Variable refrigerant flow system with power consumption sharing
By introducing a variable refrigerant flow management system into the variable refrigerant flow system, the consumption factor of the indoor unit is calculated using outdoor instruments and activation requests, the problem of uneven distribution of power consumption of outdoor condensation units in multi-tenant buildings is solved, and the power is realized Accurate allocation and fairness of costs.
Patent Information
- Application Number
- CN201980031607.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2018-03-13
- Filing Date
- 2019-03-12
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2039-03-12
AI Technical Summary
In multi-tenant buildings, the power consumption of the outdoor condensing unit of the variable refrigerant flow system is difficult to accurately allocate to each tenant, resulting in an uneven distribution of power costs.
By introducing a variable refrigerant flow management system into the variable refrigerant flow system, the outdoor instrument is used to measure the power consumption of the outdoor unit, and the outdoor consumption factor and power ratio index of the indoor unit are calculated based on the activation request and the compressor request frequency, and thus the multi-dimensional energy consumption rate of the indoor unit is The outdoor power consumption is shared among the indoor units.
The precise allocation of power consumption of outdoor condensation units is achieved, ensuring that each tenant pays according to actual consumption, and improving the fairness and accuracy of power costs.
Smart Images

Figure CN112105995B_ABST
Abstract
Description
[0001] CROSS-REFERENCE TO RELATED APPLICATIONS
[0002] This application claims the benefit of and priority to U.S. Patent Application No. 15 / 920,077, filed on March 13, 2018, the entire disclosure of which is incorporated herein by reference. Background Art
[0003] The present disclosure relates generally to the field of variable refrigerant flow systems, and more particularly to a method and system for sharing electrical power costs among multiple tenants of a facility served by a variable refrigerant flow system in which refrigerant is conditioned by an outdoor condensing unit and circulated within a building to multiple indoor units, wherein a majority of the electrical power consumption of the system may be caused by the outdoor condensing unit.
[0004] Variable refrigerant flow systems are popular in multi-tenant buildings, such as apartment buildings, office buildings, or mixed-use facilities. For many multi-tenant buildings, each tenant is billed for electricity utility costs based on the tenant's electricity consumption, which is determined, for example, by meters that measure the electricity consumption attributable to the tenant units in the building. However, because the electricity consumption in a variable refrigerant flow system may be largely caused by outdoor condensing units serving multiple tenants, there is a challenge in accurately apportioning the cost of the electricity consumption of the outdoor condensing units among the tenants served by the outdoor condensing units. Summary of the invention
[0005] One embodiment of the present disclosure is a variable refrigerant flow system for a building. The variable refrigerant flow system includes a plurality of indoor units, a first outdoor unit, an outdoor meter, and a variable refrigerant flow management system. The plurality of indoor units are configured to generate an activation request. The first outdoor unit is configured to receive the activation request and to provide refrigerant to the plurality of indoor units in response to the activation request. The outdoor meter is configured to provide an outdoor unit power consumption measurement. The variable refrigerant flow management system is configured to receive the outdoor unit power consumption measurement and activation data indicating the activation request, and to apportion an outdoor share of the outdoor power consumption measurement to each of the plurality of indoor units based on the activation data.
[0006] In some embodiments, the first outdoor unit includes a compressor, and the activation data includes a compressor request frequency of each of the plurality of indoor units. In some embodiments, the variable refrigerant flow management system is configured to apportion each outdoor share of the outdoor power consumption by: calculating an outdoor consumption factor of the indoor unit based on the compressor request frequency corresponding to each indoor unit; calculating a power proportional index of the indoor unit by dividing the outdoor consumption factor corresponding to each indoor unit by the sum of the outdoor consumption factors of each of the plurality of indoor units; and multiplying the power proportional index of each indoor unit by the outdoor power consumption measurement value.
[0007] In some embodiments, the variable refrigerant flow system further comprises one or more additional outdoor units configured to receive an activation request. The outdoor meter measures power consumption of the first outdoor unit and the one or more additional outdoor units to generate the outdoor unit consumption measurement value. The variable refrigerant flow management system is further configured to allocate a share of the outdoor unit consumption measurement value to the first outdoor unit based on the activation request.
[0008] In some embodiments, the first outdoor unit includes a compressor, and the activation data includes a compressor request frequency. The variable refrigerant flow management system is further configured to apportion a share of the outdoor unit consumption measurement value to the first outdoor unit based on the activation request by: determining a compressor run time of the first outdoor unit; determining a compressor total frequency based on the compressor request frequency in the activation request received by the first outdoor unit; calculating a consumption factor of the first outdoor unit based on an average compressor total frequency and the compressor run time; calculating a power proportion index of the first outdoor unit by dividing the consumption factor of the first outdoor unit by the sum of the consumption factors of the one or more additional outdoor units and the consumption factor of the first outdoor unit; and multiplying the outdoor unit consumption measurement value by the power proportion index.
[0009] In some embodiments, the variable refrigerant flow system further comprises an indoor meter, the indoor meter measuring power consumption of the plurality of indoor units to generate an indoor power consumption measurement value. The variable refrigerant flow management system is further configured to apportion the indoor power consumption measurement value among the plurality of indoor units.
[0010] Another embodiment of the present disclosure is a method for operating a variable refrigerant flow system for a building. The method includes generating an activation request by a plurality of indoor units, and receiving the activation request by a first outdoor unit. In response to the activation request, the first outdoor unit provides refrigerant to the plurality of indoor units. The method also includes: obtaining the outdoor unit power consumption measurement and activation data indicating the activation request; and apportioning an outdoor share of the outdoor power consumption measurement to each of the plurality of indoor units based on the activation data.
[0011] In some embodiments, the first outdoor unit includes a compressor, and the activation data includes a compressor request frequency for each of the plurality of indoor units. In some embodiments, allocating an outdoor share of the outdoor power consumption measurement value to each of the plurality of indoor units based on the activation data includes: calculating an outdoor consumption factor for each indoor unit based on the compressor request frequency; calculating a power proportional index for the indoor unit by dividing the outdoor consumption factor corresponding to each indoor unit by the sum of the outdoor consumption factors for each of the plurality of indoor units; and multiplying the power proportional index for each indoor unit by the outdoor power consumption measurement value.
[0012] In some embodiments, obtaining the outdoor power consumption measurement includes: measuring the power consumption of the first outdoor unit and one or more additional outdoor units to generate a total outdoor unit consumption measurement; and allocating the outdoor unit consumption measurement as a portion of the total outdoor unit consumption measurement to the first outdoor unit based on the activation data. In some embodiments, the first outdoor unit includes a compressor, and the activation data includes a compressor request frequency. Allocating the outdoor unit consumption measurement to the first outdoor unit includes: determining the compressor run time of the first outdoor unit; determining the total compressor frequency based on the compressor request frequency in the activation request received by the first outdoor unit; calculating a consumption factor of the first outdoor unit based on the total compressor frequency and the compressor run time; calculating a power ratio index of the first outdoor unit by dividing the consumption factor of the first outdoor unit by the sum of the consumption factors of the one or more additional outdoor units and the consumption factor of the first outdoor unit; and multiplying the total outdoor unit consumption measurement by the power ratio index.
[0013] In some embodiments, the method further comprises: obtaining indoor power consumption measurements of the plurality of indoor units; and allocating indoor shares of the indoor power consumption measurements among the plurality of indoor units. In some embodiments, attributing each indoor share of the indoor power consumption measurements among the plurality of indoor units comprises: calculating an indoor consumption factor of the indoor unit based on an operating time and a capacity corresponding to each indoor unit; calculating an indoor power proportion index of the indoor unit by dividing the indoor consumption factor corresponding to the indoor unit by the sum of the indoor consumption factors of each of the plurality of indoor units; and multiplying the power proportion index of each indoor unit by the indoor power consumption measurement.
[0014] In some embodiments, the method further comprises determining the total indoor unit consumption by adding the indoor share corresponding to the indoor unit to the outdoor share corresponding to the indoor unit. The method further comprises generating the total indoor unit cost of the indoor unit by multiplying the total indoor unit consumption corresponding to each indoor unit by the electricity rate. In some embodiments, the method further comprises generating an electricity bill for each of a plurality of tenants. Each tenant corresponds to one or more of the plurality of indoor units.
[0015] Another embodiment of the present disclosure is a system. The system includes an outdoor meter and a management system. The outdoor meter is configured to provide an outdoor power consumption measurement of an outdoor unit of a variable refrigerant flow system. The outdoor unit is configured to provide refrigerant to the multiple indoor units in response to an activation request from the multiple indoor units. The management system includes a processing system having a memory and a processor. The memory is configured to store instructions that are executable by the processor and cause the processing circuit to: receive an outdoor power consumption measurement from the outdoor meter; receive activation data related to the activation request; and apportion the outdoor power consumption measurement among the multiple indoor units based on the activation data.
[0016] In some embodiments, the activation data includes at least one of the following: compressor request frequency, average compressor request frequency, thermo-on time, indoor unit model, or indoor unit capacity. In some embodiments, the processing circuit is caused to apportion the outdoor power consumption measurement value among the plurality of indoor units based on the activation data by: determining an outdoor consumption factor for each of the plurality of indoor units based on the activation data; determining a power proportion index for each of the plurality of indoor units based on the outdoor consumption factor; and multiplying each power proportion index by the outdoor power consumption measurement value.
[0017] In some embodiments, the system further comprises an indoor meter that provides indoor power consumption measurements of the plurality of indoor units. The indoor units are configured to provide runtime data. The processing circuit is further prompted to: receive the indoor power consumption measurements; receive runtime data related to the runtime of the plurality of indoor units; look up the capacity of each of the plurality of indoor units in a database; and apportion the indoor power consumption measurements among the plurality of indoor units based on the runtime data and the capacities.
[0018] In some embodiments, the plurality of indoor units are operable to adjust temperatures in respective building zones corresponding to respective tenants.The processing circuitry is further caused to generate an electricity bill for the respective tenants based on the apportioned outdoor electricity consumption measurements. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1A is a diagram of a variable refrigerant flow (VRF) system including an outdoor VRF unit and a plurality of indoor VRF units according to an exemplary embodiment.
[0020] Figure 1B is another illustration of the VRF system of FIG. 1 showing some indoor VRF units operating in a cooling mode while other indoor VRF units are operating in a heating mode according to an exemplary embodiment.
[0021] Figure 2 is a block diagram of a VRF system with an electric meter according to an exemplary embodiment.
[0022] Figure 3A is a block diagram of a first outdoor unit metering scenario according to an exemplary embodiment.
[0023] Figure 3B is a block diagram of a second outdoor unit metering scenario according to an exemplary embodiment.
[0024] Figure 4A is a block diagram of a first indoor unit metering scenario according to an exemplary embodiment.
[0025] Figure 4B is a block diagram of a second indoor unit metering scenario according to an exemplary embodiment.
[0026] Figure 5 is a block diagram of a VRF system with power cost sharing according to an exemplary embodiment.
[0027] Figure 6 is a flow chart of a process for grouping indoor units and outdoor units according to an exemplary embodiment.
[0028] Fig. 7Ais a first portion of a flow chart of a process for apportioning power consumption of outdoor units that share a meter among the outdoor units according to an exemplary embodiment.
[0029] Figure 7B According to an exemplary embodiment Fig. 7A The second part of the flowchart of the process for allocating power consumption of outdoor units among outdoor units that share a meter.
[0030] Figure 8 is a flow chart of a process for apportioning power consumption of an outdoor unit among indoor units served by the outdoor unit according to an exemplary embodiment.
[0031] Fig. 9 is a flow chart of a process for apportioning power consumption of indoor units among indoor units that share a meter according to an exemplary embodiment.
[0032] Fig.10 is a method for performing a method based on FIG. 7 to FIG. Fig. 9 Flowchart of the process for calculating tenant expenses by apportionment. DETAILED DESCRIPTION
[0033] Variable refrigerant flow system
[0034] Now refer to Figure 1A to Figure 1B , a variable refrigerant flow (VRF) system 100 according to some embodiments is shown. The VRF system 100 is shown to include one or more outdoor VRF units 102 and a plurality of indoor VRF units 104. The outdoor VRF unit 102 may be located outside the building and may be operated to heat or cool the refrigerant. The outdoor VRF unit 102 may consume electricity to convert the refrigerant between a liquid phase, a gas phase, and / or a superheated gas phase. The indoor VRF units 104 may be distributed throughout various building areas within the building and may receive heated or cooled refrigerant from the outdoor VRF unit 102. Each indoor VRF unit 104 may provide temperature control for a specific building area where the indoor VRF unit 104 is located. Although the term "indoor" is used to indicate that the indoor VRF unit 104 is typically located inside the building, in some cases, one or more indoor VRF units are located "outdoors" (i.e., outside the building), such as for heating / cooling a courtyard, an entryway, a walkway, etc.
[0035] One advantage of the VRF system 100 is that some indoor VRF units 104 can be operated in cooling mode while other indoor VRF units 104 are operated in heating mode. For example, each of the outdoor VRF unit 102 and the indoor VRF unit 104 can be operated in heating mode, cooling mode, or off mode. Each building area can be controlled independently and can have different temperature settings. In some embodiments, each building has up to three outdoor VRF units 102 located outside the building (e.g., on the roof) and up to 128 indoor VRF units 104 distributed throughout the building (e.g., in various building areas). Building areas can include apartment units, offices, retail spaces, and public areas, etc. In some cases, various building areas are owned, leased, or otherwise occupied by various tenants, all of which are served by the VRF system 100.
[0036] There are many different configurations of the VRF system 100. In some embodiments, the VRF system 100 is a two-pipe system, where each outdoor VRF unit 102 is connected to a single refrigerant return line and a single refrigerant outlet line. In a two-pipe system, all of the outdoor VRF units 102 operate in the same mode because only one of heated or cooled refrigerant can be provided via a single refrigerant outlet line. In other embodiments, the VRF system 100 is a three-pipe system, where each outdoor VRF unit 102 is connected to a refrigerant return line, a hot refrigerant outlet line, and a cold refrigerant outlet line. In a three-pipe system, both heating and cooling can be provided simultaneously via the dual refrigerant outlet lines. Figure 2 An example of a three-pipe VRF system is described in more detail.
[0037] Now refer to Figure 2 , a block diagram showing a VRF system 200 according to some embodiments is shown. The VRF system 200 is shown to include an outdoor VRF unit 202, a number of heat recovery units 206, and a number of indoor VRF units 204. The outdoor VRF unit 202 may include a compressor 208, a fan 210, or other power-consuming refrigerant components configured to convert the refrigerant between a liquid phase, a gas phase, and / or a superheated gas phase. The indoor VRF units 204 may be distributed throughout various building areas within a building and may receive heated or cooled refrigerant from the outdoor VRF units 202. Each indoor VRF unit 204 may provide temperature control for a specific building area where the indoor VRF unit 204 is located. The heat recovery unit 206 may control the flow of refrigerant between the outdoor VRF unit 202 and the indoor VRF unit 204 (e.g., by opening or closing a valve) and may minimize the heating or cooling load served by the outdoor VRF unit 202.
[0038] The outdoor VRF unit 202 is shown to include a compressor 208 and a heat exchanger 212. The compressor 208 circulates refrigerant between the heat exchanger 212 and the indoor VRF unit 204. The compressor 208 operates at a variable frequency controlled by the outdoor unit control circuit 214. At a higher frequency, the compressor 208 provides a greater heat transfer capacity for the indoor VRF unit 204. The electrical power consumption of the compressor 208 increases in proportion to the compressor frequency.
[0039] The heat exchanger 212 can function as a condenser (allowing the refrigerant to reject heat to the outside air) when the VRF system 200 is operating in a cooling mode, or as an evaporator (allowing the refrigerant to absorb heat from the outside air) when the VRF system 200 is operating in a heating mode. A fan 210 provides airflow through the heat exchanger 212. The speed of the fan 210 can be adjusted (e.g., by the outdoor unit control circuit 214) to regulate the rate of heat transfer of the refrigerant into or out of the heat exchanger 212.
[0040] Each indoor VRF unit 204 is shown to include a heat exchanger 216 and an expansion valve 218. Each of the heat exchangers 216 can function as a condenser (allowing the refrigerant to reject heat to the air within the room or zone) when the indoor VRF unit 204 is operating in a heating mode, or can function as an evaporator (allowing the refrigerant to absorb heat from the air within the room or zone) when the indoor VRF unit 204 is operating in a cooling mode. A fan 220 provides airflow through the heat exchanger 216. The speed of the fan 220 can be adjusted (e.g., by the indoor unit control circuit 222) to regulate the rate of heat transfer of the refrigerant into or out of the heat exchanger 216.
[0041] exist Figure 2 , the indoor VRF unit 204 is shown as operating in cooling mode. In cooling mode, refrigerant is provided to the indoor VRF unit 204 via cooling line 224. The refrigerant is expanded to a cold, low-pressure state through expansion valve 218 and flows through heat exchanger 216 (acting as an evaporator) to absorb heat from a room or area within the building. The heated refrigerant then flows back to the outdoor VRF unit 202 via return line 226 and is compressed to a hot, high-pressure state by compressor 208. The compressed refrigerant flows through heat exchanger 212 (acting as a condenser) and discharges heat to the outside air. The cooled refrigerant can then be provided back to the indoor VRF unit 204 via cooling line 224. In cooling mode, flow control valve 228 can be closed and expansion valve 230 can be fully opened.
[0042] In heating mode, the refrigerant is provided to the indoor VRF unit 204 in a hot state via the heating line 232. The hot refrigerant flows through the heat exchanger 216 (acting as a condenser) and rejects heat to the air in the room or area of the building. The refrigerant then flows back to the outdoor VRF unit via the cooling line 224 (opposite to the flow direction shown in FIG. 4). The refrigerant may be expanded to a cooler, lower pressure state by the expansion valve 230. The expanded refrigerant flows through the heat exchanger 212 (acting as an evaporator) and absorbs heat from the outside air. The heated refrigerant may be compressed by the compressor 208 and provided back to the indoor VRF unit 204 in a hot, compressed state via the heating line 232. In heating mode, the flow control valve 228 may be fully opened to allow the refrigerant from the compressor 208 to flow into the heating line 232.
[0043] like Figure 2 As shown, each indoor VRF unit 204 includes an indoor unit control circuit 222. In response to a building zone temperature set point or other request to provide heating / cooling to a building zone, the indoor unit control circuit 222 controls the operation of components of the indoor VRF unit 204, including the fan 220 and the expansion valve 218. For example, the indoor unit control circuit 222 can generate signals to turn the fan 220 on and off. The indoor unit control circuit 222 also determines the required heat transfer capacity of the indoor VRF unit 204 and the frequency of the compressor 208 corresponding to the capacity. When the indoor unit control circuit 222 determines that the indoor VRF unit 204 must provide a certain capacity of heating or cooling, the indoor unit control circuit 222 then generates a compressor frequency request and sends the compressor frequency request to the outdoor unit control circuit 214 including the compressor frequency corresponding to the required capacity.
[0044] The outdoor unit control circuit 214 receives compressor frequency requests from one or more indoor unit control circuits 222 and aggregates the requests, for example, by adding the compressor frequency request to the compressor total frequency. In some embodiments, the compressor frequency has an upper limit so that the compressor total frequency cannot exceed the upper limit. The outdoor unit control circuit 214 supplies the compressor total frequency to the compressor, for example, as an input frequency of a DC inverter compressor motor given to the compressor. The indoor unit control circuit 222 and the outdoor unit control circuit 214 are thus combined to modulate the compressor frequency to match the heating / cooling demand. The outdoor unit control circuit 214 can also generate signals to control the valve positions of the flow control valve 228 and the expansion valve 230, the compressor power setting value, the refrigerant flow setting value, the refrigerant pressure setting value (for example, the pressure differential setting value of the pressure measured by the pressure sensor 236), the on / off command, the staging command, or other signals that affect the operation of the compressor 208, and the control signal provided to the fan 210, the control signal including the fan speed setting value, the fan power setting value, the airflow setting value, the on / off command, or other signals that affect the operation of the fan 210.
[0045] The indoor unit control circuit 222 and the outdoor unit control circuit 214 further store and / or provide a data history of one or more control signals generated by or provided to the control circuit 214, the control circuit 222. For example, the indoor unit control circuit 222 may store and / or provide a log of the compressor request frequency, fan on / off times, and indoor VRF unit 204 on / off times generated. The outdoor unit control circuit 214 may store and / or provide a log of the compressor request frequency and / or the compressor total frequency and compressor run time. Figure 5 The manner in which data points are provided to the VRF management system 502 is shown and discussed in detail with reference to that figure.
[0046] The VRF system 200 is shown to operate on electrical power provided by an energy grid 250 via an outdoor meter 252 and an indoor meter 254. According to various embodiments, the energy grid 250 is any power supply, such as an electrical grid maintained by a utility company and supplied by one or more power plants. The outdoor meter 252 measures the electrical power consumption of the outdoor VRF unit 202 over time, for example in kilowatt-hours (kWh). The indoor meter 254 measures the electrical power consumption of the indoor VRF unit 204 over time, for example in kWh. FIG. 3A to FIG. 4B As shown and discussed in detail below, various metering configurations are possible for a VRF system. Outdoor meter 252 and indoor meter 254 may be connected to Figure 5 The VRF management system 502 is shown communicating to provide power consumption measurements to the VRF management system 502 .
[0047] Power metering configuration for VRF system
[0048] Now refer to FIG. 3A to FIG. 4B , showing various metering configurations for a VRF system (e.g., VRF system 100, VRF system 200) having one or more outdoor VRF units (ODUs) and multiple indoor VRF units (IDUs). The systems and methods described herein for power cost allocation in a VRF system take into account FIG. 3A to FIG. 4B Each configuration shown, and any combination of the four configurations shown. Thus, the cost allocation systems and methods described herein are suitable for use with a variety of existing or future metering configurations without requiring rewiring of existing meters and systems or installation of new meters. FIG. 3A to FIG. 3B shows the metering configuration for the ODU, while FIG. 4A to FIG. 4B A metering configuration for an IDU is shown.
[0049] Now refer specifically to Figure 3A , shows a first metering configuration 300 according to an exemplary embodiment. The first metering configuration 300 includes an ODU 302, which is powered by power provided from an energy grid 306 via an outdoor meter 308. The outdoor meter 308 measures the power consumption of the ODU unit 302, for example in kWh. The ODU 302 serves a plurality of indoor units 304 (shown as IDU1 to IDU N ), the plurality of indoor units are located in various building areas and correspond to a plurality of tenants 310, namely, tenant_1 to tenant_N. In some cases, one tenant may correspond to two or more IDUs 304. Each building area may have a different size, temperature set point, or other different temperature regulation characteristics (such as insulation), so that the demand for ODU 302 varies according to the plurality of IDUs 304.
[0050] In many cases, each building area is leased to or otherwise corresponds to a specific tenant 310 (e.g., Tenant_2) who is responsible for the electrical utility costs of that building area. In the first metering configuration 300, each of the plurality of tenants 310 is responsible for the portion of the power consumption of the ODU 302 measured by the outdoor meter 308 that corresponds to the IDU 304 of that tenant. Because the electrical power consumption of the ODU 302 measured by the outdoor meter 308 corresponds to the cooling / heating provided to all IDUs 304, there is a challenge in accurately apportioning the measured electrical power consumption among the plurality of IDUs 304. As described in detail below, Figure 8 A process 800 for accurately apportioning measured electrical power consumption among multiple IDUs 304 is shown.
[0051] Now refer to Figure 3B, shows a second metering configuration 350 according to an exemplary embodiment. The second metering configuration 350 includes a plurality of ODUs 352 (ie, ODUs 352) that draw electrical power from an energy grid 356 via a single outdoor meter 358. A To ODU Ω ). A single outdoor meter 358 measures the electrical power consumption of multiple ODUs 352 with one aggregate kWh reading.
[0052] As in the first metering configuration 300, each ODU 352 serves multiple IDUs 354 located in various building areas corresponding to various tenants 355. For example, the ODU A Serves IDUs located in the building areas corresponding to Tenant_A1 to Tenant_AN A1 To IDU AN In the second metering configuration 350, the building areas and tenants also correspond to various system managers 360. According to various embodiments, the system manager 360 is a landlord, a building owner, or a property management company. For example, in a mixed-use facility, the system manager A may be an apartment management company that manages apartments leased by Tenant_A1 to Tenant_AN, the system manager B may be an apartment owners association that manages apartment owners Tenant_B1 to Tenant_BN, and the system manager Ω may be a commercial leasing company that manages commercial tenants including Tenant_Ω1 to Tenant_ΩN.
[0053] Each ODU 352 typically consumes a different amount of electrical power based on the demand on each ODU 352 from the IDUs 354 served by the ODU 352. Therefore, in order to share the utility costs of a facility's electricity among system managers 360, there is a challenge to accurately share the total power consumption measurements of the outdoor meters 358 among multiple ODUs 352. FIG. 7A to FIG. 7B A process 700 is shown for allocating power consumption among multiple ODUs. Once a portion of the consumption measured by outdoor meter 358, for example using process 700, is attributed to each ODU 352 (i.e., ODU A To ODU Ω ), each system administrator 560 will have a Figure 3A The first metering configuration 300 is similarly configured in a manner such as according to Figure 8 The process 800 is used to handle the settings.
[0054] Now refer to Figure 4A, a third metering configuration 400 according to an exemplary embodiment is shown. The third metering configuration 400 shows a plurality of IDUs 402 and a plurality of tenant meters 404. Each IDU 402 corresponds to a tenant 408 and is connected to a corresponding tenant meter 404. Each IDU 402 consumes power delivered from an energy grid 406 through the tenant meter 404 corresponding to the IDU 402, such that the tenant meter 404 measures the electrical power consumption of the corresponding IDU 402 and does not measure the electrical power consumption of the IDUs 402 corresponding to other tenants. In some cases, a plurality of IDUs 402 correspond to a single tenant 408 and may be metered together in the tenant meter 404. Each tenant meter 404 may also measure the non-VRF-related electrical power consumption of the corresponding tenant, such as the electrical power consumption of lights, appliances, and other electrical devices located in the building area occupied by the tenant. In this case, the electrical power consumption associated with the operation of the IDUs 402 in the building area of the tenant (e.g., for use Figure 2 The power used to operate the fan 220 and control circuit 222 of the indoor VRF unit 204 shown is included with other power consumption in this building area. Therefore, a utility bill for this consumption can be generated without making VRF-specific considerations.
[0055] Now refer to Figure 4B , shows a fourth metering configuration 450 according to an exemplary embodiment. Multiple IDUs 452 consume electrical power delivered from an energy grid 454 via a single shared indoor meter 456. The indoor meter 456 measures the electrical power consumption of the multiple IDUs 354 with one total kWh reading. Figure 4B As shown, each IDU 452 corresponds to a different tenant 458 (ie, Tenant_1 through Tenant_N). In order to accurately generate a utility bill for each tenant's electrical power consumption, there is a challenge of accurately apportioning the total consumption measured by the indoor meter 456 among the multiple IDUs 452 . Fig. 9 A process 900 is shown for accurately apportioning total consumption measured by a shared indoor meter among multiple IDUs.
[0056] According to various embodiments, the third metering configuration 400 and / or the fourth metering configuration 450 are used together with the first metering configuration 300 and / or the second metering configuration 350 to generate various possible metering configurations. Figure 2 The VRF system 200 is shown having a first metering configuration 300 (the outdoor VRF unit 202 is metered individually by the outdoor meter 252) and a fourth metering configuration 450 ( Figure 2In other examples of metered VRF systems, some IDUs are metered together in a fourth metering configuration 450 and some IDUs are metered separately in a third metering configuration 400, while some ODUs are metered together in a second metering configuration 350 and other ODUs are metered individually in a first metering configuration 300, such that all four metering configurations 300, 350, 400, 450 are represented. Figures 5 to 10 The systems and methods shown in and described below address any such various metering configurations.
[0057] VRF system and method with cost sharing
[0058] Now refer to Figure 5 , shows a variable refrigerant flow (VRF) system 500 according to an exemplary embodiment. In general, the VRF system 500 converts electricity into heating and / or cooling for building areas occupied by various tenants, and accurately allocates electricity costs among the tenants. The VRF system 500 includes a VRF management system 502, an indoor VRF unit (IDU) 506, an outdoor VRF unit (ODU) 504, an outdoor meter 508, an indoor meter 510, and an energy grid 512.
[0059] Energy grid 512 supplies electrical power to VRF system 500. Energy grid 512 is any supply of electrical power, such as a regional power grid maintained by a utility company and supplied by one or more power plants that generate electrical power from nuclear, hydroelectric, geothermal, solar, wind, fossil fuels, or other energy sources. In some embodiments, energy grid 512 is a local energy supply, such as a system of building solar panels or another local power system.
[0060] The ODUs 504 may be located outside of a building and may be operated to heat or cool a refrigerant, for example by consuming electricity to convert the refrigerant between a liquid phase, a vapor phase, and / or a superheated vapor phase. Each ODU serves a plurality of IDUs 506 by providing refrigerant to the IDUs 506. Each ODU 504 includes one or more compressors (e.g., Figure 2 The compressor frequency determines the heat transfer capacity provided by the ODU to the IDU. The compressor frequency is proportional to the power consumption. The compressor frequency is based on the total compressor frequency obtained by summing the compressor frequency requests received by the ODU 504 from the IDU 506 and can be controlled by the ODU control circuit (e.g., Figure 2The ODU 504 is controlled by the outdoor unit control circuit 214 of the ODU 504. The ODU 504 also collects data related to the operation of the ODU 504 (e.g., in the ODU control circuit) and shares the data with the VRF management system 502, including, for example, compressor operating time, received compressor frequency requests with time stamps, compressor total frequency over time, and average compressor total frequency over a calculated cycle time. In some embodiments, some or all of this data is additionally or alternatively collected and stored by a building management system or building control server located outside the ODU 504. According to various embodiments, the VRF system 500 includes any number of ODUs 504 of various brands, manufacturers, models, etc.
[0061] The IDUs 506 may be distributed throughout various building zones within a building and may receive heated or cooled refrigerant from the ODUs 504. Each IDU 506 may provide temperature control for a particular building zone in which the IDU 506 is located. Figure 2 As shown, the IDU 506 may include an electric fan that blows air through a heat exchanger to heat or cool a particular building area. The refrigerant is then circulated back to the corresponding ODU 504 for recooling / reheating.
[0062] Each IDU 506 determines the required heat transfer capacity of the IDU 506 and the frequency of the compressor 208 corresponding to the capacity, for example, using IDU control circuitry (e.g., indoor unit control circuitry 222). The heat transfer capacity required by the IDU 506 can be based on a building zone temperature set point, a current building zone temperature reading, and / or some other setting or measurement. When the IDU 506 determines that the IDU 506 must provide a certain capacity of heating or cooling, the IDU 506 then generates a compressor frequency request and sends the compressor frequency request to the ODU 504 including the compressor frequency corresponding to the required capacity. In some embodiments, the determination of the required capacity and the generation of the compressor frequency request are performed by a building management server external to the IDU 506.
[0063] The IDU 506 is also configured to collect, store, and provide data related to the operation of the IDU. The IDU data includes, for example, IDU operating time (e.g., fan operating time), thermo-on time (i.e., time to request / receive heated / cooled refrigerant), compressor request frequency, and / or other data. The IDU 506 provides the IDU data to the VRF management system 502. According to various embodiments, the VRF system 500 includes any number of IDUs 506 of different brands, manufacturers, models, etc.
[0064] The outdoor meter 508 measures the power consumption of the ODU unit 504, for example in kWh (kilowatt-hours). According to various embodiments, the outdoor meter 508 may be any meter of various brands, types, manufacturers, and models suitable for measuring power consumption. The outdoor meter 508 may be in units such as FIG. 3A to FIG. 3B Various metering configurations shown and described in detail with reference thereto are linked to the ODU 504. The outdoor meter 508 provides power consumption measurements of the ODU 504 to the VRF management system 502. The consumption measurements may be sent continuously while the consumption is being measured, or may be provided at set time intervals (e.g., total consumption for a week, a month, etc.). In some embodiments, the consumption measurements are transmitted from the outdoor meter 508 to the VRF management system 502 via a utility company server or some other computing system for managing the electric meter.
[0065] The indoor meter 510 measures the power consumption of the IDU unit 506, for example, in kWh. According to various embodiments, the indoor meter 510 can be any meter of various brands, types, manufacturers, and models suitable for measuring power consumption. The indoor meter 510 can be in units such as FIG. 4A to FIG. 4B Various metering configurations shown and described in detail with reference thereto are linked to the IDU 506. The indoor meter 510 provides power consumption measurements of the IDU 506 to the VRF management system 502. The consumption measurements may be sent continuously while the consumption is being measured, or may be provided at set time intervals (e.g., total consumption for a week, a month, etc.). In some embodiments, the consumption measurements are transmitted from the indoor meter 510 to the VRF management system 502 via a utility company server or some other computing system for managing the electric meter.
[0066] The VRF management system 502 collects consumption measurements from outdoor meters 508 and indoor meters 510, ODU data from ODU 504, and IDU data from IDU 506, and uses this information and stored VRF system information to allocate electricity costs among tenants. The VRF management system 502 includes processing circuitry 520, data collection circuitry 526, a VRF database 528, cost allocation circuitry 530, and input / output circuitry 532.
[0067] The processing circuit 520 is configured to perform one or more functions of the VRF management system 502 described herein. The processing circuit 520 includes a memory 522 and a processor 524. The processor 524 can be implemented as a general-purpose processor, an application-specific integrated circuit (ASIC), one or more field programmable gate arrays (FPGA), a digital signal processor (DSP), a group of processing components that can be distributed in different geographical locations or accommodated in a single location, or other suitable electronic processing components. One or more memory devices including the memory 522 (e.g., RAM, NVRAM, ROM, flash memory, hard disk storage devices, etc.) can store data and / or computer codes for facilitating the various processes described herein. In addition, one or more memory devices including the memory 522 can be or include tangible non-transitory volatile memory or non-volatile memory. Therefore, the memory 522 can include a database component, an object code component, a script component, or any other type of information structure for supporting the various activities and information structures described herein.
[0068] The data collection circuit 526 is configured to receive and sort data from the ODU 504, the IDU 506, the outdoor meter 508, and the indoor meter 510. The data received by the data collection circuit 526 includes, but is not necessarily limited to, compressor run time, requested compressor frequency, compressor total frequency (and / or average compressor total frequency over a period of time), thermo-on time, IDU run time, outdoor meter power consumption measurement, and indoor meter power consumption measurement. The data collection circuit 526 sorts the received data and stores it in the VRF database 528.
[0069] The VRF database 528 receives and stores data from the data collection circuit 526, and stores other VRF-related information. Other VRF-related information in the VRF database 528 includes a directory of meters 508 to 510, IDUs 506, and ODUs 504, the directory including relationship information defining the associations between the meters 508 to 510, IDUs 506, and ODUs 504 (i.e., showing which IDUs 506 are served by which ODUs 504, and which meters 508 to 510 measure the consumption of which IDUs and ODUs), and the connections between system managers, tenants, and ODUs 504 and IDUs 506 (e.g., showing which IDUs 506 operate to heat / cool building areas leased to specific tenants). The VRF database 528 thus stores information for use in obtaining information from references to the VRF database 528. FIG. 3A to FIG. 4B The information required to determine the metering / VRF configuration of the VRF system 500 is explained among the various possible configurations.
[0070] For each ODU 504, the VRF database 528 stores a set of ODU characteristics, including, but not limited to, the model number, the number of compressors included in the ODU 504, the amount of standby power consumption, and the ODU capacity (e.g., provided by the manufacturer and provided in a product bulletin or manual). For each IDU 506, the VRF database 528 stores a set of IDU characteristics, including, but not limited to, the model number and the IDU capacity (e.g., provided by the manufacturer and provided in a product bulletin or manual). The VRF database 528 may also store: electricity rate information, such as a set amount per kWh or some other electricity rate scheme (e.g., a variable electricity cost rate, such that a kWh unit costs more at certain times of the day than at other times); and contact information or payment information of the tenant to facilitate the provision and / or payment of a bill corresponding to the electricity consumption of the VRF system 500.
[0071] Cost allocation circuitry 530 is configured to access information stored in VRF database 528 and use this information to accurately allocate the power consumption of VRF system 500 among multiple tenants and determine the amount to be charged to each tenant for the cost of the power consumption. Figures 6 to 10 One or more of a series of processes for accurately allocating power consumption and allocating monetary costs are shown in and described in detail with reference to the figures. Typically, the cost allocation circuit 530 uses the following methods to allocate power consumption:
[0072] The cost sharing circuit 530 shares the cost from the outdoor meter 508 (i.e., shared by multiple ODUs 504) among the ODUs in the following manner: Figure 3B The second metering configuration 350 of the present invention comprises: accessing the average compressor total frequency of each ODU 504, the compressor running time of the ODU, and the number of compressors in the ODU 504 in the VRF database 528 to generate an ODU consumption factor for each ODU 504; and apportioning the consumption measurement value based on a proportionality index defined by the consumption factor of the particular ODU compared to the sum of the ODU consumption factors of all ODUs measured by the meter. In some cases, the consumption measurement value can be apportioned based on the ODU standby consumption or some other standby calculation.
[0073] The cost sharing circuit 530 distributes the cost of the multiple IDUs 506 (i.e., Figure 3AThe first metering configuration 300) apportions the consumption measurements attributed to the ODUs among: for each IDU 506, accessing the thermo-on time, compressor request frequency, model, and IDU capacity in the VRF database 528 to generate an IDU outdoor consumption factor for each IDU 506; and apportioning the consumption measurements based on a proportional index defined by the outdoor consumption factor of the specific IDU compared to the sum of the outdoor consumption factors of other IDUs 506 served by the ODU 504.
[0074] The cost sharing circuit 530 shares the cost of the indoor meter 510 (ie, Figure 4B consumption measurements of a fourth metering configuration 450): for each IDU 506, accessing the IDU capacity and the IDU operating time in the VRF database 528 to generate an indoor consumption factor for each IDU 506; and allocating the consumption measurements among the multiple IDUs 506 based on a proportional index defined by the indoor consumption factor of a specific IDU compared to the sum of the indoor consumption factors of other IDUs 506 sharing the indoor meter 510.
[0075] Cost allocation circuitry 530 allocates monetary charges to tenants by determining which IDUs correspond to which tenants based on information stored in VRF database 528; accessing rates in VRF database 528; and calculating charges by multiplying the rates by the total power consumption allocated to the IDUs corresponding to each tenant.
[0076] The input / output circuitry 532 is configured to generate notifications, bills, user interfaces, and / or other communications to users of the VRF system 500, and to receive user input to the VRF management system 502 regarding set-ups, settings, options, or other information that the user wishes to provide to the VRF management system 502. For example, in some embodiments, the input / output circuitry 532 generates an email containing an indication of a monetary charge that a tenant should pay for the tenant's share of the power consumption of the VRF system 500, and sends the email to the tenant's email inbox, mobile device, or other electronic device. In some embodiments, the input / output circuitry 532 generates a user interface that a system administrator can access using a computing device (e.g., a laptop, tablet computer, mobile device, desktop computer) to view the VRF power allocations and edit tenant information or other settings. The input / output circuitry 532 thereby facilitates communicating the power consumption allocations of the cost allocation circuitry 530 to one or more users.
[0077] Now refer to Figure 6, a process 600 for grouping outdoor units and indoor units to share electricity costs according to an exemplary embodiment is shown. Process 600 can be performed by a cost sharing circuit 530 in communication with a VRF database 528. At step 602, the cost sharing circuit 530 accesses a list of all IDUs and ODUs of the VRF system 500 in the VRF database 528. At step 604, the cost sharing circuit 530 accesses a list of outdoor meters 508 corresponding to ODUs 504 and a list of indoor meters 510 corresponding to IDUs 506 in the VRF database 528. According to various embodiments, these lists are automatically generated by the VRF management system 502, input by a user via an input / output circuit 532, or some combination of the two. At step 606, the ODUs corresponding to the same meter are grouped in a virtual outdoor power group. The determination results of the virtual outdoor power group can be stored in the VRF database 528. At step 608, the IDUs corresponding to the same meter are grouped in a virtual indoor power group. The determination result of the virtual indoor power group may be stored in the VRF database 528. The virtual outdoor power group and the virtual indoor power group may be used to share power costs between the ODUs and IDUs in the virtual power group.
[0078] Now refer to FIG. 7A to FIG. 7B , shows a process 700 for apportioning power consumption measurements among multiple ODUs 504 metered by a single outdoor meter 508 according to an exemplary embodiment. Fig. 7A The first part of the process 700 is shown. Figure 7B The second part of process 700 is shown. Process 700 may be performed by Figure 5 The process 700 is performed by the VRF management system 502 and more specifically by the cost allocation circuit 530 in communication with the VRF database 528. Figure 3B The challenge posed by the second metering configuration 350 is that when power consumption of multiple ODUs is measured by a shared meter, the power consumption needs to be accurately allocated among the multiple ODUs.
[0079] At step 702, for each outdoor power group, the number of tenants is determined. Figure 6 As described, the outdoor power group includes all ODUs connected to one outdoor meter. To perform step 702, the cost allocation circuit 530 may access the VRF database 528 to access the directory of tenant-ODU relationships and count the number of tenants associated with the ODUs in the outdoor power group.
[0080] At step 704, the cost allocation circuit 530 queries whether the number of tenants in the outdoor power group is greater than one. If not, the process 700 proceeds to step 706, where the power consumption reading is obtained from the outdoor meter and assigned a label "kWh_outdoor." Because only one tenant is served by the outdoor power group, the total kWh_outdoor can be attributed to the tenant for power cost allocation, and the process 700 can end at step 706.
[0081] If the number of tenants served by the outdoor power group is greater than one, then at step 708, the cost allocation circuit 530 accesses a power consumption measurement from the outdoor meter and labels it as "kWh_outdoor_overall". The measurement kWh_outdoor_overall includes power consumption corresponding to multiple tenants that can be allocated among multiple ODUs according to the remaining steps of process 700.
[0082] At step 710, the cost sharing circuit 530 identifies all ODUs in the outdoor power group between which kWh_outdoor_overall will be shared. Fig. 7A Step 710 in continues to Figure 7B Step 712 in the following steps (i.e., Figure 7B The steps shown in ) are performed for each ODU in the outdoor power group, wherein the symbol ODUn is used in the following discussion to refer to any ODU in the outdoor power group.
[0083] At step 712, the VRF management system 502 determines whether all IDUs served by the ODUn are in standby. Standby may refer to a state in which none of the IDUs served by the ODUn is operating to heat / cool the corresponding building area during the sampling period. If all IDUs served by the ODUn are in standby, then at step 714, the VRF management system 502 determines whether the IDU is in standby or in absolute standby. If the IDU is in standby, then at step 716, the cost allocation circuit 530 accesses the VRF database 528 to look up the standby consumption (“Standby_kWh”) of the ODUn. ODUn (Standby_kWh ODUn )”), which standby consumption may be stored in the VRF database 528 based on the standby consumption rate referenced in the product manual or information table. At step 718, the cost allocation circuit 530 will be attributable to ODUn (“kWh_outdoor ODUn (kWh_outdoor ODUn )”) is defined as equal to Standby_kWh ODUn .
[0084] If the IDU is in absolute standby, then at step 720, the cost sharing circuit 530 accesses the total consumption measurement ("kWh_outdoor_overall") measured by the outdoor meter and the ODU capacity of each ODU in the outdoor power group. The ODU capacity may be stored and accessed in the VRF database 528 based on the capacity information found in the product manual or information table. The kWh_outdoor_overall measurement may be provided to the cost sharing circuit by the data collection circuit 526, or may be stored and accessed in the VRF database 528.
[0085] At step 722, the cost allocation circuit 530 converts kWh_outdoor ODUn Calculated as kWh_outdoor_overall multiplied by ODU n The capacity of the outdoor power group is divided by the sum of the capacities of all ODUs in the outdoor power group. That is, kWh_outdoor ODUn = kWh_outdoor_overall*(ODU n capacity) / (ΣODU k,对于功率组中的所有k In other words, kWh_outdoor_overall is apportioned proportionally based on the manufacturer-defined capacity of the ODU.
[0086] If not all IDUs are on standby (i.e., serving ODUs n If one or more IDUs are not on standby), process 700 proceeds from step 712 to step 724, wherein for each ODU n The cost allocation circuit 530 obtains the average ODU in the sampling time period n The total frequency of the compressor ("AVG_ODU n _TOT_FREQ”), the compressor operating time of each compressor in ODUn, and the ODU n For example, the cost allocation circuit 530 can access this data in the VRF database 528. In some embodiments, the cost allocation circuit 530 obtains a series of ODUs in the sampling time period. n The compressor total frequency and run an average calculation to determine the average ODU for the time period n The total frequency of the compressor to obtain the average ODU n Overall compressor frequency.
[0087] At step 726, the ODUn compressor run time factor is defined as the sum of the compressor run times divided by the product of the calculated cycle time and the number of compressors in ODUn. That is, ODUn compressor run time factor = (sum of compressor run times) / (number of compressors in ODUn * calculated cycle time). In some embodiments, for example, the calculated cycle time is thirty minutes. At step 728, the ODUn actual capacity factor is defined as the average ODUn compressor total frequency divided by the product of the calculated cycle time and the number of compressors in ODUn. That is, ODUn actual capacity factor = AVG_ODUn_TOT_FREQ / (number of compressors in ODUn × calculated cycle time). At step 730, the ODUn consumption factor ("OdCF Factor") is calculated. ODUn ”) is defined as the ODUn compressor operating time factor multiplied by the ODUn actual capacity factor. That is, OdCF ODUn =(ODUn compressor operating time factor)*(ODUn actual capacity factor).
[0088] At step 732, the outdoor ODU n Power Proportional Index (“PPI outdoor_ODUn (PPI 室外_ODUn )”) is defined as the ODUn consumption factor divided by the sum of the ODU consumption factors of all ODUs in the outdoor power group. That is, PPI outdoor_ODUn =OdCF ODUn / ΣOdCF ODUk,对于功率组中的所有ODUk .
[0089] At step 734, PPI outdoor_ODUn Used to apportion kWh_outdoor_overall between the ODUs in the outdoor power group to obtain the consumption measurement value of each ODUn ("kWh_outdoor ODUn (kWh_outdoor ODUn )”). The cost sharing circuit 530 calculates kWh_outdoor ODUn =PPI outdoor_ODUn *kWh_outdoor_overall. The process 700 thus produces an accurate apportioned amount of power consumption for each ODU 504 in the VRF system 500.
[0090] Now refer to Figure 8 , a flowchart of a process 800 for allocating power consumption of an ODU among IDUs served by the ODU according to an exemplary embodiment is shown. The process 800 may be performed by Figure 5 The process 800 is performed by the cost allocation circuit 530 in communication with the VRF database 528 of the VRF management system 502. The process 800 is for allocating the consumption of an ODU (such as Figure 3A The challenge of the first metering configuration 300 is shown.
[0091] At step 802, the cost allocation circuit 530 obtains the power consumption of the ODU of interest, for example, by obtaining kWh_outdoor from step 706 of process 700, or obtaining kWh_outdoor_ODU from steps 718, 722, or 734 of process 700. n Let's start process 800.
[0092] At step 804, the cost allocation circuit 530 identifies all IDUs served by the ODU and inquires whether all IDUs are on standby. If all IDUs are on standby, then at step 806, the cost allocation circuit 530 counts the IDUs to determine the number of IDUs served by the ODU. In some embodiments, the cost allocation circuit 530 looks up the number of IDUs served by the ODU in the VRF database 528. At step 808, the power consumption of the ODU attributable to each IDU (“kWh_outdoor_IDU n (kWh_outdoor_IDU n )”) is calculated as kWh_outdoor_ODU n Divided by ODU n The number of IDUs served. That is, kWh_outdoor_IDU n =kWh_outdoor_ODU n / (number of IDUs).
[0093] If it is determined in step 804 that not all IDUs are on standby, process 800 proceeds to step 810. At step 810, for each IDU served by the ODUn, n The cost allocation circuit 530 obtains the thermo-on time (“THER_ON_IDU n ”), the compressor request frequency during the sampling period (“COMP_REQ_FREQ_IDU n ”) and IDU n For example, the cost sharing circuit 530 can search for these data in the VRF database 528. At step 812, the IDU n The thermo-on time factor is calculated to be equal to THER_ON_IDU n Divide by the duration of the sampling period.
[0094] At step 814, the cost allocation circuit 530 searches for the IDU based on the model number in the VRF database 528. n Capacity ("IDUn _cap(IDU n _capacity)"). IDUn_cap is for n The model is stored in the VRF database 528 and is used by the IDU n The manufacturer of the product includes the value in the product information table. At step 816, the average zone load ("AVG_ZN_LOAD_IDU n ”) is defined as COMP_REQ_FREQ_IDU in the sampling period n At step 820, the IDUn actual capacity factor is defined as AVG_ZN_LOAD_IDU n Multiply by IDU n _cap.
[0095] At step 822, IDU n Outdoor Consumption Factor (“OCF IDUn ”) is defined as IDUn thermo-on time factor multiplied by IDU n Actual capacity factor. At step 824, IDU n Outdoor Power Proportional Index (“PPI outdoor_IDUn (PPI 室外_IDUn )”) is defined as OCF IDUn Divided by the sum of the outdoor consumption factors of all IDUs in the indoor power group (i.e., all IDUs served by the ODU). That is, PPI outdoor_IDUn =OCF IDUn / ΣOCF IDUk,k对于由ODU服务的所有IDU .
[0096] At step 826, the IDU n Electricity consumption (“kWh_outdoor_IDU n ”) calculated as PPI outdoor_IDUn Multiply by the total power consumption attributed to the ODU (i.e., kWh_outdoor_ODU n ). That is, kWH_outdoor_IDU n =PPI outdoor_IDUn *kWh_outdoor_ODU n The process 800 thus apportions the power consumption of one ODU (eg, ODUn) among the IDUs served by the ODU.
[0097] Now refer to Fig. 9 The process 900 is used to allocate power consumption among multiple IDUs having indoor power consumption meters that share indoor meters. The process 900 thus solves Figure 4BThe fourth metering configuration 450. The process 900 can be performed by the cost allocation circuit 530 in communication with the VRF database 538 in the VRF management system 502.
[0098] At step 902, the cost allocation circuit 530 measures the cost of a plurality of IDUs 506 (eg, Figure 4B The indoor meter 510 of the indoor consumption of the indoor meter 456 obtains the power consumption measurement value ("kWh_indoor"). Figure 6 As described, all IDUs corresponding to the meter may be grouped in an indoor power group. According to various embodiments, the cost allocation circuit 530 looks up kWh_indoor in the VRF database 528 and / or receives kWh_indoor from the data collection circuit 526 .
[0099] At step 904, for each IDU in the indoor power group (eg, IDU n ), the cost sharing circuit 530 is based on the IDU in the VRF database 528 n Find the IDU model number n Capacity ("IDU n _cap(IDU n _Capacity)") and obtain the IDU n _Runtime("RT_IDU n ”). In some cases, RT_IDU n Corresponding to IDU n The duration that the fan in RT_IDU is powered on and spinning during the calculation cycle time. n It can be collected by the data collection circuit 526 and stored in the VRF database 528.
[0100] At step 906, the IDU n The run time factor is defined as RT_IDU n Divide by the duration of the calculation cycle time. That is, IDU n The running time factor is the ratio of IDU running to the total computing cycle time. n Capacity factor is defined as equal to IDU n _cap. At step 910, IDU n Indoor Consumption Factor (ICF IDUn ”) is defined as IDU n Run time factor multiplied by IDU n Capacity factor.
[0101] At step 912, the IDU indoor power ratio index (“PPI indoor_IDUn (PPI 室内_IDUn)”) is defined as equal to ICF IDUn Divide by the sum of the indoor consumption factors of all IDUs in the indoor power group. That is, PPI indoor_IDUn =ICF IDUn / ΣICF IDUk,k对于由同一室内仪表测量的所有IDU .
[0102] At step 914, the cost allocation circuit 530 determines the indoor power consumption attributable to each IDU (“kWh_indoor_IDU n (kWh_Indoor_IDU n )”). More specifically, the cost allocation circuit 530 calculates kWh_indoor_IDU n =PPI indoor_IDUn *kWh_indoor. Process 900 thus generates the indoor power consumption attributable to each IDU in the indoor power group.
[0103] Now refer to Fig.10 , shows a process 1000 for determining the electricity costs of each tenant according to an exemplary embodiment. Process 1000 can be performed by VRF management system 502 to solve the problem of FIG. 3A to FIG. 4B Any combination of the described metering configurations. Process 1000 may be performed once per billing cycle (eg, monthly), upon request by the user, or at some other frequency.
[0104] At step 1002, the cost allocation circuit 530 obtains the kWh_outdoor_IDU for all n from the end of the process 800 (ie, from step 808 and / or step 826). n At step 1004, the cost allocation circuit 530 obtains the kWh_indoor_IDU for all n from the end of the process 900 (ie, from step 914). n .
[0105] At step 1006, the total IDU n Power consumption (“kWh_IDU n ”) is defined as kWh_IDU n =kWh_outdoor_IDU n +kWh_indoor_IDU n That is, the outdoor consumption attributable to each IDU is added to the indoor consumption attributable to the IDU to obtain the total power consumption of the IDU.
[0106] At step 1008, the cost allocation circuit 530 obtains a rate per unit of electricity (e.g., a few dollars per kWh). The rate can be rated in any currency per unit of electricity consumption (e.g., US dollars, euros, rupees). The rates can be stored in the VRF database 528, such as provided by the power utility company. At step 1010, the cost allocation circuit 530 calculates the cost of each IDU during the sampling period. n Charge (“Charge_IDU n (Fee_IDU n )”) is defined as the rate multiplied by kWh_IDU n .
[0107] At step 1012, the cost allocation circuit 530 calculates the charge for each tenant as Charge_IDU of all IDUs allocated to the tenant. k The cost allocation may access the list of tenants and IDUs in the VRF database 528 to determine which IDUs correspond to which tenants. The process 1000 thus generates a monetary amount that can be charged to the tenant that accurately reflects the tenant's contribution to the power consumption of the VRF system 500. In some embodiments, the input / output circuit 532 generates bills, sends bills to tenants, receives payment information from tenants, and otherwise facilitates the tenants to pay the calculated fees.
[0108] Configuration of the Exemplary Embodiment
[0109] The construction and arrangement of the system and method as shown in each exemplary embodiment are only illustrative. Although only several embodiments are described in detail in the present disclosure, many modifications are possible (for example, the size, dimensions, structure, shape and ratio of various elements, the value of parameter, installation arrangement, the use of material, color, orientation, etc.). For example, the position of the element can be reversed or otherwise changed, and the property or quantity or position of the discrete element can be changed or changed. Therefore, all such modifications are intended to be included in the scope of the present disclosure. The order or sequence of any process or method step can be changed or reordered according to alternative embodiments. Without departing from the scope of the present disclosure, other substitutions, modifications, changes, and omissions can be made in the design, operating conditions and arrangement of the exemplary embodiments.
[0110] As used herein, the term "circuit" may include hardware structured to perform the functions described herein. In some embodiments, each corresponding "circuit" may include a machine-readable medium for configuring hardware to perform the functions described herein. The circuit may be implemented as one or more circuit system components, including but not limited to processing circuit systems, network interfaces, peripheral devices, input devices, output devices, sensors, etc. In some embodiments, the form of the circuit may be one or more analog circuits, electronic circuits (e.g., integrated circuits (ICs), discrete circuits, system-on-chip (SOC) circuits, etc.), telecommunications circuits, hybrid circuits, and any other type of "circuit". In some embodiments, the form of the circuit may be one or more analog circuits, electronic circuits (e.g., integrated circuits (ICs), discrete circuits, system-on-chip (SOC) circuits, etc.), telecommunications circuits, hybrid circuits, and any other type of "circuit". In this regard, the "circuit" may include any type of component for implementing or facilitating the implementation of the operations described herein. For example, the circuit described herein may include one or more transistors, logic gates (e.g., NAND, AND, NOR, OR, XOR, NOT, XNOR, etc.), resistors, multiplexers, registers, capacitors, inductors, diodes, wiring, etc.).
[0111] "Circuit" may also include one or more processors that are communicatively coupled to one or more memories or memory devices. In this regard, the one or more processors may execute instructions stored in the memory, or may execute instructions that the one or more processors are otherwise accessible to. In some embodiments, the one or more processors may be implemented in various ways. The one or more processors may be constructed in a manner sufficient to at least perform the operations described herein. In some embodiments, the one or more processors may be shared by multiple circuits (e.g., circuit A and circuit B may include or otherwise share the same processor, and in some example embodiments, the processor may execute instructions stored or otherwise accessed via different areas of the memory). Alternatively or additionally, the one or more processors may be configured to perform or otherwise perform certain operations independently of one or more coprocessors. In other example embodiments, two or more processors may be coupled via a bus to implement independent, parallel, pipeline, or multithreaded instruction execution. Each processor may be implemented as one or more general-purpose processors, application-specific integrated circuits (ASICs), field programmable gate arrays (FPGAs), digital signal processors (DSPs), or other suitable electronic data processing components configured to perform instructions provided by a memory. One or more processors may take the form of a single-core processor, a multi-core processor (e.g., a dual-core processor, a triple-core processor, a quad-core processor, etc.), a microprocessor, etc. In some embodiments, one or more processors may be external to the device, for example, one or more processors may be a remote processor (e.g., a cloud-based processor). Alternatively or additionally, the one or more processors may be internal and / or local to the device. In this regard, a given circuit or its components may be arranged locally (e.g., as part of a local server, a local computing system, etc.) or remotely (e.g., as part of a remote server such as a cloud-based server). To this end, a "circuit" as described herein may include components distributed across one or more locations. The present disclosure contemplates methods, systems, and program products on any machine-readable medium for completing various operations. The embodiments of the present disclosure may be implemented using an existing computer processor or by a dedicated computer processor in combination with an appropriate system for this purpose or another purpose or by a hard-wired system. Embodiments within the scope of the present disclosure include program products, which include machine-readable media for carrying or having machine-executable instructions or data structures stored thereon. Such a machine-readable medium may be any available medium that can be accessed by a general-purpose or special-purpose computer or other machine with a processor.For example, such machine-readable media may include RAM, ROM, EPROM, EEPROM, CD-ROM or other optical disk storage, magnetic disk storage or other magnetic storage devices, or any other medium that can be used to carry or store the desired program code in the form of machine-executable instructions or data structures and can be accessed by a general-purpose or special-purpose computer or other machine with a processor. Combinations of the above are also included within the scope of machine-readable media. Machine-executable instructions include, for example, instructions and data that cause a general-purpose computer, a special-purpose computer, or a special-purpose processing machine to perform a function or a group of functions.
[0112] Although the accompanying drawings show a specific order of method steps, the order of steps may be different from the described order. Two or more steps may also be performed simultaneously or partially simultaneously. Such variations will depend on the selected software and hardware systems and the designer's choice. All such variations are within the scope of the present disclosure. Similarly, software implementation methods may be implemented with standard programming techniques having rule-based logic and other logic for implementing various connection steps, calculation steps, processing steps, comparison steps, and decision steps.
Claims
1. A variable refrigerant flow system for a building, the variable refrigerant flow system include: a plurality of indoor units of the building, the plurality of indoor units configured to generate an activation request; a first outdoor unit configured to receive the activation request and to provide refrigerant to the plurality of indoor units in response to the activation request; an outdoor meter configured to provide an outdoor unit power consumption measurement; as well as A variable refrigerant flow management system, the variable refrigerant flow management system being configured to: receiving the outdoor unit power consumption measurement and activation data indicative of the activation request; and apportioning an outdoor share of the outdoor power consumption measurement value to each of the plurality of indoor units based on the activation data, wherein the first outdoor unit includes a compressor, and the activation data includes a compressor request frequency of each of the plurality of indoor units; and The variable refrigerant flow management system is configured to apportion each outdoor share of the outdoor power consumption by calculating an outdoor consumption factor of the indoor unit based on a compressor request frequency corresponding to each indoor unit.
2. The variable refrigerant flow system according to claim 1, in, The variable refrigerant flow management system is further configured to apportion each outdoor share of the outdoor power consumption by: calculating a power proportion index of the indoor unit by dividing an outdoor consumption factor corresponding to each indoor unit by a sum of the outdoor consumption factors of each of the plurality of indoor units; as well as The power proportionality index of each indoor unit is multiplied by the outdoor power consumption measurement.
3. The variable refrigerant flow system according to claim 1, further comprising: include: one or more additional outdoor units, the one or more additional outdoor units configured to receive an activation request; wherein the outdoor meter measures power consumption of the first outdoor unit and the one or more additional outdoor units to generate the outdoor unit consumption measurements; and The variable refrigerant flow management system is further configured to allocate a share of the outdoor unit consumption measurement value to the first outdoor unit based on the activation request.
4. The variable refrigerant flow system according to claim 3, in, The variable refrigerant flow management system is further configured to apportion a share of the outdoor unit consumption measurement value to the first outdoor unit based on the activation request by: determining a compressor operation time of the first outdoor unit; determining a compressor total frequency based at least on a compressor request frequency in the activation request received by the first outdoor unit; calculating a consumption factor of the first outdoor unit based on at least an average total compressor frequency and an operating time of the compressor; calculating a power proportional index of the first outdoor unit by dividing the consumption factor of the first outdoor unit by a sum of the consumption factors of the one or more additional outdoor units and the consumption factor of the first outdoor unit; as well as The outdoor unit consumption measurement is multiplied by the power proportionality index.
5. The variable refrigerant flow system according to claim 1, further comprising: include: an indoor meter configured to measure power consumption of the plurality of indoor units to generate indoor power consumption measurements; and Wherein, the variable refrigerant flow management system is further configured to apportion the indoor power consumption measurements among the plurality of indoor units.
6. A method for operating a variable refrigerant flow system for a building, include: generating activation requests by a plurality of indoor units of the building; receiving the activation request by a first outdoor unit, wherein the first outdoor unit includes a compressor; providing, by the first outdoor unit, refrigerant to the plurality of indoor units in response to the activation request; obtaining an outdoor unit power consumption measurement and activation data indicative of the activation request, wherein the activation data includes a compressor request frequency for each of the plurality of indoor units; as well as An outdoor share of the outdoor power consumption measurement value is apportioned to each of the plurality of indoor units based on the activation data by calculating an outdoor consumption factor based on the compressor request frequency.
7. The method according to claim 6, in, Apportioning an outdoor share of the outdoor power consumption measurement to each of the plurality of indoor units based at least on the activation data comprises: calculating a power proportion index of the indoor unit by dividing an outdoor consumption factor corresponding to each indoor unit by a sum of the outdoor consumption factors of each of the plurality of indoor units; and The power proportionality index of each indoor unit is multiplied by the outdoor power consumption measurement.
8. The method according to claim 6, in, Obtaining the outdoor unit power consumption measurement includes: measuring power consumption of the first outdoor unit and one or more additional outdoor units to generate a total outdoor unit consumption measurement; and The outdoor unit consumption measurement as a portion of the total outdoor unit consumption measurement is apportioned to the first outdoor unit based on the activation data.
9. The method according to claim 8, in, Allocating the outdoor unit consumption measurement value to the first outdoor unit includes: determining a compressor operation time of the first outdoor unit; determining a compressor total frequency based on a compressor request frequency in the activation request received by the first outdoor unit; calculating a consumption factor of the first outdoor unit based on at least the compressor total frequency and the compressor operation time; calculating a power proportional index of the first outdoor unit by dividing the consumption factor of the first outdoor unit by a sum of the consumption factors of the one or more additional outdoor units and the consumption factor of the first outdoor unit; and The total outdoor unit consumption measurement is multiplied by the power proportionality index.
10. The method of claim 6, further comprising: include: obtaining indoor power consumption measurements of the plurality of indoor units; as well as An indoor share of the indoor power consumption measurement value is apportioned among the plurality of indoor units.
11. The method according to claim 10, in, Attributing each indoor share of the indoor power consumption measurement value among the plurality of indoor units includes: calculating an indoor consumption factor of each indoor unit based at least on an operating time and a capacity corresponding to the indoor unit; calculating an indoor power ratio index of the indoor unit by dividing an indoor consumption factor corresponding to each indoor unit by a sum of indoor consumption factors of each of the plurality of indoor units; and The power proportionality index of each indoor unit is multiplied by the indoor power consumption measurement.
12. The method of claim 10, further comprising: include: determining a total indoor unit consumption of each indoor unit by adding an indoor share corresponding to the indoor unit to an outdoor share corresponding to the indoor unit; as well as The indoor unit total cost of each indoor unit is generated by multiplying the indoor unit total consumption corresponding to the indoor unit by the electricity rate.
13. The method of claim 12, further comprising: include: An electricity bill is generated for each of a plurality of tenants, each tenant corresponding to one or more of the plurality of indoor units.
14. A system, include: an outdoor meter configured to provide a measurement of outdoor power consumption of an outdoor unit of a variable refrigerant flow system, the outdoor unit including a compressor and configured to provide refrigerant to a plurality of indoor units in response to activation requests from the plurality of indoor units; as well as A management system comprising a processing circuit having a memory and a processor, wherein the memory is configured to store instructions executable by the processor and causing the processing circuit to: receiving the outdoor power consumption measurement from the outdoor meter; receiving activation data related to the activation request, the activation data comprising a compressor request frequency; and Based on the activation data, the outdoor power consumption measurement value is apportioned among the plurality of indoor units by determining outdoor consumption factors of the plurality of indoor units based on the compressor request frequency.
15. The system of claim 14, in, The processing circuit is caused to apportion the outdoor power consumption measurements among the plurality of indoor units based on the activation data by: determining a power proportion index for each of the plurality of indoor units based at least on the outdoor consumption factor; as well as Each power proportionality index is multiplied by the outdoor power consumption measurement.
16. The system of claim 14, further comprising: include: an indoor meter configured to provide indoor power consumption measurements of the plurality of indoor units, the indoor units further configured to provide runtime data; and wherein the processing circuit is further caused to: receiving the indoor power consumption measurement; receiving operating time data related to operating times of the plurality of indoor units; looking up the capacity of each of the plurality of indoor units in a database; and The indoor power consumption measurements are apportioned among the plurality of indoor units based at least on the operating time data and the capacities.
17. The system of claim 14, in, The plurality of indoor units are operable to adjust temperature in respective building zones corresponding to respective tenants; and wherein the processing circuitry is further caused to generate an electricity bill for the respective tenant based on the apportioned outdoor electricity consumption measurements.
