Large equipment lifting and moving device and method

By designing a lifting and moving device for large equipment, using the combination of jacks and hydraulic cylinders, the overall displacement problem of large equipment when the lifting unit is not available, and a safe and labor-saving heavy object displacement in a narrow space is achieved.

CN111807290BActive Publication Date: 2025-04-22HUAINAN MINING IND GRP
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202010800041.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-08-11
Publication Date
2025-04-22
Estimated Expiration
2040-08-11

AI Technical Summary

Technical Problem

When the prior art cannot use the hoisting unit, it is difficult to meet the overall displacement of large equipment.

Method used

A large-scale equipment lifting and moving device is designed, including at least two sets of mobile devices, multiple jacks, tracks, support and hydraulic devices. Through the jack fixed support, the hydraulic cylinder pushes the support gradually to move out along the track, realizing the overall movement of large equipment.

Benefits of technology

Effectively used in a narrow space, it has the advantages of large load-bearing capacity, good stability, and continuous movement. It is safer, labor-saving, time-saving and cost-saving than traditional methods, and can easily and quickly move heavy objects to designated locations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111807290B_ABST
    Figure CN111807290B_ABST
Patent Text Reader

Abstract

The present invention discloses a large-scale equipment lifting and moving device, including at least two groups of moving devices and multiple jacks. Each group of moving devices includes a track, a first support, a second support, and a hydraulic device. The track is arranged between the bottom of the large-scale equipment and the ground. The first support is placed on the track, and the front end of the first support is inserted between the large-scale equipment and the track. The second support is placed on the track. The hydraulic device includes a hydraulic cylinder. The two ends of the hydraulic cylinder are connected to the first support and the second support. The jack connects the second support and the track. And a method for using the device. The beneficial effects of the present invention are as follows: the second support is fixed by the jack, and the extension of the hydraulic cylinder pushes the first support, and then pushes the large-scale equipment to gradually move out along the track, which overcomes the problem of lifting equipment without a lifting point on site. It is an effective tool for moving heavy objects and installing them in a small space and over a short distance. It has the advantages of large bearing capacity, good stability, and continuous movement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a mobile device, in particular to a large-scale equipment lifting and moving device. Background Art

[0002] The chiller in a mine's refrigeration room was dismantled. The chiller had an overall dimension of 6109×2781×3594mm and a total weight of 27.8t. There was no lifting beam above the chiller on site and no fixed rooting point in front of the chiller, so it was impossible to use a hand winch to drag it. Therefore, it was extremely difficult to dismantle the chiller and move it out of the refrigeration room.

[0003] For example, application number: 201720383999.1, a chiller transport structure and chiller, each of the L-shaped lifting plates is provided with a lifting hole, and the condenser tube plate / evaporator tube plate is also provided with a lifting hole. When the unit is lifted, the hook is connected to each lifting hole through a lifting chain to directly lift the unit; however, this method cannot be used when there is no lifting unit;

[0004] For example, for larger equipment or units, it is usually necessary to set lifting holes on the units and lift them to move them. However, due to site constraints, there is often insufficient space to use lifting tools. Traditional methods include using sleepers and rollers, but these are manual operations with low safety. Therefore, there are currently no suitable tools for the overall dismantling and relocation of large equipment.

[0005] The information disclosed in this background technology section is only intended to enhance the understanding of the overall background of the invention and should not be regarded as an acknowledgment or any form of suggestion that the information constitutes the prior art already known to a person skilled in the art. Summary of the invention

[0006] The technical problem to be solved by the present invention is: how to solve the problem in the prior art that the need for overall displacement of large equipment cannot be met when a hoisting unit cannot be used.

[0007] The present invention solves the above technical problems through the following technical means:

[0008] A large equipment lifting and moving device includes at least two groups of moving devices and multiple jacks. Each group of moving devices includes a track, a first support, a second support, and a hydraulic device. The track is arranged between the bottom of the large equipment and the ground. The first support is placed on the track, and the front end of the first support is inserted between the large equipment and the track. The second support is placed on the track. The hydraulic device includes a hydraulic cylinder. Both ends of the hydraulic cylinder are connected to the first support and the second support. When the hydraulic cylinder is extended, the jack connects the second support and the track.

[0009] The present invention fixes the second support by a jack, and the extension of the hydraulic cylinder pushes the first support, and then pushes the large device to gradually move out along the track. The present invention overcomes the problem of no lifting point lifting equipment on site, and can still be used in a small space. It is an effective tool for short-distance moving and installing heavy objects. It has the advantages of large bearing capacity, good stability, and continuous movement. Therefore, it can be within a certain working range. Compared with the traditional method of using sleepers and rollers to transport heavy objects, it is safer, labor-saving, time-saving, and cost-saving. It is simple to operate and only requires a small number of operators to use and operate. It can conveniently, quickly, safely, and accurately move heavy objects such as super-large equipment to the designated installation position.

[0010] Preferably, the rails are I-beams, and at least two rails are arranged in parallel between the large equipment and the ground.

[0011] Preferably, the first support is an L-shaped structure, the front end of the horizontal plate of the L-shaped structure is wedge-shaped, and the rear end of the vertical plate of the L-shaped structure has a first connecting support for connecting to the hydraulic cylinder.

[0012] Preferably, the first connecting support is formed by two flat plates arranged at an interval, the flat plates are provided with connecting holes, and the telescopic end of the hydraulic cylinder is connected to the connecting hole through a pin shaft.

[0013] Preferably, the second support includes two vertical plates, a horizontal plate, and a second connecting support for connecting a hydraulic cylinder. The bottoms of the two vertical plates have grooves that are snapped onto the rails. The two vertical plates are arranged in parallel and spaced apart. The horizontal plate is connected between the two vertical plates. The second connecting support is fixed on the vertical plate close to the first support.

[0014] Preferably, the second connecting support is formed by two flat plates arranged at an interval, the flat plates are provided with connecting holes, and the fixed end of the hydraulic cylinder is connected to the connecting hole through a pin shaft.

[0015] Preferably, the hydraulic device further comprises a hydraulic pump station, and the hydraulic pump station is connected to the hydraulic cylinder.

[0016] Preferably, the jack is a hydraulic split jack.

[0017] A method for moving large equipment, using the above-mentioned large equipment lifting and moving device, comprises the following steps:

[0018] Step 1: Use at least four jacks to lift the large equipment to a height greater than the track, then place at least two tracks under the large equipment, release the pressure on the jacks, and place the large equipment on the track;

[0019] Step 2: On the rear of the large equipment, arrange the first support and the second support on the track, connect the hydraulic cylinder between the first support and the second support, and arrange the jack between the second support and the track;

[0020] Step 3: Operate the jack to fix the second support on the track;

[0021] Step 4: Operate the hydraulic cylinder to move the large equipment forward;

[0022] Step 5: When the hydraulic cylinder reaches the maximum position and reaches the full stroke, the pressure on the jack and the hydraulic cylinder is released at the same time. When the pressure is released, the hydraulic cylinder and the second support automatically move forward at the same time;

[0023] Step 6: Press the jack again to fix the second support on the track, then press the hydraulic cylinder to push the large equipment forward again, and repeat the operation until the large equipment is moved out.

[0024] The moving method of the present invention does not require the use of a large crane for cooperation during use, which saves machine hours and costs. It not only improves construction efficiency, but also reduces construction costs, achieving the purpose of reducing costs and increasing efficiency.

[0025] The advantages of the present invention are:

[0026] (1) The present invention fixes the second support by a jack, and the extension of the hydraulic cylinder pushes the first support, and then pushes the large device to gradually move out along the track. The present invention overcomes the problem of no lifting point lifting equipment on site, and can still be used in a narrow space. It is an effective tool for moving heavy objects in a short distance and installing them in place. It has the advantages of large bearing capacity, good stability, and continuous movement. Therefore, it can be within a certain working range. Compared with the traditional method of using sleepers and rollers to transport heavy objects, it is safer, labor-saving, time-saving, and cost-saving. It is simple to operate and only requires a small number of operators to operate. It can conveniently, quickly, safely, and accurately move heavy objects such as super-large equipment to the designated installation position;

[0027] (2) The relocation method of the present invention does not require the use of a large crane during use, which saves machine hours and costs. It not only improves construction efficiency but also reduces construction costs, achieving the purpose of reducing costs and increasing efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a structural schematic diagram of a large equipment lifting and moving device according to an embodiment of the present invention;

[0029] Figure 2 It is a structural diagram of a large equipment lifting and moving device;

[0030] Figure 3 is a schematic diagram of the structure of the mobile device;

[0031] Figure 4 It is an exploded view of the mobile device;

[0032] Figure 5 is a structural diagram of the first support;

[0033] Figure 6 is a schematic diagram of the structure of the second support;

[0034] Numbers in the figure: 1, track; 2, first support; 21, L-shaped structure; 22, first connecting support; 3, second support; 31, vertical plate; 32, horizontal plate; 33, second connecting support; 4, hydraulic device; 41, hydraulic cylinder; 42, hydraulic pump station; 5, jack; 6, large equipment; DETAILED DESCRIPTION

[0035] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in combination with the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] Embodiment 1:

[0037] like Figure 1 As shown, the large equipment lifting and moving device includes two groups of moving devices and four jacks 5, wherein during the moving process, each moving device is configured with a jack 5, and each group of moving devices includes a track 1, a first support 2, a second support 3, and a hydraulic device 4. The track 1 is arranged between the bottom of the large equipment 6 and the ground, the first support 2 is placed on the track 1, and the front end of the first support 2 is inserted between the large equipment 6 and the track 1, the second support 3 is placed on the track 1, and the hydraulic device 4 includes a hydraulic cylinder 41, and both ends of the hydraulic cylinder 41 are connected to the first support 2 and the second support 3. When the hydraulic cylinder 41 is extended, the jack 5 connects the second support 3 and the track 1.

[0038] The rail 1 is an I-beam, and two rails 1 are arranged in parallel between the large equipment 6 and the ground. The rail 1 is selected to be 38 kg / m and has a length greater than that of the large equipment 6.

[0039] like Figure 5As shown, the first support 2 includes an L-shaped structure 21, the front end of the horizontal plate of the L-shaped structure 21 is wedge-shaped, which is convenient for insertion between the large equipment 6 and the track 1, and the rear end of the vertical plate of the L-shaped structure 21 has a first connecting support 22 for connecting the hydraulic cylinder 41. The first connecting support 22 is formed by two flat plates arranged at intervals, and the flat plates have connecting holes. The telescopic end of the hydraulic cylinder 41 is connected to the connecting hole through a pin shaft. The L-shaped structure 21 can be made of angle steel of at least 200*200.

[0040] like Figure 6 As shown, the second support 3 includes two vertical plates 31, a horizontal plate 32, and a second connecting support 33 for connecting the hydraulic cylinder 41. The two vertical plates 31 are made of steel plates of at least 30 mm, with length*width=220*260. The bottom of the vertical plates has a concave notch that is clamped on the track 1. The width of the concave notch is preferably adapted to the width of the track 1. The two vertical plates 31 are arranged in parallel and spaced apart. The horizontal plate 32 is connected between the two vertical plates 31. After the second support 3 is clamped on the track 1, the space between the horizontal plate 32 and the track 1 is used to place the jack 5. The second connecting support 33 is fixed to the vertical plate 31 on the left. The second connecting support 33 is formed by two flat plates spaced apart. The flat plates have a connecting hole. The fixed end of the hydraulic cylinder 41 is connected to the connecting hole through a pin.

[0041] like Figure 1 As shown, the hydraulic device 4 also includes a hydraulic pump station 42, which is connected to the hydraulic cylinder 41 to provide power for the hydraulic cylinder 41. In this embodiment, the hydraulic pump station 42 is of model: ZB50-1-6.

[0042] Embodiment 2:

[0043] On the basis of the above-mentioned embodiment 1, the jack 5 described in this embodiment is an ultra-thin hydraulic split jack. In this embodiment, four jacks 5 are used to lift the equipment and fix the second support 3. The jack 5 has a stroke of at least 10t. The jack 5 can be selected as model: FPY-10, and is equipped with a hydraulic pump CP-180.

[0044] Of course, you can choose a larger stroke to save more time according to actual usage.

[0045] The large equipment moving method implemented by the large equipment lifting and moving device in the above-mentioned embodiment 1 or embodiment 2 comprises the following steps:

[0046] Step 1: Use at least four jacks 5 to be arranged at the four corners of the large equipment, lift the large equipment 6 to a height greater than the track 1, then arrange two tracks 1 under the large equipment 6, relieve the pressure on the jacks 5, and place the large equipment 6 on the track 1;

[0047] Step 2: Arrange the first support 2 and the second support 3 on the track 1 behind the large equipment 6, connect the hydraulic cylinder 41 between the first support 2 and the second support 3, and arrange the jack 5 between the cross plate 32 of the second support 3 and the track 1;

[0048] Step 3: operate the jack 5, the jack 5 is extended and supported on the bottom surface of the horizontal plate 32 and the top surface of the track 1, so that the second support 3 is fixed on the track 1, and the fixed position serves as the fulcrum of the hydraulic cylinder 41;

[0049] Step 4: operate the hydraulic cylinder 41, the hydraulic cylinder 41 extends, pushes the first support 2 forward, and then uses the hydraulic cylinder 41 to shift the large equipment 6 forward;

[0050] Step 5: When the hydraulic cylinder 41 reaches the maximum position and reaches the full stroke, the jack 15 and the hydraulic cylinder 41 are depressurized at the same time. During the depressurization, since the first support 2 is under the large equipment 6, the hydraulic cylinder 41 is extended and retracted, and the hydraulic cylinder 41 and the second support 3 are automatically moved forward at the same time;

[0051] Step 6: Press the jack 5 again to fix the second support 3 on the track 1, then press the hydraulic cylinder 41 to push the large equipment 6 forward again, and repeat the operation until the large equipment 6 is moved out.

[0052] In this embodiment, the second support 3 is fixed by the jack 5, and the extension of the hydraulic cylinder 41 pushes the first support 2, and then pushes the large equipment 6 to gradually move out along the track 1. This embodiment overcomes the problem of lifting equipment without a lifting point on site, and can still be used in a small space. It is an effective tool for moving heavy objects over a short distance and installing them in place. It has the advantages of large carrying capacity, good stability, and continuous movement. Therefore, it can be within a certain working range. Compared with the traditional method of using sleepers and rollers to transport heavy objects, it is safer, more labor-saving, time-saving, and cost-saving. It is simple to operate and only requires a small number of operators to use and operate. It can conveniently, quickly, safely, and accurately move heavy objects such as super-large equipment to the designated installation position.

[0053] At present, only 4-5 people are needed to operate it, and it can conveniently, quickly, safely and accurately move heavy objects such as chillers (weighing about 30 tons) and other super-large equipment to the designated installation location.

[0054] After the A Mine Refrigeration Room used the jacking and moving device to dismantle the chiller and achieved good results, the device was used again during the installation of the second phase chiller in the B Mine Refrigeration Room to quickly and conveniently move the new chiller into place on the foundation. It can be seen that the device can be used to achieve moving-in and moving-out operations. Since the device has a low cost and strong adaptability, it can be promoted to various occasions and is not limited to small spaces.

[0055] The moving method in this embodiment does not require the use of a large crane for cooperation during use, which saves machine hours, saves costs, greatly saves time, and is safe and efficient; it saves costs by about 50,000 yuan per time, which not only improves construction efficiency, but also reduces construction costs, achieving the purpose of reducing costs and increasing efficiency.

[0056] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for lifting and moving large equipment, characterized in that: The lifting and moving device for large equipment is used; the lifting and moving device for large equipment includes at least two groups of moving devices and at least four jacks, each group of moving devices includes a track, a first support, a second support, and a hydraulic device, the track is arranged between the bottom of the large equipment and the ground, the first support is placed on the track, and the front end of the first support is inserted between the large equipment and the track, the second support is placed on the track, the hydraulic device includes a hydraulic cylinder, the two ends of the hydraulic cylinder are connected to the first support and the second support, when the hydraulic cylinder is extended, the jack connects the second support and the track; the first support is an L-shaped structure, the front end of the horizontal plate of the L-shaped structure is wedge-shaped, and the rear end of the vertical plate of the L-shaped structure has a first connecting support for connecting the hydraulic cylinder; The following steps are involved: Step 1: Use at least four jacks to lift the large equipment to a height greater than the track, then place at least two tracks under the large equipment, release the pressure on the jacks, and place the large equipment on the track; Step 2: On the rear of the large equipment, arrange the first support and the second support on the track, connect the hydraulic cylinder between the first support and the second support, and arrange the jack between the second support and the track; Step 3: Operate the jack to fix the second support on the track; Step 4: Operate the hydraulic cylinder to move the large equipment forward; Step 5: When the hydraulic cylinder reaches the maximum position and reaches the full stroke, the pressure on the jack and the hydraulic cylinder is released at the same time. When the pressure is released, the hydraulic cylinder and the second support automatically move forward at the same time; Step 6: Press the jack again to fix the second support on the track, then press the hydraulic cylinder to push the large equipment forward again, and repeat the operation until the large equipment is moved out.

2. The method for lifting and moving large equipment according to claim 1, characterized in that: The rails are I-beams, and at least two rails are arranged in parallel between the large equipment and the ground.

3. The method for lifting and moving large equipment according to claim 1, characterized in that: The first connecting support is formed by two flat plates spaced apart from each other. The flat plates are provided with connecting holes, and the telescopic end of the hydraulic cylinder is connected to the connecting hole via a pin shaft.

4. The method for lifting and moving large equipment according to claim 1, characterized in that: The second support includes two vertical plates, a horizontal plate, and a second connecting support for connecting a hydraulic cylinder. The bottoms of the two vertical plates have grooves that are snapped onto the track. The two vertical plates are arranged in parallel and spaced apart. The horizontal plate is connected between the two vertical plates. The second connecting support is fixed on the vertical plate close to the first support.

5. The method for lifting and moving large equipment according to claim 4, characterized in that: The second connecting support is formed by two flat plates arranged at an interval, the flat plates are provided with connecting holes, and the fixed end of the hydraulic cylinder is connected to the connecting hole through a pin shaft.

6. The method for lifting and moving large equipment according to claim 1, characterized in that: The hydraulic device also includes a hydraulic pump station, which is connected to the hydraulic cylinder.

7. The method for lifting and moving large equipment according to claim 1, characterized in that: The jack is a hydraulic split jack.

Citation Information

Patent Citations

  • Cooling water set transportation structure and cooling water set

    CN206890717U

  • Vehicle shifter in ship cabin

    CN103482029A

  • Method and device for moving heavy object

    CN1785792A

  • Large equipment jacking and moving device

    CN212403411U