A method and device for dispatching a photovoltaic charging station
By using power prediction models and weight matrix in optical storage charging stations to optimize the working state of the energy storage system, the problems of unstable interaction between the optical storage charging station and the power grid and the short service life of the battery pack are solved, and stable interaction and resource utilization are achieved. promote.
Patent Information
- Application Number
- CN201910960353.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-10-10
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2039-10-10
AI Technical Summary
The interaction between the optical storage charging station and the power grid is unstable and the battery pack in the energy storage system is short. This is mainly due to the fluctuations in the power generation power caused by the weather, and the lack of effective charging and discharge management.
By predicting the working power of the energy storage system at the next moment based on the power data of the optical storage charging station at the current time, a scheduling plan is formulated to optimize the charging and discharging operation of the energy storage system, and using the power prediction model and weight matrix to optimize the working status of the energy storage system. Ensure stability of interaction with the power grid and the service life of the battery pack.
It improves the stability of the interaction between the optical storage charging station and the power grid, extends the service life of the battery pack in the energy storage system, and maximizes the use of power resources, saving the cost of the optical storage charging station.
Smart Images

Figure CN110854842B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power dispatching, and in particular to a method and device for dispatching a photovoltaic storage charging station. Background Art
[0002] In recent years, the scale of electric vehicles has increased year by year due to their low-carbon, environmentally friendly advantages and continuously improved vehicle performance. As a special new type of load, large-scale electric vehicles have produced some new impacts on traditional power grids. Electric vehicle charging has a certain randomness in time and space. This disordered charging mode increases the risk of power grid instability. With the development of renewable energy generation technology, photovoltaic and other renewable energy generation has become more and more widely used due to its low-carbon, environmentally friendly and low-cost advantages.
[0003] At present, the DC photovoltaic storage charging station with a common DC bus composed of photovoltaic-energy storage-electric vehicle charging piles is one of the new forms of electric vehicle charging stations. By utilizing the characteristics of photovoltaics and energy storage, it can not only serve as a power supply supplement for charging stations and reduce the electricity purchase costs of charging stations, but also improve the friendliness of large-scale electric vehicle charging to the power grid through the coordinated control of photovoltaics, energy storage, and charging piles. At the same time, the DC topology of the charging station based on the common DC bus reduces a large number of current conversion links and reduces the investment in charging stations. However, photovoltaic power generation is greatly affected by factors such as weather, resulting in randomness and volatility of power generation, leading to instability in the interaction between photovoltaic storage charging stations and the power grid; and the energy storage system in the photovoltaic storage charging station lacks charge and discharge management, which affects the service life of its energy storage battery pack.
[0004] Therefore, there is a need in the art for a scheduling method that can improve the stability of the interaction between a photovoltaic storage charging station and the power grid and extend the service life of the battery pack in the energy storage system. Summary of the invention
[0005] In view of the deficiencies in the prior art, the purpose of the present invention is to provide a method and device for scheduling a photovoltaic charging station, which can obtain the working power of the energy storage system and the scheduling plan of the energy storage system at the next moment through the power data of the photovoltaic charging station at the current moment. The scheduling plan improves the stability of the interaction between the photovoltaic charging station and the power grid and extends the service life of the energy storage battery group in the energy storage system, maximizes the use of electricity resources, and saves the cost of the photovoltaic charging station.
[0006] The purpose of the present invention is achieved by adopting the following technical solutions:
[0007] The present invention provides a method for scheduling a photovoltaic charging station, wherein the method comprises:
[0008] Determine the working power of the energy storage system in the photovoltaic charging station at the next moment according to the power data of the photovoltaic charging station at the current moment;
[0009] Determine a scheduling plan for the solar-energy storage charging station at the next moment according to the working power of the energy storage system in the solar-energy storage charging station at the next moment;
[0010] Based on the scheduling plan of the photovoltaic charging station at the next moment, scheduling the photovoltaic charging station at the next moment;
[0011] The power data includes: the interaction power between the photovoltaic charging station and the power grid, the working power of the energy storage system in the photovoltaic charging station, and the charge state of the energy storage system in the photovoltaic charging station.
[0012] Preferably, the method of determining the working power of the energy storage system in the photovoltaic charging station at the next moment according to the power data of the photovoltaic charging station at the current moment includes:
[0013] Substitute the power data of the photovoltaic charging station at the current moment into the power prediction model, solve the model, and obtain the predicted change in the working power of the energy storage system in the photovoltaic charging station at the next moment;
[0014] Based on this change, the working power P of the energy storage system in the photovoltaic charging station at the k+1th moment is obtained as follows: ES (k+1):
[0015] P ES (k+1)=P ES (k)+ΔP ES (k+1)
[0016] Where P ES (k) is the working power of the energy storage system in the photovoltaic charging station at the kth moment, ΔP ES (k+1) is the predicted change in the working power of the energy storage system in the solar-storage charging station at the k+1th moment, and k is the current moment.
[0017] Furthermore, the objective function J of the power prediction model is determined as follows:
[0018]
[0019] Where Y g (S) is the interaction power matrix between the photovoltaic charging station and the power grid S moments after the current moment, Y g,c (S) is the interactive power target value matrix between the photovoltaic charging station and the power grid S moments after the current moment, ΔY ES (S) is the change matrix of the working power of the energy storage system in the photovoltaic charging station S moments after the current moment, Q is the first weight, and R is the second weight.
[0020] Further, the Y is determined as follows: g (S), Y g,c (S) and Y g,c (S):
[0021]
[0022] Where P g (k+t) is the interaction power between the photovoltaic charging station and the power grid at the k+t moment, P g,c (k+t) is the target value of the interaction power between the photovoltaic charging station and the power grid at the k+t moment, ΔP ES (k+t) is the predicted change in the working power of the energy storage system in the photovoltaic charging station at the k+tth moment, t∈[1,S];
[0023] The interaction power P between the photovoltaic charging station and the power grid at the k+t moment is determined as follows: g (k+t):
[0024]
[0025] Where P ES (k+t) is the working power of the energy storage system in the photovoltaic charging station at the k+t moment, P g (k+t-1) is the interaction power between the photovoltaic charging station and the power grid at the k+t-1th moment, P ES (k+t-1) is the working power of the energy storage system in the photovoltaic charging station at the k+t-1th moment, SOC(k+t-1) is the state of charge of the energy storage system in the photovoltaic charging station at the k+t-1th moment, ΔP PV (k+t) is the change in the working power of the photovoltaic system in the photovoltaic charging station at the k+t moment, ΔP EV (k+t) is the change in charging power of electric vehicles in the photovoltaic charging station at the k+t moment, ΔP L (k+t) is the change in working power of other loads in the solar-storage charging station at the k+t moment, A is the first coefficient matrix, B is the second coefficient matrix, C is the third coefficient matrix, and F is the fourth coefficient matrix.
[0026] Furthermore, the constraints of the power prediction model include:
[0027] Power balance constraints:
[0028] P g (k+t)=P PV (k+t)+P ES (k+t)-P EV (k+t)-P q (k+t)
[0029] Where P PV (k+t) is the working power of the photovoltaic system in the photovoltaic charging station at the k+t moment, P EV (k+t) is the charging power of the electric vehicle in the photovoltaic charging station at the k+t moment, P q(k+t) is the working power of other loads in the solar-storage charging station at the k+t moment;
[0030] Energy storage system charge state constraints:
[0031] SOC min <SOC(k+t)<SOC max
[0032] In the formula, SOC min SOC is the minimum charge state limit of the energy storage system in the photovoltaic charging station. max It is the maximum limit of the state of charge of the energy storage system in the photovoltaic charging station;
[0033] Energy storage system operating power constraints:
[0034] P ES,min ≤P ES (k+t)≤P ES,max
[0035] Where P ES,min is the minimum working power limit of the energy storage system in the photovoltaic charging station, P ES,max It is the maximum operating power limit of the energy storage system in the solar-storage charging station.
[0036] Constraints on the change in working power of energy storage system:
[0037] ΔP ES,min ≤ΔP ES (k+t)≤ΔP ES,max
[0038] In the formula, ΔP ES,min is the minimum limit of the working power change of the energy storage system in the photovoltaic charging station, ΔP ES,max It is the maximum limit of the change in the working power of the energy storage system in the photovoltaic charging station.
[0039] Preferably, the step of determining the scheduling scheme of the photovoltaic storage charging station at the next moment according to the working power of the energy storage system in the photovoltaic storage charging station at the next moment includes:
[0040] If the working power P of the energy storage system in the photovoltaic charging station at the k+1th moment ES (k+1)<0, then obtain the acceptable charging power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th time, and determine the charging power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th time according to the acceptable charging power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th time;
[0041] If the working power P of the energy storage system in the photovoltaic charging station at the k+1th moment ES(k+1)>0, then obtain the discharge power that each energy storage battery group of the energy storage system in the photovoltaic charging station can provide at the k+1th time, and determine the discharge power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th time according to the discharge power that each energy storage battery group of the energy storage system in the photovoltaic charging station can provide at the k+1th time;
[0042] Among them, k is the current moment.
[0043] Furthermore, the charging power P that can be accepted by the i-th energy storage battery group in the energy storage system of the photovoltaic charging station at the k+1th time is obtained as follows: i,ch,c (k+1):
[0044]
[0045] In the formula, SOC i (k) is the state of charge of the i-th energy storage battery pack in the energy storage system of the solar energy storage charging station at the k-th time, SOC i,max is the maximum limit of the state of charge of the i-th energy storage battery group in the energy storage system of the solar storage charging station, P i,ch,c,max is the maximum charging power of the i-th energy storage battery group in the energy storage system of the solar energy storage charging station, S i is the rated capacity of the i-th energy storage battery group in the energy storage system of the photovoltaic charging station, and Δt is the scheduling time interval;
[0046] The discharge power P that the i-th energy storage battery group in the energy storage system of the photovoltaic charging station can provide at the k+1th time can be obtained by the following formula: i,dis,c (k+1):
[0047]
[0048] In the formula, SOC i,min is the minimum limit of the state of charge of the i-th energy storage battery group in the energy storage system of the photovoltaic charging station, P i,dis,max It is the maximum discharge power of the i-th energy storage battery group in the energy storage system of the solar storage charging station.
[0049] Further, the method of determining the charging power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th moment according to the charging power that each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th moment can accept includes:
[0050] like The charging power P of the lth energy storage battery group at the k+1th time is determined as follows: l,ch (k+1):
[0051]
[0052] like and Then the charging power of L energy storage battery groups at the k+1th time is the acceptable charging power, and the charging power P of the mth energy storage battery group at the k+1th time is determined as follows: m,ch (k+1):
[0053]
[0054] like and At the k+1th time, the charging power of L+M energy storage battery groups is their acceptable charging power. The charging power P of the nth energy storage battery group at the k+1th time is determined by the following formula: n,ch (k+1):
[0055]
[0056] like Then the charging powers of N+M+L energy storage battery groups at the k+1th time are all the acceptable charging powers;
[0057] Where N is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is greater than the preset upper limit, M is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is greater than the preset lower limit and not greater than the preset upper limit, L is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is not greater than the preset lower limit, n∈[1,N], m∈[1,M], l∈[1,L], N+M+L is the total number of energy storage battery groups in the energy storage system in the photovoltaic charging station, P n,ch,c (k+1) is the charging power that the nth energy storage battery pack can accept at the k+1th time, P m,ch,c (k+1) is the charging power that the mth energy storage battery pack can accept at the k+1th time, P l,ch,c (k+1) is the charging power that the lth energy storage battery pack can accept at the k+1th time, P i,ch,c (k+1) is the charging power that the i-th energy storage battery pack can accept at the k+1th time.
[0058] Further, the method of determining the discharge power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th moment according to the discharge power that each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th moment can provide includes:
[0059] like The discharge power P of the nth energy storage battery group at the k+1th time is determined as follows: n,dis (k+1):
[0060]
[0061] like and Then the discharge power of N energy storage battery groups at the k+1th time is the discharge power they can provide, and the discharge power P of the mth energy storage battery group at the k+1th time is determined as follows: m,dis (k+1):
[0062]
[0063] like and At the k+1th moment, the discharge powers of the N+L energy storage battery groups are all the discharge powers they can provide, and the discharge power P of the lth energy storage battery group at the k+1th moment is determined as follows: l,dis (k+1):
[0064]
[0065] like Then at the k+1th moment, the discharge powers of the N+M+L energy storage battery groups are all the discharge powers they can provide;
[0066] Where N is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is greater than the preset upper limit, M is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is greater than the preset lower limit and not greater than the preset upper limit, L is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is not greater than the preset lower limit, n∈[1,N], m∈[1,M], l∈[1,L], N+M+L is the total number of energy storage battery groups in the energy storage system in the photovoltaic charging station, P n,dis,c (k+1) is the discharge power that the nth energy storage battery pack can accept at the k+1th time, P m,dis,c (k+1) is the discharge power that the mth energy storage battery pack can provide at the k+1th time, P l,dis,c (k+1) is the discharge power that the lth energy storage battery pack can provide at the k+1th time, P i,dis,c (k+1) is the discharge power that the i-th energy storage battery pack can provide at the k+1-th moment.
[0067] Based on the same inventive concept, the present invention also provides a solar energy storage charging station scheduling device, the improvement of which is that the device comprises:
[0068] A first determination unit is used to determine the working power of the energy storage system in the photovoltaic charging station at the next moment according to the power data of the photovoltaic charging station at the current moment;
[0069] A second determining unit is used to determine a scheduling scheme of the photovoltaic storage charging station at the next moment according to the working power of the energy storage system in the photovoltaic storage charging station at the next moment;
[0070] A scheduling unit, configured to schedule the solar-energy storage charging station at a next moment based on the scheduling plan of the solar-energy storage charging station at the next moment;
[0071] The power data includes: the interaction power between the photovoltaic charging station and the power grid, the working power of the energy storage system in the photovoltaic charging station, and the charge state of the energy storage system in the photovoltaic charging station.
[0072] Compared with the closest prior art, the present invention has the following beneficial effects:
[0073] The present invention provides a method and device for scheduling a photovoltaic charging station. The method and device determine the working power of an energy storage system in the photovoltaic charging station at the next moment according to the power data of the photovoltaic charging station at the current moment; determine the scheduling scheme of the photovoltaic charging station at the next moment according to the working power of the energy storage system in the photovoltaic charging station at the next moment; and schedule the photovoltaic charging station at the next moment based on the scheduling scheme of the photovoltaic charging station at the next moment. The method is based on the power data of the photovoltaic charging station at the current moment, and the working power of the energy storage system in the photovoltaic charging station at the next moment is obtained by minimizing the sum of the difference between the power of the photovoltaic charging station interacting with the power grid at multiple moments after the current moment and the target value and the change in the working power of the energy storage system, thereby improving the stability of the interaction between the photovoltaic charging station and the power grid. When obtaining the scheduling scheme, the working power of the energy storage system is distributed according to the charge state of each energy storage battery group at the current moment to obtain the charging and discharging power of the energy storage battery group, thereby extending the service life of the energy storage battery group in the energy storage system. The scheduling method of the present invention maximizes the use of electric power resources and saves the cost of photovoltaic charging stations. BRIEF DESCRIPTION OF THE DRAWINGS
[0074] Figure 1 It is a flow chart of the method for dispatching a photovoltaic charging station according to the present invention;
[0075] Figure 2 It is a schematic diagram of the scheduling device of the photovoltaic storage charging station of the present invention. DETAILED DESCRIPTION
[0076] The specific implementation modes of the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0077] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0078] When the photovoltaic charging station is actually running, in order to ensure the economical interaction between the charging station and the power grid, the energy management system of the charging station will give a power grid interaction power target curve. Therefore, based on this, the present invention provides a photovoltaic charging station scheduling method, such as Figure 1 As shown, the method includes:
[0079] Determine the working power of the energy storage system in the photovoltaic charging station at the next moment according to the power data of the photovoltaic charging station at the current moment;
[0080] Determine a scheduling plan for the solar-energy storage charging station at the next moment according to the working power of the energy storage system in the solar-energy storage charging station at the next moment;
[0081] Based on the scheduling plan of the photovoltaic charging station at the next moment, scheduling the photovoltaic charging station at the next moment;
[0082] The power data includes: the interaction power between the photovoltaic charging station and the power grid, the working power of the energy storage system in the photovoltaic charging station, and the charge state of the energy storage system in the photovoltaic charging station.
[0083] In order to more clearly illustrate the purpose of the present invention, the method of the present invention is described in detail through the following examples.
[0084] In an embodiment of the present invention, the above-mentioned determining the working power of the energy storage system in the photovoltaic charging station at the next moment according to the power data of the photovoltaic charging station at the current moment includes:
[0085] Substitute the power data of the photovoltaic charging station at the current moment into the power prediction model, solve the model, and obtain the predicted change in the working power of the energy storage system in the photovoltaic charging station at the next moment;
[0086] Based on this change, the working power P of the energy storage system in the photovoltaic charging station at the k+1th moment is obtained as follows: ES (k+1):
[0087] P ES (k+1)=P ES (k)+ΔP ES (k+1)
[0088] Where P ES (k) is the working power of the energy storage system in the photovoltaic charging station at the kth moment, ΔP ES (k+1) is the predicted change in the working power of the energy storage system in the solar-storage charging station at the k+1th moment, and k is the current moment.
[0089] Specifically, the objective function J of the power prediction model is determined as follows:
[0090]
[0091] Where Y g (S) is the interaction power matrix between the photovoltaic charging station and the power grid S moments after the current moment, Y g,c(S) is the interactive power target value matrix between the photovoltaic charging station and the power grid S moments after the current moment, ΔY ES (S) is the change matrix of the working power of the energy storage system in the photovoltaic charging station S moments after the current moment, Q is the first weight, and R is the second weight.
[0092] Further, the Y is determined as follows: g (S), Y g,c (S) and Y g,c (S):
[0093]
[0094] Where P g (k+t) is the interaction power between the photovoltaic charging station and the power grid at the k+t moment, P g,c (k+t) is the target value of the interaction power between the photovoltaic charging station and the power grid at the k+t moment, ΔP ES (k+t) is the predicted change in the working power of the energy storage system in the photovoltaic charging station at the k+tth moment, t∈[1,S];
[0095] The interaction power P between the photovoltaic charging station and the power grid at the k+t moment is determined as follows: g (k+t):
[0096]
[0097] Where P ES (k+t) is the working power of the energy storage system in the photovoltaic charging station at the k+t moment, P g (k+t-1) is the interaction power between the photovoltaic charging station and the power grid at the k+t-1th moment, P ES (k+t-1) is the working power of the energy storage system in the photovoltaic charging station at the k+t-1th moment, SOC(k+t-1) is the state of charge of the energy storage system in the photovoltaic charging station at the k+t-1th moment, ΔP PV (k+t) is the change in the working power of the photovoltaic system in the photovoltaic charging station at the k+t moment, ΔP EV (k+t) is the change in charging power of electric vehicles in the photovoltaic charging station at the k+t moment, ΔP L (k+t) is the change in working power of other loads in the solar-storage charging station at the k+t moment, A is the first coefficient matrix, B is the second coefficient matrix, C is the third coefficient matrix, and F is the fourth coefficient matrix.
[0098] in, C =
[1000] .
[0099] Specifically, the constraints of the power prediction model include:
[0100] Power balance constraints:
[0101] P g (k+t)=P PV (k+t)+P ES (k+t)-P EV (k+t)-P q (k+t)
[0102] Where P PV (k+t) is the working power of the photovoltaic system in the photovoltaic charging station at the k+t moment, P EV (k+t) is the charging power of the electric vehicle in the photovoltaic charging station at the k+t moment, P q (k+t) is the working power of other loads in the solar-storage charging station at the k+t moment;
[0103] Energy storage system charge state constraints:
[0104] SOC min <SOC(k+t)<SOC max
[0105] In the formula, SOC min SOC is the minimum charge state limit of the energy storage system in the photovoltaic charging station. max It is the maximum limit of the state of charge of the energy storage system in the photovoltaic charging station;
[0106] Energy storage system operating power constraints:
[0107] P ES,min ≤P ES (k+t)≤P ES,max
[0108] Where P ES,min is the minimum working power limit of the energy storage system in the photovoltaic charging station, P ES,max It is the maximum operating power limit of the energy storage system in the solar-storage charging station.
[0109] Constraints on the change in working power of the energy storage system:
[0110] ΔP ES,min ≤ΔP ES (k+t)≤ΔP ES,max
[0111] Where ΔP ES,min is the minimum limit of the working power change of the energy storage system in the photovoltaic charging station, ΔP ES,max It is the maximum limit of the change in the working power of the energy storage system in the photovoltaic charging station.
[0112] In an embodiment of the present invention, the above-mentioned determining the scheduling scheme of the photovoltaic storage charging station at the next moment according to the working power of the energy storage system in the photovoltaic storage charging station at the next moment includes:
[0113] If the working power P of the energy storage system in the photovoltaic charging station at the k+1th moment ES (k+1)<0, then obtain the acceptable charging power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th time, and determine the charging power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th time according to the acceptable charging power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th time;
[0114] If the working power P of the energy storage system in the photovoltaic charging station at the k+1th moment ES (k+1)>0, then obtain the discharge power that each energy storage battery group of the energy storage system in the photovoltaic charging station can provide at the k+1th time, and determine the discharge power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th time according to the discharge power that each energy storage battery group of the energy storage system in the photovoltaic charging station can provide at the k+1th time;
[0115] Among them, k is the current moment.
[0116] Specifically, the charging power P that the i-th energy storage battery group in the energy storage system in the photovoltaic charging station can accept at the k+1th time is obtained as follows: i,ch,c (k+1):
[0117]
[0118] In the formula, SOC i (k) is the state of charge of the i-th energy storage battery pack in the energy storage system of the solar energy storage charging station at the k-th time, SOC i,max is the maximum limit of the state of charge of the i-th energy storage battery group in the energy storage system of the solar storage charging station, P i,ch,c,max is the maximum charging power of the i-th energy storage battery group in the energy storage system of the solar energy storage charging station, S i is the rated capacity of the i-th energy storage battery group in the energy storage system of the photovoltaic charging station, and Δt is the scheduling time interval;
[0119] The discharge power P that the i-th energy storage battery group in the energy storage system of the photovoltaic charging station can provide at the k+1th time can be obtained by the following formula: i,dis,c (k+1):
[0120]
[0121] In the formula, SOC i,min is the minimum limit of the state of charge of the i-th energy storage battery group in the energy storage system of the photovoltaic charging station, P i,dis,max It is the maximum discharge power of the i-th energy storage battery group in the energy storage system of the solar storage charging station.
[0122] Specifically, the method of determining the charging power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th moment according to the charging power that each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th moment can accept includes:
[0123] like The charging power P of the lth energy storage battery group at the k+1th time is determined as follows: l,ch (k+1):
[0124]
[0125] like and Then the charging power of L energy storage battery groups at the k+1th time is the acceptable charging power, and the charging power P of the mth energy storage battery group at the k+1th time is determined as follows: m,ch (k+1):
[0126]
[0127] like and At the k+1th time, the charging power of L+M energy storage battery groups is their acceptable charging power. The charging power P of the nth energy storage battery group at the k+1th time is determined by the following formula: n,ch (k+1):
[0128]
[0129] like Then the charging powers of N+M+L energy storage battery groups at the k+1th time are all the acceptable charging powers;
[0130] Where N is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is greater than the preset upper limit, M is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is greater than the preset lower limit and not greater than the preset upper limit, L is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is not greater than the preset lower limit, n∈[1,N], m∈[1,M], l∈[1,L], N+M+L is the total number of energy storage battery groups in the energy storage system in the photovoltaic charging station, P n,ch,c (k+1) is the charging power that the nth energy storage battery pack can accept at the k+1th time, P m,ch,c (k+1) is the charging power that the mth energy storage battery pack can accept at the k+1th time, P l,ch,c (k+1) is the charging power that the lth energy storage battery pack can accept at the k+1th time, P i,ch,c (k+1) is the charging power that the i-th energy storage battery pack can accept at the k+1th time.
[0131] Specifically, the method of determining the discharge power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th moment according to the discharge power that each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th moment can provide includes:
[0132] like The discharge power P of the nth energy storage battery group at the k+1th time is determined as follows: n,dis (k+1):
[0133]
[0134] like and Then the discharge power of N energy storage battery groups at the k+1th time is the discharge power they can provide, and the discharge power P of the mth energy storage battery group at the k+1th time is determined as follows: m,dis (k+1):
[0135]
[0136] like and At the k+1th moment, the discharge powers of the N+L energy storage battery groups are all the discharge powers they can provide, and the discharge power P of the lth energy storage battery group at the k+1th moment is determined as follows: l,dis (k+1):
[0137]
[0138] like Then at the k+1th moment, the discharge powers of the N+M+L energy storage battery groups are all the discharge powers they can provide;
[0139] Where N is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is greater than the preset upper limit, M is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is greater than the preset lower limit and not greater than the preset upper limit, L is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is not greater than the preset lower limit, n∈[1,N], m∈[1,M], l∈[1,L], N+M+L is the total number of energy storage battery groups in the energy storage system in the photovoltaic charging station, P n,dis,c (k+1) is the discharge power that the nth energy storage battery pack can accept at the k+1th time, P m,dis,c (k+1) is the discharge power that the mth energy storage battery pack can provide at the k+1th time, P l,dis,c (k+1) is the discharge power that the lth energy storage battery pack can provide at the k+1th time, P i,dis,c (k+1) is the discharge power that the i-th energy storage battery pack can provide at the k+1-th moment.
[0140] Based on the same inventive concept, the present invention also provides a solar energy storage charging station scheduling device, such as Figure 2 As shown, the device comprises:
[0141] A first determination unit is used to determine the working power of the energy storage system in the photovoltaic charging station at the next moment according to the power data of the photovoltaic charging station at the current moment;
[0142] A second determining unit is used to determine a scheduling scheme of the photovoltaic storage charging station at the next moment according to the working power of the energy storage system in the photovoltaic storage charging station at the next moment;
[0143] A scheduling unit, configured to schedule the solar-energy storage charging station at a next moment based on the scheduling plan of the solar-energy storage charging station at the next moment;
[0144] The power data includes: the interaction power between the photovoltaic charging station and the power grid, the working power of the energy storage system in the photovoltaic charging station, and the charge state of the energy storage system in the photovoltaic charging station.
[0145] In an embodiment of the present invention, the first determining unit includes:
[0146] The prediction module is used to substitute the power data of the photovoltaic charging station at the current moment into the power prediction model, solve the model, and obtain the predicted change in the working power of the energy storage system in the photovoltaic charging station at the next moment;
[0147] The calculation module is used to obtain the working power P of the energy storage system in the photovoltaic charging station at the k+1th moment based on the change amount according to the following formula: ES (k+1):
[0148] P ES (k+1)=P ES (k)+ΔP ES (k+1)
[0149] Where P ES (k) is the working power of the energy storage system in the photovoltaic charging station at the kth moment, ΔP ES (k+1) is the predicted change in the working power of the energy storage system in the solar-storage charging station at the k+1th moment, and k is the current moment.
[0150] Specifically, the objective function J of the power prediction model is determined as follows:
[0151]
[0152] Where Y g (S) is the interaction power matrix between the photovoltaic charging station and the power grid S moments after the current moment, Y g,c (S) is the interactive power target value matrix between the photovoltaic charging station and the power grid S moments after the current moment, ΔY ES(S) is the change matrix of the working power of the energy storage system in the photovoltaic charging station S moments after the current moment, Q is the first weight, and R is the second weight.
[0153] Further, the Y is determined as follows: g (S), Y g,c (S) and Y g,c (S):
[0154]
[0155] Where P g (k+t) is the interaction power between the photovoltaic charging station and the power grid at the k+t moment, P g,c (k+t) is the target value of the interaction power between the photovoltaic charging station and the power grid at the k+t moment, ΔP ES (k+t) is the predicted change in the working power of the energy storage system in the photovoltaic charging station at the k+tth moment, t∈[1,S];
[0156] The interaction power P between the photovoltaic charging station and the power grid at the k+t moment is determined as follows: g (k+t):
[0157]
[0158] Where P ES (k+t) is the working power of the energy storage system in the photovoltaic charging station at the k+t moment, P g (k+t-1) is the interaction power between the photovoltaic charging station and the power grid at the k+t-1th moment, P ES (k+t-1) is the working power of the energy storage system in the photovoltaic charging station at the k+t-1th moment, SOC(k+t-1) is the state of charge of the energy storage system in the photovoltaic charging station at the k+t-1th moment, ΔP PV (k+t) is the change in the working power of the photovoltaic system in the photovoltaic charging station at the k+t moment, ΔP EV (k+t) is the change in charging power of electric vehicles in the photovoltaic charging station at the k+t moment, ΔP L (k+t) is the change in working power of other loads in the solar storage charging station at the k+t moment, A is the first coefficient matrix, B is the second coefficient matrix, C is the third coefficient matrix, and F is the fourth coefficient matrix.
[0159] Specifically, the constraints of the power prediction model include:
[0160] Power balance constraints:
[0161] P g (k+t)=P PV (k+t)+P ES (k+t)-PEV (k+t)-P q (k+t)
[0162] Where P PV (k+t) is the working power of the photovoltaic system in the photovoltaic charging station at the k+t moment, P EV (k+t) is the charging power of the electric vehicle in the photovoltaic charging station at the k+t moment, P q (k+t) is the working power of other loads in the solar-storage charging station at the k+t moment;
[0163] Energy storage system charge state constraints:
[0164] SOC min <SOC(k+t)<SOC max
[0165] In the formula, SOC min SOC is the minimum charge state limit of the energy storage system in the photovoltaic charging station. max It is the maximum limit of the state of charge of the energy storage system in the photovoltaic charging station;
[0166] Energy storage system operating power constraints:
[0167] P ES,min ≤P ES (k+t)≤P ES,max
[0168] Where P ES,min is the minimum working power limit of the energy storage system in the photovoltaic charging station, P ES,max It is the maximum operating power limit of the energy storage system in the solar-storage charging station.
[0169] Constraints on the change in working power of energy storage system:
[0170] ΔP ES,min ≤ΔP ES (k+t)≤ΔP ES,max
[0171] In the formula, ΔP ES,min is the minimum limit of the working power change of the energy storage system in the photovoltaic charging station, ΔP ES,max It is the maximum limit of the change in the working power of the energy storage system in the photovoltaic charging station.
[0172] In an embodiment of the present invention, the second determining unit is specifically configured to:
[0173] If the working power P of the energy storage system in the photovoltaic charging station at the k+1th moment ES(k+1)<0, then obtain the acceptable charging power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th time, and determine the charging power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th time according to the acceptable charging power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th time;
[0174] If the working power P of the energy storage system in the photovoltaic charging station at the k+1th moment ES (k+1)>0, then obtain the discharge power that each energy storage battery group of the energy storage system in the photovoltaic charging station can provide at the k+1th time, and determine the discharge power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th time according to the discharge power that each energy storage battery group of the energy storage system in the photovoltaic charging station can provide at the k+1th time;
[0175] Among them, k is the current moment.
[0176] Specifically, the charging power P that the i-th energy storage battery group in the energy storage system in the photovoltaic charging station can accept at the k+1th time is obtained as follows: i,ch,c (k+1):
[0177]
[0178] In the formula, SOC i (k) is the state of charge of the i-th energy storage battery pack in the energy storage system of the solar energy storage charging station at the k-th time, SOC i,max is the maximum limit of the state of charge of the i-th energy storage battery group in the energy storage system of the solar storage charging station, P i,ch,c,max is the maximum charging power of the i-th energy storage battery group in the energy storage system of the solar energy storage charging station, S i is the rated capacity of the i-th energy storage battery group in the energy storage system of the photovoltaic charging station, and Δt is the scheduling time interval;
[0179] The discharge power P that the i-th energy storage battery group in the energy storage system of the photovoltaic charging station can provide at the k+1th time can be obtained by the following formula: i,dis,c (k+1):
[0180]
[0181] In the formula, SOC i,min is the minimum limit of the state of charge of the i-th energy storage battery group in the energy storage system of the photovoltaic charging station, P i,dis,max It is the maximum discharge power of the i-th energy storage battery group in the energy storage system of the solar storage charging station.
[0182] Specifically, the method of determining the charging power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th moment according to the charging power that each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th moment can accept includes:
[0183] like The charging power P of the lth energy storage battery group at the k+1th time is determined as follows: l,ch (k+1):
[0184]
[0185] like and Then the charging power of L energy storage battery groups at the k+1th time is the acceptable charging power, and the charging power P of the mth energy storage battery group at the k+1th time is determined as follows: m,ch (k+1):
[0186]
[0187] like and At the k+1th time, the charging power of L+M energy storage battery groups is their acceptable charging power. The charging power P of the nth energy storage battery group at the k+1th time is determined by the following formula: n,ch (k+1):
[0188]
[0189] like Then the charging powers of N+M+L energy storage battery groups at the k+1th time are all the acceptable charging powers;
[0190] Where N is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is greater than the preset upper limit, M is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is greater than the preset lower limit and not greater than the preset upper limit, L is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is not greater than the preset lower limit, n∈[1,N], m∈[1,M], l∈[1,L], N+M+L is the total number of energy storage battery groups in the energy storage system in the photovoltaic charging station, P n,ch,c (k+1) is the charging power that the nth energy storage battery pack can accept at the k+1th time, P m,ch,c (k+1) is the charging power that the mth energy storage battery pack can accept at the k+1th time, P l,ch,c (k+1) is the charging power that the lth energy storage battery pack can accept at the k+1th time, P i,ch,c (k+1) is the charging power that the i-th energy storage battery pack can accept at the k+1th time.
[0191] Specifically, the method of determining the discharge power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th moment according to the discharge power that each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th moment can provide includes:
[0192] like The discharge power P of the nth energy storage battery group at the k+1th time is determined as follows: n,dis (k+1):
[0193]
[0194] like and Then the discharge power of N energy storage battery groups at the k+1th time is the discharge power they can provide, and the discharge power P of the mth energy storage battery group at the k+1th time is determined as follows: m,dis (k+1):
[0195]
[0196] like and At the k+1th moment, the discharge powers of the N+L energy storage battery groups are all the discharge powers they can provide, and the discharge power P of the lth energy storage battery group at the k+1th moment is determined as follows: l,dis (k+1):
[0197]
[0198] like Then at the k+1th moment, the discharge powers of the N+M+L energy storage battery groups are all the discharge powers they can provide;
[0199] Where N is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is greater than the preset upper limit, M is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is greater than the preset lower limit and not greater than the preset upper limit, L is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is not greater than the preset lower limit, n∈[1,N], m∈[1,M], l∈[1,L], N+M+L is the total number of energy storage battery groups in the energy storage system in the photovoltaic charging station, P n,dis,c (k+1) is the discharge power that the nth energy storage battery pack can accept at the k+1th time, P m,dis,c (k+1) is the discharge power that the mth energy storage battery pack can provide at the k+1th time, P l,dis,c (k+1) is the discharge power that the lth energy storage battery pack can provide at the k+1th time, P i,dis,c (k+1) is the discharge power that the i-th energy storage battery pack can provide at the k+1-th moment.
[0200] In summary, the present invention provides a method and device for scheduling a photovoltaic charging station, which determines the working power of the energy storage system in the photovoltaic charging station at the next moment according to the power data of the photovoltaic charging station at the current moment; determines the scheduling plan of the photovoltaic charging station at the next moment according to the working power of the energy storage system in the photovoltaic charging station at the next moment; and schedules the photovoltaic charging station at the next moment based on the scheduling plan of the photovoltaic charging station at the next moment; wherein, based on the power data of the photovoltaic charging station at the current moment, the working power of the energy storage system in the photovoltaic charging station at the next moment is obtained by minimizing the difference between the power of the photovoltaic charging station interacting with the power grid at multiple moments after the current moment and the target value and the sum of the changes in the working power of the energy storage system, thereby improving the stability of the interaction between the photovoltaic charging station and the power grid; when obtaining the scheduling plan, the working power of the energy storage system is distributed according to the charge state of each energy storage battery group at the current moment to obtain the charging and discharging power of the energy storage battery group, thereby extending the service life of the energy storage battery group in the energy storage system; the scheduling method of the present invention maximizes the use of power resources and saves the cost of photovoltaic charging stations.
[0201] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0202] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0203] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0204] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0205] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A method for scheduling a photovoltaic charging station, characterized in that: The method comprises: Determine the working power of the energy storage system in the photovoltaic charging station at the next moment according to the power data of the photovoltaic charging station at the current moment; Determine a scheduling plan for the solar-energy storage charging station at the next moment according to the working power of the energy storage system in the solar-energy storage charging station at the next moment; Based on the scheduling plan of the photovoltaic charging station at the next moment, scheduling the photovoltaic charging station at the next moment; The power data includes: the interaction power between the photovoltaic charging station and the power grid, the working power of the energy storage system in the photovoltaic charging station, and the state of charge of the energy storage system in the photovoltaic charging station; The objective function J of the power prediction model is determined as follows: Where Y g (S) is the interaction power matrix between the photovoltaic charging station and the power grid S moments after the current moment, Y g,c (S) is the interactive power target value matrix between the photovoltaic charging station and the power grid S moments after the current moment, ΔY ES (S) is the change matrix of the working power of the energy storage system in the photovoltaic charging station S moments after the current moment, Q is the first weight, and R is the second weight; Determine Y as follows: g (S), Y g,c (S) and ΔY ES (S): Where P g (k+t) is the interaction power between the photovoltaic charging station and the power grid at the k+t moment, P g,c (k+t) is the target value of the interaction power between the photovoltaic charging station and the power grid at the k+t moment, ΔP ES (k+t) is the predicted change in the working power of the energy storage system in the photovoltaic charging station at the k+tth moment, t∈[1,S]; The interaction power P between the photovoltaic charging station and the power grid at the k+t moment is determined as follows: g (k+t): Where P g (k+t-1) is the interaction power between the photovoltaic charging station and the power grid at the k+t-1th moment, P ES (k+t-1) is the working power of the energy storage system in the photovoltaic charging station at the k+t-1th moment, SOC(k+t-1) is the state of charge of the energy storage system in the photovoltaic charging station at the k+t-1th moment, ΔP PV (k+t) is the change in the working power of the photovoltaic system in the photovoltaic charging station at the k+t moment, ΔP EV (k+t) is the change in charging power of electric vehicles in the photovoltaic charging station at the k+t moment, ΔP L (k+t) is the change in working power of other loads in the solar storage charging station at the k+t moment, A is the first coefficient matrix, B is the second coefficient matrix, C is the third coefficient matrix, and F is the fourth coefficient matrix.
2. The method according to claim 1, characterized in that The method of determining the working power of the energy storage system in the photovoltaic charging station at the next moment according to the power data of the photovoltaic charging station at the current moment includes: Substitute the power data of the photovoltaic charging station at the current moment into the power prediction model, solve the model, and obtain the predicted change in the working power of the energy storage system in the photovoltaic charging station at the next moment; Based on this change, the working power P of the energy storage system in the photovoltaic charging station at the k+1th moment is obtained as follows: ES (k+1): P ES (k+1)=P ES (k)+ΔP ES (k+1) Where P ES (k) is the working power of the energy storage system in the photovoltaic charging station at the kth moment, ΔP ES (k+1) is the predicted change in the working power of the energy storage system in the solar-storage charging station at the k+1th moment, and k is the current moment.
3. The method according to claim 2, characterized in that The constraints of the power prediction model include: Power balance constraints: P g (k+t)=P PV (k+t)+P ES (k+t)-P EV (k+t)-P q (k+t) Where P PV (k+t) is the working power of the photovoltaic system in the photovoltaic charging station at the k+t moment, P EV (k+t) is the charging power of the electric vehicle in the photovoltaic charging station at the k+t moment, P q (k+t) is the working power of other loads in the solar-storage charging station at the k+t moment; Energy storage system charge state constraints: SOC min <SOC(k+t)<SOC max In the formula, SOC min SOC is the minimum charge state limit of the energy storage system in the photovoltaic charging station. max It is the maximum limit of the state of charge of the energy storage system in the photovoltaic charging station; Energy storage system operating power constraints: P ES,min ≤P ES (k+t)≤P ES,max Where P ES,min is the minimum working power limit of the energy storage system in the photovoltaic charging station, P ES,max The maximum operating power limit of the energy storage system in the solar-storage charging station; Constraints on the change in working power of the energy storage system: ΔP ES,min ≤ΔP ES (k+t)≤ΔP ES,max Where ΔP ES,min is the minimum limit of the working power change of the energy storage system in the photovoltaic charging station, ΔP ES,max It is the maximum limit of the change in the working power of the energy storage system in the photovoltaic charging station.
4. The method according to claim 1, characterized in that The step of determining the scheduling scheme of the photovoltaic charging station at the next moment according to the working power of the energy storage system in the photovoltaic charging station at the next moment includes: If the working power P of the energy storage system in the photovoltaic charging station at the k+1th moment ES (k+1)<0, then obtain the acceptable charging power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th time, and determine the charging power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th time according to the acceptable charging power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th time; If the working power P of the energy storage system in the photovoltaic charging station at the k+1th moment ES (k+1)>0, then obtain the discharge power that each energy storage battery group of the energy storage system in the photovoltaic charging station can provide at the k+1th time, and determine the discharge power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th time according to the discharge power that each energy storage battery group of the energy storage system in the photovoltaic charging station can provide at the k+1th time; Among them, k is the current moment.
5. The method according to claim 4, characterized in that The charging power P that can be accepted by the i-th energy storage battery group in the energy storage system of the photovoltaic charging station at the k+1th time is obtained as follows: i,ch,c (k+1): In the formula, SOC i (k) is the state of charge of the i-th energy storage battery pack in the energy storage system of the solar energy storage charging station at the k-th time, SOC i,max is the maximum limit of the state of charge of the i-th energy storage battery group in the energy storage system of the solar storage charging station, P i,ch,c,max is the maximum charging power of the i-th energy storage battery group in the energy storage system of the solar energy storage charging station, S i is the rated capacity of the i-th energy storage battery group in the energy storage system of the photovoltaic charging station, and Δt is the scheduling time interval; The discharge power P that the i-th energy storage battery group in the energy storage system of the photovoltaic charging station can provide at the k+1th time can be obtained by the following formula: i,dis,c (k+1): In the formula, SOC i,min is the minimum limit of the state of charge of the i-th energy storage battery group in the energy storage system of the photovoltaic charging station, P i,dis,max It is the maximum discharge power of the i-th energy storage battery group in the energy storage system of the solar storage charging station.
6. The method according to claim 4, characterized in that The method of determining the charging power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th moment according to the charging power that each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th moment can accept includes: like The charging power P of the lth energy storage battery group at the k+1th time is determined as follows: l,ch (k+1): like and Then the charging power of L energy storage battery groups at the k+1th time is the acceptable charging power, and the charging power P of the mth energy storage battery group at the k+1th time is determined as follows: m,ch (k+1): like and At the k+1th moment, the charging powers of the L+M energy storage battery groups are all acceptable charging powers. The charging power P of the nth energy storage battery group at the k+1th moment is determined by the following formula: n,ch (k+1): like Then the charging powers of N+M+L energy storage battery groups at the k+1th time are all the acceptable charging powers; Where N is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is greater than the preset upper limit, M is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is greater than the preset lower limit and not greater than the preset upper limit, L is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is not greater than the preset lower limit, n∈[1,N], m∈[1,M], l∈[1,L], N+M+L is the total number of energy storage battery groups in the energy storage system in the photovoltaic charging station, P n,ch,c (k+1) is the charging power that the nth energy storage battery pack can accept at the k+1th time, P m,ch,c (k+1) is the charging power that the mth energy storage battery pack can accept at the k+1th time, P l,ch,c (k+1) is the charging power that the lth energy storage battery pack can accept at the k+1th time, P i,ch,c (k+1) is the charging power that the i-th energy storage battery pack can accept at the k+1th time.
7. The method according to claim 4, characterized in that The method of determining the discharge power of each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th moment according to the discharge power that each energy storage battery group of the energy storage system in the photovoltaic charging station at the k+1th moment can provide includes: like The discharge power P of the nth energy storage battery group at the k+1th time is determined as follows: n,dis (k+1): like and Then the discharge power of N energy storage battery groups at the k+1th time is the discharge power they can provide, and the discharge power P of the mth energy storage battery group at the k+1th time is determined as follows: m,dis (k+1): like and At the k+1th moment, the discharge powers of the N+L energy storage battery groups are all the discharge powers they can provide, and the discharge power P of the lth energy storage battery group at the k+1th moment is determined as follows: l,dis (k+1): like Then at the k+1th moment, the discharge powers of the N+M+L energy storage battery groups are all the discharge powers they can provide; Where N is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is greater than the preset upper limit, M is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is greater than the preset lower limit and not greater than the preset upper limit, L is the total number of energy storage battery groups in the energy storage system at the kth moment whose state of charge is not greater than the preset lower limit, n∈[1,N], m∈[1,M], l∈[1,L], N+M+L is the total number of energy storage battery groups in the energy storage system in the photovoltaic charging station, P n,dis,c (k+1) is the discharge power that the nth energy storage battery pack can accept at the k+1th time, P m,dis,c (k+1) is the discharge power that the mth energy storage battery pack can provide at the k+1th time, P l,dis,c (k+1) is the discharge power that the lth energy storage battery pack can provide at the k+1th time, P i,dis,c (k+1) is the discharge power that the i-th energy storage battery pack can provide at the k+1-th moment.
8. A device for implementing the solar energy storage charging station scheduling method according to any one of claims 1 to 7, characterized in that: The device comprises: A first determination unit is used to determine the working power of the energy storage system in the photovoltaic charging station at the next moment according to the power data of the photovoltaic charging station at the current moment; A second determining unit is used to determine a scheduling scheme of the photovoltaic storage charging station at the next moment according to the working power of the energy storage system in the photovoltaic storage charging station at the next moment; A scheduling unit, configured to schedule the solar-energy storage charging station at a next moment based on the scheduling plan of the solar-energy storage charging station at the next moment; The power data includes: the interaction power between the photovoltaic charging station and the power grid, the working power of the energy storage system in the photovoltaic charging station, and the charge state of the energy storage system in the photovoltaic charging station.
Citation Information
Patent Citations
Multi-time-scale decision method for charging power of electric automobile charging station
CN102436607A
Multi-objective optimization scheduling method for electric vehicle charging station including photovoltaic power generation system
CN103793758A
Energy storage capacity allocation method considering schedulability of electric vehicle charging station
CN106253315A
Charge-discharge-storage integrated station control method based on improved V2G and priority scheduling
CN107634532A
Microgrid operation method and system containing electric automobile power conversion station under demand side response
CN109687486A
