Simulation test equipment and method for super-large load anchor pile beam reaction device

Through the simulation of the test scenarios of anchor piles and test piles and the hierarchical loading method, the stability and reliability inspection problems of the beam reaction device of the super-large load anchor pile are solved, and scientific and rigorous test data acquisition and equipment performance verification are achieved.

CN112854324BActive Publication Date: 2024-11-19SHANGHAI TONGJI CONSTR QUALITY INSPECTION STATION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110180527.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-02-08
Publication Date
2024-11-19
Estimated Expiration
2041-02-08

AI Technical Summary

Technical Problem

The prior art has risks when conducting the stability, reliability and practical inspection of the reaction force device of the super-large load anchor pile beam, and lacks reliable experimental data, making it difficult to meet the strength, stiffness and stability requirements of the test equipment.

Method used

A simulation test equipment and method was designed to fully simulate the test scenarios of anchor piles and test piles by building a test equipment platform, using ultra-high pressure oil pump stations and jacks to provide power, apply hierarchical loading and unloading, and use displacement sensors and dial meters. Record the deformation amount and determine whether the main beam and secondary beam meet the strength, overall stability and stiffness requirements at maximum load, and the simulated distance between the anchor pile and the test pile meets the pile foundation static load test specifications.

Benefits of technology

The stability, reliability and practicality of the test equipment are effectively tested, scientific and rigorous test data are provided, and the stability and reliability of the equipment under excessive loads are ensured, reducing the test cost and time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112854324B_ABST
    Figure CN112854324B_ABST
Patent Text Reader

Abstract

The invention discloses a simulation test device and method for a super-large load anchor pile crossbeam reaction device. In the device, the middle parts of two secondary beams are arranged on the top surfaces of both ends of the main beam, and the anchor pile caps are arranged on the top surfaces of both ends of the secondary beams; two secondary pressure-bearing reaction box beams are arranged on a test platform, and the reaction anchor pile caps are arranged on the bottom surfaces of both ends of the secondary pressure-bearing reaction box beams, four main pressure-bearing reaction box beams are arranged in parallel and the two ends are arranged on the middle top surfaces of the two secondary pressure-bearing reaction box beams, four-hole box beams are sleeved on the two ends of the four main pressure-bearing reaction box beams, upper and lower steel box pads are arranged on the middle bottom surface of the main beam and the middle top surfaces of the four main pressure-bearing reaction box beams, six sets of jacks are arranged between the upper and lower steel box pads, a number of first threaded steel bars are welded between the anchor pile caps and the reaction anchor pile caps, and displacement sensors and dial indicators are arranged on the main beam and the two secondary beams for detecting stiffness and deformation. This method uses six sets of jacks to load and unload the main beam and four main pressure-bearing reaction box beams in stages to determine whether the main beam and secondary beams meet the requirements at the maximum load.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction engineering, and in particular to a simulation test device and method for a super-large load anchor pile crossbeam reaction device. Background Art

[0002] The static load test of pile foundation is the most primitive, basic and reliable method to determine the bearing capacity of a single pile. The static load test of a single pile is a test method that uses a test method close to the actual working conditions of vertical compression. The load acts on the top of the pile, causing the top of the pile to displace (settlement). The load-settlement (PS) curve of a single test pile can be obtained, as well as the settlement-time logarithm (S-lgt) curve and other curves required for analysis.

[0003] Generally, the single pile static load test equipment is composed of a loading device and a load and deformation observation device. The loading device is composed of a main beam, a secondary beam, an anchor pile or a weight and other reaction devices, a jack and an oil pump. The load and deformation observation device is composed of a pressure gauge, a pressure sensor or a load sensor. The reaction device can be divided into three types according to the existing conditions: an anchor pile crossbeam reaction device, a weight platform reaction device, and an anchor pile weight platform combined reaction device. The reaction force provided by the reaction device should have a certain margin relative to the maximum load, which is generally 1.2 to 1.5 times the maximum load.

[0004] The common reaction beams in the anchor pile crossbeam reaction device are generally steel beams, which are composed of a main beam, two secondary beams and other auxiliary parts. Steel beams are divided into steel beams and composite beams. When the load and span are large, and the cross-section of the steel cannot meet the strength, rigidity or stability, a composite beam is used. The composite beam is welded from steel plates or steel sections. The commonly used steel plate welded composite beam consists of a box-shaped section composed of upper and lower wing plates and a web plate, which has large bending and torsional rigidity. The main beam and secondary beam of the anchor pile crossbeam reaction device are subject to concentrated loads. The maximum force area of ​​the main beam is in the middle of the beam, so in actual processing and manufacturing, the middle of the main beam is generally strengthened.

[0005] The stiffness and strength of the steel beam in the anchor pile crossbeam reaction device and the cross section of the anchor pile reinforcement must be verified before the test to meet the three requirements of strength, overall stability and stiffness. For the entire test device, in addition to the cross section of the steel beam meeting the above three requirements, it must also ensure that each auxiliary component (such as anchor pile cap, anchor pile tie rod, tie rod bolt, upper and lower steel pad box of the jack, etc.) meets the stability requirements of the test.

[0006] According to the requirements of relevant testing specifications, pile foundation testing units should formulate practical and feasible testing plans based on the purpose of testing, the characteristics of the testing methods and the scope of application, taking into account factors such as geological conditions and the reliability of construction quality, and combining the testing units' own testing capabilities and testing equipment. In actual testing operations, when the pile foundation testing units formulate testing plans, they verify the load of the reaction beam by theoretically calculating and estimating the maximum load of the reaction beam. However, for extremely large loads (especially those exceeding 1,000 tons), there are certain risks in using this theoretical calculation value to estimate the maximum load value, and there is no reliable experimental data for the stability, reliability and operability of the entire reaction device. For this reason, it is necessary to use test data to verify whether the reaction beam (stiffness, strength, stability), loading device (stability, reliability, operability), load and deformation observation device (reliability, accuracy) can meet the requirements.

[0007] In the single pile static load test, four anchor piles are generally used for the anchor pile crossbeam reaction device. If the reaction force provided by four anchor piles cannot meet the requirements (such as shallow soil burial or soft soil), the number can be increased to six. However, when testing the stability, reliability, and operability of the reaction force device itself, it is necessary to consider appropriate methods of providing reaction force. The first method is for the testing unit to process and manufacture test piles and anchor piles, and the second method is for the tested unit to provide test piles and anchor piles at the construction site. However, both methods are not practical and are not economical.

[0008] Based on the above reasons, it is necessary to develop a test environment and method that can simulate test piles, anchor piles, etc., to test the stability, reliability, and operability of the super-large load reaction device itself, and to evaluate whether the steel beam, loading device, load and deformation observation device can meet the test requirements. Summary of the invention

[0009] The technical problem to be solved by the present invention is to provide a simulation test equipment and method for an ultra-large load anchor pile crossbeam reaction device. The equipment and method completely simulate the test scenarios of anchor piles and test piles by building a test equipment platform, and the distance between the simulated anchor piles and the test piles complies with the provisions of the pile foundation static load test specification. During the entire simulation test process, in the absence of anchor piles to provide reaction force, the test pile reaction force is applied to the steel box beam combination of the simulated anchor piles, thereby verifying the stability, reliability and practicability of the entire test equipment system.

[0010] In order to solve the above technical problems, the simulation test equipment for the super-large load anchor pile crossbeam reaction device of the present invention comprises a main beam, two secondary beams and anchor pile caps, the middle parts of the two secondary beams are arranged on the top surfaces of the two ends of the main beam and are arranged perpendicular to the main beam, and the anchor pile caps are respectively arranged on the top surfaces of the two ends of the two secondary beams; the equipment also comprises four main pressure-bearing reaction box beams, two secondary pressure-bearing reaction box beams, four-hole box beam sleeves, upper steel box pads, lower steel box pads, six sets of jacks, reaction anchor pile caps, displacement sensors, dial indicators and a plurality of first threaded steel bars, the two secondary pressure-bearing reaction box beams are arranged at intervals on the test platform and are arranged at intervals parallel to the two secondary beams, and the reaction anchor piles are arranged at intervals. The caps are respectively arranged on the bottom surfaces at both ends of the two secondary pressure-bearing reaction box girders, the four main pressure-bearing reaction box girders are arranged in parallel and the two ends are arranged on the middle top surfaces of the two secondary pressure-bearing reaction box girders, the four-hole box girder sleeves are respectively arranged on the two ends of the four main pressure-bearing reaction box girders, the upper steel box pad and the lower steel box pad are respectively arranged on the middle bottom surface of the main beam and the middle top surfaces of the four main pressure-bearing reaction box girders, the six sets of jacks are arranged in two rows between the upper steel box pad and the lower steel box pad, a number of first threaded steel bars are welded between the anchor pile cap and the reaction anchor pile cap, the displacement sensor and the dial indicator are respectively arranged on the main beam and the two secondary beams for detecting stiffness and deformation.

[0011] Furthermore, the geometric centers of the upper steel box pad and the lower steel box pad are located on the same vertical line as the geometric centers of the four main pressure-bearing reaction box girders and the combined force centers of the six sets of jacks.

[0012] Furthermore, the test platform is two I-beams laid at intervals on a flat test site, and the two I-beams can withstand a pressure of no less than 100 tons.

[0013] Furthermore, the equipment also includes a single-hole box beam sleeve and a plurality of second threaded steel bars. The single-hole box beam sleeve is respectively inserted into the two ends of the main beam, and a plurality of second threaded steel bars are welded between the single-hole box beam sleeve and the four-hole box beam sleeve.

[0014] Furthermore, the equipment also includes an ultra-high pressure oil pump station, which is connected to the six sets of jacks via high pressure pipelines. The six sets of jacks are arranged in parallel and are lifted or lowered synchronously.

[0015] Furthermore, the six sets of jacks are 320T jacks respectively.

[0016] Furthermore, the equipment also includes a total station, which is set up on one side of the test platform and monitors the inclination of the main beam and four main pressure-bearing reaction box beams.

[0017] Furthermore, the diameter of the first threaded steel bar is 250 mm.

[0018] A simulation test method based on the simulation test equipment for the super-large load anchor pile beam reaction device comprises the following steps:

[0019] Step 1: Use an ultra-high pressure oil pump station to provide power for six sets of jacks, start the six sets of jacks to generate a combined force, and the combined force is transmitted upward through the upper steel box pad to the main beam above it. When the main beam is lifted up and displaced upward, the two secondary beams are also lifted up. The secondary beams move upward so that the anchor pile caps at both ends are pulled up;

[0020] Step 2: After the anchor pile caps at both ends of the secondary beam are pulled up, the anchor pile caps pull up the reaction anchor pile caps at both ends of the secondary pressure-bearing reaction box beam through a number of first threaded steel bars. After the reaction anchor pile caps are pulled up, the secondary pressure-bearing reaction box beam is supported, so that the secondary pressure-bearing reaction box beam is displaced upward. At this time, the reaction anchor pile caps simulate the effect of the super-large load anchor piles;

[0021] Step 3: The upward displacement of the secondary pressure-bearing reaction box beam is transmitted to the four main pressure-bearing reaction box beams, so that the four main pressure-bearing reaction box beams are displaced upward. The upward displacement of the four main pressure-bearing reaction box beams drives the four-hole box beam sleeves at both ends to displace upward;

[0022] Step 4: While the six sets of jacks lift the main beam upward through the upper steel box pad, the downward pressure generated is transmitted to the middle of the four main pressure-bearing reaction box beams through the lower steel box pad. At this time, the lower steel box pad simulates the test pile;

[0023] Step 5. Simulate the actual test conditions and use six sets of jacks to load and unload the main beam and four main pressure-bearing reaction box beams in stages. During each stage of loading and unloading, the deformation of the main beam and secondary beam is recorded by displacement sensors and dial indicators, and the overall stability of the equipment is observed to determine whether the main beam and secondary beam meet the requirements of strength, overall stability and stiffness at maximum load.

[0024] Furthermore, the graded loading is carried out in 10 levels, each level is loaded equally at 1 / 10 of the maximum load, the first level takes 2 times the load difference, the last level takes 0.5 times the load difference, and each level of load is held for 1.5 hours; the graded unloading is carried out in 5 levels, each level of unloading is unloaded at 2 times the load level, and each level of load is held for 0.5 hours.

[0025] Since the simulation test equipment and method for the reaction device of super-large load anchor pile crossbeam of the present invention adopts the above-mentioned technical scheme, that is, the middle parts of two secondary beams in the equipment are arranged on the top surfaces of both ends of the main beam, and the anchor pile caps are arranged on the top surfaces of both ends of the two secondary beams; two secondary pressure-bearing reaction box beams are arranged on the test platform, and the reaction anchor pile caps are arranged on the bottom surfaces of both ends of the two secondary pressure-bearing reaction box beams, four main pressure-bearing reaction box beams are arranged in parallel and the two ends are arranged on the middle top surfaces of the two secondary pressure-bearing reaction box beams, the four-hole box beam is sleeved on the two ends of the four main pressure-bearing reaction box beams, the upper steel box pad and the lower steel box pad are arranged on the middle bottom surface of the main beam and the middle top surfaces of the four main pressure-bearing reaction box beams, six sets of jacks are arranged between the upper steel box pad and the lower steel box pad, a number of first threaded steel bars are welded between the anchor pile caps and the reaction anchor pile caps, and displacement sensors and dial indicators are arranged on the main beam and the two secondary beams for detecting stiffness and deformation. This method simulates the actual test conditions, and uses six sets of jacks to load and unload the main beam and four main pressure-bearing reaction box beams in stages to determine whether the main beam and secondary beam meet the requirements at the maximum load. This equipment and method completely simulates the test scene of anchor piles and test piles by building a test equipment platform, and the distance between the simulated anchor piles and the test piles meets the requirements of the pile foundation static load test specification. The entire simulation test process is in the scenario where there is no anchor pile to provide reaction force, and the test pile reaction force is applied to the steel box beam combination of the simulated anchor pile, which verifies the stability, reliability and operability of the entire test equipment system. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments:

[0027] Figure 1 It is a schematic diagram of a simulation test device for a super-large load anchor pile crossbeam reaction device of the present invention;

[0028] Figure 2 for Figure 1 Side view of. DETAILED DESCRIPTION

[0029] Implementation example Figure 1 and Figure 2As shown, the simulation test equipment for the reaction device of the super-large load anchor pile beam of the present invention comprises a main beam 1, two secondary beams 2 and anchor pile caps 3, the middle parts of the two secondary beams 2 are arranged on the top surfaces of both ends of the main beam 1 and are arranged perpendicular to the main beam 1, and the anchor pile caps 3 are respectively arranged on the top surfaces of both ends of the two secondary beams 2; the equipment also comprises four main pressure-bearing reaction box beams 4, two secondary pressure-bearing reaction box beams 5, four-hole box beam sleeves 6, upper steel box pads 7, lower steel box pads 8, six sets of jacks 9, reaction anchor pile caps 10, displacement sensors 11, dial indicators 12 and a plurality of first threaded steel bars 13, the two secondary pressure-bearing reaction box beams 5 are arranged at intervals on the test platform 14 and are arranged at intervals parallel to the two secondary beams 2 up and down, and the reaction anchor pile caps 10 They are respectively arranged on the bottom surfaces at both ends of the two secondary pressure-bearing reaction box girders 5, the four main pressure-bearing reaction box girders 4 are arranged in parallel and the two ends are arranged on the middle top surfaces of the two secondary pressure-bearing reaction box girders 5, the four-hole box girder sleeves 6 are respectively arranged on the two ends of the four main pressure-bearing reaction box girders 4, the upper steel box pad 7 and the lower steel box pad 8 are respectively arranged on the middle bottom surface of the main beam 1 and the middle top surfaces of the four main pressure-bearing reaction box girders 4, the six sets of jacks 9 are arranged in two rows and arranged between the upper steel box pad 7 and the lower steel box pad 8, a number of first threaded steel bars 13 are welded between the anchor pile cap 3 and the reaction anchor pile cap 10, and the displacement sensor 11 and the dial indicator 12 are respectively arranged on the main beam 1 and the two secondary beams 2 for detecting stiffness and deformation.

[0030] Preferably, the geometric centers of the upper steel box pad 7 and the lower steel box pad 8 are located on the same vertical line as the geometric centers of the four main pressure-bearing reaction box beams 4 and the centers of the combined forces of the six sets of jacks 9.

[0031] Preferably, the test platform 14 is two I-beams laid at intervals on a flat test site, and the two I-beams can withstand a pressure of no less than 100 tons.

[0032] Preferably, the device further comprises a single-hole box girder sleeve 15 and a plurality of second threaded steel bars 17 , wherein the single-hole box girder sleeve 15 is respectively inserted into both ends of the main beam 1 , and a plurality of second threaded steel bars 17 are welded at intervals between the single-hole box girder sleeve 15 and the four-hole box girder sleeve 6 .

[0033] Preferably, the equipment further comprises an ultra-high pressure oil pump station, and the ultra-high pressure oil pump station is connected to the six sets of jacks 9 via high pressure pipelines, and the six sets of jacks 9 are arranged in parallel and are lifted or lowered synchronously.

[0034] Preferably, the six sets of jacks 9 are 320T jacks respectively.

[0035] Preferably, the device further comprises a total station 16 , which is set up on one side of the test platform 14 and monitors the inclination of the main beam 1 and the four main pressure-bearing reaction box beams 4 .

[0036] Preferably, the diameter of the first threaded steel bar 13 is 250 mm.

[0037] A simulation test method based on the simulation test equipment for the super-large load anchor pile beam reaction device comprises the following steps:

[0038] Step 1: Use an ultra-high pressure oil pump station to provide power for six sets of jacks, start the six sets of jacks to generate a combined force, and the combined force is transmitted upward through the upper steel box pad to the main beam above it. When the main beam is lifted up and displaced upward, the two secondary beams are also lifted up. The secondary beams move upward so that the anchor pile caps at both ends are pulled up;

[0039] Step 2: After the anchor pile caps at both ends of the secondary beam are pulled up, the anchor pile caps pull up the reaction anchor pile caps at both ends of the secondary pressure-bearing reaction box beam through a number of first threaded steel bars. After the reaction anchor pile caps are pulled up, the secondary pressure-bearing reaction box beam is supported, so that the secondary pressure-bearing reaction box beam is displaced upward. At this time, the reaction anchor pile caps simulate the effect of the super-large load anchor piles;

[0040] Step 3: The upward displacement of the secondary pressure-bearing reaction box beam is transmitted to the four main pressure-bearing reaction box beams, so that the four main pressure-bearing reaction box beams are displaced upward. The upward displacement of the four main pressure-bearing reaction box beams drives the four-hole box beam sleeves at both ends to displace upward;

[0041] Step 4: While the six sets of jacks lift the main beam upward through the upper steel box pad, the downward pressure generated is transmitted to the middle of the four main pressure-bearing reaction box beams through the lower steel box pad. At this time, the lower steel box pad simulates the test pile;

[0042] Step 5. Simulate the actual test conditions and use six sets of jacks to load and unload the main beam and four main pressure-bearing reaction box beams in stages. During each stage of loading and unloading, the deformation of the main beam and secondary beam is recorded by displacement sensors and dial indicators, and the overall stability of the equipment is observed to determine whether the main beam and secondary beam meet the requirements of strength, overall stability and stiffness at maximum load.

[0043] Preferably, the graded loading is carried out in 10 levels, each level is loaded equally at 1 / 10 of the maximum load, the first level takes a load difference of 2 times, the last level takes a load difference of 0.5 times, and each level of load is held for 1.5 hours; the graded unloading is carried out in 5 levels, each level of unloading is unloaded at 2 times the load level, and each level of load is held for 0.5 hours.

[0044] The present invention uses a set of steel box beams simulating anchor piles to build a test equipment platform and reasonably assemble the equipment to completely simulate the test scenario of six anchor piles and one test pile, and the distance between the simulated anchor piles and the test piles meets the requirements of relevant specifications. During the entire test process, in the scenario where there is no anchor pile to provide reaction force, the test pile reaction force is applied to the steel box beam combination simulating anchor piles, which verifies the stability, reliability and operability of the entire test equipment.

[0045] This equipment uses four main pressure-bearing reaction box beams in parallel as the main reaction frames. The placement positions of the six sets of jacks simulate the positions of the test piles. The four-hole box beam sleeves placed at both ends of the four main pressure-bearing reaction box beams lock them and serve as simulated anchor pile heads. The single-hole box beam sleeves placed at both ends of the main beams provide the reaction force of the anchor piles. At the same time, the reaction anchor pile caps placed on the bottom surfaces of the two secondary pressure-bearing reaction box beams are connected to the anchor pile caps on the top surfaces of the two secondary beams through the first threaded steel bars, which provide the reaction force of the anchor piles and form a test model with one test pile and six anchor piles.

[0046] When installing this equipment, the distance between the main beam and the secondary beam, the distance between the simulated anchor pile and the simulated test pile, and the center of force of the jack are strictly followed in accordance with the distance and position specified in the relevant inspection specifications. The jacks, oil pressure sensors, pressure gauges and load sensors used in the test institute are all calibrated according to the national legal measurement units. Displacement sensors and dial indicators are installed at the concentrated force-bearing parts of the main beam and the secondary beam to record the changes in the main beam and the secondary beam under each level of load. At the same time, a total station is installed 20 meters away from the main beam to observe the stability of the overall equipment in real time.

[0047] The loading and unloading process of the test procedure completely simulates the graded loading and unloading requirements of the single pile static load test specified in the relevant inspection specifications, and each graded loading and unloading process makes a detailed record of the changes in the concentrated stress points of the main beam and secondary beam.

[0048] The present invention completes the capacity verification of the super-large load anchor pile crossbeam reaction device test equipment through the combination of equipment without the need for anchor pile test piles. The entire test equipment has a short installation time and is economically feasible. The test process is scientific and rigorous, and the test data is true and reliable.

Claims

1. A simulation test device for an ultra-large load anchor pile crossbeam reaction device, comprising a main beam, two secondary beams and anchor pile caps, wherein the middle parts of the two secondary beams are arranged on the top surfaces of both ends of the main beam and are arranged perpendicular to the main beam, and the anchor pile caps are respectively arranged on the top surfaces of both ends of the two secondary beams; characterized in that: It also includes four main pressure-bearing reaction box girders, two secondary pressure-bearing reaction box girders, a four-hole box girder sleeve, an upper steel box pad, a lower steel box pad, six sets of jacks, reaction anchor pile caps, a displacement sensor, a dial indicator and a plurality of first threaded steel bars. The two secondary pressure-bearing reaction box girders are arranged at intervals on the test platform and are arranged at intervals parallel to the two secondary girders. The reaction anchor pile caps are respectively arranged on the bottom surfaces of both ends of the two secondary pressure-bearing reaction box girders. The four main pressure-bearing reaction box girders are arranged in parallel and the two ends are arranged on the two secondary pressure-bearing reaction box girders. The top surface of the middle part of the force box beam, the four-hole box beam sleeves are respectively arranged at the two ends of the four main pressure-bearing reaction box beams, the upper steel box pad and the lower steel box pad are respectively arranged on the bottom surface of the middle part of the main beam and the top surface of the middle part of the four main pressure-bearing reaction box beams, the six sets of jacks are arranged in two rows between the upper steel box pad and the lower steel box pad, a number of first threaded steel bars are welded between the anchor pile cap and the reaction anchor pile cap, and the displacement sensor and the dial indicator are respectively arranged on the main beam and the two secondary beams for detecting stiffness and deformation; The test platform is two I-beams laid at intervals on a flat test site, and the two I-beams withstand a pressure of no less than 100 tons; The device also includes a single-hole box beam sleeve and a plurality of second threaded steel bars, wherein the single-hole box beam sleeve is respectively inserted into the two ends of the main beam, and a plurality of second threaded steel bars are welded between the single-hole box beam sleeve and the four-hole box beam sleeve; The equipment also includes a total station, which is set up on one side of the test platform and monitors the inclination of the main beam and four main pressure-bearing reaction box beams.

2. The simulation test equipment for the reaction force device of the super-large load anchor pile beam according to claim 1 is characterized in that: The geometric centers of the upper steel box pad and the lower steel box pad are located on the same vertical line as the geometric centers of the four main pressure-bearing reaction box beams and the combined force centers of the six sets of jacks.

3. The simulation test equipment for the reaction device of the super-large load anchor pile beam according to claim 1 or 2, characterized in that: The equipment also includes an ultra-high pressure oil pump station, which is connected to the six sets of jacks through high pressure pipelines. The six sets of jacks are arranged in parallel and are lifted or lowered synchronously.

4. The simulation test equipment for the reaction force device of the super-large load anchor pile beam according to claim 3 is characterized in that: The six sets of jacks are 320T jacks respectively.

5. The simulation test equipment for the reaction force device of the super-large load anchor pile beam according to claim 1, characterized in that: The diameter of the first threaded steel bar is 250 mm.

6. A simulation test method based on the simulation test equipment for the super-load anchor pile crossbeam reaction device according to any one of claims 1 to 5, characterized in that This method comprises the following steps: Step 1: Use an ultra-high pressure oil pump station to provide power for six sets of jacks, start the six sets of jacks to generate a combined force, and the combined force is transmitted upward through the upper steel box pad to the main beam above it. When the main beam is lifted up and displaced upward, the two secondary beams are also lifted up. The secondary beams move upward so that the anchor pile caps at both ends are pulled up; Step 2: After the anchor pile caps at both ends of the secondary beam are pulled up, the anchor pile caps pull up the reaction anchor pile caps at both ends of the secondary pressure-bearing reaction box beam through a number of first threaded steel bars. After the reaction anchor pile caps are pulled up, the secondary pressure-bearing reaction box beam is supported, so that the secondary pressure-bearing reaction box beam is displaced upward. At this time, the reaction anchor pile caps simulate the effect of the super-large load anchor piles; Step 3: The upward displacement of the secondary pressure-bearing reaction box beam is transmitted to the four main pressure-bearing reaction box beams, so that the four main pressure-bearing reaction box beams are displaced upward. The upward displacement of the four main pressure-bearing reaction box beams drives the four-hole box beam sleeves at both ends to displace upward; Step 4: While the six sets of jacks lift the main beam upward through the upper steel box pad, the downward pressure generated is transmitted to the middle of the four main pressure-bearing reaction box beams through the lower steel box pad. At this time, the lower steel box pad simulates the test pile; Step 5. Simulate the actual test conditions and use six sets of jacks to perform graded loading and graded unloading on the main beam and four main pressure-bearing reaction box beams. During each stage of loading and unloading, the deformation of the main beam and secondary beam is recorded by displacement sensors and dial indicators, and the overall stability of the equipment is observed to determine whether the main beam and secondary beam meet the requirements of strength, overall stability and stiffness at maximum load.

7. The simulation test method for the reaction device of super-large load anchor pile beam according to claim 6, characterized in that: The graded loading is carried out in 10 levels, and each level is loaded equally at 1 / 10 of the maximum load. The first level takes a load difference of 2 times, and the last level takes a load difference of 0.5 times. Each load level is held for 1.5 hours. The graded unloading is carried out in 5 levels, and each level is unloaded at 2 times the load level, and each level is held for 0.5 hours.