An object-oriented analysis method for production early report data based on control cloud
By objectifying, standardizing and structuring the accident abnormal data and maintenance work order data in the production morning report, the existing technology problems of low production morning report compilation efficiency and insufficient data correlation analysis capabilities are solved, and the control cloud-based control system is realized. Efficient data analysis and in-depth simulation analysis improve power grid operation support.
Patent Information
- Application Number
- CN201911086638.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-08
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2039-11-08
AI Technical Summary
The preparation of the existing production morning report mainly relies on professionals to manually produce PPT, which is inefficient and difficult to perform in-depth data correlation analysis. It fails to fully utilize the intelligent convergence advantages of the control cloud big data platform.
The production morning report data object analysis method based on the regulation cloud is adopted. By extracting accident abnormal data and maintenance work order data, it is objectified, standardized and structured. The data description is objectified, standardized and structured, and the production morning report and regulation are integrated. Cloud power system analysis shows the conclusions of in-depth simulation analysis of power grid operation.
It improves the production morning report compilation efficiency and data correlation analysis capabilities, realizes in-depth simulation analysis of data, and provides more accurate and efficient power grid operation support.
Abstract
Description
Technical Field
[0001] The invention relates to an object-oriented analysis method for production early report data based on a control cloud. Background Art
[0002] The production morning report is an important tool for Shanghai Company's production and operation management. The control center has accumulated rich experience in the compilation and application of the production morning report. The production morning report requires timely and accurate collection of various professional information on power grid dispatching and operation, and in-depth correlation analysis.
[0003] At present, the compilation of production morning reports is mainly completed by professionals making PPT. With the continuous advancement of the construction of the "Control Cloud" of State Grid Corporation of China, the conditions for conducting research on the objectification and analysis technology of production morning reports based on the Control Cloud have been met to give full play to the advantages of data intelligence aggregation of the Control Cloud big data platform, further improve the compilation efficiency of production morning reports and data correlation analysis capabilities, and provide strong support for the safe production of power grids.
[0004] The production morning report is a typical application scenario of big data in power grid dispatching, which closely fits the needs of production applications. The relevant technology has high practical value and application promotion value.
[0005] State Grid Corporation of China attaches great importance to the research and application of big data technology.
[0006] In terms of dispatch data objectification, the control cloud platform fully absorbs the ideas and experience of model data standards related to smart grid dispatch control technology at home and abroad, including the localization of IEC61970 and CIM / E technical standards, and solves the problem of model data objectification information sharing between dispatch data centers and between various disciplines within the dispatch center. In terms of specific technical implementation, the control cloud deploys the unified maintenance and distribution function of metadata and data dictionary, and each application end and source data end can subscribe to metadata and dictionary data through subscription.
[0007] As an important part of the control cloud, the data cloud platform provides data management and data services, including abstract modeling and sub-standard design of power control business objects and the relationship between objects for physical power grids, physical equipment and organizational structures, and the establishment of a standardized and unified dispatch model database. On this basis, the model data cloud platform, operation data cloud platform, real-time data cloud platform and big data platform are constructed to achieve the management and maintenance of model, operation, real-time and other data. Summary of the invention
[0008] The purpose of the present invention is to overcome the defects of the prior art and provide an object-oriented analysis method for production early report data based on the control cloud, objectify, standardize and structure the data description, integrate the production early report with the advanced application of power system analysis of the control cloud, and display the relevant conclusions of the in-depth simulation analysis of the power grid operation.
[0009] The technical solution to achieve the above purpose is: a method for object-oriented analysis of production early report data based on control cloud, including the step of object-oriented accident abnormality data and the step of object-oriented maintenance work order data.
[0010] The accident abnormality data objectification step includes the following steps:
[0011] S11, extracting original accident abnormal source data from the accident dispatch module, abnormal dispatch module, DC accident and abnormal module, operation abnormal module, accident monitoring module, abnormal monitoring module, and ground accident and abnormal module;
[0012] S12, using unified plant and station equipment information, object-oriented, standardized and structured the description of the original accident abnormal source data. In the parsing process, the plant and station name, equipment name, description and processing information in the original data are first extracted, and then the corresponding object is found from the control cloud equipment library according to the plant and station name and equipment name; then the original description text is segmented according to the corresponding keywords, and the required information is extracted segment by segment to form the corresponding standardized record data, and the standardized and structured record data is divided into 6 major categories, including DC category, power plant category, operation abnormality category, ground adjustment category, main network line equipment category and main network non-line equipment category;
[0013] The maintenance work order data objectification step includes the following steps:
[0014] S21, extracting unfiled and filed but unprocessed data from the maintenance work order every hour, and extracting the equipment name, plant station name, equipment type, process status, planned time, start time, completion time and equipment status;
[0015] S22, then match the extracted equipment name, plant station name and equipment type with the data stored in the control cloud to obtain the unit object and the power plant object; analyze the equipment status of each equipment, match the equipment status with the standard description in the control cloud, and then construct the unit equipment downtime according to the process status, planned time, start time and completion time of the maintenance work order;
[0016] S23, then classifying the equipment into power grid equipment and unit equipment according to different equipment types;
[0017] Determine whether the unit equipment is a peak-shaving unit or a coal-fired unit or whether the capacity is greater than or equal to 300MW. If so, set the data to be displayed in the report, and store the processed data in the unit equipment decommissioning and recommissioning schedule;
[0018] Determine whether the power grid equipment is DC, and then determine whether the DC to which the equipment belongs is Lusheng DC. If it is Lusheng DC, the DC equipment is set not to be displayed on the PPT; if it is not DC, continue to determine whether the equipment voltage level is 1000 / 500 / 220kV. If the voltage level is 1000 / 500kV, then the equipment type is not main transformer / bus / line, and it will not be displayed in the report; if the voltage level is 220kV, then the power grid equipment type is not bus / line, and it will not be displayed in the report; then the processed data is stored in the power grid equipment decommissioning and recommissioning schedule.
[0019] The above-mentioned object-oriented analysis method of production early report data based on the control cloud, wherein the accident dispatch module and the abnormal dispatch module store the dispatch accidents and dispatch anomalies of equipment with a voltage level of 220kV and above in a one-to-one correspondence, and the fields of the original accident abnormal source data extracted therefrom include plant station name, equipment name, protection action, fault phase, mode adjustment, line patrol situation, partition and ring release, fault distance measurement information / unit emergency start and stop situation, unit processing adjustment situation, load transfer situation, loss load, lower-level self-cutting action situation, 35kV and above single power supply risk, protection user situation, important user situation, power-off user situation and reclosing situation;
[0020] The DC accident and abnormality module stores DC accidents and abnormalities of equipment with a voltage level of 220kV and above, and the fields of the original accident and abnormality source data extracted therefrom include the emergency start and stop of the unit, mode adjustment, line inspection, unit processing and adjustment, load adjustment, network adjustment and reduction of power supply, power transfer, frequency change, response measures, accident impact, power transmission size before locking, and DC accident abnormality;
[0021] The operation abnormality module stores the operation abnormalities of equipment with a voltage level of 220kV and above, and the fields of the original accident abnormality source data extracted therefrom include the equipment name, plant station name, the operation content and result that triggered the accident abnormality, and the subsequent operation;
[0022] The accident monitoring module and the abnormal monitoring module store monitoring accidents and monitoring abnormalities of equipment with a voltage level of 220kV and above in a one-to-one correspondence, and the fields of the original accident abnormal source data extracted therefrom include recovery status, accident handling status, fault / abnormal status, equipment name and plant station name;
[0023] The ground dispatching accident and abnormality module stores dispatching accidents and abnormalities of equipment voltage levels of 220kV and above, and the fields of the original accident abnormality source data extracted therefrom include equipment name, plant station name, lower-level self-cutting action status, 35kV and above single power supply risk, protection user status, important user status, power-off user status, reclosing status and loss load.
[0024] The object-oriented analysis method of production early report data based on the control cloud of the present invention objectifies, standardizes and structures the description of data, integrates the production early report with the advanced application of power system analysis of the control cloud, and displays the relevant conclusions of the in-depth simulation analysis of power grid operation. DETAILED DESCRIPTION
[0025] In order to enable those skilled in the art to better understand the technical solution of the present invention, the specific implementation methods are described in detail below:
[0026] A method for object-oriented analysis of production early report data based on a control cloud comprises an accident abnormality data objectification step and a maintenance work order data objectification step.
[0027] S1, the accident abnormality data objectification step includes the following steps:
[0028] S11, extracting original accident abnormal source data from accident dispatch module, abnormal dispatch module, DC accident and abnormal module, abnormal operation module, accident monitoring module, abnormal monitoring module, and ground survey accident and abnormal module; accident dispatch module, abnormal dispatch module, DC accident and abnormal module, abnormal operation module, accident monitoring module, abnormal monitoring module, and ground survey accident and abnormal module, a total of 7 modules correspond to 7 tables respectively. In general, the objects to be extracted are plant objects and equipment objects; the main contents to be proposed are fault description, fault impact, fault cause, impact recovery, and equipment recovery. Depending on the type of equipment, the accident abnormal source data to be extracted are also different.
[0029] The accident dispatch module and the abnormal dispatch module store the dispatch accidents and dispatch anomalies of the equipment with voltage level of 220kV and above in a one-to-one correspondence. The fields of the original accident abnormal source data extracted from them include the plant name (power plant), equipment name (unit), protection action, fault phase, mode adjustment, line patrol, partition and ring release, fault distance measurement information / unit emergency start and stop, unit processing adjustment, load transfer, loss load, lower-level self-cutting action, 35kV and above single power supply risk, protection user situation, important user situation, power-off user situation and reclosing situation;
[0030] The DC accident and abnormality module stores DC accidents and abnormalities of equipment with voltage levels of 220kV and above. The fields of the original accident and abnormality source data extracted from it include unit emergency start and stop conditions, mode adjustment, line inspection conditions, unit processing and adjustment conditions, load adjustment, network adjustment and reduction of power supply conditions, power transfer conditions, frequency changes, response measures, accident impact, power transmission size before locking, and DC accident abnormal conditions;
[0031] The operation anomaly module stores the operation anomalies of equipment with a voltage level of 220kV and above. The fields of the original accident anomaly source data extracted from it include the equipment name, plant station name, the operation content and result that triggered the accident anomaly, and the subsequent operation;
[0032] The accident monitoring module and the abnormal monitoring module store the monitoring accidents and monitoring abnormalities of the equipment with voltage level of 220kV and above in a one-to-one correspondence. The fields of the original accident abnormal source data extracted therefrom include recovery status, accident handling status, fault / abnormal status, equipment name and plant station name;
[0033] The ground dispatching accident and abnormality module stores dispatching accidents and abnormalities of equipment voltage levels of 220kV and above. The fields of the original accident and abnormality source data extracted from it include equipment name, plant name, lower-level self-cutting action status, 35kV and above single power supply risks, protection user status, important user status, power-off user status, reclosing status and loss load.
[0034] S12, since the original record of the accident anomaly records data in an unstructured manner and has different structures (accident, anomaly, monitoring accident, monitoring anomaly, DC anomaly, operation anomaly, ground control accident anomaly), it is necessary to use unified plant and station equipment information to objectify, standardize and structure the description of the original accident anomaly source data. In the parsing process, first extract the plant and station name, equipment name, description and processing information in the original data, and then find the corresponding object from the control cloud equipment library according to the plant and station name and equipment name; then, according to the corresponding keywords, segment the original description text, extract the required information segment by segment, and form the corresponding standardized record data. The standardized and structured record data is divided into 6 major categories, including DC, power plant, operation anomaly, ground control, main network line equipment and main network non-line equipment.
[0035] S2, the maintenance work order data objectification step includes the following steps:
[0036] S21, extract unfiled and filed but unprocessed data from the maintenance work order every hour, and extract the equipment name, plant name, equipment type, process status, planned time (approval time of the dispatching station), start time (time from the dispatching station to start work to the dispatching order time), completion time (time from the dispatching station to complete work to the construction completion time) and equipment status;
[0037] S22, then match the extracted equipment name, plant station name and equipment type with the data stored in the control cloud to obtain the unit object and the power plant object; analyze the equipment status of each equipment, match the equipment status with the standard description in the control cloud, and then construct the unit equipment downtime according to the process status, planned time, start time and completion time of the maintenance work order;
[0038] S23, then classifying the equipment into power grid equipment and unit equipment according to different equipment types;
[0039] Determine whether the unit equipment is a peak-shaving unit or a coal-fired unit or whether the capacity is greater than or equal to 300MW. If so, set the data to be displayed in the report, and store the processed data in the unit equipment decommissioning and recommissioning schedule;
[0040] Determine whether the power grid equipment is DC, and then determine whether the DC to which the equipment belongs is Lusheng DC. If it is Lusheng DC, the DC equipment is set not to be displayed on the PPT; if it is not DC, continue to determine whether the equipment voltage level is 1000 / 500 / 220kV. If the voltage level is 1000 / 500kV, then the equipment type is not main transformer / bus / line, and it will not be displayed in the report; if the voltage level is 220kV, then the power grid equipment type is not bus / line, and it will not be displayed in the report; then the processed data is stored in the power grid equipment decommissioning and recommissioning schedule.
[0041] The maintenance work order data objectification step obtains the outage sequence data of various types of equipment by analyzing the maintenance work order. The outage sequence data is extracted and formatted as required to construct the "main unit start and stop" and "current grid outage and re-commissioning equipment" modules on the report. Since the data in the maintenance work order is highly objectified, the focus is on the standardization of data objects and data verification.
[0042] The production morning report involves a wide variety of data, rich and diverse analysis methods, high requirements for summary and abstraction, and complex scenarios to be handled. It is necessary to comprehensively summarize and summarize the actual operation of the existing production morning report business, and form a research report from the two aspects of data acquisition needs and data analysis needs; based on the data analysis and mining research status and effectiveness survey of the control cloud, form a review: survey the current application status of control cloud data mining and analysis, survey best practices, and combine the business demand characteristics of Shanghai production morning report to deeply evaluate the support of the control cloud data objectification for the production morning report. Research and propose technical solutions for morning report data extraction, data analysis, and visualization, carry out technical experiments, and form a review report; Study the standard format storage of production morning reports and related automation technologies, organize technical development, establish a production morning report test platform based on the control cloud, normalize simulation operation, and continuously optimize and improve iteratively; explore advanced data analysis methods including artificial intelligence, connect with the functions of the control cloud application platform, and further enhance the depth of production morning report analysis. Explore a variety of production morning report data analysis and display methods, including two-dimensional, three-dimensional, animation, map and other big data data analysis display methods, so that the content of the production morning report is more vivid.
[0043] In summary, the object-oriented analysis method of production early report data based on the control cloud of the present invention objectifies, standardizes and structures the data description, integrates the production early report with the advanced application of power system analysis of the control cloud, and displays the relevant conclusions of the in-depth simulation analysis of power grid operation.
[0044] Those skilled in the art should recognize that the above embodiments are only used to illustrate the present invention, and are not intended to limit the present invention. As long as they are within the spirit of the present invention, any changes or modifications to the above embodiments will fall within the scope of the claims of the present invention.
Claims
1. A method for object-oriented analysis of production early report data based on control cloud, characterized in that: It includes the steps of objectifying accident abnormality data and the steps of objectifying maintenance work order data. The accident abnormality data objectification step includes the following steps: S11, extracting original accident abnormal source data from the accident dispatch module, the abnormal dispatch module, the DC accident and abnormal module, the operation abnormal module, the accident monitoring module, the abnormal monitoring module, and the ground accident and abnormal module; S12, using unified plant and station equipment information, object-oriented, standardized and structured the description of the original accident abnormal source data. In the parsing process, the plant and station name, equipment name, description and processing information in the original data are first extracted, and then the corresponding object is found from the control cloud equipment library according to the plant and station name and equipment name; then the original description text is segmented according to the corresponding keywords, and the required information is extracted segment by segment to form the corresponding standardized record data, and the standardized and structured record data is divided into 6 major categories, including DC category, power plant category, operation abnormality category, ground adjustment category, main network line equipment category and main network non-line equipment category; The maintenance work order data objectification step includes the following steps: S21, extracting unfiled and filed but unprocessed data from the maintenance work order every hour, and extracting the equipment name, plant station name, equipment type, process status, planned time, start time, completion time and equipment status; S22, then match the extracted equipment name, plant station name and equipment type with the data stored in the control cloud to obtain the unit object and the power plant object; analyze the equipment status of each equipment, match the equipment status with the standard description in the control cloud, and then construct the unit equipment downtime according to the process status, planned time, start time and completion time of the maintenance work order; S23, then classifying the equipment into power grid equipment and unit equipment according to different equipment types; Determine whether the unit equipment is a peak-shaving unit or a coal-fired unit or whether the capacity is greater than or equal to 300MW. If so, set the data to be displayed in the report, and store the processed data in the unit equipment decommissioning and recommissioning schedule; Determine whether the power grid equipment is DC, and then determine whether the DC to which the equipment belongs is Lusheng DC. If it is Lusheng DC, the DC equipment is set not to be displayed on the PPT; if it is not DC, continue to determine whether the equipment voltage level is 1000 / 500 / 220kV. If the voltage level is 1000 / 500kV, then the equipment type is not main transformer / bus / line, and it will not be displayed in the report; if the voltage level is 220kV, then the power grid equipment type is not bus / line, and it will not be displayed in the report; then the processed data is stored in the power grid equipment decommissioning and recommissioning schedule.
2. According to the object-oriented analysis method of production early report data based on control cloud according to claim 1, it is characterized in that: The accident dispatch module and the abnormal dispatch module store the dispatch accidents and dispatch anomalies of the equipment with voltage level of 220kV and above in a one-to-one correspondence, and the fields of the original accident abnormal source data extracted therefrom include plant station name, equipment name, protection action, fault phase, mode adjustment, line patrol situation, partition and ring release, fault distance measurement information / unit emergency start and stop situation, unit processing adjustment situation, load transfer situation, loss load, lower level self-cutting action situation, 35kV and above single power supply risk, protection user situation, important user situation, power loss user situation and reclosing situation; The DC accident and abnormality module stores DC accidents and abnormalities of equipment with a voltage level of 220kV and above, and the fields of the original accident and abnormality source data extracted therefrom include the emergency start and stop of the unit, mode adjustment, line inspection, unit processing and adjustment, load adjustment, network adjustment and reduction of power supply, power transfer, frequency change, response measures, accident impact, power transmission size before locking, and DC accident abnormality; The operation abnormality module stores the operation abnormalities of equipment with a voltage level of 220kV and above, and the fields of the original accident abnormality source data extracted therefrom include the equipment name, plant station name, the operation content and result that triggered the accident abnormality, and the subsequent operation; The accident monitoring module and the abnormal monitoring module store monitoring accidents and monitoring abnormalities of equipment with a voltage level of 220kV and above in a one-to-one correspondence, and the fields of the original accident abnormal source data extracted therefrom include recovery status, accident handling status, fault / abnormal status, equipment name and plant station name; The ground dispatching accident and abnormality module stores dispatching accidents and abnormalities of equipment voltage levels of 220kV and above, and the fields of the original accident abnormality source data extracted therefrom include equipment name, plant station name, lower-level self-cutting action status, 35kV and above single power supply risk, protection user status, important user status, power-off user status, reclosing status and loss load.
Citation Information
Patent Citations
Power dispatching accident handling scheme preparing system and power dispatching accident handling scheme preparing method based on OMS
CN105843182A
Intelligent warning system distributed between main station and sub-stations and fault diagnosis method therefor
CN106908690A