Pipe group isolation pipe-jacking construction method
A construction method and pipe jacking technology, which is applied in earthwork drilling, wellbore lining, tunnel lining, etc., can solve problems such as increasing project risk and cost, lengthening open-cut and buried sections, and increasing the thickness of segments to achieve social effects Significantly, reduce the effect of covering soil and reducing settlement deformation
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2020-05-29
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of underground pipe jacking engineering, in particular to a pipe group isolated pipe jacking construction method. Background technique
[0002] The pipe jacking method is a construction method that has little impact on ground structures, and the impact on the ground surface is often controlled by controlling the thickness of the soil above the pipe jacking. However, as the size of the pipe jacking section becomes larger and larger, controlling the deformation by thickening the cover soil thickness will bring the following unfavorable factors:
[0003] (1) The thickness of the segment increases due to the increase of the covering soil;
[0004] (2) As a result, the open-cut and buried sections of pipe jacking wells and tunnels are lengthened, and the excavation depth is increased, which directly increases the project risk and cost;
[0005] (3) lead to taking more valuable urban underground space.
[0006] ...
Examples
Embodiment
[0035] Such as Figure 1 to Figure 4 As shown in the pipe group isolation pipe jacking construction method, there are deformation-sensitive structures on the ground 3; the steps are as follows:
[0036] Step 1, pre-embed a number of seamless steel pipe guide pipes 7 in the side wall 6 of the originating shaft 4 of the pipe jacking 1;
[0037] Step 2: Drilling a number of seamless steel pipes 2 above the corresponding pipe jacking 1 by micro-pipe jacking technology to form a group of ribbed pipes; each seamless steel pipe 2 extends from the starting shaft 4 along the corresponding seamless steel pipe guide pipe out, and penetrate into the receiving well 5 of the pipe jacking 1;
[0038] The laying elevation angle of each seamless steel pipe 2 must be kept within the range of 1:1 to 1:1.2 with the corresponding pipe jacking 1 elevation angle, and the laying length range should be more than 4m beyond the outer edge of the structure on the ground;
[0039] Step 3: After the seam...