Travel risk control method in high-risk road segment
A risk control and high-risk technology, applied in the traffic control system of road vehicles, traffic control system, arrangement of variable traffic instructions, etc., can solve the problem of missing high-risk road sections, poor pertinence, and deteriorating traffic safety of high-risk road sections conditions and other issues, to achieve the effect of ensuring driving safety, facilitating management, and saving funds
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2020-01-10
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of driving safety, and in particular relates to a driving risk control method for high-risk road sections. Background technique
[0002] The identification methods for high-risk road sections in the prior art are all based on historical traffic accident data. The severity of traffic accidents on different types of high-risk road sections is different, so the casualties caused by traffic accidents must also be considered. In order to identify the location and distribution of high-risk road sections more comprehensively, but only considering the number of equivalent accidents to identify high-risk road sections, the real high-risk road sections will inevitably be missed. The safety improvement measures for high-risk road sections at home and abroad have not formed a set of clear and comprehensive improvement countermeasures, and the improvement measures adopted are not well targeted, and may even worsen the tr...
Examples
Embodiment
[0082] The high-risk road section K4+000-K6+600 selected by the present invention belongs to the Xi'an Ring Expressway. This section is a two-way six-lane section, including Xiewang Interchange in the east-west direction, and part of the main road between Xingyuan and Huokou. According to the actual mileage, the number of lanes, etc. of the high-risk road section K4+000~K6+600, draw the schematic diagram of the road section in the TransModeler simulation software, refer to the driving risk control scheme designed in the present invention, and set corresponding measures for simulation. Such as Figure 7 Shown is a schematic diagram of the high-risk road section K4+000~K6+600, in which the numbers in the figure are the numbers of the OD starting and ending points.
[0083] Among them, the simulation diagram of Xiewang Interchange is as follows: Figure 8 shown.
[0084] Simulation parameter settings:
[0085] (1) Basic parameter setting
[0086] The OD matrix describes the s...