A high-precision weak current engineering detection method, system, and storage medium

By analyzing the internal circuit detection information of the fire box and the data of fault maintenance personnel, the personnel who complete the maintenance are selected as soon as possible and provide a route indicator map, the problem of low maintenance efficiency in firefighting weak current projects is solved, and fast and accurate fault handling is achieved. .

CN112801385BActive Publication Date: 2024-11-05HUNAN MINGXUN LOW-ALTITUDE ECONOMIC DEVELOPMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110149589.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-02-03
Publication Date
2024-11-05
Estimated Expiration
2041-02-03

AI Technical Summary

Technical Problem

In the safety inspection of fire weak current projects, it is difficult for the system backend administrator to accurately judge and assign maintenance personnel to complete the maintenance task as soon as possible, resulting in inefficient maintenance.

Method used

By obtaining the internal circuit detection information of the fire box, analyzing the fault condition, and combining the arrival time and maintenance success rate of the faulty maintenance personnel, the personnel who are expected to complete the maintenance as soon as possible are selected, and the route indicators are displayed in the building to assist the maintenance personnel. Quickly reach the faulty location.

Benefits of technology

It improves the maintenance efficiency of fire box failures, ensures the shortest maintenance time and the highest success rate, and speeds up the maintenance process of faulty fire box to the greatest extent.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112801385B_ABST
    Figure CN112801385B_ABST
Patent Text Reader

Abstract

The present application relates to a high-precision weak current engineering detection method, system, and storage medium, and relates to the technical field of weak current engineering technology. It solves the problem that when the system backend administrator assigns maintenance personnel, he often makes subjective judgments on their maintenance efficiency based on personal experience, and is also uncertain about the location of the assigned personnel, which easily causes the assigned personnel to spend a lot of time and energy to complete the corresponding fire extinguisher maintenance. It includes: obtaining the internal circuit detection information of the fire extinguisher; analyzing whether the internal circuit detection information of the fire extinguisher falls within the preset internal circuit detection information range; and selecting the personnel who are expected to complete the maintenance of the faulty fire extinguisher the fastest as the notified faulty maintenance personnel, and sending information notifications. The present application can more accurately analyze and confirm the maintenance personnel who takes the shortest time to complete the maintenance of the fire extinguisher and notify them, thereby improving the maintenance efficiency of the faulty fire extinguisher.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to a technical field of weak current engineering technology, and in particular to a high-precision weak current engineering detection method, system, and storage medium. Background Art

[0002] Weak current engineering is a category of power application. Power application can be divided into strong current and weak current according to the strength of power transmission. The power used in buildings and building complexes generally refers to weak current of AC 220V 50Hz and below.

[0003] There is a kind of weak current engineering related to fire protection. Since the circuits involved are all weak current lines, they are generally referred to as "fire protection weak current". The safety detection of fire protection weak current is related to fire safety and is very important.

[0004] At present, the safety detection of fire-fighting weak current is mainly achieved by installing a fire-fighting weak current engineering safety detection device on one side of the fire-fighting weak current box. The fire-fighting weak current engineering safety detection device is mainly used to detect the conditions of each detection circuit in the fire-fighting box, and feedback to the system background when a detection circuit failure occurs, allowing the system background administrator to independently determine the appropriate maintenance personnel and send them for maintenance.

[0005] With respect to the above-mentioned related technologies, the inventors believe that there are the following defects: when the system backend administrator assigns maintenance personnel, he often makes subjective judgments on their maintenance efficiency based on his personal experience, and is also unsure of the location of the assigned personnel, which may easily cause the assigned personnel to spend a lot of time and energy to complete the maintenance of the corresponding fire extinguisher box. Summary of the invention

[0006] In order to more accurately analyze and identify the maintenance personnel who completes the fire extinguisher box maintenance in the shortest time and notify them, thereby improving the maintenance efficiency of faulty fire extinguisher boxes, the present application provides a high-precision weak current engineering detection method, system, and storage medium.

[0007] In the first aspect, the present application provides a high-precision weak current engineering detection method, which adopts the following technical solution:

[0008] A high-precision weak current engineering detection method, comprising:

[0009] Obtaining internal circuit detection information of fire extinguishing boxes, which are multiple and distributed in various places inside the building;

[0010] Analyze whether the internal circuit detection information of the fire extinguisher box falls within the preset internal circuit detection information range;

[0011] If the internal circuit detection information of the fire extinguisher box falls within the preset internal circuit detection information range, no reminder will be given; otherwise, based on the internal circuit detection information that does not fall within the preset internal circuit detection information range, possible fire extinguisher box failure conditions are analyzed, and based on the analyzed possible fire extinguisher box failure conditions, the estimated time for the fault maintenance personnel to arrive at the faulty fire extinguisher box, and the estimated maintenance time for the fault maintenance personnel, the personnel who are expected to complete the maintenance of the faulty fire extinguisher box the fastest are selected as the notified fault maintenance personnel, and an information notification is sent;

[0012] Obtain information on whether the notified person has arrived at the corresponding building. If the notified person has arrived at the corresponding building, generate an adaptive route indication map of the faulty fire extinguisher box based on the relative positions of all fire extinguishers in the corresponding building and the faulty fire extinguisher box, and send the route indication map of the faulty fire extinguisher box to the display screen of the corresponding fire extinguisher box for real-time display;

[0013] When the notified personnel arrive at the location of the faulty fire extinguisher, the real-time display of other fire extinguisher display screens in the building will be stopped.

[0014] By adopting the above technical scheme, it is possible to effectively analyze whether there is a fault in the internal circuit of the fire extinguisher box, and when there is a fault in the internal circuit of the fire extinguisher box, analyze the probability of possible failure of the fire extinguisher box, and combine the total time consumed by different fault maintenance personnel to reach the location of the faulty fire extinguisher box and complete the maintenance of the corresponding faulty fire extinguisher box, screen out the fault maintenance personnel with the shortest total time, and further consider the situation that when the fault maintenance personnel arrive at the building where the corresponding faulty fire extinguisher box is located, because there are many fire extinguisher boxes distributed in different situations in the building, the fault maintenance personnel are not familiar with it, by displaying a route instruction map from the corresponding fire extinguisher box to the faulty fire extinguisher box on each fire extinguisher box, it is effectively assisted for the fault maintenance personnel who arrive at the scene to determine the location of the faulty fire extinguisher box as soon as possible and reach the faulty fire extinguisher box. In summary, the effective maintenance of the faulty fire extinguisher box is accelerated to the greatest extent.

[0015] Optional, possible fire extinguisher box failure analysis steps are as follows:

[0016] Acquiring internal circuit detection information that does not fall within a preset internal circuit detection information range;

[0017] From a preset first database that stores inconsistent internal circuit detection information, possible faults caused by the corresponding inconsistent internal circuit detection information, and corresponding fault probabilities, the inconsistent internal circuit detection information is used as a query object to find out the possible faults caused by the corresponding inconsistent internal circuit detection information and the corresponding fault probabilities.

[0018] By adopting the above technical solution, it is possible to effectively analyze the possible faults and corresponding fault situations of the fire box based on the internal detection signals of the fire box outside the preset range and the pre-set first database.

[0019] Optionally, the analysis steps for the estimated repair time of the fault by the fault repair personnel are as follows:

[0020] Obtain the possible faults and corresponding fault probabilities caused by the inconsistent internal circuit detection information;

[0021] From the pre-set second database storing fault repair personnel, the repair time and repair success rate of the corresponding fault repair personnel for different faults, one by one, taking the fault repair personnel as the query object, obtain the repair time and repair success rate of each fault repair personnel for different faults;

[0022] Based on the repair time of each fault repair personnel for different faults and the probability of the possible fault, apply the pre-constructed calculation formula for the effective repair time of the fault repair personnel to repair the faulty fire box, and calculate the effective repair time of each fault repair personnel to repair the current faulty fire box one by one. The pre-constructed calculation formula for the fault repair personnel to repair the faulty fire box is as follows:

[0023] Z = A1*q1 + A2*q2 +......A i *q i +......A n *q n , 0 < i <= n, i is a natural number;

[0024] Where,

[0025] Z is the effective repair time of the fault repair personnel to repair the current faulty fire box;

[0026] n is the total number of faults obtained;

[0027] A i is the effective repair time of the fault repair personnel to repair the i-th fault;

[0028] A n is the effective repair time of the fault repair personnel to repair the n-th fault;

[0029] q i is the probability of the i-th fault;

[0030] q n is the probability of the n-th fault.

[0031] By adopting the above technical solution, the maintenance time consumed by each fault maintenance personnel for different faults can be effectively obtained. At the same time, combined with the probability of possible failure of the fire extinguisher box and applying the pre-built calculation formula for the fault maintenance personnel to repair the faulty fire extinguisher box, the effective maintenance time for each fault maintenance personnel to repair the current faulty fire extinguisher box can be effectively analyzed and calculated, thereby facilitating more accurate screening of the fault maintenance personnel with the shortest overall time consumption.

[0032] Optionally, the steps for obtaining the estimated time required for the fault maintenance personnel to reach the faulty fire extinguisher box are as follows:

[0033] Obtain the location of the fault maintenance personnel, the entrance location of the building where the faulty fire fighting box is located, and the location of the faulty fire fighting box;

[0034] Taking the location of each fault maintenance personnel as the starting point and the entrance of the building where the faulty fire extinguisher is located as the end point, the route from each fault maintenance personnel to the entrance of the building where the faulty fire extinguisher is located is planned and the distance of the corresponding route is obtained;

[0035] The distance of the corresponding route is used as the dividend, and the preset driving speed of the corresponding fault maintenance personnel is used as the divisor, and the time taken by each corresponding fault maintenance personnel to reach the building where the fault fire extinguisher box is located is calculated one by one. Simultaneously, based on the location of the fault fire extinguisher box, the entrance location of the building where the fault fire extinguisher box is located, the frequency of the corresponding fault maintenance personnel to the building, and the unit time moving time of the corresponding fault maintenance personnel under different frequency ranges, the estimated time taken by the corresponding fault maintenance personnel from the building entrance to the fault fire extinguisher box is analyzed;

[0036] The estimated time for the corresponding fault maintenance personnel to reach the fault fire extinguishing box from the building entrance is added to the time it takes for the corresponding fault maintenance personnel to reach the building where the fault fire extinguishing box is located, which is used as the estimated time for the fault maintenance personnel to reach the fault fire extinguishing box.

[0037] By adopting the above technical solution, the estimated time for the fault maintenance personnel to reach the fault fire extinguisher box is divided into the time for the fault maintenance personnel to reach the entrance of the building where the fault fire extinguisher box is located, and the time for the fault maintenance personnel to travel from the entrance of the building where the fault fire extinguisher box is located to the specific location of the fault fire extinguisher box. Compared with the current existing navigation system which simply analyzes the time for the fault maintenance personnel to reach the entrance of the building where the fault fire extinguisher box is located, it further improves the analysis and calculation of the estimated time for the fault maintenance personnel to reach the fault fire extinguisher box.

[0038] Optionally, the analysis steps for the estimated time required for the corresponding fault maintenance personnel to travel from the building entrance to the faulty fire extinguisher box are as follows:

[0039] Obtain the location of the faulty fire extinguisher and the entrance location of the building where the faulty fire extinguisher is located, plan the shortest route from the entrance location of the building where the faulty fire extinguisher is located to the location of the faulty fire extinguisher and obtain the distance of the corresponding shortest route;

[0040] From a preset third database storing fault maintenance personnel, the frequency of the corresponding fault maintenance personnel entering the corresponding building, and the speed at which the corresponding fault maintenance personnel find the fault fire extinguisher box within different frequency ranges, the fault maintenance personnel and the corresponding building are taken as query objects, the frequency of the corresponding fault maintenance personnel entering the corresponding building, and the speed at which the corresponding fault maintenance personnel find the fault fire extinguisher box within different frequency ranges are obtained, and the speed at which the corresponding fault maintenance personnel find the fault fire extinguisher box after entering the corresponding building is analyzed;

[0041] The distance of the corresponding shortest route is taken as the dividend, and the speed at which the corresponding fault maintenance personnel find the faulty fire extinguisher box after entering the corresponding building is taken as the divisor, and the estimated time required for the corresponding fault maintenance personnel to travel from the building entrance to the faulty fire extinguisher box is calculated and analyzed.

[0042] By adopting the above technical solution, based on the historical frequency of fault maintenance personnel arriving at the building where the corresponding fault fire extinguisher is located, the speed of the fault maintenance personnel in different frequency ranges can be effectively determined, so that the estimated time taken for the fault maintenance personnel to travel from the building entrance to the fault fire extinguisher can be analyzed more accurately.

[0043] Optional, screening steps for personnel who are expected to complete the repair of a faulty fire extinguisher the fastest are as follows:

[0044] The sum of the estimated time it takes for the corresponding fault maintenance personnel to reach the faulty fire extinguishing box and the estimated time it takes for the fault maintenance personnel to repair the fault is taken as the total time it takes for the corresponding fault maintenance personnel to complete the repair of the faulty fire extinguishing box;

[0045] The fault repair personnel who takes the least total time to complete the repair of the faulty fire extinguishing box are selected as the personnel who are expected to complete the repair of the faulty fire extinguishing box the fastest.

[0046] By adopting the above technical solution, the estimated time for the fault maintenance personnel to travel from the building entrance to the faulty fire extinguisher box and the estimated repair time for the fault by the fault maintenance personnel are comprehensively considered, so as to more accurately analyze the fault maintenance personnel with the shortest total time to complete the repair of the faulty fire extinguisher box.

[0047] Optionally, the high-precision weak current engineering detection method further includes a step after selecting the personnel who are expected to complete the repair of the faulty fire extinguisher box the fastest as the notified fault repair personnel and before sending the information notification;

[0048] If there are multiple personnel who are expected to complete the repair of the faulty fire extinguisher box the fastest, the personnel who are expected to complete the repair of the faulty fire extinguisher box the fastest are used as query objects one by one, and the repair success rates of the corresponding fault repair personnel for different faults are obtained from the second database;

[0049] Based on the repair success rates of the corresponding fault maintenance personnel for different faults and the probability of possible faults, the overall effective repair success rate calculation formula of the corresponding fault maintenance personnel constructed in advance is applied to calculate the overall effective repair success rate calculation formula of the corresponding fault maintenance personnel. The pre-constructed overall effective repair success rate calculation formula of the corresponding fault maintenance personnel is specifically as follows:

[0050] Y=a1*q1+......a i *q i +......a n *q n;

[0051] in,

[0052] Y is the overall effective repair success rate of the fault maintenance personnel;

[0053] a i is the repair success rate of the fault maintenance personnel for the i-th fault;

[0054] a n The repair success rate of the fault maintenance personnel for the nth fault;

[0055] n is the total number of faults obtained;

[0056] q i is the probability of the i-th failure;

[0057] q n is the probability of the nth failure.

[0058] From among multiple personnel who are expected to complete the repair of the faulty fire extinguishing box fastest, the faulty repair personnel with the highest overall effective repair success rate are selected as the personnel who need to be notified.

[0059] By adopting the above technical solution, it is further taken into consideration that when there are multiple people who are expected to complete the repair of the faulty fire extinguisher box the fastest, the success rate of the corresponding fault maintenance personnel for repairing different faults and the probability of possible faults can be effectively analyzed by combining the success rate of the fault maintenance personnel for repairing the current faulty fire extinguisher box.

[0060] Optionally, the steps of generating a faulty fire extinguisher box route indication map based on the locations of all fire extinguisher boxes in the corresponding building and the locations of the faulty fire extinguisher boxes are as follows:

[0061] Obtain the relative position of each fire extinguisher box and the faulty fire extinguisher box in the corresponding building in space;

[0062] A travel route map from each fire fighting box in the corresponding building to the corresponding faulty fire fighting box is planned one by one as a route indication map applicable to the corresponding fire fighting box.

[0063] By adopting the above technical solution, when the fault maintenance personnel arrive at the building where the faulty fire extinguisher is located, a route instruction map from the corresponding fire extinguisher to the faulty fire extinguisher can be displayed on each fire extinguisher, thereby further facilitating the fault maintenance personnel to more accurately understand the location of the faulty fire extinguisher.

[0064] In the second aspect, the present application provides a high-precision weak current engineering detection system, which adopts the following technical solutions:

[0065] A high-precision weak-current engineering detection system comprises a memory, a processor and a program stored in the memory and executable on the processor, wherein the program can be loaded and executed by the processor to implement a high-precision weak-current engineering detection method as described in any one of the above claims.

[0066] By adopting the above technical scheme and calling the program, it is possible to effectively analyze whether the internal circuit of the fire extinguisher box is faulty, and in the case of a fault in the internal circuit of the fire extinguisher box, analyze the probability of possible failure of the fire extinguisher box, and combine the total time taken by different fault maintenance personnel to reach the location of the faulty fire extinguisher box and complete the maintenance of the corresponding faulty fire extinguisher box, screen out the fault maintenance personnel with the shortest total time, and further consider the situation that when the fault maintenance personnel arrive at the building where the corresponding faulty fire extinguisher box is located, because there are many fire extinguisher boxes distributed in different situations in the building, the fault maintenance personnel are not familiar with it, by displaying a route instruction map from the corresponding fire extinguisher box to the faulty fire extinguisher box on each fire extinguisher box, the fault maintenance personnel who arrive at the scene are effectively assisted to determine the location of the faulty fire extinguisher box and reach the faulty fire extinguisher box as soon as possible. In summary, the effective maintenance of the faulty fire extinguisher box is accelerated to the greatest extent.

[0067] In a third aspect, the present application provides a computer storage medium, which adopts the following technical solution:

[0068] A computer storage medium includes a program that can be loaded and executed by a processor to implement a high-precision weak current engineering detection method as described in any one of the above claims.

[0069] By adopting the above technical scheme and calling the program, it is possible to effectively analyze whether the internal circuit of the fire extinguisher box is faulty, and in the case of a fault in the internal circuit of the fire extinguisher box, analyze the probability of possible failure of the fire extinguisher box, and combine the total time taken by different fault maintenance personnel to reach the location of the faulty fire extinguisher box and complete the maintenance of the corresponding faulty fire extinguisher box, screen out the fault maintenance personnel with the shortest total time, and further consider the situation that when the fault maintenance personnel arrive at the building where the corresponding faulty fire extinguisher box is located, because there are many fire extinguisher boxes distributed in different situations in the building, the fault maintenance personnel are not familiar with it, by displaying a route instruction map from the corresponding fire extinguisher box to the faulty fire extinguisher box on each fire extinguisher box, the fault maintenance personnel who arrive at the scene are effectively assisted to determine the location of the faulty fire extinguisher box and reach the faulty fire extinguisher box as soon as possible. In summary, the effective maintenance of the faulty fire extinguisher box is accelerated to the greatest extent.

[0070] In summary, the beneficial technical effects of this application are:

[0071] 1. Be able to effectively analyze whether the fire extinguisher box is faulty and the specific fault situation, and determine the appropriate fault maintenance personnel based on the fault situation analysis.

[0072] 2. When the fault maintenance personnel arrive at the building where the faulty fire fighting box is located, a route instruction map from the corresponding fire fighting box to the faulty fire fighting box can be displayed on each fire fighting box, so as to facilitate the fault maintenance personnel to reach the location of the faulty fire fighting box as soon as possible. BRIEF DESCRIPTION OF THE DRAWINGS

[0073] Figure 1 It is a schematic diagram of the overall steps of the high-precision weak current engineering detection method according to the embodiment of the present application.

[0074] Figure 2 yes Figure 1 Schematic diagram of the analysis steps for possible fire extinguisher box failure situations mentioned in step SA00.

[0075] Figure 3 yes Figure 1 Schematic diagram of the analysis steps of the estimated repair time of the fault by the fault maintenance personnel mentioned in step SA00.

[0076] Figure 4 yes Figure 1 Schematic diagram of the steps for obtaining the estimated time required for the fault maintenance personnel to reach the faulty fire extinguishing box mentioned in step SA00.

[0077] Figure 5 yes Figure 4 Schematic diagram of the analysis steps for the estimated time consumed by the corresponding fault maintenance personnel from the building entrance to the faulty fire extinguishing box mentioned in step SA40.

[0078] Figure 6 yes Figure 1 Schematic diagram of the screening steps for the personnel who are expected to complete the repair of the faulty fire extinguishing box the fastest as mentioned in step SA00.

[0079] Figure 7 is located in Figure 1 Schematic diagram of the steps of selecting the personnel who are expected to complete the repair of the faulty fire extinguisher box the fastest as the notified fault repair personnel and sending the information notification as mentioned in step SA00.

[0080] Figure 8 yes Figure 1 Schematic diagram of the steps mentioned in step SB00 of generating a faulty fire box route indication map based on the locations of all fire boxes located in the corresponding building and the locations of the faulty fire boxes. DETAILED DESCRIPTION

[0081] The present application is further described in detail below in conjunction with the accompanying drawings.

[0082] Reference Figure 1 , which is a high-precision weak current engineering detection method disclosed in the present application, including step S100, step S200, step Sa00, step SA00, step SB00, and step SC00, wherein step Sa00 and step SA00 are parallel steps.

[0083] In step S100, internal circuit detection information of a fire extinguisher box is obtained. There are several fire extinguisher boxes distributed in various places inside the building.

[0084] Specifically, the internal circuit of the fire extinguisher box mentioned in step S100 includes but is not limited to an ambient temperature detection circuit, a smoke concentration detection circuit and a gas concentration circuit. Taking the above circuits as examples, the ambient temperature detection circuit is used for the external temperature, the smoke concentration detection circuit is used to detect whether there is smoke in the outside world, and the gas concentration circuit can be used to detect the concentration of various gases such as carbon dioxide and carbon monoxide in the outside world. Based on the above, when the external temperature is high and there is smoke in the outside world, and when a high concentration of related gases such as carbon dioxide and carbon monoxide is detected, it can be judged that there is a fire in the outside world.

[0085] The internal circuit detection information of the fire extinguisher box is the detection information for the internal circuit of the fire extinguisher box, and the detection content includes the voltage and current conditions of each circuit. By analyzing the voltage and current conditions of each circuit, it can be effectively determined whether each circuit is operating normally.

[0086] In step S200, it is analyzed whether the internal circuit detection information of the fire extinguisher box falls within a preset internal circuit detection information range.

[0087] Specifically, the analysis of whether the internal circuit detection information of the fire extinguisher box falls within the preset internal circuit detection information range mentioned in step S200 mainly analyzes whether the line voltage information detected by each circuit falls within the preset voltage range of the corresponding circuit, and analyzes whether the line current information detected by each circuit falls within the preset current range of the corresponding circuit.

[0088] In step Sa00, if the internal circuit detection information of the fire extinguisher box falls within the preset internal circuit detection information range, no reminder is given.

[0089] In step SA00, on the contrary, based on the internal circuit detection information that does not fall within the preset internal circuit detection information range, the possible fire extinguisher box failure conditions are analyzed, and based on the analyzed possible fire extinguisher box failure conditions, the estimated time for the fault maintenance personnel to arrive at the faulty fire extinguisher box, and the estimated repair time for the fault maintenance personnel, the personnel who are expected to complete the repair of the faulty fire extinguisher box the fastest are screened out as the notified fault maintenance personnel, and an information notification is sent.

[0090] Specifically, the information notification mentioned in step SA00 may be sent via text message or voice dialing, and the specific number may be obtained by retrieving a preset database storing the mobile phone numbers of the fault maintenance personnel.

[0091] For example, assuming that part of the line voltage of the ambient temperature detection circuit inside the fire extinguishing box does not fall within the preset voltage range, the possible fault conditions may be as follows: Possible fault 1: poor line contact or broken line, short circuit grounding fault; Possible fault 2: uneven load distribution of the power supply transformer; Possible fault 3: low voltage on the low-voltage side of the power supply transformer.

[0092] Reference Figure 2 The analysis steps of possible fire extinguisher box failure conditions mentioned in step SA00 can be divided into steps SAa0 to SAb0.

[0093] In step SAa0, internal circuit detection information that does not fall within a preset internal circuit detection information range is obtained.

[0094] In step SAb0, from a preset first database storing inconsistent internal circuit detection information, possible faults caused by the corresponding inconsistent internal circuit detection information, and corresponding fault probabilities, the inconsistent internal circuit detection information is used as a query object to find out the possible faults caused by the corresponding inconsistent internal circuit detection information and the corresponding fault probabilities.

[0095] Reference Figure 3, wherein, the analysis steps of the estimated repair time of the fault by the fault repair personnel mentioned in step SA00 can be divided into steps SAA0 to SAC0.

[0096] In step SAA0, obtain the possible faults and corresponding fault probabilities caused by the inconsistent internal circuit detection information.

[0097] In step SAB0, from the second database preset with fault repair personnel, the repair time and repair success rate of the corresponding fault repair personnel for different faults, one by one, use the fault repair personnel as the query object to obtain the repair time and repair success rate of each fault repair personnel for different faults.

[0098] In step SAC0, based on the repair time of each fault repair personnel for different faults and the probability of possible faults, apply the pre-constructed calculation formula for the effective repair time of the fault repair personnel to repair the faulty fire box, and calculate the effective repair time of each fault repair personnel to repair the current faulty fire box one by one. The pre-constructed calculation formula for the fault repair personnel to repair the faulty fire box is as follows: Z = A1*q1 + A2*q2 +......A i *q i +......A n *q n , 0 < i <= n, i is a natural number; where, Z is the effective repair time of the fault repair personnel to repair the current faulty fire box; n is the total number of faults obtained; A i is the effective repair time of the fault repair personnel to repair the i-th fault; A n is the effective repair time of the fault repair personnel to repair the n-th fault; q i is the probability of the i-th fault; q n is the probability of the n-th fault.

[0099] For example, there are currently repair personnel A, B, and C. The current detected situation is that the voltage of some lines of the environmental temperature detection circuit inside the fire box does not fall within the preset voltage range. In this case, there are three possible faults, as follows: Possible fault 1: poor line contact or disconnection, short-circuit grounding fault, with a probability of occurrence of 30%; Possible fault 2: uneven load distribution of the power supply transformer, with a probability of occurrence of 30%; Possible fault 3: low voltage on the low-voltage side of the power supply transformer, with a probability of occurrence of 40%.

[0100] It takes 40 minutes for A to repair possible fault 1, 50 minutes for A to repair possible fault 2, and 60 minutes for A to repair possible fault 3. Then, according to the pre-constructed calculation formula for the effective maintenance time of the fault maintenance personnel to repair the faulty fire extinguishing box, it can be calculated that the effective maintenance time of A for the currently faulty fire extinguishing box is 51 minutes; the maintenance time of B for possible fault 1 is 50 minutes, the maintenance time of B for possible fault 2 is 55 minutes, and the maintenance time of B for possible fault 3 is 70 minutes. Then, the effective maintenance time of B for the currently faulty fire extinguishing box is 59.5 minutes; the maintenance time of C for possible fault 1 is 45 minutes, the maintenance time of C for possible fault 2 is 50 minutes, and the maintenance time of C for possible fault 3 is 70 minutes. Then, the effective maintenance time of C for the currently faulty fire extinguishing box is 56.5 minutes.

[0101] Reference Figure 4 , wherein the step of obtaining the estimated time required for the fault maintenance personnel to reach the faulty fire extinguishing box mentioned in step SA00 can be divided into steps SA10 to SA40.

[0102] In step SA10, the location of the fault maintenance personnel, the entrance location of the building where the faulty fire extinguisher is located, and the location of the faulty fire extinguisher are obtained.

[0103] In step SA20, the location of each maintenance personnel is taken as the starting point and the entrance of the building where the faulty fire extinguisher is located is taken as the end point, and the route from each maintenance personnel to the entrance of the building where the faulty fire extinguisher is located is planned and the distance of the corresponding route is obtained.

[0104] In step SA30, the distance of the corresponding route is used as the dividend, and the preset driving speed of the corresponding fault maintenance personnel is used as the divisor, and the time taken for each corresponding fault maintenance personnel to reach the building where the fault fire extinguisher is located is calculated one by one. Simultaneously, based on the location of the fault fire extinguisher, the entrance location of the building where the fault fire extinguisher is located, the frequency of the corresponding fault maintenance personnel to the building, and the unit time movement time of the corresponding fault maintenance personnel in different frequency ranges, the estimated time taken for the corresponding fault maintenance personnel to travel from the building entrance to the fault fire extinguisher is analyzed.

[0105] In step SA40, the estimated time for the corresponding fault maintenance personnel to reach the faulty fire extinguisher from the building entrance is summed with the time for the corresponding fault maintenance personnel to reach the building where the faulty fire extinguisher is located as the estimated time for the fault maintenance personnel to reach the faulty fire extinguisher.

[0106] Specifically, the location of the fault maintenance personnel mentioned in step SA10 to step SA40 can be obtained by inputting the corresponding mobile phone number of each fault maintenance personnel through a mobile phone tracker to obtain the location of each fault maintenance personnel.

[0107] For example, the existing maintenance personnel are A, B, and C. A is 2.4 kilometers away from the building where the faulty fire extinguisher is located, and his driving speed is 60 kilometers per hour. It takes A 0.04 hours, or 2.4 minutes, to reach the building where the faulty fire extinguisher is located; B is 3.6 kilometers away from the building where the faulty fire extinguisher is located, and his driving speed is 72 kilometers per hour. It takes B 0.05 hours, or 3 minutes, to reach the building where the faulty fire extinguisher is located; C is 2 kilometers away from the building where the faulty fire extinguisher is located, and his driving speed is 40 kilometers per hour. It takes C 0.05 hours, or 3 minutes, to reach the building where the faulty fire extinguisher is located.

[0108] Reference Figure 5 , wherein the analysis step of the estimated time consumed by the corresponding fault maintenance personnel from the building entrance to the faulty fire extinguishing box mentioned in step SA40 can be divided into steps SA4a to SA4c.

[0109] In step SA4a, the location of the faulty fire extinguisher and the entrance location of the building where the faulty fire extinguisher is located are obtained, the shortest route from the entrance location of the building where the faulty fire extinguisher is located to the location of the faulty fire extinguisher is planned, and the distance of the corresponding shortest route is obtained.

[0110] In step SA4b, from a preset third database which stores fault maintenance personnel, the frequency of the corresponding fault maintenance personnel entering the corresponding building, and the speed at which the corresponding fault maintenance personnel find the fault fire extinguisher within different frequency ranges, the fault maintenance personnel and the corresponding building are taken as query objects, the frequency of the corresponding fault maintenance personnel entering the corresponding building, and the speed at which the corresponding fault maintenance personnel find the fault fire extinguisher within different frequency ranges are obtained, and the speed at which the corresponding fault maintenance personnel find the fault fire extinguisher after entering the corresponding building is analyzed.

[0111] In step SA4c, the distance of the corresponding shortest route is used as the dividend, and the speed at which the corresponding fault maintenance personnel enter the corresponding building and find the faulty fire extinguisher box is used as the divisor, and the estimated time taken by the corresponding fault maintenance personnel from the building entrance to the faulty fire extinguisher box is calculated and analyzed.

[0112] For example, the existing maintenance personnel are A, B, and C. Assuming that the planned path from the building entrance to the faulty fire extinguisher box is 80m, assuming that A arrives at the building where the faulty fire extinguisher box is located 0 times, and the speed at which A finds the faulty fire extinguisher box in this case is 0.4m / second, then it takes A 200 seconds to find the faulty fire extinguisher box from the building entrance; assuming that B arrives at the building where the faulty fire extinguisher box is located 10 times, and the speed at which B finds the faulty fire extinguisher box in this case is 0.6m / second, and it takes B 133.3 seconds to find the faulty fire extinguisher box from the building entrance; assuming that C arrives at the building where the faulty fire extinguisher box is located 5 times, and the speed at which the faulty fire extinguisher box is found in this case is 0.5m / second, and it takes C 160 seconds to find the faulty fire extinguisher box from the building entrance.

[0113] Reference Figure 6 , wherein the screening step mentioned in step SA00 for the personnel who are expected to complete the repair of the faulty fire extinguishing box the fastest can be divided into steps SAc0 to SAd0.

[0114] In step SAc0, the sum of the estimated time taken by the corresponding fault maintenance personnel to reach the faulty fire extinguisher and the estimated time taken by the fault maintenance personnel to repair the fault is taken as the total time taken by the corresponding fault maintenance personnel to complete the repair of the faulty fire extinguisher.

[0115] In step SAd0, the fault repair personnel who takes the least time to repair the faulty fire extinguisher hood are selected as the personnel who are expected to complete the repair of the faulty fire extinguisher hood the fastest.

[0116] Reference Figure 7 , wherein there are steps between screening out the personnel who are expected to complete the repair of the faulty fire extinguisher box the fastest as the notified faulty repair personnel mentioned in step SA00 and sending the information notification, and the corresponding steps can be divided into steps SAe0 to SAg0.

[0117] In step SAe0, if there are multiple personnel who are expected to complete the repair of the faulty fire extinguisher box the fastest, the personnel who complete the repair of the faulty fire extinguisher box the fastest are used as query objects one by one, and the repair success rate of the corresponding fault repair personnel for different faults is queried from the second database.

[0118] In step SAf0, based on the repair success rate of the corresponding fault maintenance personnel for different faults and the probability of possible faults, the overall effective repair success rate calculation formula of the corresponding fault maintenance personnel constructed in advance is applied to calculate the overall effective repair success rate calculation formula of the corresponding fault maintenance personnel. The pre-constructed overall effective repair success rate calculation formula of the corresponding fault maintenance personnel is specifically as follows: Y=a1*q1+......a i *q i +......a n *qn; Among them, Y is the overall effective repair success rate of the fault maintenance personnel; a i is the repair success rate of the fault maintenance personnel for the i-th fault; a n is the repair success rate of the fault maintenance personnel for the nth fault, n is the total number of faults obtained; q i is the probability of the i-th failure; q n is the probability of the nth failure.

[0119] In step SAg0, from among multiple personnel who are expected to complete the repair of the faulty fire extinguisher box fastest, the faulty repair personnel with the highest overall effective repair success rate are screened out as the personnel to be notified.

[0120] For example, assume that there are three people who are expected to complete the repair of the faulty fire extinguisher box the fastest, namely A, B, and C. There are currently three possible faults, as follows: Possible fault 1: poor line contact or disconnection, short circuit and grounding fault, with a probability of 30%; Possible fault 2: uneven load distribution of the power supply transformer, with a probability of 30%; Possible fault 3: low voltage on the low-voltage side of the power supply transformer, with a probability of 40%.

[0121] The repair success rate of A for possible fault 1 is 95%, the repair success rate for possible fault 2 is 96%, and the repair success rate for possible fault 3 is 98%. According to the calculation formula for the overall effective repair success rate of the corresponding fault maintenance personnel constructed first, the overall effective repair success rate of the corresponding fault A can be calculated to be 96.5%; the repair success rate of B for possible fault 1 is 96%, the repair success rate for possible fault 2 is 97%, and the repair success rate for possible fault 3 is 98%. According to the calculation formula for the overall effective repair success rate of the corresponding fault maintenance personnel constructed first, the overall effective repair success rate of the corresponding fault B can be calculated to be 97.1%; the repair success rate of C for possible fault 1 is 99%, the repair success rate of C for possible fault 2 is 98%, and the repair success rate of C for possible fault 3 is 96%. According to the calculation formula for the overall effective repair success rate of the corresponding fault maintenance personnel constructed first, the repair success rate of the corresponding fault C can be calculated to be 97.5%.

[0122] Therefore, according to step SAg0, it can be analyzed that the highest overall maintenance success rate is 97.5%, so the person screened out is C.

[0123] In step SB00, information is obtained on whether the notified person has arrived at the corresponding building. If the notified person has arrived at the corresponding building, an adapted route indication map for the faulty fire box is generated based on the relative positions of all fire extinguishers in the corresponding building and the faulty fire box, and the route indication map for the faulty fire box is sent to the display screen of the corresponding fire box for real-time display.

[0124] Reference Figure 8 Among them, the step mentioned in step SB00 of generating a faulty fire box route indication map based on the locations of all fire boxes located in the corresponding building and the locations of the faulty fire boxes can be divided into steps SBa0 to SBb0.

[0125] In step SBa0, the relative positions of each fire extinguisher box and the faulty fire extinguisher box in the corresponding building in space are obtained.

[0126] In step SBb0, a travel route map from each fire extinguisher box located in the corresponding building to the corresponding faulty fire extinguisher box is planned one by one as a route indication map applicable to the corresponding fire extinguisher box.

[0127] Specifically, the planning of the travel route map mentioned in step SBb0 is mainly achieved through a trip planner.

[0128] In step SC00, when the notified personnel arrive at the location of the faulty fire extinguisher, the real-time display of other fire extinguisher display screens in the building is stopped.

[0129] Among them, the method mentioned in step SC00 for obtaining the information of the notified personnel arriving at the location of the faulty fire extinguisher box can be by setting an identity recognition device at the location of the faulty fire extinguisher box, such as a fingerprint reader, face reader, iris reader or other human feature information collection device, but is not limited to this.

[0130] An embodiment of the present invention provides a computer-readable storage medium, comprising a computer-readable storage medium capable of being loaded and executed by a processor to implement the following Figure 1-Figure 8 Procedure for either method.

[0131] The computer-readable storage medium includes, for example, various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

[0132] Based on the same inventive concept, an embodiment of the present invention provides a high-precision weak current engineering detection system, including a memory and a processor, wherein the memory stores a program that can be executed on the processor to implement the following Figures 1 to 8 Procedure for either method.

[0133] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional modules is used as an example. In actual applications, the above-mentioned functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. The specific working process of the system, device and unit described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0134] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of modules or units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.

[0135] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0136] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0137] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, server, or network device, etc.) or a processor to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory, a random access memory, a magnetic disk or an optical disk.

[0138] The embodiments of this specific implementation method are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore, any equivalent changes made based on the structure, shape, and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A high-precision weak current engineering detection method, characterized in that: include: Obtaining internal circuit detection information of fire extinguishing boxes, which are multiple and distributed in various places inside the building; Analyze whether the internal circuit detection information of the fire extinguisher box falls within the preset internal circuit detection information range; If the internal circuit detection information of the fire extinguisher box falls within the preset internal circuit detection information range, no reminder will be given; On the contrary, based on the internal circuit detection information that does not fall within the preset internal circuit detection information range, possible fire extinguisher box fault conditions are analyzed, and based on the analyzed possible fire extinguisher box fault conditions, the estimated time for the fault maintenance personnel to arrive at the faulty fire extinguisher box, and the estimated maintenance time for the fault maintenance personnel, the personnel who are expected to complete the maintenance of the faulty fire extinguisher box the fastest are selected as the notified fault maintenance personnel, and an information notification is sent; Obtain information on whether the notified person has arrived at the corresponding building. If the notified person has arrived at the corresponding building, generate an adaptive route indication map of the faulty fire extinguisher box based on the relative positions of all fire extinguishers in the corresponding building and the faulty fire extinguisher box, and send the route indication map of the faulty fire extinguisher box to the display screen of the corresponding fire extinguisher box for real-time display; When the notified personnel arrive at the location of the faulty fire fighting box, the real-time display of other fire fighting box display screens in the building is stopped; The analysis steps for the estimated maintenance time of a fault by the maintenance personnel are as follows: Obtain possible faults caused by inconsistent internal circuit detection information and corresponding fault probabilities; From a preset second database storing fault maintenance personnel, the maintenance time and the maintenance success rate of the corresponding fault maintenance personnel for different faults, the fault maintenance personnel are used as query objects one by one to obtain the maintenance time and the maintenance success rate of each fault maintenance personnel for different faults; Based on the maintenance time of each fault maintenance personnel for different faults and the probability of possible faults, the effective maintenance time calculation formula for the fault maintenance personnel to repair the fault fire extinguishing box is applied to calculate the effective maintenance time of each fault maintenance personnel to repair the current fault fire extinguishing box one by one. The pre-built calculation formula for the fault maintenance personnel to repair the fault fire extinguishing box is as follows: Z = A1*q1 + A2*q2 +......A i *q i +......A n *q n , 0 < i <= n, where i is a natural number; in, Z is the effective maintenance time for the fault maintenance personnel to repair the current faulty fire extinguisher; n is the total number of faults obtained; A i The effective maintenance time for the fault maintenance personnel to repair the i-th fault; A n The effective maintenance time for the maintenance personnel to repair the nth fault; q i is the probability of the i-th failure; q n is the probability of the nth failure; The steps to obtain the estimated time required for the maintenance personnel to reach the faulty fire extinguisher are as follows: Obtain the location of the fault maintenance personnel, the entrance location of the building where the faulty fire fighting box is located, and the location of the faulty fire fighting box; Taking the location of each fault maintenance personnel as the starting point and the entrance of the building where the faulty fire extinguisher is located as the end point, the route from each fault maintenance personnel to the entrance of the building where the faulty fire extinguisher is located is planned and the distance of the corresponding route is obtained; The distance of the corresponding route is used as the dividend, and the preset driving speed of the corresponding fault maintenance personnel is used as the divisor, and the time taken by each corresponding fault maintenance personnel to reach the building where the fault fire extinguisher box is located is calculated one by one. Simultaneously, based on the location of the fault fire extinguisher box, the entrance location of the building where the fault fire extinguisher box is located, the frequency of the corresponding fault maintenance personnel to the building, and the unit time moving time of the corresponding fault maintenance personnel under different frequency ranges, the estimated time taken by the corresponding fault maintenance personnel from the building entrance to the fault fire extinguisher box is analyzed; The estimated time taken by the corresponding fault maintenance personnel to reach the fault fire extinguishing box from the building entrance is added to the time taken by the corresponding fault maintenance personnel to reach the building where the fault fire extinguishing box is located, which is used as the estimated time taken by the fault maintenance personnel to reach the fault fire extinguishing box; The high-precision weak current engineering detection method also includes a step located after selecting a person who is expected to complete the repair of the faulty fire extinguisher box the fastest as the notified fault repair person and before sending the information notification; If there are multiple personnel who are expected to complete the repair of the faulty fire extinguisher box the fastest, the personnel who are expected to complete the repair of the faulty fire extinguisher box the fastest are used as query objects one by one, and the repair success rates of the corresponding fault repair personnel for different faults are obtained from the second database; Based on the repair success rates of the corresponding fault maintenance personnel for different faults and the probability of possible faults, the overall effective repair success rate calculation formula of the corresponding fault maintenance personnel constructed in advance is applied to calculate the overall effective repair success rate calculation formula of the corresponding fault maintenance personnel. The pre-constructed overall effective repair success rate calculation formula of the corresponding fault maintenance personnel is specifically as follows: Y=a1*q1+......a i *q i +......a n *q n; in, Y is the overall effective repair success rate of the fault maintenance personnel; a i is the repair success rate of the fault maintenance personnel for the i-th fault; a n The repair success rate of the fault maintenance personnel for the nth fault; n is the total number of faults obtained; q i is the probability of the i-th failure; q n is the probability of the nth failure; From multiple personnel who are expected to complete the repair of the faulty fire extinguishing box fastest, the faulty repair personnel with the highest overall effective repair success rate are selected as the personnel who need to be notified.

2. A high-precision weak current engineering detection method according to claim 1, characterized in that: The steps for analyzing possible fire hydrant failure situations are as follows: Acquiring internal circuit detection information that does not fall within a preset internal circuit detection information range; From a preset first database that stores inconsistent internal circuit detection information, possible faults caused by the corresponding inconsistent internal circuit detection information, and corresponding fault probabilities, the inconsistent internal circuit detection information is used as a query object to find out the possible faults caused by the corresponding inconsistent internal circuit detection information and the corresponding fault probabilities.

3. A high-precision weak current engineering detection method according to claim 1, characterized in that: The analysis steps for the estimated time taken by the maintenance personnel from the building entrance to the faulty fire extinguisher are as follows: Obtain the location of the faulty fire extinguisher and the entrance location of the building where the faulty fire extinguisher is located, plan the shortest route from the entrance location of the building where the faulty fire extinguisher is located to the location of the faulty fire extinguisher and obtain the distance of the corresponding shortest route; From a preset third database storing fault maintenance personnel, the frequency of the corresponding fault maintenance personnel entering the corresponding building, and the speed at which the corresponding fault maintenance personnel find the fault fire extinguisher box within different frequency ranges, the fault maintenance personnel and the corresponding building are taken as query objects, the frequency of the corresponding fault maintenance personnel entering the corresponding building, and the speed at which the corresponding fault maintenance personnel find the fault fire extinguisher box within different frequency ranges are obtained, and the speed at which the corresponding fault maintenance personnel find the fault fire extinguisher box after entering the corresponding building is analyzed; The distance of the corresponding shortest route is taken as the dividend, and the speed at which the corresponding fault maintenance personnel find the faulty fire extinguisher box after entering the corresponding building is taken as the divisor, and the estimated time required for the corresponding fault maintenance personnel to travel from the building entrance to the faulty fire extinguisher box is calculated and analyzed.

4. A high-precision weak current engineering detection method according to claim 3, characterized in that: The screening steps for the personnel who are expected to complete the repair of the faulty fire extinguisher the fastest are as follows: The sum of the estimated time it takes for the corresponding fault maintenance personnel to reach the faulty fire extinguishing box and the estimated time it takes for the fault maintenance personnel to repair the fault is taken as the total time it takes for the corresponding fault maintenance personnel to complete the repair of the faulty fire extinguishing box; The fault repair personnel who takes the least total time to complete the repair of the faulty fire extinguishing box are selected as the personnel who are expected to complete the repair of the faulty fire extinguishing box the fastest.

5. A high-precision weak current engineering detection method according to claim 1, characterized in that: The steps for generating a faulty fire box route map based on the locations of all fire boxes in the corresponding building and the locations of the faulty fire boxes are as follows: Obtain the relative position of each fire extinguisher box and the faulty fire extinguisher box in the corresponding building in space; A travel route map from each fire fighting box in the corresponding building to the corresponding faulty fire fighting box is planned one by one as a route indication map applicable to the corresponding fire fighting box.

6. A high-precision weak current engineering detection system, characterized by: It includes a memory, a processor, and a program stored in the memory and executable on the processor, wherein the program can be loaded and executed by the processor to implement a high-precision weak current engineering detection method as described in any one of claims 1 to 5.

7. A computer storage medium, characterized in that: It includes a program that can be loaded and executed by a processor to implement a high-precision weak current engineering detection method as described in any one of claims 1 to 5.