A steel cage manufacturing tire frame

By designing a reversible connection of steel cages to manufacture tire frames, the problems of high cost of tire frames, repetition of material consumption and low site utilization in the prior art are solved, and efficient production of steel cages of different diameters and rapid conversion of tire frame clamps are achieved.

CN112523513BActive Publication Date: 2025-04-04CHINA RAILWAY BRIDGE BUREAU NO 7 ENG CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202011460176.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-11
Publication Date
2025-04-04
Estimated Expiration
2040-12-11

AI Technical Summary

Technical Problem

In the prior art, the cost of the steel cage is too high, and the repetitive consumption of materials is serious. The repeated disassembly and assembly of the tire frames leads to low site utilization when the steel cages of different diameters are made in a limited working space.

Method used

A steel cage manufacturing tire frame is designed, including the main tire frame clamp, the auxiliary tire frame clamp and the connecting mechanism. The auxiliary tire frame card plate and the fixed plate can be flipped and connected, and the auxiliary tire frame card plate and the main tire frame card plate can be fixedly connected through the connection mechanism to realize the production of steel cages of different diameters.

Benefits of technology

The steel cages of different diameters are made through different tire frame clamps, which avoids repeated disassembly and assembly of the tire frame, saves production sites, reduces materials and engineering volume, and improves the conversion efficiency of the tire frame clamps.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112523513B_ABST
    Figure CN112523513B_ABST
Patent Text Reader

Abstract

The present application relates to a steel cage manufacturing tire frame, and relates to the technical field of steel cage processing. The steel cage manufacturing tire frame includes: a main tire frame pallet, which is vertically arranged on a base; a pallet assembly, including an auxiliary tire frame pallet and a fixed plate; the upper end faces of the auxiliary tire frame pallet and the main tire frame pallet are both arc-shaped, and the upper end faces are provided with a plurality of U-shaped grooves at equal intervals along the arc direction, and the diameter of the arc of the upper end face of the main tire frame pallet and the diameter of the arc of the upper end face of each auxiliary tire frame pallet are different; a connecting mechanism, which is configured to fix the auxiliary tire frame pallet to the main tire frame pallet when any auxiliary tire frame pallet is flipped to be in the same plane as the corresponding fixed plate, and the upper end face of the auxiliary tire frame pallet is higher than the upper end face of the main tire frame pallet. The present application can produce steel cages with different diameters, save the steel cage production site, reduce the materials and engineering volume of the steel cage tire frame, and improve the conversion efficiency of the tire frame pallet when producing steel cages with different diameters.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of steel cage processing, and in particular to a steel cage manufacturing frame. Background Art

[0002] At present, pile foundation is the most common foundation type in the foundations of modern bridges, culverts and buildings. It transfers the load from the superstructure of the bridge and culvert together with its own weight to the foundation. In the field of bridges, as bridges continue to cross large rivers and mountain valleys, in order to better adapt to the terrain characteristics and save costs, different pile foundation diameters exist in the same bridge, such as main pier pile foundation, side pier pile foundation, water pier pile foundation, and land pile foundation. In the construction process of the pile foundation, it is necessary to make steel cages of different diameters for pile foundations of different diameters. At the construction site, the production of steel cages for pile foundations of different diameters and the steel cage processing site have become the focus of attention during the construction process.

[0003] In the related art, the steel cage needs to be made by using a steel cage frame, and each diameter of the steel cage has several steel cage frames. However, when manufacturing steel cages of different diameters, it is necessary to replace the steel cage frame as a whole or to set up a new site to install the frames corresponding to the steel cages of different diameters. This production process is not only time-consuming and labor-intensive, but also has low site utilization, and there are problems such as high cost of the steel cage frame and serious repeated consumption of materials. Summary of the invention

[0004] In view of one of the defects existing in the prior art, the purpose of the present application is to provide a steel cage manufacturing frame to solve the problems of low site utilization in the related technology, high cost of the steel cage frame and serious repeated consumption of materials.

[0005] In order to achieve the above objectives, the present application provides a steel cage manufacturing tire frame, which includes:

[0006] A main tire frame plate, which is vertically arranged on the base;

[0007] A pallet assembly, which is provided with at least one group, the pallet assembly comprises an auxiliary tire frame pallet and a fixed plate, the auxiliary tire frame pallet is flipably connected to the fixed plate, the fixed plate is vertically arranged on the base and is arranged parallel to the main tire frame pallet;

[0008] The upper end surfaces of the auxiliary tire frame pallet and the main tire frame pallet are both arc-shaped, and the upper end surfaces are provided with a plurality of U-shaped grooves for limiting the steel bars at equal intervals along the arc direction. The diameter of the arc of the upper end surface of the main tire frame pallet and the diameter of the arc of the upper end surface of each auxiliary tire frame pallet are different;

[0009] The connecting mechanism is configured to fix any auxiliary tire frame pallet to the main tire frame pallet when the auxiliary tire frame pallet is flipped to be in the same plane as the corresponding fixed plate, and the upper end surface of the auxiliary tire frame pallet is higher than the upper end surface of the main tire frame pallet.

[0010] In some embodiments, the above-mentioned connecting mechanism is provided in plurality, and each connecting mechanism comprises:

[0011] A connecting piece, which is connected to the side of the main tire frame card plate facing the auxiliary tire frame card plate, and is configured to fit tightly with the auxiliary tire frame card plate when the auxiliary tire frame card plate and the fixing plate are located in the same plane;

[0012] A positioning member connected to the connecting member;

[0013] A fastener is passed through the auxiliary tire frame clamping plate, and the fastener is configured to pass through the connecting piece and be fastened to the positioning piece when the auxiliary tire frame clamping plate and the fixing plate are located in the same plane.

[0014] In some embodiments, the connecting member is an angle steel, which includes a first folded edge and a second folded edge connected to each other, the end of the first folded edge away from the second folded edge is welded and fixed to the main tire frame pallet, the end face of the second folded edge facing the main tire frame pallet is fixed with the positioning member, and is provided with a through hole for the fastener to pass through.

[0015] In some embodiments, the plurality of angle steels are mirror-symmetrically arranged on both sides of the main tire frame pallet, the angle steels on each side of the main tire frame pallet are arranged in rows, and the upper end faces of each row of angle steels are located on the same horizontal plane, and the second folded edge portions of the bottom row of angle steels are welded and fixed to the corresponding fixing plates.

[0016] In some embodiments, the auxiliary tire frame clamping plate is connected to the fixed plate via a flip assembly, and the flip assembly is a hinge structure, which includes a flip shaft, and a first hinge body and a second hinge body hinged via the flip shaft;

[0017] The first hinge body is fixed to one end of the fixing plate close to the auxiliary tire frame clamping plate and away from the side of the main tire frame clamping plate;

[0018] The second hinge body is fixed to one end of the auxiliary tire frame clamping plate close to the fixed plate and away from one side of the main tire frame clamping plate.

[0019] In some embodiments, the first hinge body and the second hinge body are provided in plurality, the flip shaft is provided in plurality, and the flip shaft is provided in plurality. The opposite sides of each first hinge body and the second hinge body are provided with hinged protrusions for the flip shaft to pass through.

[0020] In some embodiments, the above-mentioned pallet assembly is provided with two groups, and the two groups of pallet assemblies are respectively arranged on both sides of the above-mentioned main tire frame pallet.

[0021] In some embodiments, the upper end surfaces of the main tire frame pallet and the auxiliary tire frame pallet are both arc-shaped with one-third of a circle, and the diameter of the arc of the upper end surface of the main tire frame pallet is larger than the diameter of the arc of the upper end surface of any auxiliary tire frame pallet.

[0022] In some embodiments, the main tire frame bracket and the auxiliary tire frame bracket are provided with mounting holes near the unopened side of each U-shaped groove, a spring is hung on each mounting hole, and the other end of the spring is provided with a hook for hanging steel bars.

[0023] In some embodiments, the base is fixed to the ground by expansion bolts, and a plurality of stiffening plates are provided on the base. The plurality of stiffening plates are perpendicular to the main tire frame plate and are arranged on both sides thereof, and the two ends of each stiffening plate are respectively welded and fixed to the main tire frame plate and a fixing plate.

[0024] The beneficial effects of the technical solution provided by this application include:

[0025] The present application provides a tire frame for manufacturing a steel cage. Since the main tire frame pallet and the fixed plate are arranged parallel to each other and are both arranged vertically on the base, the auxiliary tire frame pallet and the fixed plate can be flipped and connected. When any auxiliary tire frame pallet is flipped to be located in the same plane as the corresponding fixed plate, the auxiliary tire frame pallet can be fixedly connected to the main tire frame pallet through a connecting mechanism, and the upper end surface of the auxiliary tire frame pallet is higher than the upper end surface of the main tire frame pallet. When the main tire frame pallet needs to be used to manufacture a steel cage, the auxiliary tire frame pallet can be flipped to a point where its upper end surface is lower than the upper end surface of the main tire frame pallet. When the auxiliary tire frame pallet is needed, the auxiliary tire frame pallet can be flipped over to be in the same plane with the corresponding fixed plate and fixedly connected to the main tire frame pallet. At this time, the main tire frame pallet will not affect the auxiliary tire frame pallet. Therefore, steel cages with different diameters can be produced by using different tire frame pallets, avoiding repeated disassembly and assembly of tire frames when producing steel cages of different diameters in a limited working space, saving steel cage production site, reducing the materials and engineering workload for producing steel cage tire frames, and improving the conversion efficiency of tire frame pallets when producing steel cages of different diameters. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0027] Figure 1 A schematic diagram of the structure of a steel cage manufacturing frame according to an embodiment of the present application;

[0028] Figure 2 for Figure 1 Side view of

[0029] Figure 3 This is a schematic structural diagram of the auxiliary tire frame clamping plate of an embodiment of the present application.

[0030] Reference numerals:

[0031] 1. Main tire frame pallet;

[0032] 2. Auxiliary tire frame pallet;

[0033] 3. Fixed plate;

[0034] 4. U-shaped groove;

[0035] 5. Connecting mechanism; 51. Positioning member; 52. Connecting member; 53. Fastener;

[0036] 6. Turning assembly; 61. First hinge body; 62. Second hinge body; 63. Turning axis;

[0037] 7. Spring;

[0038] 8. Hook;

[0039] 9. Base; 91. Expansion bolts; 92. Stiffening plate. DETAILED DESCRIPTION

[0040] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0041] The embodiment of the present application provides a steel cage manufacturing frame, which can solve the problems of low site utilization, high cost of the steel cage frame, and serious repeated consumption of materials in the related technology.

[0042] like Figure 1 and Figure 2 As shown, a steel cage manufacturing tire frame includes a base 9, a main tire frame clamping plate 1, a clamping plate assembly and a connecting mechanism 5.

[0043] The main tire frame clamping plate 1 is vertically arranged on the base 9. The upper end surface of the main tire frame clamping plate 1 is arc-shaped, and the upper end surface is provided with a plurality of U-shaped grooves 4 for limiting the steel bars at equal intervals along the arc direction.

[0044] There is at least one group of pallet assemblies, which include an auxiliary tire frame pallet 2 and a fixed plate 3. The auxiliary tire frame pallet 2 and the fixed plate 3 are flippably connected. The fixed plate 3 is vertically arranged on the base 9 and parallel to the main tire frame pallet 1.

[0045] In this embodiment, the upper end surface of the auxiliary tire frame clamping plate 2 is also arc-shaped, and the upper end surface is provided with a plurality of U-shaped grooves 4 for limiting the steel bars at equal intervals along the arc direction. The diameter of the arc of the upper end surface of the main tire frame clamping plate 1 and the diameter of the arc of the upper end surface of each auxiliary tire frame clamping plate 2 are different, and steel cages with different diameters can be manufactured by using different tire frame clamping plates.

[0046] The connecting mechanism 5 is configured to fix the auxiliary tire frame pallet 2 to the main tire frame pallet 1 when any auxiliary tire frame pallet 2 is flipped to be in the same plane as the corresponding fixed plate 3, and the upper end surface of the auxiliary tire frame pallet 2 is higher than the upper end surface of the main tire frame pallet 1, so that the main tire frame pallet 1 will not affect the production of the steel cage using the auxiliary tire frame pallet 2.

[0047] The steel cage manufacturing tire frame of the present embodiment has a main tire frame pallet and a fixed plate arranged parallel to each other and both arranged vertically on the base, and the auxiliary tire frame pallet and the fixed plate can be flipped and connected. When any auxiliary tire frame pallet is flipped to be in the same plane with the corresponding fixed plate, the auxiliary tire frame pallet can be fixedly connected to the main tire frame pallet through the connecting mechanism, and the upper end surface of the auxiliary tire frame pallet is higher than the upper end surface of the main tire frame pallet. When the main tire frame pallet is needed to manufacture the steel cage, the auxiliary tire frame pallet can be flipped to have its upper end surface lower than the upper end surface of the main tire frame pallet; when the auxiliary tire frame pallet is needed to be used, the auxiliary tire frame pallet can be flipped to be in the same plane with the corresponding fixed plate and fixedly connected to the main tire frame pallet. At this time, the main tire frame pallet will not affect the auxiliary tire frame pallet. Therefore, it is possible to manufacture steel cages with different diameters through different tire frame pallets, avoiding repeated disassembly and assembly of the tire frame when manufacturing steel cages with different diameters in a limited working space, saving the steel cage manufacturing site, reducing the materials and engineering workload for manufacturing the steel cage tire frame, and improving the conversion efficiency of the tire frame pallet when manufacturing steel cages with different diameters.

[0048] Preferably, the above-mentioned connecting mechanism 5 is provided in plurality, and each connecting mechanism 5 includes a positioning member 51 , a connecting member 52 and a fastener 53 .

[0049] The connecting member 52 is connected to the side of the main tire frame pallet 1 facing the auxiliary tire frame pallet 2, and is configured to fit tightly with the auxiliary tire frame pallet 2 when the auxiliary tire frame pallet 2 and the fixing plate 3 are located in the same plane. The positioning member 51 is fixedly connected to the connecting member 52.

[0050] The fastener 53 is passed through the auxiliary tire frame clamping plate 2 , and is configured to pass through the connecting member 52 and be fastened to the positioning member 51 when the auxiliary tire frame clamping plate 2 and the fixing plate 3 are located in the same plane.

[0051] Optionally, the positioning member 51 is a positioning nut, the fastener 53 is a fastening bolt, and the auxiliary tire frame clamping plate 2 is provided with a waist-shaped round hole for the fastening bolt to pass through.

[0052] In this embodiment, the connecting member 52 is an angle steel, which includes a first folded edge and a second folded edge connected to each other. The end of the first folded edge away from the second folded edge is welded and fixed to the main tire frame pallet 1. The positioning member 51 is fixed to the end surface of the second folded edge facing the main tire frame pallet 1. The second folded edge is also provided with a through hole for the fastener 53 to pass through, that is, the second folded edge is provided with a through hole for the fastening bolt to pass through, so that the fastening bolt passes through the waist hole of the auxiliary tire frame pallet 2 and the through hole of the second folded edge in sequence, and is fastened and connected with the positioning nut. Preferably, the first folded edge and the second folded edge are arranged perpendicular to each other.

[0053] Optionally, multiple angle steels are arranged in mirror symmetry on both sides of the main tire frame pallet 1, and the angle steels on each side of the main tire frame pallet 1 are arranged in rows, and the upper end faces of each row of angle steels are located on the same horizontal plane, that is, the lower end faces of each row of angle steels are also located on the same horizontal plane.

[0054] In this embodiment, three rows of angle steels are provided on each side of the main tire frame clamping plate 1, and the bottom row of angle steels is arranged close to the fixing plate 3. Preferably, the second folded edge portion of the bottom row of angle steels is welded and fixed to the corresponding fixing plate 3, and the stability of the fixing plate 3 can be further increased by welding and fixing the second folded edge to the fixing plate 3.

[0055] Optionally, the first folded edges of the angle steels in the non-bottommost row are arranged horizontally, and the first folded edges of the angle steels in the bottommost row are arranged vertically, so as to facilitate welding with the fixing plate 3 .

[0056] In other embodiments, the connecting member 52 may also be a U-shaped steel, which includes a first arm and a second arm arranged parallel to each other, and a horizontal plate connecting the two. The end face of the first arm away from the second arm is welded and fixed to the main tire frame clamping plate 1, and the surface of the second arm facing the first arm is welded and fixed with the positioning nut, and a through hole is also provided for the fastening bolt to pass through.

[0057] Furthermore, the auxiliary tire frame clamping plate 2 is connected to the fixed plate 3 via a flip assembly 6 . The flip assembly 6 is a hinge structure. The flip assembly 6 includes a flip shaft 63 , and a first hinge body 61 and a second hinge body 62 hinged via the flip shaft 63 .

[0058] The first hinge body 61 is fixed to one end of the fixing plate 3 close to the auxiliary tire frame clamping plate 2 and away from the side of the main tire frame clamping plate 1 .

[0059] The second hinge body 62 is fixed to one end of the auxiliary tire frame clamping plate 2 close to the fixing plate 3 and away from the side of the main tire frame clamping plate 1 .

[0060] In this embodiment, the first hinge body 61 is welded and fixed on the fixing plate 3 , and the second hinge body 62 is welded and fixed on the corresponding auxiliary tire frame clamping plate 2 .

[0061] In this embodiment, the first hinge body 61 and the second hinge body 62 are each provided with a plurality, and the flip shaft 63 is provided with one. The opposite sides of each first hinge body 61 and the second hinge body 62 are provided with a hinged protrusion for the flip shaft 63 to pass through. The auxiliary tire frame plate 2 adjusts its direction by rotating the flip shaft 63 to approach and move away from the main tire frame plate 1.

[0062] Preferably, the above-mentioned pallet assembly is provided with two groups, and the two groups of pallet assemblies are respectively arranged on both sides of the above-mentioned main tire frame pallet 1.

[0063] In this embodiment, three types of steel cages with different diameters can be manufactured by using a main tire frame pallet 1 and two auxiliary tire frame pallets 2 to meet the actual basic needs of on-site construction.

[0064] In this embodiment, the upper end faces of the main tire frame pallet 1 and the auxiliary tire frame pallet 2 are both arc-shaped with one-third of a circle, and the diameter of the arc of the upper end face of the main tire frame pallet 1 is larger than the diameter of the arc of the upper end face of any auxiliary tire frame pallet 2.

[0065] like Figure 3 As shown, optionally, the main tire frame clamp 1 and the auxiliary tire frame clamp 2 are provided with mounting holes near the unopened side of each U-shaped groove 4, and a spring 7 is hung on each mounting hole. The other end of the spring 7 is provided with a hook 8 for hanging steel bars. When the steel bars are placed in the U-shaped groove 4, they can be hung on the steel bars through the hook 8 to achieve further limiting effect on the steel bars and prevent the steel bars from escaping from the U-shaped groove 4.

[0066] In this embodiment, the base 9 is fixed to the ground by expansion bolts 91, wherein at least four expansion bolts 91 are provided. The base 9 is also provided with a plurality of stiffening plates 92, which are perpendicular to the main tire frame card plate 1 and arranged on both sides thereof, and the two ends of each stiffening plate 92 are respectively welded and fixed to the main tire frame card plate 1 and a fixing plate 3.

[0067] In this embodiment, four stiffening plates 92 are provided, and two stiffening plates 92 are vertically provided on both sides of the main tire frame card plate 1, and the stiffening plates 92 are perpendicular to the base 9 and the fixing plate 3. The main tire frame card plate 1 and the fixing plate 3 can be more firmly stabilized on the base 9 through the stiffening plates 92.

[0068] In this embodiment, when a steel cage with the largest diameter needs to be manufactured, the auxiliary tire frame pallets 2 on both sides of each main tire frame pallet 1 only need to be flipped outward to touch the ground, and the main tire frame pallet 1 can be used to manufacture the steel cage.

[0069] When it is necessary to make steel cages of other diameters, each steel cage is adjusted to make a tire frame, and the specific steps include:

[0070] First, all the fastening bolts on the auxiliary tire frame clamping plate 2 corresponding to the steel reinforcement cage of non-corresponding diameter are taken out, and the auxiliary tire frame clamping plate 2 is flipped by the flipping assembly 6 until one end is against the ground.

[0071] Then, another auxiliary tire frame pallet 2, that is, the auxiliary tire frame pallet 2 corresponding to the steel cage of the corresponding diameter, is flipped by the flip assembly 6 to fit closely with the angle steel, and the fastening bolts are passed through the waist round hole of the auxiliary tire frame pallet 2 and the through hole of the second folded edge of the angle steel in sequence, and then fastened with the positioning nut to complete the positioning of the auxiliary tire frame pallet 2. Then, the steel cage of the required diameter can be processed.

[0072] For steel cages of different diameters, it is only necessary to make several steel cage manufacturing frames according to the length of the steel cages, and then replace the corresponding frame pallet for each steel cage manufacturing frame, and then adjust each steel cage manufacturing frame according to the above steps.

[0073] When manufacturing the steel cage, the hook 8 on each spring 7 can also be hung on the corresponding main reinforcement to fix the main reinforcement and prevent the main reinforcement from escaping from the U-shaped groove 4.

[0074] The steel cage manufacturing frame of this embodiment has a simple structure, which can not only improve the work efficiency and site utilization when manufacturing the steel cage, but also save materials and engineering workload for processing the steel cage manufacturing frame.

[0075] In the description of the present application, it should be noted that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to the specific circumstances.

[0076] It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0077] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.

Claims

1. A steel cage manufacturing tire frame, characterized in that: It includes: A main tire frame clamping plate (1) vertically arranged on the base (9); A pallet assembly, which is provided with at least one group, the pallet assembly comprising an auxiliary tire frame pallet (2) and a fixing plate (3), the auxiliary tire frame pallet (2) and the fixing plate (3) being flippably connected, the fixing plate (3) being vertically arranged on the base (9) and arranged parallel to the main tire frame pallet (1); The upper end surfaces of the auxiliary tire frame clamping plate (2) and the main tire frame clamping plate (1) are both arc-shaped, and the upper end surfaces are provided with a plurality of U-shaped grooves (4) for limiting the position of the steel bars at equal intervals along the arc direction, and the diameter of the arc of the upper end surface of the main tire frame clamping plate (1) and the diameter of the arc of the upper end surface of each auxiliary tire frame clamping plate (2) are different; A connecting mechanism (5) is configured to fix the auxiliary tire frame card plate (2) to the main tire frame card plate (1) when any auxiliary tire frame card plate (2) is flipped over to be located on the same plane as the corresponding fixed plate (3), and the upper end surface of the auxiliary tire frame card plate (2) is higher than the upper end surface of the main tire frame card plate (1); The pallet assembly is provided with two groups, and the two groups of pallet assemblies are respectively arranged on both sides of the main tire frame pallet (1); The upper end faces of the main tire frame card plate (1) and the auxiliary tire frame card plate (2) are both in the shape of an arc of one-third of a circle, and the diameter of the arc of the upper end face of the main tire frame card plate (1) is greater than the diameter of the arc of the upper end face of any auxiliary tire frame card plate (2).

2. The steel cage manufacturing tire frame according to claim 1, characterized in that: The connecting mechanism (5) is provided in plurality, and each connecting mechanism (5) comprises: A connecting member (52) connected to a side of the main tire frame cardboard (1) facing the auxiliary tire frame cardboard (2), and configured to fit tightly with the auxiliary tire frame cardboard (2) when the auxiliary tire frame cardboard (2) and the fixing plate (3) are located in the same plane; A positioning member (51) connected to the connecting member (52); A fastener (53) is inserted through the auxiliary tire frame card plate (2), and the fastener (53) is configured to penetrate into the connecting piece (52) and be fastened to the positioning piece (51) when the auxiliary tire frame card plate (2) and the fixing plate (3) are located in the same plane.

3. The steel cage manufacturing cradle according to claim 2, characterized in that: The connecting piece (52) is an angle steel, and the angle steel comprises a first folded edge and a second folded edge connected to each other, the end of the first folded edge away from the second folded edge is welded and fixed to the main tire frame card plate (1), and the end surface of the second folded edge facing the main tire frame card plate (1) is fixed with the positioning piece (51) and is provided with a through hole for the fastener (53) to pass through.

4. The steel cage manufacturing cradle according to claim 3, characterized in that: The plurality of angle steels are arranged in a mirror-symmetrical manner on both sides of the main tire frame pallet (1); the angle steels on each side of the main tire frame pallet (1) are arranged in rows, and the upper end faces of each row of angle steels are located on the same horizontal plane; the second folded edge portions of the bottom row of angle steels are welded and fixed to the corresponding fixing plates (3).

5. The steel cage manufacturing cradle according to claim 1, characterized in that: The auxiliary tire frame clamping plate (2) is connected to the fixed plate (3) via a flip assembly (6); the flip assembly (6) is a hinge structure, comprising a flip shaft (63), and a first hinge body (61) and a second hinge body (62) hingedly connected via the flip shaft (63); The first hinge body (61) is fixed to one end of the fixing plate (3) close to the auxiliary tire frame clamping plate (2) and to a side away from the main tire frame clamping plate (1); The second hinge body (62) is fixed to one end of the auxiliary tire frame clamping plate (2) close to the fixing plate (3) and to a side away from the main tire frame clamping plate (1).

6. The steel cage manufacturing cradle according to claim 5, characterized in that: The first hinge body (61) and the second hinge body (62) are each provided with a plurality, the flip shaft (63) is provided with one, and the opposite sides of each first hinge body (61) and the second hinge body (62) are provided with a hinged protrusion for the flip shaft (63) to pass through.

7. The steel cage manufacturing cradle according to claim 1, characterized in that: The main tire frame clamping plate (1) and the auxiliary tire frame clamping plate (2) are provided with mounting holes on the unopened side close to each U-shaped groove (4), and a spring (7) is hung on each mounting hole. The other end of the spring (7) is provided with a hook (8) for hanging a steel bar.

8. The steel cage manufacturing cradle according to claim 1, characterized in that: The base (9) is fixed to the ground by expansion bolts (91), and a plurality of stiffening plates (92) are provided on the base (9). The plurality of stiffening plates (92) are perpendicular to the main tire frame card plate (1) and are arranged on both sides thereof, and the two ends of each stiffening plate (92) are respectively welded and fixed to the main tire frame card plate (1) and a fixing plate (3).

Citation Information

Patent Citations

  • Reinforcement cage manufacturing jig frame

    CN214091053U