uplink transmission is associated with PTRS port 1. The sub-band SRS resource indication of the first layer can only be selected from the first SRS resource group; the sub-band SRS resource indication of the second layer can only be selected from the second SRS resource group.
[0218] 2) The SRS resource indication of the first DCI is: 11001001, indicating that the number of layers of the uplink transmission channel is 4, the 1st and 2nd layers of uplink transmission are associated with PTRS port 0, and the 3rd and 4th layers of uplink transmission are associated with PTRS port 1. The sub-band SRS resource indication of the 1st and 2nd layers can only select 2 from the 1st SRS resource group; the sub-band SRS resource indication of the 3rd and 4th layers can only select 2 from the 2nd SRS resource group.
[0219] 3) The SRS resource indication of the first DCI is: 11111111, indicating that the number of layers of the uplink transmission channel is 8, and all SRS resources are selected, then there is no second DCI.
[0220] 4) The SRS resource indication of the first DCI is: 11110000 / 00001111, indicating that the number of layers of the uplink transmission channel is 4. At this time, there is no second DCI.
[0221] Different SRS resources of an SRS resource group can only be associated with the same PTRS port, and the number of SRS resources selected by multiple sub-band SRS resource indications in the same resource group can be different. A specific example is, assuming that there are two SRS resource groups, and the PTRS port selection of the uplink transmission channel is jointly determined by the SRS resource indication in the first DCI and the second sub-band SRS resource indication. Each SRS resource group contains 4 SRS resources. All SRS resources of the first SRS resource group are associated with PTRS port 0; all SRS resources of the second SRS resource group are associated with PTRS port 1. Regarding the SRS resource indication of the first DCI and the sub-band SRS resource indication of the second DCI, for example:
[0222] 1) The SRS resource indication of the first DCI is: 10000001, indicating that the number of layers of the uplink transmission channel is 2. For any sub-band SRS resource indication, 2 SRS resources can be selected from 8 SRS resources. The PTRS associated with the actual uplink transmission depends on the number of transmission layers and the sub-band SRS resource indication.
[0223] 2) The SRS resource indication of the first DCI is: 11001001, indicating that the number of layers of the uplink transmission channel is 4. For any sub-band SRS resource indication, 4 SRS resources can be selected from 8 SRS resources. The PTRS associated with the actual uplink transmission depends on the number of transmission layers and the sub-band SRS resource indication selection.
[0224] The remaining implementation methods may adopt the same implementation methods if they do not conflict with other implementation methods.
[0225] In another embodiment, there are N SRS resource groups, where the i-th SRS resource group includes M i SRS resources, and the first DCI indicates the frequency hopping and the frequency hopping offset. Figure 6 As shown, Figure 6 A schematic diagram of the frequency domain range of the uplink transmission channel scheduled by the first DCI in the presence of frequency hopping. The frequency domain range actually occupied by the uplink transmission channel is determined by the frequency hopping indication of the first DCI, the frequency hopping offset indication of the first DCI, and the frequency domain resource allocation of the first DCI. The uplink subband number and multiple subband SRS resource indications of the second DCI should be based on the frequency domain range actually occupied by the uplink transmission channel. The remaining implementation methods can adopt the same implementation method if they do not conflict with other implementation methods.
[0226] Figure 7 A flowchart of another uplink transmission method provided by an embodiment, such as Figure 7 As shown, the method provided in this embodiment includes the following steps.
[0227] Step S7010: Send a downlink reference signal to the first communication node, where the downlink reference signal is used to obtain downlink channel information.
[0228] The uplink transmission method provided in this embodiment is applied to a second communication node in a wireless communication system, and the second communication node is, for example, a base station. The base station uses a downlink transmission channel for downlink transmission in the wireless communication system, and schedules the second communication node to send an uplink transmission channel through downlink control signaling. The base station sends downlink data and downlink signaling to the UE through the downlink transmission channel. When the uplink channel and the downlink channel between the base station and the UE are reciprocal, that is, the spatial environment experienced by the uplink channel and the downlink channel between the base station and the UE is the same, the UE can use the downlink channel information obtained by the base station sending the downlink reference signal to send the uplink transmission channel. In particular, for the precoding used for the uplink transmission channel, the traditional uplink transmission channel adopts broadband precoding, and the accuracy of broadband precoding is insufficient, and the performance improvement of uplink transmission is limited. When the uplink channel and the downlink channel between the base station and the UE are reciprocal, this embodiment considers using the precoding information calculated by the downlink channel information to apply to the uplink transmission channel.
[0229] First, the base station serving as the second communication node sends a downlink reference signal to the first communication node, where the downlink reference signal includes downlink channel information.
[0230] Step S7020: Receive an uplink reference signal sent by the first communication node using downlink channel information.
[0231] After acquiring the downlink channel information, the first communication node calculates the precoding information of the uplink transmission channel based on the downlink channel information and caches the precoding information. The precoding is selected from the cached precoding information for generating an uplink reference signal, and the precoding selection information is cached. The second communication node will receive the uplink reference signal sent by the first communication node.
[0232] Step S7030: Send downlink control signaling to the first communication node, where the downlink control signaling includes a sub-band SRS resource indication.
[0233] After receiving the uplink reference signal sent by the first communication node, the second communication node can send a downlink control signaling to the first communication node, and the downlink control signaling is used to schedule the uplink transmission channel of the first communication node, and the downlink control signaling includes a subband SRS resource indication. The subband SRS resource indication is used to indicate the subband precoding of the uplink transmission channel, and the precoding used by the uplink transmission channel in a certain uplink subband is determined by the subband SRS resource indication corresponding to the uplink subband.
[0234] Step S7040: receiving the uplink transmission channel sent by the first communication node according to the scheduling of the downlink control signaling.
[0235] After monitoring the downlink control signaling, the first communication node can send the uplink transmission channel according to the scheduling of the downlink control signaling. Since the downlink control signaling includes the sub-band SRS resource indication, the first communication node can determine the precoding of the uplink transmission channel to be transmitted according to the sub-band SRS resource indication in the downlink control signaling, and send the uplink transmission channel. Then the second communication node will receive the uplink transmission channel sent by the first communication node.
[0236] The uplink transmission method provided in this embodiment is applied to the second communication node, firstly sends a downlink reference signal to the first communication node, the downlink reference signal includes downlink channel information, then receives the uplink reference signal sent by the first communication node using the downlink channel information, after sending downlink control signaling to the first communication node, the downlink control signaling includes a sub-band SRS resource indication, and receives the uplink transmission channel sent by the first communication node according to the scheduling of the downlink control signaling, so that when there is reciprocity between the uplink transmission channel and the downlink transmission channel, the uplink transmission channel can use the precoding information calculated by the downlink channel information, thereby improving the channel estimation accuracy and facilitating the enhancement of uplink transmission.
[0237] The uplink transmission method provided in this embodiment is Figure 1 The uplink transmission method provided in the embodiment shown is respectively the processing on the base station side and the processing on the UE side, wherein the specific implementation method has been Figure 1 The detailed description is given in the illustrated embodiment and will not be repeated in this embodiment.
[0238] Figure 8 FIG. 1 is a schematic diagram of the structure of an uplink transmission device provided in an embodiment. The uplink transmission device provided in this embodiment is arranged in a first communication node, such as Figure 8 As shown, the uplink transmission device provided in this embodiment includes:
[0239] The reference signal receiving module 81 is configured to receive a downlink reference signal sent by the second communication node and obtain downlink channel information; the reference signal sending module 82 is configured to send an uplink reference signal using the downlink channel information; the monitoring module 83 is configured to monitor the downlink control signaling sent by the second communication node, the downlink control signaling including a sub-band SRS resource indication; the channel sending module 84 is configured to send an uplink transmission channel according to the scheduling of the downlink control signaling.
[0240] The uplink transmission device provided in this embodiment is used to implement Figure 1 The uplink transmission method of the illustrated embodiment and the uplink transmission device provided in this embodiment have similar implementation principles and technical effects, which will not be described in detail here.
[0241] Fig. 9 FIG. 1 is a schematic diagram of the structure of another uplink transmission device provided by an embodiment. The uplink transmission device provided by this embodiment is arranged at the second communication node, such as Fig. 9 As shown, the uplink transmission device provided in this embodiment includes:
[0242] A reference signal sending module 91 is configured to send a downlink reference signal to the first communication node, where the downlink reference signal is used to obtain downlink channel information; a reference signal receiving module 92 is configured to receive an uplink reference signal sent by the first communication node using the downlink channel information; a signaling sending module 93 is configured to send downlink control signaling to the first communication node, where the downlink control signaling includes a sub-band SRS resource indication; a channel receiving module 94 is configured to receive an uplink transmission channel sent by the first communication node according to the scheduling of the downlink control signaling.
[0243] The uplink transmission device provided in this embodiment is used to implement Figure 7 The uplink transmission method of the illustrated embodiment and the uplink transmission device provided in this embodiment have similar implementation principles and technical effects, which will not be described in detail here.
[0244] Fig.10 A schematic diagram of the structure of an uplink transmission system provided by an embodiment is shown in FIG. Fig.10 As shown, the uplink transmission system provided in this embodiment includes: a first communication node 101 and a second communication node 102. The first communication node 101 includes Figure 8 The uplink transmission device shown in the figure, the second communication node 102 includes Fig. 9 The uplink transmission device shown in the figure: The first communication node 101 is, for example, a UE, and the second communication node 102 is, for example, a base station.
[0245] Fig.11 A schematic diagram of a terminal structure provided by an embodiment is shown in FIG. Fig.11 As shown, the terminal includes a processor 111, a memory 112, a transmitter 113 and a receiver 114; the number of processors 111 in the terminal can be one or more. Fig.11 In the example, a processor 111 is used; the processor 111 and the memory 112 in the terminal can be connected by a bus or other means. Fig.11 The example of connecting through bus is taken in the following.
[0246] The memory 112 is a computer-readable storage medium that can be configured to store software programs, computer executable programs, and modules, such as the present application. Figure 1 The program instructions / modules corresponding to the uplink transmission method in the embodiment (for example, the reference signal receiving module 81, the reference signal sending module 82, the monitoring module 83 and the channel sending module 84 in the uplink transmission device). The processor 111 runs the software programs, instructions and modules stored in the memory 112, so that the terminal performs at least one functional application and data processing, that is, implements the above-mentioned uplink transmission method.
[0247] The memory 112 may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system and at least one application required for a function; the data storage area may store data created according to the use of the terminal, etc. In addition, the memory 112 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage devices.
[0248] The transmitter 113 is a module or device combination capable of transmitting radio frequency signals into space, such as a combination of a radio frequency transmitter, an antenna, and other devices. The receiver 114 is a module or device combination capable of receiving radio frequency signals from space, such as a combination of a radio frequency receiver, an antenna, and other devices.
[0249] Fig.12 A schematic diagram of the structure of a base station provided by an embodiment is shown in FIG. Fig.12As shown, the base station includes a processor 121, a memory 122, a transmitter 123 and a receiver 124; the number of processors 121 in the base station can be one or more. Fig.12 In the example, a processor 121 is used; the processor 121 and the memory 122 in the base station can be connected by a bus or other means. Fig.12 The example of connecting through bus is taken in the following.
[0250] The memory 122 is a computer-readable storage medium that can be configured to store software programs, computer executable programs, and modules, such as the present application. Figure 7 The program instructions / modules corresponding to the uplink transmission method in the embodiment (for example, the reference signal sending module 91, the reference signal receiving module 92, the signaling sending module 93, and the channel receiving module 94 in the uplink transmission device). The processor 121 executes the software programs, instructions, and modules stored in the memory 122, so that at least one functional application and data processing of the base station are implemented, that is, the above-mentioned uplink transmission method is implemented.
[0251] The memory 122 may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system and an application required for at least one function; the data storage area may store data created according to the use of the base station, etc. In addition, the memory 122 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage devices.
[0252] The transmitter 123 is a module or device combination capable of transmitting radio frequency signals into space, such as a combination of a radio frequency transmitter, an antenna, and other devices. The receiver 124 is a module or device combination capable of receiving radio frequency signals from space, such as a combination of a radio frequency receiver, an antenna, and other devices.
[0253] An embodiment of the present application also provides a storage medium containing computer executable instructions, which, when executed by a computer processor, are used to execute an uplink transmission method, the method comprising: receiving a downlink reference signal sent by a second communication node, and obtaining downlink channel information; using the downlink channel information to send an uplink reference signal; monitoring downlink control signaling sent by the second communication node, the downlink control signaling including a sub-band SRS resource indication; and sending an uplink transmission channel according to the scheduling of the downlink control signaling.
[0254] An embodiment of the present application also provides a storage medium containing computer executable instructions, which, when executed by a computer processor, are used to execute an uplink transmission method, the method comprising: sending a downlink reference signal to a first communication node, the downlink reference signal being used to obtain downlink channel information; receiving an uplink reference signal sent by the first communication node using the downlink channel information; sending downlink control signaling to the first communication node, the downlink control signaling comprising a sub-band SRS resource indication; and receiving an uplink transmission channel sent by the first communication node according to the scheduling of the downlink control signaling.
[0255] The above are merely exemplary embodiments of the present application and are not intended to limit the protection scope of the present application.
[0256] It will be appreciated by those skilled in the art that the term user terminal covers any suitable type of wireless user equipment, such as a mobile phone, a portable data processing device, a portable web browser or a vehicle-mounted mobile station.
[0257] In general, various embodiments of the present application can be implemented in hardware or dedicated circuits, software, logic or any combination thereof. For example, some aspects can be implemented in hardware, while other aspects can be implemented in firmware or software that can be executed by a controller, microprocessor or other computing device, although the present application is not limited thereto.
[0258] Embodiments of the present application may be implemented by executing computer program instructions by a data processor of a mobile device, for example in a processor entity, or by hardware, or by a combination of software and hardware. The computer program instructions may be assembly instructions, instruction set architecture (ISA) instructions, machine instructions, machine-dependent instructions, microcode, firmware instructions, state setting data, or source code or object code written in any combination of one or more programming languages.
[0259] The block diagram of any logic flow in the drawings of the present application may represent program steps, or may represent interconnected logic circuits, modules and functions, or may represent a combination of program steps and logic circuits, modules and functions. A computer program may be stored in a memory. The memory may be of any type suitable for the local technical environment and may be implemented using any suitable data storage technology, such as but not limited to read-only memory (ROM), random access memory (RAM), optical memory devices and systems (digital versatile discs (DVD) or compact discs (CD), etc.). Computer-readable media may include non-transitory storage media. The data processor may be of any type suitable for the local technical environment, such as but not limited to general-purpose computers, special-purpose computers, microprocessors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FGPAs) and processors based on multi-core processor architectures.
Claims
1. An uplink transmission method, applied to a first communication node, characterized in that: include: Receive a downlink reference signal sent by the second communication node to obtain downlink channel information; An uplink reference signal is sent using the downlink channel information; wherein the uplink reference signal includes N SRS resource groups, and the i-th SRS resource group includes M i SRS resources, where each SRS resource group is associated with a downlink reference signal, i, N, M i is an integer greater than or equal to 1, 1≤i≤N; Monitoring downlink control signaling sent by the second communication node, where the downlink control signaling includes a subband sounding reference signal SRS resource indication; Sending an uplink transmission channel according to the scheduling of the downlink control signaling; The sending of the uplink reference signal by using the downlink channel information comprises: determining the precoding of each uplink subband of the uplink reference signal according to the downlink channel information; generating the uplink reference signal according to the precoding of each uplink subband of the uplink reference signal and sending the uplink reference signal; The uplink sub-band division method includes at least one of the following methods: division according to the bandwidth of the carrier component where the uplink transmission channel is located and the sub-band division granularity size; division according to the frequency domain range and sub-band division granularity size of the partial bandwidth BWP where the uplink transmission channel is located; division according to the frequency domain range and sub-band division granularity size of the SRS resource.
2. The method according to claim 1, characterized in that The downlink control signaling includes any of the following methods: Downlink control information DCI for scheduling an uplink transmission channel; Two DCIs for independently scheduling uplink transmission channels; Two DCIs for jointly scheduling uplink transmission channels.
3. The method according to claim 2, characterized in that The DCI for scheduling an uplink transmission channel includes a sub-band SRS resource indication.
4. The method according to claim 2, characterized in that: The frequency domain ranges indicated by the DCIs of the two independently scheduled uplink transmission channels do not overlap, and the DCIs of the two independently scheduled uplink transmission channels both include sub-band SRS resource indications.
5. The method according to claim 2, characterized in that: The two DCIs for jointly scheduling an uplink transmission channel include a first DCI and a second DCI, and the first DCI and the second DCI jointly schedule an uplink transmission channel.
6. The method according to claim 5, characterized in that The first DCI includes at least one of the following information: carrier indication, BWP indication, frequency domain resource allocation, time domain resource allocation, frequency hopping indication, frequency modulation offset indication, modulation coding mode, redundancy version, process number, SRS resource indication, SRS resource group indication, transmission layer number indication, demodulation reference signal DMRS port indication, DMRS sequence initialization indication, and size indication of the second DCI; The second DCI includes at least one of the following information: an uplink subband number, multiple subband SRS resource indications, a modulation and coding mode, a redundancy version, a redundancy version offset, a DMRS sequence initialization indication, and a DMRS sequence initialization offset indication.
7. The method according to claim 6, characterized in that The information bit size of the second DCI is determined by at least one of the following methods: the size indication of the second DCI of the first DCI, the association between the SRS resources and the PTRS port, the number of SRS resource groups, the number of SRS resources contained in each SRS resource group, the selection of SRS resource groups, the number of SRS resources contained in each uplink subband, the frequency hopping indication of the first DCI, the frequency hopping offset indication of the first DCI, the SRS resource indication of the first DCI, and the frequency domain resource allocation of the first DCI.
8. The method according to claim 6, characterized in that The relationship between the uplink subband number of the second DCI and the multiple subband SRS resource indications includes at least one of the following methods: The second DCI includes multiple sub-band SRS resource indications and does not include an uplink sub-band number; The second DCI includes an uplink subband number and multiple subband SRS resource indications, wherein one uplink subband number corresponds to one subband SRS resource indication; The second DCI includes an uplink subband number and a plurality of subband SRS resource indications, wherein a group of uplink subband numbers corresponds to one subband SRS resource indication.
9. The method according to claim 5, characterized in that The number of layers of the uplink transmission channel is determined by at least one of the following information: an SRS resource indication of the first DCI, an indication of the number of transmission layers of the first DCI, an indication of a DMRS port of the first DCI, and an indication of multiple sub-band SRS resources of the second DCI.
10. The method according to claim 5, characterized in that The sending of the uplink transmission channel according to the scheduling of the downlink control signaling includes: If the second DCI is not detected, scheduling the uplink transmission channel according to the first DCI; If the second DCI is monitored, the uplink transmission channel is jointly scheduled according to the first DCI and the second DCI.
11. The method according to claim 10, characterized in that Determine that the second DCI is monitored according to at least one of the following methods: The uplink transmission channel adopts the modulation and coding mode indicated by the second DCI; The uplink transmission channel adopts the redundancy version indicated by the second DCI; The redundancy version of the uplink transmission channel is jointly determined by the redundancy version indicated by the first DCI and the redundancy version offset indicated by the second DCI; The DMRS sequence initialization of the uplink transmission channel adopts the DMRS sequence initialization indication in the second DCI; The DMRS sequence initialization of the uplink transmission channel is determined by the DMRS sequence initialization indicated by the first DCI and the DMRS sequence initialization offset indicated by the second DCI.
12. The method according to claim 1, characterized in that The sub-band SRS resource indication is used to indicate the precoding of the uplink transmission channel. The precoding used by the uplink transmission channel in each uplink sub-band is determined by the sub-band SRS resource indication corresponding to each uplink sub-band.
13. An uplink transmission method, applied to a second communication node, characterized in that: include: Sending a downlink reference signal to the first communication node, where the downlink reference signal is used to obtain downlink channel information; receiving an uplink reference signal sent by the first communication node using the downlink channel information; wherein the uplink reference signal includes N SRS resource groups, and the i-th SRS resource group includes M i SRS resources, where each SRS resource group is associated with a downlink reference signal, i, N, M i is an integer greater than or equal to 1, 1≤i≤N; Sending a downlink control signaling to the first communication node, where the downlink control signaling includes a subband sounding reference signal (SRS) resource indication; Receiving an uplink transmission channel sent by the first communication node according to the scheduling of the downlink control signaling; The receiving of the uplink reference signal sent by the first communication node using the downlink channel information includes: receiving the uplink reference signal generated and sent by the first communication node according to the precoding of each uplink subband of the uplink reference signal after the first communication node determines the precoding of each uplink subband of the uplink reference signal according to the downlink channel information; The uplink sub-band division method includes at least one of the following methods: division according to the bandwidth of the carrier component where the uplink transmission channel is located and the sub-band division granularity size; division according to the frequency domain range and sub-band division granularity size of the partial bandwidth BWP where the uplink transmission channel is located; division according to the frequency domain range and sub-band division granularity size of the SRS resource.
14. An uplink transmission device, comprising a processor and a memory, characterized in that: The processor is configured to run program instructions stored in the memory to perform the method according to any one of claims 1-13.