Radio station, radio terminal, and method for terminal measurement

By controlling terminal measurements on unlicensed frequencies with precise timing and period signaling, the method addresses inaccuracies in determining radio terminal suitability, enhancing system performance through improved throughput and capacity.

CN112492639BActive Publication Date: 2024-12-06NEC CORP
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202011127281.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2014-09-12
Filing Date
2015-04-17
Publication Date
2024-12-06
Estimated Expiration
2035-04-17

AI Technical Summary

Technical Problem

Existing methods for determining whether a radio terminal can communicate on an unlicensed frequency may inaccurately assess the suitability of the frequency due to shared usage, leading to suboptimal performance improvements in throughput and cell capacity.

Method used

A method and device that involve controlling terminal measurements on unlicensed frequencies through precise timing and period signaling from a radio station to a radio terminal, allowing accurate determination of communication suitability on unlicensed frequencies.

Benefits of technology

Enables the radio station to accurately assess whether a radio terminal can communicate on unlicensed frequencies, thereby improving system performance by enhancing throughput and capacity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112492639B_ABST
    Figure CN112492639B_ABST
Patent Text Reader

Abstract

The present invention relates to a radio station, a radio terminal, and a method for terminal measurement. A radio station (1) transmits control signaling (S102) associated with at least one of a measurement timing and a measurement period of terminal measurement on an unlicensed frequency to a radio terminal (3) on a licensed frequency (cell #1), and in response to the control signaling (S102), receives (S105) a result of the terminal measurement performed according to at least one of the measurement timing and the measurement period from the radio terminal (3) on the licensed frequency. Due to this configuration, for example, the present invention can help obtain useful information for determining whether to allow a radio terminal to communicate on the unlicensed frequency at the radio station.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] This application is a divisional application of an application which entered the Chinese national phase on March 13, 2017, with PCT application number PCT / JP2015 / 002119, international application date April 17, 2015, Chinese application number 201580049238.6, and invention name “Radio station, radio terminal, and method for terminal measurement”. Technical Field

[0002] The present application relates to a radio communication system in which a radio station performs communication with a radio terminal at an unlicensed frequency or a shared frequency. Background Art

[0003] In order to improve the degradation of communication quality due to the recent dramatic growth of mobile services and to provide faster high-speed communications, 3GPP Long Term Evolution (LTE) has specified a carrier aggregation (CA) function that enables a radio terminal (user equipment (UE)) to communicate with a radio base station (eNode B (eNB)) by using multiple cells. Note that the cells that the UE can use in CA are limited to multiple cells of a single eNB (i.e., multiple cells operated or managed by a single eNB). The cells used by the UE in CA are classified into a primary cell (PCell) that has been used as a serving cell when CA is started and a secondary cell (SCell) that is used additionally or in a dependent manner. In the PCell, when a radio connection is (re) established (radio resource control (RRC) connection establishment, RRC connection reestablishment), non-access stratum (NAS) mobility information and security information (security input) are transmitted (see Section 7.5 of Non-Patent Document 1).

[0004] From a functional point of view, the introduction of CA has achieved high-speed communication. However, in actual use, it is considered that it will be difficult to solve the problem of further increase in mobile services in the future due to the limitation (shortage) of the frequency allocated to each operator. Therefore, in the 3GPP standardization process, discussions on unlicensed LTE that uses unlicensed frequencies (unlicensed bands, unlicensed spectrum) to perform LTE have begun (non-patent documents 2 and 3). Unlicensed LTE is also called LTE-U or U-LTE, and is referred to as LTE-U hereinafter.

[0005] As methods for implementing LTE-U, two methods are considered, namely: License Assisted Access (LAA), in which the eNB communicates with the UE on an unlicensed frequency associated with the licensed frequency (e.g., as an SCell of CA); and, Standalone (SA), in which the eNB performs communication with the UE only on the unlicensed frequency. An unlicensed frequency is, for example, the 5 GHz band, which is also used by other systems such as radar systems and wireless LANs (WLAN or also known as WiFi). Therefore, with respect to the SA scheme that performs communication only on unlicensed frequencies, it will be difficult to implement the complex control prescribed for LTE, so the more feasible LAA scheme (also known as LA-LTE) has been mainly discussed. In the following description, LTE-U through the LAA scheme will be mainly explained, in which CA using licensed and unlicensed frequencies is performed. A licensed frequency refers to a dedicated frequency allocated to a specific operator. An unlicensed frequency refers to a frequency that is not allocated to a specific operator or a shared frequency allocated to multiple operators. In the latter case, the frequency can be referred to as a licensed shared frequency, rather than an unlicensed frequency, and communication using the frequency is also referred to as licensed shared access (LSA). In the following description, frequencies other than licensed frequencies licensed only to any particular operator are collectively referred to as unlicensed frequencies.

[0006] LTE-U through LAA solution is basically based on Fig.15 The sequence shown is performed. In this example, it is assumed that the eNB performs data transmission (or reception) with UE#1 in cell #1 which is a licensed frequency and cell #2 which is an unlicensed frequency. First, a radio connection is established between the eNB and UE#1 in cell #1 (RRC connection establishment, S901), and a bearer is established between the core network (Evolved Packet Core: EPC) and UE#1. That is, cell #1 becomes the PCell of UE#1. When there is downlink (DL) user data (also called user plane (UP) data) to be transmitted to UE#1, or when there is uplink (UL) user data that UE#1 wants to transmit, the eNB transmits or receives the user data in cell #1 (DL (or UL) UP data transmission, S902).

[0007] Next, when the eNB determines at a certain point that it is valid for UE#1 to transmit and receive user data in cell #2 (triggering LTE-U of UE#1, S903), the eNB transmits control information about the radio resource configuration for cell #2 to UE#1 in cell #1 (radio resource configuration of cell #2, S904). The control information corresponds to the RadioResourceConfigDedicated information element (IE) and the RadioResourceConfigCommon IE (non-patent document 4) transmitted in the RRC connection reconfiguration message of LTE. As a result, cell #2 thus becomes the SCell of UE#1. When transmitting user data in the downlink, the eNB performs sensing in cell #2 to determine whether cell #2 is available (perform channel sensing, S905). When it is determined that cell #2 is available, the eNB transmits user data to UE#1 or receives user data from UE#1 (DL (or UL) UP data transmission, S906). As described above, by using unlicensed frequencies, it is expected that the throughput will be further improved or the cell capacity will be increased.

[0008] The above-mentioned sensing is called listen before talk (LBT) (non-patent document 2), which determines whether communication of another operator's LTE-U or another radio system (e.g., WLAN) is performed near the target unlicensed frequency. The above-mentioned sensing corresponds to, for example, a channel availability check (CAC) for a radar system and a clear channel assessment (CCA) performed by a WLAN access point (AP) (patent document 1).

[0009] Citation List

[0010] Non-patent literature

[0011] [Non-Patent Document 1] 3GPP TS 36.300 V12.2.0 (2014-06), “3rd Generation Partnership Project; Technical Specification Organization Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRAN); Global Description; Stage 2 (Release 12)”, June 2014

[0012] [Non-Patent Document 2] 3GPP RP-131635, “Introduction of LTE in Unlicensed Spectrum”, Qualcomm, Ericsson, December 2013

[0013] [Non-Patent Document 3] 3GPP Workshop on LTE in Unlicensed Spectrum, “LTE in Unlicensed Spectrum: European Regulations and Coexistence Considerations”, Nokia, June 2014

[0014] [Non-Patent Document 4] 3GPP TS 36.331 V12.2.0 (2014-06), “3rd Generation Partnership Project; Technical Specification Organization Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Radio Resource Control (E-UTRA); Protocol Specification (Release 12)”, June 2014

[0015] [Non-Patent Document 5] 3GPP TR 36.842 V12.0.0 (2013-12) “3rd Generation Partnership Project; Technical Specification Organization Radio Access Network; Study on Small Cell Improvements for E-UTRA and E-UTRAN; Higher Layer Aspects (Release 12)”, December 2013

[0016] Patent Literature

[0017] [Patent Document 1] U.S. Patent No. 7,443,821 Summary of the invention

[0018] Technical issues

[0019] In the above background technology, it is assumed that the base station (eNB) determines whether to allow the UE to perform communication in a cell (cell #2) on an unlicensed frequency based on the terminal measurement report of the UE (the measurement report of the UE). For example, the eNB transmits an instruction for sending a terminal measurement report to the UE in the cell (cell #1) on the licensed frequency, and the UE performs terminal measurement in the cell (cell #2, etc.) on the unlicensed frequency, and reports the result of the terminal measurement through cell #1. The eNB determines whether it is appropriate to transmit user data to the UE in cell #2 based on the result of the terminal measurement in cell #2. The eNB may, for example, determine that the received quality (RSRP or RSRQ) of the reference signal (RS) in the cell (cell #2, etc.) on the unlicensed frequency is equal to or greater than a predetermined value. When the eNB determines that cell #2 is suitable for user data transmission, the eNB transmits user data to the UE in cell #2 (e.g., UE #1 in the background technology).

[0020] However, if the terminal measurement report of normal LTE is used, there is a possibility that the appropriate UE is sometimes not allowed to perform communication on the unlicensed frequency (in the cell). This is because, since the unlicensed frequency is shared with other communication systems as described above, the reference signal is not always transmitted as in the cell of LTE. For example, the UE may also calculate the value of the terminal measurement report by averaging the reception quality during the transmission of the reference signal from the other radio system and the reception quality during the transmission of the reference signal (in this case, the resulting value becomes an invalid value). Then, the reception quality on the unlicensed frequency indicated in the terminal measurement report may be calculated to be lower than the threshold level defined as determining suitability for performing communication on the unlicensed frequency (in the cell). In this case, even when the unlicensed frequency is determined to be available based on the above-mentioned sensing of the eNB ( Fig.15 In S905 in the flow chart, unless appropriate UEs are allowed to use the unlicensed frequencies, it is not possible to provide sufficient improvement in performance (eg, improvement in throughput or increase in cell capacity) by using the unlicensed frequencies.

[0021] Therefore, the purpose of the embodiments disclosed in this article is to provide a device, method and program that help obtain information useful to a radio station (e.g., eNB) to accurately determine whether a radio terminal (e.g., UE) is allowed to communicate on an unlicensed frequency (in a cell).

[0022] Solutions to the Problem

[0023] In a first aspect, a method performed in a radio station comprises: (a) communicating with a radio terminal on a licensed frequency; (b) transmitting control signaling associated with at least one of a measurement timing and a measurement period of terminal measurements on an unlicensed frequency to the radio terminal on the licensed frequency; and (c) in response to the control signaling, receiving results of the terminal measurements performed according to at least one of the measurement timing and the measurement period from the radio terminal on the licensed frequency.

[0024] In a second aspect, a radio station includes a radio communication unit (transceiver) and a control unit (controller). The radio communication unit is configured to communicate on a licensed frequency and an unlicensed frequency. The control unit is configured to: transmit control signaling associated with at least one of a measurement timing and a measurement period of a terminal measurement on an unlicensed frequency to a radio terminal on the licensed frequency; and in response to the control signaling, receive a result of the terminal measurement performed according to at least one of the measurement timing and the measurement period from the radio terminal on the licensed frequency.

[0025] In a third aspect, a method performed in a radio terminal includes: (a) communicating with a radio station on a licensed frequency; (b) receiving control signaling associated with at least one of a measurement timing and a measurement period of terminal measurements on an unlicensed frequency from the radio station on the licensed frequency; (c) in response to the control signaling, performing the terminal measurements according to at least one of the measurement timing and the measurement period, and (d) transmitting the results of the terminal measurements to the radio station on the licensed frequency.

[0026] In a fourth aspect, a radio terminal includes a radio communication unit (transceiver) and a control unit (controller). The radio communication unit is configured to communicate with a radio station on a licensed frequency and an unlicensed frequency. The control unit is configured to: receive control signaling associated with at least one of a measurement timing and a measurement period of a terminal measurement on an unlicensed frequency from a radio station on a licensed frequency; perform the terminal measurement according to at least one of the measurement timing and the measurement period in response to the control signaling; and transmit the result of the terminal measurement to the radio station on the licensed frequency.

[0027] In a fifth aspect, a program comprises instructions (software codes) which, when loaded into a computer, cause the computer to execute the method according to the aforementioned first aspect.

[0028] In a sixth aspect, a program includes instructions (software codes) which, when loaded into a computer, cause the computer to execute the method according to the aforementioned third aspect.

[0029] In a seventh aspect, a method for terminal measurement comprises: (a) transmitting control signaling associated with at least one of a measurement timing and a measurement period of terminal measurement on an unlicensed frequency from a radio station to a radio terminal on a licensed frequency; (b) in response to the control signaling, the radio terminal performs the terminal measurement according to at least one of the measurement timing and the measurement period; and (c) transmitting the result of the terminal measurement from the radio terminal to the radio station on the licensed frequency.

[0030] Advantageous Effects of the Invention

[0031] According to the above aspects, an apparatus, method, and program can be provided that facilitate acquisition of information useful for a radio station (eg, eNB) to determine whether a radio terminal (eg, UE) is allowed to perform communication (in a cell) on an unlicensed frequency. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1A is a diagram showing a configuration example of a radio communication system and another radio system according to several embodiments;

[0033] Figure 1B is a diagram showing a configuration example of a radio communication system and another radio system according to several embodiments;

[0034] Figure 2 is a diagram showing a configuration example of a radio communication system and another radio system according to several embodiments;

[0035] Figure 3 is a sequence diagram showing one example of the operations of the radio base station and the radio terminal according to the first embodiment;

[0036] Figure 4 is a sequence diagram showing one example of the operation of the radio base station and the radio terminal according to the first embodiment (Specific Example 1);

[0037] Figure 5 is a diagram showing one example of terminal measurement of the radio terminal according to the first embodiment (specific example 2);

[0038] Figure 6 is a diagram showing one example of terminal measurement of the radio terminal according to the first embodiment (specific example 3);

[0039] Figure 7 is a diagram showing one example of terminal measurement of the radio terminal according to the first embodiment (specific example 4);

[0040] Figure 8 is a sequence diagram showing one example of the operation of the radio base station and the radio terminal according to the second embodiment;

[0041] Fig. 9 is a diagram showing a configuration example of a radio communication system and another radio system according to several embodiments;

[0042] Fig.10 is a sequence diagram showing one example of the operations of two radio base stations and a radio terminal according to the third embodiment;

[0043] Fig.11 is a sequence diagram showing an operation example of two radio base stations (MeNB and SeNB) according to the third embodiment (Specific Example 5);

[0044] Fig.12 is a sequence diagram showing an operation example of two radio base stations (MeNB and SeNB) according to the third embodiment (Specific Example 6);

[0045] Fig.13 is a block diagram showing a configuration example of a radio base station according to several embodiments;

[0046] Fig.14is a block diagram showing a configuration example of a radio terminal according to several embodiments; and

[0047] Fig.15 : is a timing chart showing an example of the operation of a radio base station and a radio terminal in LTE-U. DETAILED DESCRIPTION

[0048] Specific embodiments are explained in detail below with reference to the accompanying drawings. In the accompanying drawings, the same or corresponding elements are indicated by the same reference numerals, and for the sake of clarity of explanation, repeated description will be avoided when necessary.

[0049] The embodiments described below are mainly explained using a specific example of an Evolved Packet System (EPS) including LTE and System Architecture Evolution (SAE). However, these embodiments are not limited to application to EPS, and can also be applied to other mobile communication networks or systems, such as 3GPP Universal Mobile Telecommunications System (UMTS), 3GPP2 CDMA2000 system (1xRTT, HRPD (High Rate Packet Data)), Global System for Mobile Communications (GSM (registered trademark)) / General Packet Radio Service (GPRS) system and WiMAX system.

[0050] First embodiment

[0051] First, some examples of unlicensed LTE using unlicensed frequencies (unlicensed bands, unlicensed spectrum) according to multiple embodiments including the present embodiment will be described. Unlicensed LTE is also referred to as LTE-U or U-LTE, and is referred to as LTE-U hereinafter. Unlicensed frequencies include frequencies used for, for example, radar systems and wireless LANs (WLAN or also referred to as WiFi), and include frequencies other than licensed frequencies that are only allocated to any particular operator (i.e., service provider). Unlicensed frequencies are, for example, but not limited to, the 5 GHz band. In addition, the multiple embodiments described below can also be applied to shared frequencies (shared bands, shared spectrum) that are commonly allocated to multiple operators. In the following description, frequencies other than licensed frequencies are collectively referred to as unlicensed frequencies.

[0052] Figure 1A , Figure 1B and Figure 2 1 and 2 are diagrams each showing a configuration example of a radio communication system of LTE-U according to a plurality of embodiments including the present embodiment and another system. Figure 1AIn the example shown, the radio communication system includes a radio base station of LTE (eNB) 11 and a radio terminal (UE) 3. The eNB 11 and the UE 3 are configured to perform communication according to normal LTE on a licensed frequency (F1) and to perform communication according to LTE-U on an unlicensed frequency (F2). On the other hand, the unlicensed frequency (F2) is also used for communication between a wireless LAN access point (WLAN AP) 4 and a wireless LAN terminal (WLAN terminal) 5. In addition to Figure 1A In addition to the examples shown, Figure 1B In the example shown, the LTE eNB 11 manages a remote base station 12 (RRH or RRE) and performs communications according to LTE-U on an unlicensed frequency (F2) using the remote base station 12.

[0053] exist Figure 1A As shown in Figure 1B The configurations shown in can coexist on the same system. In addition, Figure 1A and 1B Only a part of the radio communication system considered in this example is shown. In practice, there are multiple eNBs and their RRH / RREs and multiple UEs around the eNB 11, RRH / RRE 12, and UE 3, and multiple cells on the licensed frequency are managed by these eNBs and RRH / RREs. In addition, there may be multiple WLAN APs and multiple WLAN terminals around the eNB 11, RRH / RRE 12, and UE 3. In the following description, the term "radio base station 1" or "LTE-U eNB 1" is used to indicate any eNB having the function of LTE-U. That is, the radio base station 1 or LTE-U eNB 1 corresponds to Figure 1A The configuration shown in FIG. 1 is for an eNB 11 and corresponds to the configuration shown in FIG. Figure 1B For ease of illustration, only the configuration shown in FIG. Figure 1B The node to which the RRH / RRE 12 in the shown configuration corresponds may be referred to as a radio base station 1 or LTE-U eNB 1 .

[0054] Figure 2It is a configuration example of a radio communication system of LTE-U and another radio communication system when paying special attention to unlicensed frequencies. There is a radio base station (LTE-U eNB-A) 1A having the function of LTE-U of one operator (service provider) A and a radio terminal (UE for operator A; UE-A) 3A capable of connecting to the network of operator A. There is also a radio base station (LTE-U eNB-B) 1B having the function of LTE-U of another operator (service provider) B and a radio terminal (UE for operator B; UE-B) 3A capable of connecting to the network of operator B. Each of LTE-U eNB 1A and 1B corresponds to, for example Figure 1A and Figure 1B The eNB 11 and RRH / RRE 12 in the LTE-U are also referred to as LTE-U AP, which indicates an access point of LTE-U. Figure 1A and 1B , there are WLAN AP 4 and WLAN terminal 5 around LTE-U eNB 1A and 1B and UE 3A and 3B.

[0055] In the above description and the following description, it is assumed that LTE-U is implemented using LAA (also known as LA-LTE). As described above, in LAA, the radio base station (LTE-U eNB) 1 and the radio terminal (UE) 3 perform carrier aggregation (CA) of cells on licensed frequencies and cells on unlicensed frequencies, use the cells on licensed frequencies as primary cells (PCell), and use the cells on unlicensed frequencies as secondary cells (SCell). As described above, LTE-U can be performed using shared frequencies (shared frequency bands, shared spectrum) allocated to multiple operators (service providers) instead of using unlicensed frequencies. In this case, LTE-U can be implemented by the above-mentioned LAA or a scheme similar to LAA. Alternatively, LTE-U eNB 1 and UE 3 can perform CA using multiple shared frequencies (for example, two frequencies F3 and F4), and perform normal LTE in the PCell on one of the two shared frequencies (F3), and perform LTE-U in the SCell on the other shared frequency (F4). As described above, LTE-U using shared frequencies is specifically referred to as licensed shared access (LSA). In addition, the LTE-U eNB 1 and the UE 3 can perform CA using shared frequencies allocated to multiple operators (e.g., F3) and narrow unlicensed frequencies not allocated to any operator (e.g., F2 (e.g., 5 GHz band)), and perform normal LTE in the PCell on the shared frequency (F3) and perform LTE-U in the SCell on the narrow unlicensed frequency (F2).

[0056] In addition, in multiple embodiments including the present embodiment, it is assumed that the communication on the unlicensed frequency (or shared frequency) performed in LTE-U is basically downlink data transmission from the radio base station 1 to the radio terminal 3, in order to simplify the explanation. However, it goes without saying that the communication on the unlicensed frequency (or shared frequency) according to LTE-U can also be applied to uplink data transmission from the radio terminal 3 to the radio base station 1. In addition, when communication between the base station 1 and the radio terminal 3 on the unlicensed frequency can be performed only in the downlink, in the LAA using the unlicensed frequency as the secondary cell (SCell), the unlicensed frequency is basically not used as a separate cell, and is used only as a downlink auxiliary carrier (secondary component carrier: SCC). However, in multiple embodiments including the present embodiment, the explanation will be basically given regardless of whether the unlicensed frequency is used as a separate cell alone, and supplementary explanation will be given as needed.

[0057] Figure 3 1 is a sequence diagram showing the operations of the radio base station (LTE-U eNB) 1 and the radio terminal (UE) 3 according to the first embodiment. Figure 3 The radio terminal 3 is indicated as "UE#1". Figure 3 In the figure, it is assumed that LTE-U eNB 1 manages a cell (Cell#1) on a licensed frequency (F1) and a cell (Cell#2) on an unlicensed frequency (F2).

[0058] exist Figure 3 , UE 3 first establishes a radio connection with LTE-U eNB 1 in cell #1 (RRC connection establishment, S101), and further establishes a bearer (e.g., EPS bearer, E-RAB) with the core network (EPC) (not shown). Then, UE 3 enters a state in which, for example, UE 3 can transmit and receive user data (not shown). LTE-U eNB 1 instructs UE 3 to perform terminal measurement on an unlicensed frequency (e.g., F2) through predetermined control signaling in cell #1 (measurement configuration and instructions for unlicensed frequencies (e.g., cell #2 on F2), S102). In other words, the predetermined control signaling transmitted in cell #1 explicitly or implicitly indicates an instruction for terminal measurement (UE measurement) on an unlicensed frequency (e.g., F2).

[0059] The control signaling or the instruction for terminal measurement (S102) is associated with at least one of: a measurement timing indicating that UE 3 should perform terminal measurement on an unlicensed frequency (e.g., cell #2 of F2) (i.e., the timing at which UE 3 should perform terminal measurement); and a measurement period indicating a period during which UE 3 should perform terminal measurement (i.e., an appropriate period for performing terminal measurement). In other words, the control signaling or the instruction for terminal measurement (S102) explicitly or implicitly indicates at least one of the measurement timing and the measurement period (measurable period) of the terminal measurement to be performed by UE 3 in the unlicensed frequency (e.g., cell #2 of F2). For example, the instruction for terminal measurement may explicitly indicate at least one of the measurement timing and the measurement period, or may include information about at least one of the measurement timing and the measurement period. In addition, the instruction for terminal measurement may include information about one or both of the following: an unlicensed frequency, and a cell on the unlicensed frequency on which the terminal measurement is to be performed. In addition, the number of unlicensed frequencies on which the terminal measurement is to be performed may be one, such as Figure 3 As shown, or it may be two or more. In a similar manner, the number of cells on the unlicensed frequency may be one or may be two or more. The configuration information for terminal measurement (measurement configuration: MeasConfig) and the instruction for terminal measurement (measurement instruction) may be transmitted through the same control signaling, or may be transmitted through different control signaling (or through control messages and control signaling).

[0060] The configuration information (MeasConfig) for terminal measurement includes, for example, at least one of the following: information about one or more unlicensed frequencies on which the terminal measurement is to be performed; and information about cells on these unlicensed frequencies. The information about the unlicensed frequencies may include, for example, one or any combination of the following elements:

[0061] - A frequency identifier for LTE (e.g., E-UTRA Absolute Radio Frequency Channel Number (EARFCN));

[0062] - an unlicensed frequency identifier (eg, an unlicensed frequency index); and

[0063] - (center) frequency (eg carrier frequency).

[0064] The unlicensed frequency identifier may be defined as a number or index newly added to the unlicensed frequency available for LTE-U.

[0065] The information about cells on unlicensed frequencies may include, for example, one or any combination of the following elements:

[0066] - a cell identifier (e.g., a physical cell identifier (PCI), an EUTRAN cell global ID (ECGI), or a virtual cell ID); and

[0067] - An unlicensed frequency cell identifier (eg, unlicensed cell ID).

[0068] The virtual cell ID may be, for example, a scrambling code identifier (eg, scrambling identity or scrambling code ID) used to transmit a reference signal or another signal in a cell on an unlicensed frequency. The unlicensed frequency cell identifier may be defined as a cell number or cell index newly added to a cell on an unlicensed frequency.

[0069] In addition, MeasConfig may include another network identifier (e.g., a public land mobile network identifier (PLMN ID), a tracking area identity (TAI), or a tracking area code (TAC)). When MeasConfig includes these network identifiers, the radio terminal 3 may perform terminal measurements in the cell in response to detecting the specified network identifier in the cell.

[0070] In addition, MeasConfig may include information about other systems on the unlicensed frequency on which the terminal measurement is to be performed. The information about other systems may be, for example, a WLAN (access point) identifier (e.g., a service set identifier (SSID), a basic SSID (BSSID), or a homologous extended SSID (HESSID)). When MeasConfig includes a WLAN identifier, the radio terminal 3 may measure the reception quality of the signal from the WLAN (e.g., a received signal strength indicator (RSSI), a received channel power indicator (RCPI), or a received signal noise indicator (RSNI)) in response to detecting a designated WLAN identifier on the unlicensed frequency on which the terminal measurement is to be performed, and report the measured reception quality to the radio base station 1.

[0071] Reference again Figure 3, the description continues. UE 3 responds to the control signaling (S 102), that is, according to the instruction for terminal measurement (measurement, S 104), performs terminal measurement in cell #2, and reports the result of the terminal measurement to the LTE-U eNB in ​​cell #1 (measurement report for unlicensed frequency (e.g., cell #2 on F2), S 105). In the terminal measurement (S104), UE 3 can measure, for example, the reception strength or reception quality of the reference signal (S 103) transmitted from the LTE-U eNB 1 in cell #2. Terminal measurement and terminal measurement reporting can be performed not only in the cell (cell #2) on the unlicensed frequency (F2), but also in other cells on F2, in other unlicensed frequencies, or in licensed frequencies. The instruction for terminal measurement can be explicitly transmitted, or the transmission of the above-mentioned information about the terminal measurement timing or measurement period can be an implicit instruction for performing terminal measurement.

[0072] As described above, the radio base station (LTE-U eNB) 1 notifies or instructs the radio terminal (UE) 3 of one or both of the measurement timing and the measurement period of the terminal measurement on the unlicensed frequency, so that the expected results of the terminal measurement can be collected. The LTE-U eNB 1 can also determine whether it is possible (or appropriate) to communicate with the UE 3 on the unlicensed frequency (in the cell) (i.e., perform data transmission / reception via LTE) based on the results of the terminal measurement.

[0073] However, the radio base station (LTE-U eNB) 1 is not always capable of operating LTE on an unlicensed frequency (in a cell). The LTE-U eNB 1 may check whether the unlicensed frequency is available for LTE-U by sensing, etc., and transmit a synchronization signal and a reference signal, for example, when the unlicensed frequency is available for LTE-U. Therefore, the LTE-U eNB 1 may adjust the transmission timing of the control signaling or adjust the control information carried by the control signaling, which indicates at least one of the measurement timing and the measurement period, so that the measurement timing or the measurement period of the terminal measurement on the unlicensed frequency is within the period in which the LTE-U eNB 1 can use the unlicensed frequency (i.e., the available period). In one example, the LTE-U eNB 1 may specify one or both of the measurement timing and the measurement period so that they are within the period in which the unlicensed frequency is determined to be available. In addition, when it is determined that the unlicensed frequency is available or when the unlicensed frequency is available, the LTE-U eNB 1 may transmit an instruction for the terminal measurement on the unlicensed frequency by predetermined control signaling. As described above, the above-mentioned sensing of the LTE-U eNB 1 is also referred to as listen-before-talk (LBT). This sensing corresponds to, for example, CAC for radar systems or CCA performed by WLAN APs. When the unlicensed frequencies to be measured are not the frequencies used in radar systems, CAC does not need to be performed.

[0074] Specific Example 1

[0075] Specific Example 1 according to the first embodiment will be described. Figure 4 1 is a sequence diagram showing the operations of the radio base station (LTE-UeNB) 1 and the radio terminal 3 of Specific Example 1. Figure 4 The situation assumed in Figure 3 Assume a situation in which a radio base station (LTE-U eNB) 1 manages a cell (Cell#1) on a licensed frequency (F1) and a cell (Cell#2) on an unlicensed frequency (F2). LTE-U eNB 1 instructs UE 3 to perform terminal measurement on the unlicensed frequency (F2), and based on the result of the terminal measurement, determines whether to perform communication (e.g., downlink data transmission) with UE 3 according to LTE-U on the unlicensed frequency. The radio terminal 3 is represented as Figure 4 UE#1 in the .

[0076] exist Figure 4 In the embodiment, UE 3 first establishes a radio connection (RRC connection establishment, S201) with LTE-U eNB 1 in cell #1, and further establishes a bearer (e.g., EPS bearer, E-RAB) with a core network (EPC) (not shown). Then, UE 3 enters a state in which, for example, UE 3 can transmit and receive user data (not shown). LTE-U eNB 1 performs a first sensing (performs a first channel sensing, S202) on an unlicensed frequency (F2). The first sensing includes CAC for a radar system, CCA for other systems such as WLAN, CCA for LTE-U served by other operators (service providers), or two or all of them. When it is determined through the first sensing that the unlicensed frequency (F2) is available (S202), the LTE-U eNB 1 instructs the UE 3 to perform terminal measurement on F2 (in the cell (cell #2)) through predetermined control signaling, and then the UE 3 performs the terminal measurement according to the instruction, and reports the result of the terminal measurement to the LTE-U eNB 1 (measurement configuration, instruction and report for unlicensed frequency, S203). The LTE-U eNB 1 determines whether to perform communication (e.g., downlink data transmission) with the UE 3 in the cell #2 based on the result of the terminal measurement that has been reported (S204).

[0077] The terminal measurement may include, for example, the measurement of the reception quality of a reference signal (RS) (e.g., reference signal received power (RSRP), reference signal received quality (RSRQ), RSSI, channel quality indicator (CQI), or signal to interference plus noise ratio (SINR)). The determination made by the LTE-U eNB 1 may be performed based on whether the value of the reported reception quality is equal to or greater than a predetermined value (or greater than a predetermined value). A reference signal is a generic name for a signal whose type and sequence or a candidate thereof is known in advance in the radio terminal 3, and is also referred to as a pilot signal. Reference signals in LTE include, for example, a cell-specific reference signal (CRS) that is different per cell, a channel state information (CSI) RS also used for CQI measurement, or a discovery reference signal (DRS) used for cell detection.

[0078] In addition or alternatively, the terminal measurement may include measurement of the reception quality (RSSI, RCPI or RSNI) of a predetermined signal defined in other systems such as WLAN (e.g., a reference signal or some or all signals transmitted in the frequency of the system). In this case, the determination by the LTE-U eNB 1 may be performed based on whether the value of the reported reception quality is equal to or less than a predetermined value (or less than a predetermined value). Alternatively, the UE 3 may perform detection of a signal of another system such as WLAN (i.e., attempt to perform detection) through terminal measurement and report the result of the detection. In this case, the determination by the LTE-U eNB 1 may be performed based on whether the LTE-U eNB 1 receives a report indicating that other systems have been detected.

[0079] In addition or alternatively, UE 3 may obtain load information (basic service set (BSS) load) about other systems (such as WLAN) in terminal measurement and report the load information. In this case, the determination made by LTE-U eNB 1 may be performed based on whether the load of the other system is equal to or greater than a predetermined threshold (or greater than a threshold). LTE-U eNB 1 may determine whether to perform communication with UE 3 in cell #2 based on the above multiple results of terminal measurement.

[0080] When LTE-U eNB 1 determines to perform communication with UE 3 in cell #2, LTE-U eNB 1 transmits radio resource configuration information (e.g., RadioResourceConfigCommon and RadioResourceConfigDedicated) about cell #2 to UE 3 in cell #1 (Radio Resource Configuration of Cell #2, S205). In this case, LTE-U eNB 1 may use, for example, an RRC connection reconfiguration message.

[0081] Then, LTE-U eNB 1 performs a second sensing on the unlicensed frequency (F2) (performs a second channel sensing, S206). The second sensing may be the same as or different from the first sensing. When LTE-U eNB 1 determines that the unlicensed frequency (F2) is available, LTE-U eNB 1 transmits user data (UP data) to UE3 in cell #2 (S207). In this case, scheduling of user data (i.e., transmission of information about the allocation of radio resources) may be performed in a cell (e.g., cell #1) on a licensed frequency (e.g., F1) or in cell #2. The former scheduling may use a technique known as cross-carrier scheduling in LTE. Alternatively, user data transmission to UE 3 in cell #2 may be performed based on CSI feedback information (e.g., CQI, precoding matrix indicator (PMI), rank indicator (RI)) about cell #2 reported from UE 3 in cell #1.

[0082] Using the above process, the radio base station (LTE-U eNB) 1 can appropriately determine the radio terminal (UE) 3 that is allowed to perform LTE (LTE-U) on the unlicensed frequency. As a result, it can be expected to improve the performance (eg, system throughput) of the entire LTE radio communication system.

[0083] Specific Example 2

[0084] Specific example 2 according to the first embodiment will be described. The difference from the specific example is that the radio base station (LTE-U eNB) 1 uses control signaling, which is generated using control information defined for instructing terminal measurements on unlicensed frequencies. The control information may be explicitly included in the control signaling, or the control information may be used for data scrambling in the process of generating the control signaling. In specific example 2, a layer 1 (L1) control signal or a layer 2 (L2) control signal or both (L1 / L2 signaling) transmitted in a physical downlink control channel (PDCCH) is used as control signaling to transmit instructions for terminal measurements on an unlicensed frequency (F2). The control information is a U-RNTI (LTE-U RNTI, U-LTE RNTI, or unlicensed RNTI) which is one of the identifiers (radio network temporary identifier: RNTI) used for the generation and detection of the PDCCH. The U-RNTI may be set to a common value for a plurality of radio terminals 3 in a radio connected state (RRC_CONNECTED) in a cell on a licensed frequency (eg, F1) (ie, radio terminals having communication capabilities on an unlicensed frequency).

[0085] That is, U-RNTI is used to transmit control signaling (L1 / L2 control signal) for transmitting instructions for terminal measurement on unlicensed frequency (F2) (i.e., its cyclic redundancy check (CRC) part is scrambled by U-RNTI). In one example, a new PDCCH format (downlink control information (DCI) format) can be defined for instructions for terminal measurement on unlicensed frequency. Alternatively, a new physical control channel named "LTE-U PDCCH (U-PDCCH)" can be defined, and the U-PDCCH can be used to transmit L1 / L2 control signals instead of PDCCH. U-PDCCH can be defined, for example, to use a portion of resources for a physical downlink shared data channel (PDSCH).

[0086] In specific example 2, the reception of control signaling of the radio terminal (UE 3) implicitly indicates the measurement timing. That is, when the radio terminal (UE) 3 receives the control signaling, the radio terminal (UE) 3 recognizes that it has received an instruction to perform terminal measurement in a cell (cell #2) on an unlicensed frequency (F2). In order to implement this processing, the radio base station (LTE-U eNB) 1 can transmit configuration information (e.g., measurement configuration: MeasConfig) necessary for terminal measurement in a cell (cell #2) on an unlicensed frequency (F2) to the radio terminal (UE) 3 in the cell (cell #1) on the licensed frequency (F1) in advance by using RRC signaling.

[0087] MeasConfig includes, for example, at least one of the following: information about one or more unlicensed frequencies (F2) to be measured (e.g., EARFCN, unlicensed frequency index, or carrier frequency); and information about the cell (cell #2) on the unlicensed frequency (F2) (e.g., PCI, ECGI, virtual cell ID, unlicensed cell ID). In addition, the radio base station (LTE-U eNB) 1 can use MeasConfig or another RRC information element (IE) to notify the radio terminal (UE) about the period during which the unlicensed frequency is allowed to be allocated to LTE-U. The information about the period allowed to be allocated may include one or both of a duty cycle period (e.g., in milliseconds (ms)) and a duty cycle (e.g., in percentage (%)). The duty cycle period is a reference period for defining the period during which allocation is allowed. The duty cycle indicates the ratio of the period allowed to be allocated in the reference period. For example, when the duty cycle period is 200ms and the duty cycle is 50%, it can be considered to provide a period of 100ms allowed to be allocated to LTE-U for every 200ms. The duty cycle period and the value of the duty ratio may be predefined, for example, in the present specification, or may be transmitted from a control device (e.g., a mobility management entity (MME) or an operation, administration, and maintenance (OAM) entity) to the radio base station 1. Otherwise, the radio base station 1 itself may appropriately determine the duty cycle period and the duty ratio based on the result of sensing, etc.

[0088] Figure 5 1 is a diagram for describing terminal measurements performed by a radio terminal (UE) 3 in a cell (cell #2) on an unlicensed frequency (F2) according to specific example 2. In this example, a radio base station (LTE-U eNB) 1 dynamically switches the operating state of cell #2 based on, for example, sensing results of other systems. For example, LTE-U eNB 1 intermittently transmits a predetermined reference signal (RS) on F2 to turn cell #2 on (i.e., in operation) and off (i.e., not in operation). The period during which the predetermined reference signal (RS) is transmitted on F2 corresponds to the on (in operation) period in cell #2.

[0089] When LTE-U eNB1 determines that Cell#2 should be switched on, LTE-U eNB1 transmits control signaling (L1 / L2 control signal) transmitted through (U-)PDCCH using the above-mentioned U-RNTI in a cell on the licensed frequency to instruct UE 3 to perform terminal measurement in Cell#2. Upon receiving the control signaling, UE 3 performs terminal measurement in Cell#2.

[0090] Figure 5For example, three methods are shown in FIG. 1 as methods for terminal measurement in cell #2. In the first method (option 1), after receiving the (U-)PDCCH, UE 3 performs terminal measurement only once on a predetermined RS in cell #2. In this method, UE 3 performs terminal measurement only once after receiving the (U-)PDCCH (for example, after several ms), and UE 3 can immediately send a terminal measurement report, thereby enabling immediate use of cell #2 (if the communication criteria in cell #2 are met).

[0091] In the second method (option 2), after receiving the (U-)PDCCH, UE 3 performs terminal measurement on a predetermined RS in cell #2 multiple times. For example, UE 3 may perform a terminal measurement (i.e., L1 measurement in this example) of two or more measurements (i.e., two or more measurement samples), which is a requirement for terminal measurement for cell (re)selection, etc. in LTE, and perform averaging processing (i.e., L3 filtering) on ​​the result of the terminal measurement (secondary terminal measurement). The advantage of this method over the first method is that the reliability (accuracy) of the result of the terminal measurement is increased. However, according to the requirements for terminal measurement for cell (re)selection, etc., it is necessary to perform two measurements within approximately 200ms. Therefore, the time limit is relatively loose. Therefore, when the terminal is reused for LTE-U, it is preferred to limit the requirement for the period of performing two (or more) measurements of a terminal measurement (L1 measurement) to, for example, about 10 milliseconds or tens of milliseconds. The term "terminal measurement" refers to, but is not limited to, the above-mentioned one terminal measurement and the secondary terminal measurement (i.e., performing both the one terminal measurement and the secondary terminal measurement).

[0092] In the third method (option 3), after receiving the (U-)PDCCH, UE 3 starts and continues terminal measurement during a period in which UE 3 can detect a predetermined signal (i.e., a synchronization signal (RS) and a master information block (MIB)) transmitted in cell #2, and when UE 3 can no longer detect the predetermined signal, UE 3 suspends (or stops) terminal measurement. Here, "a period in which UE 3 can detect a predetermined signal" may also be referred to as "a period in which UE 3 can detect cell #2". The period in which UE 3 can detect a predetermined signal may be, for example, a period in which the reception quality (e.g., RSRP) of a predetermined RS (e.g., CRS) is equal to or greater than a predetermined threshold (e.g., -110 dBm). One advantage of this method is that the reliability (accuracy) of the result of the terminal measurement is further increased compared to the second method. On the other hand, it is necessary to set a condition for continuing the terminal measurement (or a condition for suspending the terminal measurement) in UE 3 so that UE 3 does not continue the terminal measurement after LTE-U eNB 1 suspends the transmission of the predetermined RS in cell #2. Alternatively, the maximum number of times or the longest duration of terminal measurements may be predefined in the specification, or may be sent from the LTE-U eNB 1 to the UE 3 .

[0093] In addition, when UE 3 has received information about the period during which unlicensed frequencies are allowed to be allocated to LTE-U (e.g., duty cycle period and duty cycle) in advance, UE 3 can determine the duration of the terminal measurement based on the information. When the duty cycle period is specified as 100ms and the duty cycle is specified as 40%, for example, 40ms in a period of 100ms corresponds to the period during which allocation is allowed. When UE 3 detects a predetermined signal (e.g., RS) in cell #2, UE 3 can start terminal measurement for a period of 40ms (e.g., subframe number (subframe #)) at the time when the predetermined signal is detected. In addition, UE 3 can repeat the same operation with a period of 100ms. That is, UE 3 can suspend terminal measurement for a period of 60ms after performing terminal measurement in the initial 40ms, and resume terminal measurement during the next 40ms.

[0094] The U-RNTI may be common to all radio terminals 3 in a cell where the radio terminal is located (serving cell: e.g., cell #1 in Specific Example 2), may be common to some radio terminals 3 (terminal group) in the cell, or may be different for each radio terminal 3 .

[0095] In addition, (U-)PDCCH can be transmitted when LTE-U eNB 1 connects to a cell (e.g., cell #2) on an unlicensed frequency (e.g., F2) (i.e., when LTE-U eNB 1 starts transmitting predetermined signals (e.g., synchronization signals (RS) and MIB)), or can be transmitted at the desired timing during the period when the cell is in the connected state.

[0096] Modification example of specific example 2

[0097] A modified example of the above-mentioned specific example 2 is described. The difference from specific example 2 is that the (U-)PDCCH generated by using U-RNTI and indicating an instruction for terminal measurement in a cell (cell #2) on an unlicensed frequency (F2) includes: information about the measurement period in which the terminal measurement should be performed. That is, when it is determined that the cell #2 should be switched on, the radio base station (LTE-U eNB) 1 transmits the (U-)PDCCH using U-RNTI in a cell (e.g., cell #1) on a licensed frequency (e.g., F1) to instruct UE 3 to perform terminal measurement in cell #2. Upon receiving the (U-)PDCCH, UE3 starts terminal measurement in cell #2, continues terminal measurement in cell #2 within the measurement period that has been instructed, and reports the result to the LTE-U eNB 1 in the cell (e.g., cell #1) on the licensed frequency. In this method, the LTE-U eNB can collect appropriate results of terminal measurement that provide the desired reliability (or accuracy).

[0098] Information about the measurement period includes, for example, the following:

[0099] - A combination of the start timing and the end timing of the terminal measurement;

[0100] - End timing of terminal measurement;

[0101] - the period of time during which the terminal is measuring; or

[0102] - Information about the period during which unlicensed frequencies are allowed to be allocated to LTE-U.

[0103] As described above, the information about the period of time allowed for allocation may include one or both of a duty cycle period (e.g., in milliseconds (ms)) and a duty cycle (e.g., in percentage (%)) as a reference period for defining the period of time allowed for allocation, the duty cycle indicating the ratio of the period of time allowed for allocation in the reference period. That is, the duty cycle period and the duty cycle may be used to specify the duty cycle and the length (duration) of the periodic period of time allowed for allocation.

[0104] The method of terminal measurement in cell #2 may vary according to the information about the measurement period. For example, when the information about the measurement period indicates a combination of the start timing and the end timing of the terminal measurement, the radio terminal 3 may start and end the terminal measurement according to the indicated start timing and the end timing. When the information about the measurement period indicates the end timing of the terminal measurement, the radio terminal 3 may start the terminal measurement in response to receiving the control signaling (L1 / L2 control signal) including the information about the measurement period, and end the terminal measurement at the indicated end timing. When the information about the measurement period indicates the period of the terminal measurement, the radio terminal 3 may continue the terminal measurement from the time when the control signaling is received to the time when the period expires.

[0105] In addition, in the above information about the measurement period, one or any combination of the following elements may be used to define the start timing, the end timing, the period of the terminal measurement, and the information about the period allowed for allocation:

[0106] -Unit time (ms);

[0107] - Subframe number (Subframe #) or frame number (SFN);

[0108] - the number of subframes or the number of frames;

[0109] - Subframe mode or frame mode;

[0110] - Subframe offset or frame offset;

[0111] - absolute time;

[0112] - relative time; and

[0113] -ratio(%).

[0114] The unit time may be indicated by, for example, us (microseconds) or s (seconds) instead of ms (milliseconds). For example, in LTE, the subframe number (subframe #) may be any value from 0 (#0) to 9 (#9), and each subframe has a length of 1 ms. The frame number is, for example, the system frame number (SFN) in LTE, which may be any value from 0 (#0) to 1023 (#1023). Each frame consists of 10 subframes (10 ms). The subframe offset or frame offset specifies a time point offset by an offset value from the start (i.e., #0) of a subframe or frame, and is effective, for example, for specifying the start timing of a terminal measurement.

[0115] The subframe mode or frame mode indicates a subframe or frame in which the terminal measurement is performed, and may be a bit sequence (bitmap) representing 10 subframes or 10 frames. For example, in the bit sequence, the bit corresponding to the subframe or frame in which the terminal measurement should be performed may be set to 1 (or 0), and the remaining bits may be set to 0 (or 1).

[0116] Absolute time is time information acquired by, for example, a global navigation satellite system (GNSS) such as a global positioning system (GPS), and can be used to specify one or both of the start timing and the end timing of terminal measurement. Relative time can indicate the time elapsed from the reception of control signaling including information about the measurement period (subframe), or from the detection (recovery) of control signaling, and can be used to specify the period in which the terminal measurement is performed.

[0117] The ratio is used, for example, to indicate the duty cycle included in the information about the period during which the unlicensed frequency is allowed to be allocated to LTE-U. That is, the ratio can be used to specify the length (duration) of the periodic period during which the allocation is allowed. The ratio of the period during which the allocation is allowed can be defined by, for example, a fractional value (0.01, 0.02, ..., 010, ..., 0.99 or 1.00) instead of a percentage (%). In addition, when the maximum value of the duty cycle is indicated by MaxDutyCycle, the value of the ratio (ie, it corresponds to the duty cycle) can be indicated by an integer value (1, 2, ..., MaxDutyCycle). In this case, the value of the ratio basically indicates the length of the on period of the duty cycle, that is, the length of the period during which the unlicensed frequency is allowed to be allocated to LTE-U.

[0118] They are only examples and the parameters that have been described above may be used in other methods. Additionally or alternatively, the information about the measurement period may include other parameters.

[0119] More specifically, when the information about the measurement period indicates one or both of the start timing and the end timing of the terminal measurement, each of the start timing and the end timing may be indicated by a unit time (ms). The radio base station 1 may specify, for example, "xx" and "yy" in (a field of) the control information that specifies the start timing and the end timing, respectively, and the radio terminal 3 may start the terminal measurement xx (ms) after the timing when it has received the control signaling including the information (i.e., the reception time or the time when the reception has been detected), and may end the terminal measurement after yy (ms) has passed. Alternatively, when each of the start timing and the end timing is expressed by a subframe number, the radio base station 1 may specify, for example, "n" and "m" for (a field of) the control information that specifies the start timing and the end timing, respectively, and the radio terminal 3 may start the terminal measurement from the subframe #n immediately after the control signaling including the information is received (i.e., the subframe in which it has been received or the subframe in which the reception has been detected), and continue the terminal measurement until the subframe #m. The same is true in the case where the frame number is used instead of the subframe number. In contrast, when each of the start timing and the end timing is expressed by an absolute time, the radio base station 1 can specify the absolute time indicating the start timing or the end timing, and the radio terminal can start or end terminal measurement at the absolute time.

[0120] When the information about the measurement period expresses the period of terminal measurement, the period can be expressed by a unit time (ms). For example, the radio base station 1 can specify "zz" of (a field of) the control information for specifying the period, and the radio terminal 3 can perform terminal measurement during a period of zz (ms) from the timing at which it has received the control signaling including the information (i.e., the reception time or the time at which the reception has been detected). Alternatively, when the period of terminal measurement is expressed by the number of subframes, the radio base station 1 can specify "N" of (a field of) the control information for specifying the period, and the radio terminal 3 can perform terminal measurement during a period of N subframes starting from the timing at which the control signaling including the information has been received (i.e., the subframe at which it has been received or the subframe at which the reception has been detected). Alternatively, when the period of terminal measurement is expressed by a subframe pattern, the radio base station 1 may specify a 10-bit bitmap (e.g., "0000001111") of (a field of) control information for specifying the period, and the radio terminal 3 performs terminal measurement in a subframe # corresponding to "1" in the bitmap (i.e., a subframe in which it has been received or a subframe in which the reception has been detected) based on the timing at which it has received control signaling including the information. For example, when control signaling is received in subframe #2, the LSB (left end) of the 10-bit bitmap corresponds to subframe #2, and subsequent bits correspond to subframes #3, #4, #5, #6, #7, #8, #9, #0, and #1 in the following order. Alternatively, each bit of the bitmap may be fixedly allocated to subframes #0, #1, #2, ..., #9 in advance from the LSB. In this case, the bitmap shown above indicates that subframes #6, #7, #8, and #9 correspond to the measurement period.

[0121] In addition, in order to specify the period of terminal measurement, both the subframe mode and the subframe offset (start offset) can be used. The radio base station 1 can use the subframe offset to specify, for example, the subframe number (subframe #) corresponding to the LSB (left end) of the 10-bit bitmap. When the start offset is set to 5 in the above example of the 10-bit bitmap, the LSB corresponds to subframe #5, and the subsequent bits correspond to subframes #6, #7, #8, #9, #0, #1, #2, #3 and #4 in the following order. The subframe mode can be expressed by a bitmap with another number of bits (for example, 40 consecutive subframes in a 40-bit bitmap), or can be expressed by another data format (for example, a list of subframes (#) corresponding to the terminal measurement period). The same applies to the case where a frame mode is used instead of a subframe mode. A frame offset can be used in addition. The frame mode can also be expressed by a bitmap or another data format.

[0122] Note that the information on the measurement period and the specific data format for indicating the information in the above-described example are merely examples, and another combination may be used.

[0123] Specific example 3:

[0124] Specific example 3 according to the first embodiment will be described. The difference from specific example 2 is that an L2 control signal (MAC signaling) including control information (MAC control element: MACCE) of a media access control (MAC) layer transmitted in a downlink shared channel (DL-SCH) is used as control signaling for transmitting terminal measurement instructions on an unlicensed frequency (F2). In the control signaling, an unlicensed band measurement MAC CE (or another name such as an unlicensed frequency measurement MAC CE, an unlicensed spectrum measurement MAC CE, or an LTE-UMAC CE, etc.) is used as control information defining instructions for performing terminal measurements on an unlicensed frequency. A new value for an identifier (logical channel identifier: LCID) for generation and recovery of a MAC subheader corresponding to an unlicensed band measurement MAC CE may be defined (e.g., LCID index for DL-SCH = 11xxx (e.g., 11001)).

[0125] In specific example 3, when the radio terminal (UE) 3 receives control signaling (MAC signaling) and successfully detects (recovers) the unlicensed band measurement MAC CE, the radio terminal (UE) 3 recognizes that it has been instructed to perform terminal measurement in the cell (Cell #2) on the unlicensed frequency (F2). In order to implement this processing, the radio base station (LTE-U eNB) 1 can transmit configuration information (measurement configuration: MeasConfig) necessary for terminal measurement of the cell (Cell #2) on the unlicensed frequency (F2) to the radio terminal (UE) 3 in the cell (Cell #1) on the licensed frequency (F1) in advance using, for example, RRC signaling.

[0126] In addition, the unlicensed band measurement MAC CE includes information about a measurement period for terminal measurements on an unlicensed frequency (eg, F2). The information about the measurement period may be similar to or different from the information described in the modification example of Specific Example 2.

[0127] Figure 6 is a diagram for describing terminal measurement performed by a radio terminal (UE) 3 in a cell (cell #2) on an unlicensed frequency (F2) according to Specific Example 3. Figure 5In specific example 3, the radio base station (LTE-U eNB) 1 dynamically switches the operation state of cell #2 based on, for example, the sensing results of other systems. When LTE-U eNB 1 determines that it should switch to the on-cell #2, LTE-U eNB 1 transmits control signaling (MAC signaling) including the above-mentioned unlicensed band measurement MAC CE in a cell (e.g., cell #1) on a licensed frequency to instruct UE 3 to perform terminal measurement in cell #2. Upon receiving the control signaling, UE 3 performs terminal measurement in cell #2. In this example, the control signaling includes information about the measurement period, and UE 3 performs terminal measurement according to the information.

[0128] Similar to the description in the modified example of specific example 2, the method of terminal measurement in cell #2 may vary according to the information about the measurement period. However, in specific example 3, the control signaling (MAC signaling) is different from the control signaling of the modified example of specific example 2, so that the operation in specific example 3 is different from the operation in specific example 2. For example, when the start timing of the terminal measurement is not explicitly specified, the terminal measurement may be started in response to the control information (unlicensed band measurement MAC CE) transmitted in the control signaling that is successfully detected (decoded) in UE 3. Alternatively, the starting point of the measurement period (measurable period) of the terminal measurement may also be set to the time point when the control information (unlicensed band measurement MAC CE) transmitted by the control signaling has been successfully detected (decoded) in UE 3.

[0129] Specific Example 4

[0130] Specific example 4 according to the first embodiment will be described. The difference from specific examples 1-3 is that the radio terminal (UE) 3 performs terminal measurement on the unlicensed frequency (F2) (in the cell (cell #2)) as specified in advance. Specifically, the radio base station (LTE-U eNB) 1 transmits configuration information (measurement configuration: MeasConfig) necessary for terminal measurement in the cell (cell #2) on the unlicensed frequency (F2) to the radio terminal (UE) 3 in advance through RRC signaling, etc. In addition, LTE-U eNB1 includes configuration information (measurement gap configuration: MeasGapConfig) about the terminal measurement gap used for terminal measurement in MeasConfig.

[0131] In specific example 4, similar to specific example 2, the L1 / L2 control signal transmitted in the physical downlink control channel (PDCCH or the above-mentioned U-PDCCH) is used as control signaling for transmitting instructions for terminal measurement on an unlicensed frequency (F2). The control signaling (L1 / L2 control signal) is transmitted using the above-mentioned U-RNTI. In addition, in specific example 4, the control signaling includes an instruction for performing a terminal measurement gap (i.e., an instruction for activating a terminal measurement gap). The instruction for performing a terminal measurement gap corresponds to information about a measurement period. The instruction for performing a terminal measurement gap may instruct, for example, to perform terminal measurement according to a MeasGapConfig that has been pre-transmitted (specified). In addition, when the LTE-U eNB 1 notifies the UE3 of multiple MeasGapConfigs (i.e., the mode of the terminal measurement gap) in advance, the instruction for performing a terminal measurement gap may indicate one of the MeasGapConfigs that should be used to perform the terminal measurement.

[0132] Figure 7 is a diagram for describing terminal measurement of a radio terminal (UE) 3 in a cell (cell #2) on an unlicensed frequency (F2) according to Specific Example 4. Figure 5 and 6 , the radio base station (LTE-U eNB) 1 dynamically switches the operation state of cell #2 based on, for example, the sensing results of other systems. LTE-U eNB 1 transmits MeasConfig including MeasGapConfig to UE 3 in a cell (e.g., cell #1) on a licensed frequency in advance. In the case where LTE-U eNB 1 determines that it should switch to Cell #2, LTE-U eNB 1 transmits control signaling (L1 / L2 control signal) transmitted through (U-)PDCCH using the above-mentioned U-RNTI in the cell (e.g., cell #1) on the licensed frequency to instruct UE 3 to perform terminal measurement in Cell #2. Upon receiving the control signaling, UE 3 performs terminal measurement in cell #2 according to the measurement gap specified by MeasGapConfig.

[0133] Figure 7 The case where the length of the terminal measurement gap (measurement gap length) is 6 ms as an example is shown. When UE 3 receives control signaling ((U-)PDCCH) and recognizes that it has received an instruction to perform terminal measurement in cell #2, UE 3 immediately activates the terminal measurement gap and starts terminal measurement. Then, UE 3 performs terminal measurement in cell #2 in a period of 6 milliseconds according to the measurement gap length. The target of the terminal measurement may be multiple cells in one unlicensed frequency (F2), or may be multiple cells in multiple unlicensed frequencies.

[0134] Therefore, terminal measurement can be dynamically performed while maintaining the reliability (accuracy) necessary for terminal measurement in the cell (cell #2) on the unlicensed frequency (F2).

[0135] Figure 7 An example is shown in which a single-shot terminal measurement using a terminal measurement gap (i.e., a single-shot terminal measurement of the length of the terminal measurement gap) is performed each time the radio terminal 3 receives control signaling (single-shot UE measurement with measurement gap). However, the radio terminal 3 may perform terminal measurement using the terminal measurement gap multiple times at a predetermined cycle in response to receiving the control signaling (multiple UE measurements with periodic measurement gaps). For example, the radio base station 1 may notify the radio terminal 3 in advance of the number of times the terminal measurement using the terminal measurement gap is performed or the period for performing the terminal measurement.

[0136] In addition, the radio base station 1 may notify the radio terminal 3 in advance of configuration information (MeasGapConfig) about a plurality of modes of terminal measurement gaps and an index specifying each of the plurality of modes. The radio base station 1 may transmit control signaling ((U-)PDCCH) indicating an index corresponding to a mode of terminal measurement gaps that should be performed.

[0137] In addition, the radio base station 1 can notify the radio terminal 3 of the waiting time (activation time) until the radio terminal 3 executes the terminal measurement gap after it receives control signaling ((U-)PDCCH) or a start offset (GapOffset) in the execution of the terminal measurement gap by using the configuration information about the terminal measurement gap (MeasGapConfig).

[0138] In addition, the radio base station 1 can specify information of a measurement period similar to the measurement period in the modified example of specific example 2 through control signaling. For example, when one or both of the start timing and the end timing of the terminal measurement are specified, the start timing and the end timing of the terminal measurement can indicate the start timing and the end timing of the terminal measurement gap, respectively. In addition, when the period of the terminal measurement is specified, the period can indicate a period during which the terminal measurement gap is valid (that is, a period during which the terminal measurement using the terminal measurement gap is performed).

[0139] Modification example of specific embodiment 4

[0140] A modified example of the above-mentioned specific example 4 is described. The difference from specific example 4 is that the control signaling indicating an instruction for performing terminal measurement in a cell (cell #2) on an unlicensed frequency (F2) is an L2 control signal (MAC signaling). This can be achieved, for example, by adding the information transmitted by the (U-)PDCCH described in specific example 4 to the unlicensed band measurement MAC CE described in specific example 3. Since other details are similar to those in specific example 4, the description thereof will be omitted.

[0141] The terminal measurement described above may be, for example, calculation of an instantaneous measurement value of the reception quality of a reference signal, may be execution of a single measurement (L1 filtering), or may be execution of a secondary measurement (L3 filtering). In addition, the contents of the terminal measurement described below may be different from those described above.

[0142] Second embodiment

[0143] A second embodiment will be described. In this embodiment, before performing terminal measurement in a cell on an unlicensed frequency as described in the first embodiment, a radio base station (LTE-U eNB) 1 selects a radio terminal (UE) 3 to which an instruction for performing terminal measurement will be sent. Figure 8 Describe the details. Figure 8 In the embodiment, LTE-U eNB 1 manages a cell (Cell#1) on a licensed frequency (F1) and a cell (Cell#2) on an unlicensed frequency (F2). In the present embodiment, the radio terminal (UE) 3 has a detection function of detecting proximity to a cell on an unlicensed frequency, and a reporting function of reporting the detection result to the radio base station when proximity is detected. Although the following description will be given assuming that the cell on the unlicensed frequency is a non-service cell for the radio terminal, the cell on the unlicensed frequency may be a service cell (or a configuration cell). Figure 8 The radio terminal 3 is indicated as "UE#1".

[0144] exist Figure 8 In the embodiment, UE 3 first establishes a radio connection (RRC connection establishment) with LTE-U eNB 1 in cell #1 as a serving cell, and establishes a bearer (e.g., EPS bearer, E-RAB) with a core network (EPC) (not shown). Then, UE 3 enters a state in which, for example, UE 3 can transmit and receive user data. LTE-U eNB 1 performs a first sensing (performs a first channel sensing, S301) on an unlicensed frequency (e.g., F2). The first sensing includes CAC for a radar system, CCA for other systems such as WLAN, CCA for LTE-U served by other operators (service providers), or two or all of them.

[0145] When it is determined through the first sensing (S301) that an unlicensed frequency (e.g., F2) is available, the LTE-UE eNB 1 transmits a notification about detecting the proximity of a cell on the unlicensed frequency to the UE 3 in the cell #1 (proximity configuration for unlicensed frequency, S302). Upon receiving the notification (i.e., in response to the notification), the UE 3 attempts to detect the proximity of the UE 3 to a cell (e.g., cell #2) on the unlicensed frequency (e.g., F2) (i.e., enables (activates) the detection function). When the UE 3 has successfully detected a non-serving cell on the unlicensed frequency (proximity detection on the unlicensed frequency (cell), S303), the UE 3 reports the detection result to the LTE-U eNB (proximity indication of unlicensed frequency, S304).

[0146] The notification about detecting the proximity of a cell on an unlicensed frequency may include, for example, at least one of the following: information about one or more unlicensed frequencies for which proximity detection is to be performed; and information about cells on these unlicensed frequencies. The information about the unlicensed frequencies may include, for example, one or any combination of the following:

[0147] - LTE frequency identifier (e.g., EARFCN);

[0148] - an unlicensed frequency identifier (eg, an unlicensed frequency index); and

[0149] - (center) frequency (eg carrier frequency).

[0150] The unlicensed frequency identifier may be defined as a number or index newly added to the unlicensed frequency available for LTE-U.

[0151] The information about cells on unlicensed frequencies may include, for example, one or any combination of the following elements:

[0152] - a cell identifier (e.g., PCI, ECGI, or virtual cell ID); and

[0153] - An unlicensed frequency cell identifier (eg, unlicensed cell ID).

[0154] The virtual cell ID may be, for example, a scrambling code identifier (eg, scrambling identity or scrambling code ID) used to transmit a reference signal or another signal in a cell on an unlicensed frequency. The unlicensed frequency cell identifier may be defined as a cell number or cell index newly added to a cell on an unlicensed frequency.

[0155] Furthermore, the notification may include another network identifier (eg, PLMN ID, TAI, or TAC). When the notification includes these network identifiers, the radio terminal 3 can use the specified network identifier to distinguish the cell to which the radio terminal 3 is to be detected approaching from other cells.

[0156] Reference again Figure 8 , the description continues. Based on the report from UE 3, LTE-eNB 1 determines to instruct UE 3 to perform terminal measurement in a cell (e.g., cell 2) on an unlicensed frequency (e.g., F2) (determination of UE measurement in unlicensed frequency for UE#1, S305). Then, similar to the first embodiment, LTE-eNB 1 and UE 3 perform a procedure for terminal measurement reporting on unlicensed frequency (measurement configuration, instruction and reporting for unlicensed frequency, S306).

[0157] like Figure 8 As shown, in the present embodiment, the radio base station (LTE-U eNB) 1 receives the result of the detection of the proximity of the radio terminal (UE) 3 to the non-serving cell on the unlicensed frequency (e.g., F2) from the radio terminal (UE) 3 before transmitting the control signaling, and determines to transmit the control signaling to the radio terminal (UE) 3 based on the result of the proximity detection (or in response to the result of the proximity detection). Therefore, for example, the radio base station (LTE-U eNB) 1 can determine the expected UE that can contribute to improving the throughput through LTE-U based on the detection result of the proximity of the cell (e.g., cell 2) on the unlicensed frequency (e.g., F2). Therefore, for example, the radio base station (LTE-U eNB) 1 can selectively enable the expected UE 3 that can improve the throughput through LTE-U to perform a terminal measurement report, which is used to determine whether to allow the radio terminal (UE) 3 to perform LTE-U using the cell on the unlicensed frequency. As a result, it is expected to reduce power consumption and reduce the control information necessary for the terminal measurement report on the UE 3 that does not have to send the terminal measurement report. This is particularly effective when the operating state of a cell on an unlicensed frequency is dynamically changed, ie, when the cell is switched on / off aperiodically.

[0158] The detection of the proximity of a cell on an unlicensed frequency by a radio terminal (UE) includes, for example, detecting a cell-specific signal transmitted from a radio base station (LTE-U eNB) 1 in the cell. The cell-specific signal contains at least one of a known symbol and a known sequence. The cell-specific signal may be, for example, a synchronization signal (in LTE, the synchronization signal includes a primary SS (PSS) and a secondary SS (SSS)), a reference signal (RS), or basic information (a master information block (MIB)) or system information (a system information block (SIB), for example, SIB1, SIB2, or SIBx defined for LTE-U) broadcast in a cell. In this case, the radio terminal 3 may detect proximity to a cell on an unlicensed frequency based on, for example, whether the reception quality (e.g., RSRP, RSRQ, RSSI, SINR, or CQI) of a cell-specific signal (e.g., RS) is equal to or greater than a predetermined threshold (or greater than a threshold). Conversely, the radio terminal 3 may detect proximity to a cell based on whether it has successfully received basic information (MIB) or system information (SIB) broadcast in a cell. The reference signal may include, for example, at least one of a cell-specific reference signal (cell-specific RS (CRS)), a reference signal for measurement reporting on channel state information (CSI) (CSIRS), and a reference signal for cell detection (discovery RS (DRS)). The DRS may be a combination of two or more of the PSS, SSS, CRS, and CSIRS, or may be a new reference signal defined for cell detection.

[0159] When the radio terminal (UE) 3 has received a notification about the detection of the proximity of a cell on an unlicensed frequency from the radio base station (LTE-U eNB) 1, the radio terminal (UE) 3 may consider that it has been configured to perform detection on the unlicensed frequency (i.e., the UE considers itself to be configured to perform a proximity check on the unlicensed frequency), or consider that it has been configured to transmit a notification (proximity indication) indicating that the proximity to a cell in the unlicensed frequency has been detected (i.e., the UE considers itself to be configured to provide a proximity indication for the unlicensed frequency). "Proximity check" is also referred to as "proximity estimation". In addition, the radio base station (LTE-U eNB) 1 may explicitly instruct the radio terminal (UE) 3 to perform detection through the notification, or may implicitly instruct the radio terminal (UE) 3 to perform detection by including information about the unlicensed frequency to be detected or about the cell on the unlicensed frequency in the notification.

[0160] In addition, a notification about the detection of proximity to a cell on an unlicensed frequency can be transmitted as dedicated control information, for example, via RRC signaling (message). In this case, the RRC message corresponding to the notification can be an RRC connection reconfiguration message, and the "ReportProximityUnlicensedConfig" IE can be newly defined as an RRC information element (IE) included therein. In addition to including information for enabling a function for detecting proximity to a cell on an unlicensed frequency (i.e., proximityIndicationUnlicensed is set to enabled), the IE also includes information about the target unlicensed frequency. In addition, the RRC message may include identification information about the cell on the unlicensed frequency (e.g., a physical cell identifier (PCI) or a global cell identifier (EUTRAN cell global ID (ECGI))). The notification can be sent on broadcast information (system information (SI), system information block (SIB)) instead of RRC signaling.

[0161] In addition, a notification (proximity indication) indicating that proximity to a cell on an unlicensed frequency has been detected may also be transmitted via RRC signaling (message). In this case, the "ProximityIndicationUnlicensed" message may be newly defined as an RRC message corresponding to the notification. The message includes a "ProximityIndicationUnlicensed" IE indicating the result of detecting proximity to a cell on an unlicensed frequency. The IE may include information indicating that proximity has been detected and information about the target unlicensed frequency. The IE may also include identification information about the cell (e.g., PCI or ECGI) that has been detected on the unlicensed frequency.

[0162] Although detecting the proximity to a cell means that the radio terminal 3 detects that it has entered the vicinity (area, region) of one or more cells on the target unlicensed frequency, the case where the radio terminal 3 is already in the vicinity of a cell before starting (attempting) the detection of the proximity to a cell is also included in the scope of the present embodiment. In addition, the detection of the proximity to a cell may be regarded (considered) as an estimation of the proximity to a cell, the detection of the availability of a cell, or, more simply, the detection (discovery) of a cell.

[0163] Third embodiment

[0164] A third embodiment according to the present invention will be described. Fig. 9 1 is a diagram showing a configuration example of an LTE-U radio communication system and another system according to a plurality of embodiments including the present embodiment. Figure 1A and Figure 1BThe main difference is that the radio base stations (eNBs) 6 and 7 and the radio terminal (UE) 8 have a dual connectivity (DC) function (non-patent document 5). Dual connectivity is a process in which the UE 8 simultaneously uses radio resources (i.e., cells or carriers) provided (i.e., managed) by a main base station (main base station, main eNB (MeNB)) 6 and a sub-base station (secondary base station, secondary eNB (SeNB)) 7 to perform communications. Fig. 9 In the example shown, MeNB 6 and SeNB 7 are connected to each other via an X2 interface, MeNB 6 manages cell #1 on licensed frequency F1, and SeNB 7 manages cell #2 on licensed frequency F2 and cell #3 on unlicensed frequency F3. MeNB 6 and SeNB 7 operate as normal LTE eNBs for UEs that do not perform DC, respectively, and are able to independently communicate with these UEs in cell #1 and cell #2, respectively.

[0165] The following is a brief introduction to dual connectivity. UE 8 is able to perform carrier aggregation (CA) using multiple cells managed by MeNB 6 and SeNB 7 and on different frequencies at the same time. The service cell group managed by MeNB 6 is called the primary cell group (MCG), and the service cell group managed by SeNB 7 is called the secondary cell group (SCG). The MCG includes at least a primary cell (PCell) and may also include one or more secondary cells (SCells). The SCG includes at least a primary SCell (abbreviated as pSCell or PSCell) and may also include one or more SCells. The pSCell is a cell to which at least a physical uplink control channel (PUCCH) is allocated and which serves as a PCell in the SCG.

[0166] The MeNB 6 maintains a connection (S1-MME) with a mobility management device (Mobility Management Entity (MME)) in a core network (Evolved Packet Core (EPC)) of the UE 8 that performs DC. Therefore, the MeNB 6 can be referred to as a mobility management point (or mobility anchor point) for the UE 8. Therefore, control information of the control plane (CP) is transmitted between the MeNB 6 and the UE 8 in the MCG. Control information about the CP of the SCG of the SeNB 7 is transmitted between the SeNB 7 and the MeNB 6 (X2 interface), and further transmitted between the MeNB 6 and the UE 8 in the MCG. For example, the radio resource configuration of the SCG (e.g., RadioResoureConfigDedicated IE) is transmitted from the SeNB 7 to the MeNB 6 through an inter-node RRC message called "SCG Configuration", and is transmitted from the MeNB 6 to the UE 8 through an RRC connection reconfiguration message. On the other hand, the terminal capability information of the UE 8 (UE-EUTRA Capability IE), security information about the SCG (e.g., SK eNB ), and the radio resource configuration of the MCG (e.g., RadioResourceConfigDedicated IE), etc. are transmitted from the MeNB 6 to the SeNB 7 via an inter-node RRC message called "SCG-ConfigInfo".

[0167] In DC, from the perspective of bearer configuration on the user plane (UP), three different configurations are supported. The first configuration is an MCG bearer. An MCG bearer is a bearer in which a radio protocol is arranged only in MeNB 6 so as to use only the resources of MeNB 6 (e.g., MCG) and a connection (S1-U) is maintained between a gateway device (S-GW or P-GW) and MeNB 6 similar to a normal LTE that does not perform DC. The second configuration is an SCG bearer. An SCG bearer is a bearer in which a radio protocol is arranged only in SeNB 7 so as to use only the resources of SeNB 7 (e.g., SCG) and a connection (S1-U) is maintained between a gateway device (S-GW or P-GW) and SeNB 7. The third configuration is a split bearer. A split bearer is a bearer in which a radio protocol is arranged in both MeNB 6 and SeNB 7 so as to use the resources of both MeNB 6 and SeNB 7 (e.g., MCG and SCG). In the split bearer, a connection (S1-U) is maintained between the gateway device (S-GW or P-GW) and the MeNB 6, and UP data (eg, PDCP PDU) to be transmitted in the SCG is forwarded from the MeNB 6 to the SeNB 7 via X2, for example.

[0168] The details of this embodiment are described below. Fig. 9In the example of DC in, when LAA is implemented by carrier aggregation of cell #3 on the unlicensed frequency F3 of SeNB7 and cell #2 on the licensed frequency F2 of SeNB 7, the problem may not be solved only by the techniques described in the above-mentioned first and second embodiments. This is because, when DC is performed, SeNB 7 cannot directly transmit or receive control information (e.g., RRC, NAS) of CP to or from the radio terminal (UE 8). Configuration information (MeasConfig) for terminal measurement and a report on the result of terminal measurement (measurement report) also correspond to the control information of CP. Reference Fig.10 , a control process for solving another problem in DC will be described. Fig.10 1 is a sequence diagram showing the operations of the radio base stations (MeNB 6 and SeNB 7) and the radio terminal (UE) 8 according to the third embodiment. Fig.10 The radio terminal (UE) 8 is indicated as "UE#2".

[0169] First, UE 8 establishes a radio connection (RRC connection) on cell #1 of MeNB 6 as pSCell, and performs configuration for dual connectivity (DC) to use cell #2 of SeNB 7 as pSCell (dual connectivity configuration, S401). Then, MeNB 6 or SeNB 7 determines whether UE 8 is required to perform terminal measurement on an unlicensed frequency (e.g., F3) (determination of UE measurement in unlicensed frequency for UE #2, S402). When it is determined that UE 8 is required to perform terminal measurement, MeNB 6 transmits configuration information (measurement configuration (MeasConfig)) necessary for terminal measurement on an unlicensed frequency (e.g., F3) to UE 8 in cell #1 using, for example, an RRC connection reconfiguration message (measurement configuration for cell #3 on unlicensed frequency (e.g., F3), S403). The measurement configuration may be generated by SeNB 7 and then transmitted to MeNB 6, or may be generated by MeNB 6. When MeNB 6 receives a completion report of reception of configuration information (and reconfiguration according to the configuration information) from UE 8, MeNB 6 may notify SeNB 7 of completion (measurement configuration complete, S404). The notification transmitted in S404 may be included in the "SCG-ConfigInfo" of the inter-node RRC container. Alternatively, the notification may be transmitted via a SeNBRECONFIGURATIONCOMPLETE message on the X2 interface (X2AP).

[0170] Then, the SeNB 7 transmits an instruction for terminal measurement in a cell on an unlicensed frequency (e.g., cell #3 on F3) (measurement instruction for unlicensed frequency (e.g., cell #3 on F3), S405) through predetermined control signaling in cell #2. The instruction for terminal measurement is associated with at least one of: a measurement timing indicating the timing when the UE 8 should perform terminal measurement on the unlicensed frequency (e.g., cell #3 in F3) (i.e., when the UE 8 should perform terminal measurement); and a measurement period indicating the period during which the UE 8 should perform measurement (i.e., an appropriate period for performing terminal measurement). In other words, the instruction for terminal measurement (S405) explicitly or implicitly indicates at least one of the measurement timing and the measurement period (measurable period) of the terminal measurement performed by the UE 8 on the unlicensed frequency (e.g., cell #3 in F3). Since the details of the measurement timing and the measurement period are the same as those described in the first embodiment, the description thereof will be omitted. The control signaling in S405 may be transmitted by the MeNB 6. In this case, the SeNB 7 may transmit at least a part of the information to be transmitted in the control signaling to the MeNB 6, which may then transmit the information to the UE 8. Alternatively, the MeNB 6 itself may generate the information to be transmitted in the control signaling.

[0171] UE 8 responds to the control signaling (S405), i.e., according to the instruction for terminal measurement (measurement, S407), performs terminal measurement in cell #3, and reports the result of the terminal measurement to the MeNB in ​​cell #1 (measurement report for unlicensed frequency (e.g., cell #3 on F3), S408). In the terminal measurement (S407), UE 8 can measure, for example, the reception strength or reception quality of the reference signal (S406) transmitted from SeNB 7 in cell #3. Terminal measurement and terminal measurement reporting can be performed not only in the cell (cell #3) on the unlicensed frequency (F3), but also in other cells on F3, in other unlicensed frequencies, or in licensed frequencies. Since the details of the terminal measurement are similar to those described in the first embodiment, the description thereof will be omitted.

[0172] MeNB 6 or SeNB 7 determines whether to perform communication (e.g., downlink data transmission) with UE 8 in cell #3 based on the result of the terminal measurement that has been reported. When MeNB 6 or SeNB 7 determines to perform communication with UE 8 in cell #3 managed by SeNB 7 (determination of LTE-U for UE #2 in cell #3, S409), MeNB 6 transmits radio resource configuration (radio resource configuration, e.g., RadioResourceConfigCommon, RadioResourceConfigDedicated) about cell #3 to UE 8 in cell #1 (radio resource configuration for cell #3, S410). In this case, MeNB 6 may use, for example, an RRC connection reconfiguration message. Radio resource configuration information about cell #3 may be generated by SeNB 7 and then forwarded to MeNB 6 as an SCG configuration, and MeNB 6 may transmit the radio resource configuration information to UE 8. Finally, SeNB 7 performs LAA using carrier aggregation of cell #2 and cell #3, and transmits user data (DL data), for example, to UE 8 (not shown).

[0173] Using the above process, even when dual connectivity is being performed, the radio terminal 3 allowed to perform LTE-U on the unlicensed frequency (in the cell) managed by the SeNB 7 can be appropriately determined. As a result, the performance (eg, system throughput) of the entire LTE radio communication system can be expected to be improved.

[0174] Specific example 5:

[0175] Specific Example 5 according to the third embodiment will be described. Specific Example 5 provides a process for determining in the MeNB 6 or SeNB 7 whether the UE 8 is required to perform terminal measurement on an unlicensed frequency (eg, F3).

[0176] Fig.11 It is shown Fig.10 FIG. 5 is a diagram of an example of the operation of MeNB 6 and SeNB 7 including the exchange of information (X2 message) in step S402 "Determination regarding UE measurement in unlicensed frequency for UE#2" shown. There are two options for the operation of MeNB 6 and SeNB 7. In the first option (Option 1), SeNB 7 determines whether to require UE 8 to perform terminal measurement on an unlicensed frequency (e.g., F3) (Determination regarding UE measurement, S501). Upon determining that UE 8 is required to perform terminal measurement, SeNB 7 notifies MeNB 6 of information about the target unlicensed frequency (available unlicensed frequency information, S502). MeNB 6 may respond to the notification (S502) (Available Unlicensed Frequency Information Response, S503).

[0177] On the other hand, in the second option (Option 2), SeNB 7 notifies MeNB 6 of information about the target unlicensed frequency (available unlicensed frequency information, S505), and MeNB 6 makes a determination (S506). Then, MeNB 6 transmits the result of the determination to SeNB 7 (available unlicensed frequency information response, S507). The result of the determination may include information indicating that MeNB 6 instructs UE 8 to perform terminal measurement on the unlicensed frequency, or it may simply include a positive acknowledgement response (ACK). The above-mentioned information about the target unlicensed frequency may be information about the unlicensed frequency (e.g., EARFCN, unlicensed frequency index, or carrier frequency), information about a cell on the unlicensed frequency (e.g., PCI, ECGI, virtual cell ID, or unlicensed cell ID), or a combination thereof. The information about the unlicensed frequency in S502 and S505 may be transmitted through an ENBCONFIGURATION UPDATE message on X2AP. Specifically, the information may be included in a "Served Cells To Add" IE or a "Served Cells To Modify" IE of the message.

[0178] Specific Example 6

[0179] Specific Example 6 according to the third embodiment will be described. Specific Example 6 provides a process for determining in the MeNB 6 or SeNB 7 whether to allow the UE 8 to perform LTE-U in a cell on an unlicensed frequency (eg, cell #3 on F3).

[0180] Fig.12 It is shown in Fig.10FIG. 6 is a diagram of an example of the operation of MeNB 6 and SeNB 7 including the exchange of information (X2 message) in step S409 “Determination of LTE-U for UE#2 in cell #3” in FIG. 6 . There are two options for the operation of MeNB 6 and SeNB 7. In the first option (option 1), MeNB 6 transmits to SeNB 7 the result of terminal measurement on the unlicensed frequency received from UE 8 (measurement result for unlicensed frequency, S601). SeNB 7 determines whether to allow UE 8 to perform LTE-U in a cell on the unlicensed frequency (cell #3 on F3) based on the result of the terminal measurement (determination of LTE-U, S602). When determining that UE 8 is allowed to perform LTE-U, SeNB 7 generates radio resource configuration information (e.g., RadioResourceConfigCommon, RadioResourceConfigDedicated) of the cell on the target unlicensed frequency (cell #3), and transmits the generated radio resource configuration information to MeNB 6 (radio resource configuration of cell #3, S603).

[0181] The result of the terminal measurement in S601 may be transmitted in the "SCG-ConfigInfo" of the inter-node RRC container. Alternatively, the result may be transmitted through the SeNB MODIFICATIONREQUEST message on X2AP. In addition, the radio resource configuration information in S603 may be transmitted in the "SCG Configuration" of the inter-node RRC container. Alternatively, the information may be transmitted through the SeNB MODIFICATION REQUEST ACKNOWLEDGE message on X2AP, or may be transmitted through the SeNBMODIFICATION REQUIRED message on X2AP.

[0182] On the other hand, in the second option (Option 2), MeNB 6 determines whether to allow UE#2 to perform LTE-U in a cell on an unlicensed frequency (cell #3 on F3) based on the result of the terminal measurement (decision on LTE-U, S605). When it is determined that UE 8 is allowed to perform LTE-U, MeNB 6 transmits a request to add the cell on the target unlicensed frequency (cell #3) to the serving cell (e.g., SCG) to SeNB 7 (cell #3 addition request, S606). The information about cell #3 included in the request may be indicated by information about the unlicensed frequency (e.g., EARFCN) and the PCI of cell #3, or by the ECGI of cell #3, or by a combination thereof. In response to the request, SeNB 7 generates radio resource configuration information (e.g., RadioResourceConfigCommon, RadioResourceConfigDedicated) of cell #3, and transmits the generated radio resource configuration information to MeNB 6 (radio resource configuration of cell #3, S607).

[0183] The request in S606 may be transmitted in the "SCG-ConfigInfo" of the inter-node RRC container. Alternatively, the request may be transmitted by a SeNB Add Request message over X2AP or by a SeNB Modify Request message over X2AP. Furthermore, similar to the message transmitted in S603, the message in S607 may be transmitted by "SCG-Config". Furthermore, the message may be transmitted by a SeNB ADDITION REQUEST ACKNOWLEDGE message over X2AP or a SeNB MODIFICATION REQUEST ACKNOWLEDGE message over X2AP.

[0184] Finally, a configuration example of a radio base station (LTE-U eNB 1, MeNB 6, SeNB 7) and a radio terminal (UE 3, UE 8) according to the above-mentioned embodiment will be described. Each of the radio base stations (LTE-U eNB 1, MeNB 6, SeNB 7) described in the above-mentioned embodiment may include a transceiver for communicating with the radio terminal (UE 3, UE 8) and a controller coupled to the transceiver. The controller performs a control process with respect to one of the radio base stations (LTE-U eNB 1, MeNB 6, SeNB 7) described in the above-mentioned embodiment (for example, control of terminal measurement on an unlicensed frequency performed by the radio terminal (UE 3, UE 8)).

[0185] Each of the radio terminals (UE 3, UE 8) described in the above embodiments may include a transceiver for communicating with a radio base station (LTE-U eNB 1, MeNB 6, SeNB 7) and a controller coupled to the transceiver. The controller performs a control process (e.g., control of terminal measurement and reporting on terminal measurement) on one of the radio terminals (UE 3, UE 8) described in the above embodiments.

[0186] Fig.13 and Fig.14 is a block diagram showing a configuration example of a radio base station 1 and a radio terminal 3 according to the first embodiment. A radio base station and a radio terminal according to other embodiments may have Fig.13 and 14 Similar configurations to those in . See Fig.13 , the radio base station 1 includes a transceiver 101 and a controller 102. The transceiver 101 is configured to communicate with a plurality of radio terminals including a radio terminal 3. The controller 102 is configured to transmit a notification to the radio terminal 3 to receive a measurement report from the radio terminal 3 so as to implement terminal measurement of the radio terminal 3 on an unlicensed frequency.

[0187] refer to Fig.14 The radio terminal 3 includes a transceiver 301 and a controller 302. The transceiver 301 is configured to communicate with the radio base station 1. The controller 302 is configured to control the terminal measurement on the unlicensed frequency according to the notification received from the radio base station 1, and transmit a measurement report to the radio base station 1.

[0188] Each of the controllers included in the radio base station and the radio terminal according to the above-mentioned embodiments can be implemented by causing a computer including at least one processor (e.g., a microprocessor, a microprocessing unit (MPU), a central processing unit CPU) to execute a program. Specifically, one or more programs including instructions for causing the computer to execute an algorithm of the UE or eNB described with reference to the timing diagram, etc. can be provided to the computer.

[0189] The program can be stored and provided to the computer using any type of non-transitory computer-readable medium. Non-transitory computer-readable media include any type of tangible storage media. Examples of non-transitory computer-readable media include magnetic storage media (such as floppy disks, magnetic tapes, hard disk drives, etc.), optical magnetic storage media (e.g., magneto-optical disks), compact disk read-only memories (CD-ROMs), CD-Rs, CD-R / Ws, and semiconductor memories (such as mask ROMs, programmable ROMs (PROMs), erasable PROMs (EPROMs), flash ROMs, random access memories (RAMs), etc.). The program can be provided to the computer using any type of temporary computer-readable media. Examples of temporary computer-readable media include electrical signals, optical signals, and electromagnetic waves. Temporary computer-readable media can provide programs to the computer via wired communication lines (e.g., wires and optical fibers) or radio communication lines.

[0190] Other embodiments

[0191] The description of the first to third embodiments has been provided for the case where the unlicensed frequency is used to transmit downlink user data. However, it goes without saying that these embodiments can be applied to the case where the unlicensed frequency is also used to transmit uplink user data. In this case, the radio terminal (UE) 3 can perform a process similar to the first sensing or the second sensing performed by the radio base station (LTE-U eNB) 1. Therefore, it is possible to avoid degradation of the performance of not only the LTE-U system but also other systems, which is due to the transmission of uplink signals in LTE-U being excessive interference to other systems.

[0192] The description of the first to third embodiments has been provided for the case of LAA. That is, in the first and second embodiments, the carrier aggregation (CA) in which the radio base station (LTE-U eNB) 1 and the radio terminal (UE) 3 use a cell on a licensed frequency as a primary cell (PCell) and a cell on an unlicensed frequency as a secondary cell (SCell) is mainly described. In the third embodiment, the dual connection (DC) in which the MeNB 6 and the SeNB 7 use a licensed frequency and the SeNB 7 also uses an unlicensed frequency is mainly described. However, as described above, in the first and second embodiments, the radio base station (LTE-U eNB) 1 can use a shared frequency (e.g., F3) as a PCell and use an unlicensed frequency in a narrow sense (e.g., F2) or another shared frequency (e.g., F4) as a secondary cell (SCell) to perform carrier aggregation. An unlicensed frequency in a narrow sense refers to a frequency that is not allocated to any operator (i.e., a frequency that is neither a licensed frequency nor a shared frequency). In this case, the radio base station (LTE-U eNB) 1 may transmit control signaling associated with at least one of a measurement timing and a measurement period measured by a terminal in an SCell (e.g., F2 or F4) to a radio terminal 3 in a PCell (e.g., F3). In a similar manner, in the third embodiment, the MeNB 6 may use a shared frequency, and the SeNB 7 may use a shared frequency in a narrow sense or an unlicensed frequency in a dual connectivity (DC).

[0193] The description of the above embodiments has been provided for the LTE system. However, as described above, these embodiments can be applied to radio communication systems other than LTE systems such as 3GPP UMTS, 3GPP2 CDMA2000 systems (1xRTT, HRPD), GSM / GPRS systems, or WiMAX systems. A radio base station (eNB) and RRH / RRE having the function of performing LTE communication on unlicensed frequencies have been referred to as a radio base station (LTE-UeNB). In other systems, a network node capable of communicating on unlicensed frequencies using the same communication scheme as that for licensed frequencies may also be introduced, and it may be referred to as a radio station. That is, the radio station corresponds, for example, to a radio base station (eNB) and RRH / RRE in LTE as described above, to a base station (node ​​B (NB)) and a base station controller (RNC) in UMTS, or to a base station (BTS) and a base station controller (BSC) in a CDMA2000 system. In addition, in an example of dual connectivity (DC), a base station system including a main base station (MeNB in ​​LTE) and a sub-base station (SeNB in ​​LTE) may be referred to as a radio station. Each of the main base station and the sub base stations may be referred to as a radio communication node.

[0194] In addition, in the above-mentioned embodiment, the cell on the licensed frequency (i.e., PCell in CA or cell operated by MeNB in ​​DC) that transmits the control signaling for the instruction for terminal measurement and the cell on the unlicensed frequency that is the target of the terminal measurement (i.e., SCell in CA or cell operated by SeNB in ​​DC) can use different radio access technologies (RAT) from each other. For example, the cell on the licensed frequency can be a cell of LTE (E-UTRAN), and the cell on the unlicensed frequency can be a cell of UMTS (UTRAN).

[0195] The above-described embodiments are merely examples of application of the technical ideas obtained by the present inventors. These technical ideas are not limited to the above-described embodiments, and various modifications are possible, of course.

[0196] This application is based upon and claims the benefit of priority from Japanese patent application No. 2004-186949, filed on Sep. 12, 2014, the disclosure of which is incorporated herein in its entirety by reference.

[0197] Reference numerals list

[0198] 1, 6, 7 Radio base stations

[0199] 3,8 Radio Terminal

[0200] 4 Wireless LAN access points

[0201] 5 Wireless LAN Terminal

[0202] 101, 301 transceiver

[0203] 102, 302 Controller

Claims

1. A radio station, comprising: a radio communication device for communicating on licensed and unlicensed frequencies; as well as control means for transmitting control information associated with a received signal strength indicator (RSSI) measurement on the unlicensed frequency to a radio terminal on the licensed frequency, wherein The control information includes: information indicating a second time period, wherein the second time period is composed of a first time period and a third time period, the first time period being capable of transmitting signals, the third time period being unnecessary for the radio terminal to perform the RSSI measurement, the first time period occurring periodically with a periodicity of the second time period, and the third time period being after the first time period; as well as an offset value indicating a subframe number and a system frame number (SFN) at which the first time period starts, and The control means is further adapted to receive, from the radio terminal, a result of the RSSI measurement on the licensed frequency, the RSSI measurement being performed within a first time period starting with the subframe number and the SFN indicated by at least the offset value.

2. The radio station according to claim 1, wherein The control information includes a physical downlink control channel including a cyclic redundancy check (CRC) portion scrambled by an unlicensed radio network temporary identifier (U-RNTI).

3. The radio station according to claim 2, wherein: The radio station sets the U-RNTI to a common value for a plurality of radio terminals that are in a radio connected state on the licensed frequency and have a capability to communicate on the unlicensed frequency.

4. The radio station according to any one of claims 1 to 3, wherein: Control information commonly applied to a plurality of radio terminals which are in a radio connection state in a cell on the licensed frequency and have a capability of communicating on the unlicensed frequency.

5. The radio station according to any one of claims 1 to 3, wherein: The control device is further adapted to: receiving, from the radio terminal, a result of detecting proximity of the radio terminal to a non-serving cell on the unlicensed frequency prior to transmitting the control information; as well as Transmitting the control information to the radio terminal is determined based on the result of detecting the approach.

6. The radio station according to any one of claims 1 to 3, wherein: The licensed frequencies include a first licensed frequency and a second licensed frequency, The radio communication device comprises a first radio communication node configured to operate a first cell on the first licensed frequency and a second radio communication node configured to operate both a second cell on the second licensed frequency and a third cell on the unlicensed frequency, transmitting the control information from the second radio communication node in the second cell, and The result of the RSSI measurement is received by the first radio communication node in the first cell.

7. A method performed in a radio station, the method comprising: communicate with radio terminals on licensed frequencies; transmitting control information associated with a received signal strength indicator (RSSI) measurement on an unlicensed frequency to the radio terminal on the licensed frequency, wherein The control information includes: information indicating a second time period, wherein the second time period is composed of a first time period and a third time period, the first time period being capable of transmitting signals, the third time period being unnecessary for the radio terminal to perform the RSSI measurement, the first time period occurring periodically with a periodicity of the second time period, and the third time period being after the first time period; as well as an offset value indicating a subframe number and a system frame number (SFN) at which the first time period starts, and The method further includes receiving, from the radioterminal on the licensed frequency, a result of the RSSI measurement performed during a first time period starting with the subframe number and the SFN.

8. A method performed in a radio terminal, the method comprising: communicate with radio stations on licensed frequencies; receiving control information associated with a received signal strength indicator (RSSI) measurement on an unlicensed frequency from the radio station on the licensed frequency, wherein The control information includes: information indicating a second period, wherein the second period is composed of a first period and a third period, the first period being capable of transmitting a signal, the third period being not required for the radio terminal to perform the RSSI measurement, the first period occurring periodically with a periodicity of the second period, and the third period being after the first period; and an offset value indicating a subframe number and a system frame number (SFN) at which the first time period starts, and The method further comprises: performing the RSSI measurement during a first time period starting with the subframe number and the SFN indicated by at least the offset value; and The result of the RSSI measurement is transmitted to the radio station on the licensed frequency.

9. A radio terminal comprising: a radio communication device for communicating with a radio station on licensed and unlicensed frequencies; as well as control means for receiving control information associated with a received signal strength indicator (RSSI) measurement on the unlicensed frequency from the radio station on the licensed frequency, wherein The control information includes: information indicating a second time period, wherein the second time period is composed of a first time period and a third time period, the first time period being capable of transmitting signals, the third time period being unnecessary for the radio terminal to perform the RSSI measurement, the first time period occurring periodically with a periodicity of the second time period, and the third time period being after the first time period; as well as an offset value indicating a subframe number and a system frame number (SFN) at which the first time period starts, and The control device is further adapted to: performing the RSSI measurement during a first time period starting with the subframe number and the SFN indicated by at least the offset value, and The result of the RSSI measurement is transmitted to the radio station on the licensed frequency.

Citation Information

Patent Citations

  • Image reception device, program and storage medium

    JP2004186949A

  • Manufacturing method of fuel cell, and anode-side gas diffusion layer integrated seal with reinforcement material

    JP2015002119A

  • Method for clear channel assessment optimization in a wireless local area network

    US7443821B2

  • Dual operation of user equipment in licensed and unlicensed spectrum

    CN103069882A

  • Radio stations, radio terminals, and methods for measuring terminals

    CN107172890B