A three-dimensional design method for long-distance pipelines
Through real-life three-dimensional map modeling technology and three-dimensional model processing engine, the problem that the existing long-term transportation pipeline design software is not compatible with three-dimensional data is solved, and the three-dimensional forward design of long-term transportation pipelines is realized, design efficiency and visualization capabilities are improved, and the requirements of digital delivery are met.
Patent Information
- Application Number
- CN202110511878.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-05-11
- Publication Date
- 2025-04-11
- Estimated Expiration
- 2041-05-11
AI Technical Summary
The existing long-distance pipeline design software is not compatible with three-dimensional data, cannot automatically generate three-dimensional pipeline models and three-dimensional geological models, lacks three-dimensional design functions, and cannot meet the requirements of digital delivery.
Using real-life three-dimensional map modeling technology and a three-dimensional model processing engine, we collect three-dimensional real-life models through drones and tilt photography data, extract elevation-related data to form a three-dimensional topographic model and three-dimensional geological model, and realize the three-dimensional forward design of long-distance pipelines.
It realizes the three-dimensional design of long-distance pipelines, improves design efficiency and visualization capabilities, and can integrate multiple professional designs in a unified design platform to meet the requirements of digital delivery.
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of long-distance pipeline design, and in particular to a three-dimensional design method for a long-distance pipeline. Background Art
[0002] The design software for long-distance pipelines is currently a CAD-based two-dimensional design platform, which integrates network, database, software engineering and other technologies. It adopts the technical route of AutoCAD+SQL Server+ ObjectARX and Microsoft's .Net development environment, and is designed and developed for long-distance pipelines. The design results are two-dimensional drawings in DWG format, Excel data tables, etc.
[0003] The current long-distance pipeline design software and computer system hardware and software mainly support two-dimensional plane map data, and are not compatible with three-dimensional real-life data such as aerial surveys and oblique photography models for design. The platform cannot be used to automatically generate three-dimensional pipeline models and three-dimensional geological models, and does not have the function of three-dimensional design. In addition, with the expansion of business, the system functions are insufficient, the system and data coverage are limited, and the real-life information model in a three-dimensional environment cannot be fully expressed, and it cannot be integrated with the three-dimensional model of the station. It cannot meet the requirements of digital delivery. Summary of the invention
[0004] The purpose of the present invention is to provide a long-distance pipeline design method that can improve design efficiency and visualization, and can enable various disciplines to design on a unified design platform to solve the problems raised in the above-mentioned background technology.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] A three-dimensional design method for a long-distance pipeline comprises: step S1, processing data provided by survey and measurement, and importing the data into a three-dimensional design platform to form a three-dimensional geological model and a three-dimensional terrain model; step S2, the line profession performs plane line selection and longitudinal section design on the basis of the three-dimensional geological model and the three-dimensional terrain model to form design results and a three-dimensional pipeline model, and publishes the design results and the three-dimensional pipeline model to downstream communication, water conservation and other professions for professional design; step S3, after the downstream profession completes the design of each profession, the design results and professional models of the profession are formed, and the design data is returned to the three-dimensional design platform for supplementation; step S4, all professional models of the downstream profession are integrated in the three-dimensional design platform to form a general model.
[0007] Preferably, step S1 comprises: using a drone with a medium format camera to shoot along the route to obtain high-definition image data and elevation and geographic coordinate data, and performing spatial three-dimensional calculations on these data to obtain a three-dimensional real-scene model; then extracting elevation-related elements and data from the three-dimensional real-scene model to form a three-dimensional terrain model; and collecting and analyzing the drilling data to obtain the stratification elements of the geological layer, geological type, stratum depth, soil coefficient, flood parameters, soil type and other parameters, and forming a three-dimensional geological model through calculation.
[0008] Preferably, the step S2 comprises: referencing the three-dimensional real scene model into the three-dimensional terrain model;
[0009] Select a route in the 3D terrain model; generate a corresponding longitudinal section model based on the selected route;
[0010] Set slope change points and crossing lines in the longitudinal section model.
[0011] Preferably, step 3 includes: extracting design data from the database to supplement the three-dimensional design platform; the data extracted from the database include: communication professional data, water conservation professional data, geological data; communication professional data include location data, identification and model data of optical cable laying, hand holes, crossings, markers, warning signs; water conservation professional data include identification, location and model data of cutoff walls, retaining walls, river revetments and other atypical structures; geological data include drilling data, geological pile foundation data, soil type data, flood level data, etc.
[0012] Preferably, the design results include: three-dimensional model, result file, and attribute data.
[0013] Preferably, the three-dimensional design platform is provided with a GIS integration interface, through which information is exchanged with the GIS platform to load the three-dimensional real scene model.
[0014] Compared with the prior art, the present invention has the following beneficial effects:
[0015] The present invention adopts real-scene 3D map modeling technology and a 3D model processing engine, which can effectively be compatible with various types of measurement data such as aerial survey and oblique photography, and can realize 3D forward design of long-distance pipelines based on real-scene 3D maps.
[0016] The real-life modeling data created by real-life 3D map modeling technology can be applied to the field of long-distance pipeline project construction. The terrain data generated by the collected field data contains elevation information and spatial geographic location information, which helps designers analyze / master existing conditions, display projects in a real environment, easily convey design intent, and gain recognition from stakeholders more quickly. Due to its fast and simple technical characteristics of data collection and model generation, project managers can quickly obtain the actual situation on site at a low collection cost and high frequency, and achieve better risk management.
[0017] By using the real-life 3D map, a vectorized model can be generated through the real-life model, and combined with the parametric engineering model creation technology, the forward design process from 3D design to 2D output can be realized. At the same time, by using the extensible characteristics of digital engineering model information, the collected GPS coordinate information of pipeline welds, components, etc. can be accurately imported in batches, and the three-dimensional design results can be obtained for the later visualization of pipeline operations. DETAILED DESCRIPTION
[0018] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technical personnel in this field without making creative work are within the scope of protection of the present invention.
[0019] The present invention provides a technical solution:
[0020] A three-dimensional design method for a long-distance pipeline comprises: step S1, processing data provided by survey and measurement, and importing the data into a three-dimensional design platform to form a three-dimensional terrain model; specifically, using an unmanned aerial vehicle with a medium-format camera to shoot along the route to obtain high-definition image data and elevation and geographic coordinate data, and performing spatial three-dimensional calculations on these data to obtain a three-dimensional real scene model; then extracting elevation-related elements and data from the three-dimensional real scene model to form a three-dimensional terrain model;
[0021] Step S2, the line professional performs plane line selection and longitudinal section design based on the three-dimensional geological model and the three-dimensional terrain model to form a design result and a three-dimensional pipeline model, and publishes the design result and the three-dimensional pipeline model to downstream communication, water conservancy and other professionals for professional design; in this step, the oblique photography data is first processed to form a three-dimensional real scene model and referenced into the three-dimensional terrain model to form a three-dimensional real terrain model; the line is selected in the three-dimensional real terrain model; according to the selected line, the corresponding longitudinal section model is generated; in the longitudinal section model, the slope points and crossing line data of different mileages are selected according to the preset specifications and parameters, and the three-dimensional design platform will dynamically calculate the parameters of the current buried depth point in real time, and display them in real time in the plane and superposition model space to help designers intuitively understand the currently determined buried depth position.
[0022] Step S3, after the downstream professional completes the design of each professional, the design results and professional models of the professional are formed, and the design data is returned to the three-dimensional design platform for supplementation; wherein, the design results include: three-dimensional model, result file, attribute data. The three-dimensional model includes a three-dimensional terrain model and a three-dimensional pipeline model; the result file includes but is not limited to the line horizontal and vertical synthesis map, steel pipe usage list, cold-bent pipe list, hot-bent pipe list, auxiliary engineering quantity list, etc.; the attribute data includes but is not limited to the mileage of the pipeline, the calculation angle of the bend, the wall thickness of the bend, the length of the bend curve, the orientation of the bend, etc. Specifically, the design data in the database is extracted to the three-dimensional design platform for supplementation; the data extracted from the database includes: communication professional data, water conservation professional data; communication professional data includes the location data, identification and model data of optical cable laying, hand holes, crossings, markers, and warning signs; water conservation professional data includes the identification, location and model data of cut-off walls, retaining walls, river revetments and other atypical structures; geological data includes: drilling data, geological pile foundation data, soil type data, flood level data, etc.
[0023] The design data of each discipline is saved in the database and can be automatically extracted and transferred during the design process. After the design is completed, the required data transfer template can be automatically generated, and after being associated with the document data and 3D model, it can be seamlessly transferred to the digital delivery platform, providing complete original data for the full life cycle management of long-distance pipelines.
[0024] In step S4, all professional models of downstream professions are integrated in the three-dimensional design platform to form an overall model covering multiple professions.
[0025] Preferably, the three-dimensional design platform is provided with a GIS integrated interface, and information is exchanged with the GIS platform through the GIS integrated interface to load the three-dimensional real-scene model. The design effect can be browsed in the GIS platform, and the pipeline direction and its surrounding environment, sensitive point information, etc. can be checked to avoid high-consequence areas in time to improve the design quality. It can also combine the three-dimensional real-scene model and geological exploration data to intuitively display the route of the long-distance transmission line, the stratigraphic model of the passing section, and the laying position of the optical cable on the three-dimensional map in the GIS platform, and automatically generate a three-dimensional animation of pipeline roaming.
[0026] In the design work of the 3D design platform, all kinds of statistics and annotation work are automatically completed by the system instead of manual work. By setting constraints in the 3D design platform, unreasonable designs can be automatically judged and reminded; the line adopts a continuous design, and after the plane centerline is adjusted, the relevant design data can be automatically updated in real time according to the adjustment; during the design process, it can provide decision-making assistance to designers according to the line conditions; simplify the modeling process, and automatically generate the required structure model in the system by associating with the data table; after the output format is selectively set according to actual needs, the line can be automatically cut and divided, and the corresponding engineering quantity table can be generated.
[0027] The above shows and describes the basic principles, main features and advantages of the present invention. Technical personnel in this industry should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only preferred examples of the present invention and are not used to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A three-dimensional design method for long-distance pipelines, characterized in that: include: Step S1, processing the data provided by the survey and measurement, and importing it into the 3D design platform to form a 3D terrain model; Step S2: The line professionals perform plane line selection and longitudinal section design based on the three-dimensional terrain model, form design results and a three-dimensional pipeline model, and publish the design results and the three-dimensional pipeline model to downstream professionals for professional design; Step S3: After the downstream professionals complete the design of each specialty, they form the design results and professional models of their own specialty, and return the design data to the 3D design platform for supplementation; Step S4, all professional models of downstream professions are integrated in the 3D design platform to form a general model; The design results include: three-dimensional model, result files, and attribute data; The achievement documents include the horizontal and vertical composite diagram of the line, the steel pipe usage list, the cold-bent pipe bending list, the hot-bent pipe bending list, and the ancillary engineering quantity list.
2. A three-dimensional design method for long-distance pipelines according to claim 1, characterized in that: The step S1 comprises: using a drone with a medium format camera to shoot along the route to obtain high-definition image data and elevation and geographic coordinate data, and performing spatial three-dimensional calculations on these data to obtain a three-dimensional real scene model; then extracting elevation-related elements and data from the three-dimensional real scene model to form a three-dimensional terrain model.
3. A three-dimensional design method for long-distance pipelines according to claim 2, characterized in that: The step S2 comprises: referencing the three-dimensional real scene model into the three-dimensional terrain model; Select routes in the 3D terrain model; Generate the corresponding longitudinal section model according to the selected route; Set slope change points and crossing lines in the longitudinal section model.
4. A three-dimensional design method for long-distance pipelines according to claim 1, characterized in that: The step S3 includes: extracting design data from the database to supplement the three-dimensional design platform; The data extracted from the database include: communication professional data, water conservation professional data, geological data; Communication professional data includes location data, identification and model data of optical cable laying, hand holes, crossings, markers and warning signs; Water conservation professional data include identification, location and model data of cutoff walls, retaining walls and river bank protection; Geological data include: drilling data, geological pile foundation data, soil type data, and flood level data.
5. A three-dimensional design method for long-distance pipelines according to claim 2, characterized in that: The three-dimensional design platform is provided with a GIS integration interface, through which information is exchanged with the GIS platform to load the three-dimensional real scene model.
Citation Information
Patent Citations
Method for constructing real scene model collaborative design platform of railway engineering
CN103699731A
Modeling method and modeling system for long-distance pipeline station model
CN105760609A