A Source-Storage-Grid Coordinated Planning Method Considering the Comprehensive Benefits of Energy Storage
A technology for comprehensive income and power planning, applied in resources, market data collection, data processing applications, etc., can solve problems such as difficult quantitative accounting, difficult identification of income, energy storage participation in auxiliary services and imperfect and clear operating modes, etc.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2022-04-26
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the field of source-storage-network coordinated planning in high-proportion renewable energy grid-connected, and is a source-storage-network coordinated planning method based on consideration of energy storage comprehensive benefits. Background technique
[0002] Energy storage has many technical characteristics such as energy throughput, controllability, and flexible installation. Its large-scale application can better solve the problem of system flexibility imbalance after a high proportion of renewable energy is connected. The key technology of the energy power system is the "necessity" of the future high proportion renewable energy power system.
[0003] At present, most of the planning and research work involving energy storage configuration, in the planning model, the role of energy storage is single, and the optimal configuration of energy storage is carried out with the goal of achieving a certain technical index or the...
Examples
Embodiment Construction
[0030] A source-storage-network coordinated planning method considering comprehensive benefits of energy storage, characterized in that it includes the following steps:
[0031] (1) According to the planning target annual load and wind power data, first calculate 0.18 without the energy storage system, carry out power supply planning and grid planning with the original planning boundary, and obtain the planned construction cost C of the power supply side and the grid side Y 、C T , and then obtain wind curtailment cost C through production sequence simulation Q and network loss cost C L .
[0032]
[0033] In the formula, C Y Planning investment costs for raw boundary power; C YN The investment cost of power planning after energy storage is put into use; G k 0–1 variable for the investment of thermal power unit k; P gk is the installed capacity of unit k; C gk is the unit installation cost of unit k; Ω g Set for candidate groups.
[0034]
[0035] In the formula,...