A simulation platform and method suitable for electromagnetic transient model of wind farm
By using signal-connected wind turbine and transformer modules in the electromagnetic transient model of a wind farm, combined with subsystems S1 and S2, independent solution and code reuse of the electromagnetic transient model of the wind farm were achieved, solving the problems of insufficient model loading and slow simulation speed, and improving simulation efficiency.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD
- Filing Date
- 2020-08-17
- Publication Date
- 2026-07-21
AI Technical Summary
The electromagnetic transient model of wind farm is complex, which leads to problems such as model loading failure, insufficient memory and slow simulation speed. Existing equivalent methods have the problem of reduced model accuracy.
By adopting the signal connection method of wind turbine module and transformer module, combined with subsystems S1 and S2, the physical connection is transformed into a signal connection, realizing independent solution of model and code reuse, and using MATLAB/Simulink model referencing technology to accelerate simulation.
It reduces the complexity of model solving, improves simulation speed, solves the memory shortage problem, and achieves the improvement of simulation speed without affecting model accuracy.
Smart Images

Figure CN112163313B_ABST