A prefabricated and cast-in-place concrete combined fan foundation
By using prefabricated assembly and cast-in-place concrete combination technology in the wind turbine foundation, and using the combination of high-strength prefabricated concrete and low-strength cast-in-place concrete, the problem that concrete strength in the wind turbine foundation construction is difficult to meet the design requirements, and the construction efficiency is improved And reduce engineering costs.
Patent Information
- Application Number
- CN202110620822.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-06-03
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2041-06-03
AI Technical Summary
The concrete strength of the existing wind turbine foundation in the key stress area is difficult to meet the design requirements, which leads to difficult construction control and supervision, and the concrete strength in the non-main stress area is not fully utilized, which increases the project cost and construction complexity.
Prefabricated assembly and cast-in-place concrete combined fan foundation, high-strength prefabricated concrete is used in the main stress area, and low-strength cast-in-place concrete is used in the non-main stress area. By combining prefabricated high-strength concrete blocks and cast-in-place concrete, prestressed and High-strength grouting technology, insertion and high-strength polymer mortar filling, serrated structure enhances binding force.
The concrete strength pouring quality in key stress areas has been improved, the project cost and construction complexity have been reduced, and the on-site concrete pouring volume has been reduced by about 30%, improving construction efficiency.
Smart Images

Figure CN113216241B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of wind farms, and in particular to a wind turbine foundation composed of prefabricated assembly and cast-in-place concrete. Background Art
[0002] The foundation of wind turbines is an important part of wind farm construction. It is not only related to the safe and reliable operation of wind farms, but also affects the investment of wind farms. According to the adaptability of geological conditions, the commonly used wind turbine foundation forms are extended wind turbine foundation and pile foundation. The extended foundation mainly uses its own gravity to resist the large moment load of the upper structure. When the geological conditions are weak, the extended foundation is also adopted after the foundation treatment. The pile foundation is adopted when the natural foundation does not meet the requirements of the bearing capacity and deformation of the foundation structure. The vertical action of the pile is used to bear the moment load of the upper structure, and the foundation pile is connected to form an integral structure. Regardless of the foundation structure form, the connection between the bottom of the tower and the foundation adopts the form of a foundation ring or an anchor cage. Stress concentration occurs near the connecting member, and the concrete strength requirement is relatively high. The concrete strength requirement is generally not less than C40, and the main range of stress concentration is generally within 7m in diameter, which can be called the main stress area; the concrete outside the 7m range basically plays an integral role, and the bending and shear strength requirements are not high, which can be called the non-main stress area. At present, foundation concrete is mostly poured continuously, and a uniform concrete strength is designed, so that the concrete strength of non-main load-bearing areas is not fully utilized. The main load-bearing areas often cannot meet the design strength requirements due to construction control reasons. Engineering problems caused by insufficient concrete strength near the foundation ring or anchor cage anchor plate have become common. Summary of the invention
[0003] The present invention provides a prefabricated and cast-in-place concrete combined fan foundation, in which high-strength concrete is prefabricated in the main stress-bearing area of the foundation structure, which well guarantees the casting quality such as concrete strength and appearance, and cast-in-place concrete is used in non-main stress-bearing areas. Under the premise of meeting the design requirements, a lower concrete strength grade is adopted, which better adapts to construction conditions, reduces engineering costs, and improves on-site operation efficiency.
[0004] In order to achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a prefabricated assembly and cast-in-place concrete combined fan foundation, including a prefabricated assembly part and a cast-in-place concrete part, the prefabricated assembly part is annular, the prefabricated assembly part is embedded in the cast-in-place concrete part, and bolts are embedded in the prefabricated assembly part.
[0005] The prefabricated assembly part is a cylinder with a circular or polygonal ring plane cross-section, and the diameter or the inscribed circle diameter of the polygon is not less than 7m.
[0006] The prefabricated assembly part includes a plurality of prefabricated high-strength concrete blocks, the maximum size of the prefabricated high-strength concrete blocks does not exceed 4.5m, and the prefabricated high-strength concrete blocks are divided into a plurality of prefabricated high-strength concrete blocks along the longitudinal direction of the prefabricated assembly part.
[0007] Prefabricated high-strength concrete blocks are interspersed with prestress or high-strength grouting to form prefabricated assembly parts.
[0008] Rebar insertion holes are reserved on the prefabricated assembly part, and the rebar insertion holes are opened along the radial direction of the prefabricated assembly part.
[0009] Dowel bars are arranged in the dowel bars holes and extend into the cast-in-place concrete part.
[0010] The gaps between the rebars and the rebar holes are filled with high-strength polymer mortar.
[0011] The concrete strength of the cast-in-place concrete part is lower than C40.
[0012] A serrated structure is arranged along the longitudinal direction around the side surface of the prefabricated assembly part.
[0013] Compared with the prior art, the present invention has at least the following beneficial effects: the present invention combines the stress characteristics of the wind turbine foundation, makes full use of the process characteristics and advantages of precast concrete and cast-in-place concrete, and adopts high-strength concrete factory prefabrication in the main stress-bearing area of the foundation structure, overcoming the difficulties of scattered construction sites, poor construction conditions, and difficulty in construction quality control and supervision in wind farms, and better guarantees the strength of concrete pouring in key stress-bearing areas than all cast-in-place construction; cast-in-place concrete is adopted in non-main stress-bearing areas, and a lower concrete strength grade is adopted on the premise of meeting the design requirements, which better adapts to construction conditions and reduces engineering costs; the volume of on-site concrete pouring is reduced by about 30%, thereby improving the construction efficiency of the project site. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 The figure is a schematic top view of an implementable structure of the present invention.
[0015] Figure 2 The present invention is a schematic elevational sectional view of an implementable structure.
[0016] Figure 3 It is a schematic diagram of the prefabricated assembly part 1.
[0017] In the figure: 1-prefabricated assembly part; 2-cast-in-place concrete part; 3-prefabricated high-strength concrete block; 4-rebar insertion hole; 5-rebar insertion; 6-fan foundation. DETAILED DESCRIPTION
[0018] The present invention is explained in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0019] like Figure 1 and Figure 2 As shown, a prefabricated assembly and cast-in-place concrete combined wind turbine foundation includes a prefabricated assembly part 1 and a cast-in-place concrete part 2. The prefabricated assembly part 1 is annular and embedded in the cast-in-place concrete part 2. The prefabricated assembly part 1 has embedded bolts, which are used to connect the wind turbine tower or wind turbine bracket.
[0020] The prefabricated assembly part 1 is a cylinder with a circular ring or polygonal ring in the plane cross section, and the diameter or the inscribed circle diameter of the polygon is not less than 7m.
[0021] The prefabricated assembly part 1 includes a plurality of prefabricated high-strength concrete blocks 3 , the maximum size of the prefabricated high-strength concrete blocks 3 does not exceed 4.5 m, and the prefabricated high-strength concrete blocks 3 are divided into a plurality of prefabricated high-strength concrete blocks 3 along the longitudinal direction of the prefabricated assembly part 1 .
[0022] The prefabricated high-strength concrete blocks 3 are interposed with each other by using methods such as prestressing or high-strength grouting to form the prefabricated assembly part 1 .
[0023] Rebar insertion holes 4 are reserved on the prefabricated assembly part 1 , and the rebar insertion holes 4 are opened along the radial direction of the prefabricated assembly part 1 .
[0024] The inserted reinforcement 5 is arranged in the reinforcement hole 4 and extends into the cast-in-place concrete part 2 .
[0025] The gap between the dowel 5 and the dowel hole is filled with high-strength polymer mortar.
[0026] The concrete strength of the cast-in-place concrete part 2 is lower than C40.
[0027] The side of the prefabricated assembly part 1 is longitudinally arranged with a serrated structure, which can make the connection between the assembly part 1 and the cast-in-place concrete part 2 more firm without affecting the compactness of the connection between the cast-in-place concrete part 2 and the prefabricated assembly part 1.
[0028] The prefabricated high-strength concrete blocks 3 are interposed with each other by using methods such as prestressing or high-strength grouting to form the prefabricated assembly part 1 .
[0029] refer to Figure 2 and Figure 3 A prefabricated and cast-in-place concrete combined wind turbine foundation comprises a prefabricated assembly part 1 and a cast-in-place concrete part 2; the prefabricated assembly part is prefabricated with concrete of grade not less than C40, and according to the transportation size restriction, it can generally be prefabricated in blocks, and then assembled to form a prefabricated structure as a whole; the prefabricated assembly part 1 adopts prestressed or high-strength grouting method to connect the prefabricated blocks into a prefabricated structure as a whole; rebar insertion holes are reserved on the prefabricated structure blocks, and rebars are inserted after being assembled into the prefabricated structure as a whole, and then low-grade concrete is poured on site to form a wind turbine foundation.
[0030] As an optional embodiment, during actual construction, the prefabricated assembly part 1 can also be divided into smaller prefabricated high-strength concrete blocks 3 according to the equipment conditions at the initial stage of construction, so as to reduce the weight and size of a single prefabricated high-strength concrete block 3 and facilitate transportation and lifting.
[0031] As an optional embodiment, an anchoring reinforcement connector, such as a prestressed anchor rod, is provided in the prefabricated high-strength concrete block 3, and a high-strength non-shrinkage grouting material is filled in the gap between the prestressed anchor rod and the prefabricated high-strength concrete block 3.
Claims
1. A prefabricated and cast-in-place concrete combined fan foundation, characterized in that: The invention comprises a prefabricated assembly part (1) and a cast-in-place concrete part (2), wherein the prefabricated assembly part (1) is annular and embedded in the cast-in-place concrete part (2), and the prefabricated assembly part (1) has embedded bolts; the prefabricated assembly part (1) comprises a plurality of prefabricated high-strength concrete blocks (3), and the plurality of prefabricated high-strength concrete blocks (3) are separated along the longitudinal direction of the prefabricated assembly part (1); a reinforcing bar hole (4) is reserved on the prefabricated assembly part (1), and the reinforcing bar hole (4) is opened along the radial direction of the prefabricated assembly part (1); and a serrated structure is arranged along the longitudinal direction around the side surface of the prefabricated assembly part (1).
2. The prefabricated and cast-in-place concrete combined wind turbine foundation according to claim 1 is characterized in that: The prefabricated assembly part (1) is a cylinder with a plane cross section in the shape of a circular ring or a polygonal ring, and the diameter or the diameter of the inscribed circle of the polygon is not less than 7m.
3. The prefabricated and cast-in-place concrete combined wind turbine foundation according to claim 1 is characterized in that: The maximum size of the prefabricated high-strength concrete block (3) shall not exceed 4.5 m.
4. The prefabricated and cast-in-place concrete combined wind turbine foundation according to claim 3 is characterized in that: The prefabricated high-strength concrete blocks (3) are connected by prestressing or high-strength grouting to form the prefabricated assembly part (1).
5. The prefabricated and cast-in-place concrete combined wind turbine foundation according to claim 1 is characterized in that: The dowel rod (5) is arranged in the dowel rod hole (4), and the dowel rod (5) extends into the cast-in-place concrete part (2).
6. The prefabricated and cast-in-place concrete combined wind turbine foundation according to claim 5 is characterized in that: The gap between the dowel (5) and the dowel hole is filled with high-strength polymer mortar.
7. The prefabricated and cast-in-place concrete combined wind turbine foundation according to claim 1 is characterized in that: The concrete strength of the cast-in-place concrete part (2) is lower than C40.