Transmission control method and device

By reporting the power control parameters used in dual connections to the network side, the problem that the network side cannot control the uplink transmission power of the terminal is solved, and effective control and optimization of the uplink transmission of MCG and SCG is achieved.

CN113473602BActive Publication Date: 2025-04-11VIVO MOBILE COMM CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010238952.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-03-30
Publication Date
2025-04-11
Estimated Expiration
2040-03-30

AI Technical Summary

Technical Problem

In dual connections, the network side cannot know the uplink transmission power in the primary cell group (MCG) or secondary cell group (SCG) used by the terminal during the adjustment process, resulting in the inability to perform effective transmission control.

Method used

The first information is sent through the terminal, notifying the primary and/or secondary nodes of power control parameters used in the dual-connection uplink power sharing mechanism, thereby enabling the network device to perform transmission control according to these parameters.

Benefits of technology

The primary and/or secondary nodes of the terminal can perform transmission control according to the power allocation of the terminal, such as power control and optimize network scheduling for uplink transmissions in MCG or SCG, thereby improving the uplink transmission quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113473602B_ABST
    Figure CN113473602B_ABST
Patent Text Reader

Abstract

An embodiment of the present invention provides a method and device for transmission control, the method comprising: sending first information, wherein the first information is used to notify the master node and / or the slave node of the terminal of the power control parameters used by the terminal in the dual-connection uplink power sharing mechanism. In an embodiment of the present invention, the master node and / or the slave node of the terminal can obtain the power control parameters used by the terminal in the dual-connection uplink power sharing mechanism based on the first information reported by the terminal, so that the master node and / or the slave node of the terminal can perform transmission control according to the power allocation of the terminal, such as power control of uplink transmission in MCG or SCG, optimization of network scheduling, etc., thereby improving the uplink transmission quality of the terminal.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present invention relate to the field of communication technology, and in particular to a transmission control method and device. Background Art

[0002] In dual connectivity, resources of two network nodes (access network elements) may be provided to a terminal (eg, user equipment (UE)), one of which is called a master node (MN) and the other is called a secondary node (SN).

[0003] At each network node, carrier aggregation (CA) is used, that is, a series of service cells controlled by the node are configured for the UE, also known as a cell group (CG). The cell group controlled by the MN is the master cell group (MCG), and the cell group controlled by the auxiliary node is the secondary cell group (SCG). Each cell group contains a special cell (SpCell) and a series of secondary cells (Scell). In the MCG, the special cell is called the primary cell (PCell), and in the SCG, the special cell is called the primary secondary cell (PSCell). In a cell group, the SpCell uses the main carrier, while other secondary cells use the secondary carrier. Resource scheduling within a cell group is performed by the SpCell.

[0004] In the dual-connection uplink power sharing mechanism, the UE needs to adjust its uplink transmission power in the MCG or SCG to ensure that when the uplink transmissions of the MCG and SCG are carried out simultaneously, the sum of the two does not exceed the maximum uplink transmission power of the terminal. However, the network side does not know the uplink transmission power in the MCG or SCG used by the terminal during the adjustment process, and thus cannot perform transmission control accordingly. Summary of the invention

[0005] One purpose of an embodiment of the present invention is to provide a method and device for transmission control to solve the problem that the network side is unaware of the uplink transmission power in the MCG or SCG used by the terminal during the adjustment process and is unable to perform transmission control accordingly.

[0006] In a first aspect, an embodiment of the present invention provides a transmission control method, applied to a terminal, including:

[0007] Sending first information, where the first information is used to notify a primary node and / or a secondary node of the terminal of a power control parameter used by the terminal in a dual-connection uplink power sharing mechanism.

[0008] In a second aspect, an embodiment of the present invention further provides a power control method, applied to a network device, comprising:

[0009] receiving first information from a terminal, where the first information is used to notify a primary node and / or a secondary node of the terminal of a power control parameter used by the terminal in a dual-connection uplink power sharing mechanism;

[0010] Perform transmission control on the terminal according to the first information.

[0011] In a third aspect, an embodiment of the present invention further provides a terminal, including:

[0012] The first sending module is used to send first information, where the first information is used to notify the primary node and / or the secondary node of the terminal of a power control parameter used by the terminal in a dual-connection uplink power sharing mechanism.

[0013] In a fourth aspect, an embodiment of the present invention further provides a network device, including:

[0014] A receiving module, configured to receive first information from a terminal, where the first information is used to notify a primary node and / or a secondary node of the terminal of a power control parameter used by the terminal in a dual-connection uplink power sharing mechanism;

[0015] A control module is used to perform transmission control on the terminal according to the first information.

[0016] In a fifth aspect, an embodiment of the present invention further provides a communication device, comprising: a processor, a memory, and a program stored in the memory and executable on the processor, wherein when the program is executed by the processor, the steps of the transmission control method as described in the first aspect or the second aspect are implemented.

[0017] In a sixth aspect, an embodiment of the present invention further provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the transmission control method as described in the first aspect or the second aspect are implemented.

[0018] In an embodiment of the present invention, the main node and / or the auxiliary node of the terminal can obtain the power control parameters used by the terminal in the dual-connection uplink power sharing mechanism based on the first information reported by the terminal, so that the main node and / or the auxiliary node of the terminal can perform transmission control according to the power allocation of the terminal, such as power control of the uplink transmission in the MCG or SCG, optimization of network scheduling, etc., thereby improving the uplink transmission quality of the terminal. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] By reading the detailed description of the following embodiments, various other advantages and benefits will become clear to those of ordinary skill in the art. The accompanying drawings are only used to illustrate the purpose of the preferred embodiments and are not considered to be limitations of the present invention. In addition, the same reference symbols are used to represent the same components throughout the accompanying drawings.

[0020] In the attached picture:

[0021] Figure 1 A schematic diagram of the architecture of a wireless communication system according to an embodiment of the present invention;

[0022] Figure 2 One of the schematic diagrams of the power control method according to an embodiment of the present invention;

[0023] Figure 3 The second schematic diagram of the power control method according to the embodiment of the present invention;

[0024] Figure 4 is a schematic diagram of a terminal according to an embodiment of the present invention;

[0025] Figure 5 A schematic diagram of a network device according to an embodiment of the present invention;

[0026] Figure 6 Schematic diagram of a communication device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0027] To facilitate understanding of the embodiments of the present invention, the following technical points are introduced below:

[0028] (1) Main scenarios of DC / CA:

[0029] Based on the different wireless access technologies and core network types, DC scenarios can be divided into the following categories:

[0030] When the core network is an Evolved Packet Core (EPC):

[0031] EN-DC (EUTRA-NR Dual Connection) is a multi-mode dual connectivity (MR-DC) architecture with an evolved Node B (eNB) as the MN and an EN-gNB (a fifth generation (5G) base station connected to the fourth generation (4G) core network under the non-independent networking architecture of the Option 3 series, called en-gNB) as the SN.

[0032] When the core network is a 5G core network (5G Core, 5GC):

[0033] New Radio Dual Connectivity (NR-DC), MR-DC architecture with gNB as MN and gNB as SN;

[0034] 5G NR and 4G radio access network dual connectivity (NE-DC), multi-mode dual connectivity (MR-DC) architecture with gNB as MN and next generation base station (NextGeneration eNodeB, NG-eNB) as SN;

[0035] Dual connectivity (NGEN-DC) between 4G radio access network and 5G NR under the 5G core network, MR-DC architecture with NG-eNB as MN and gNB as SN;

[0036] (2) Dual connection uplink power sharing mechanism:

[0037] In NR-DC, assuming that the UE maximum uplink transmission power (P total ) is certain, when the uplink transmission of the primary cell group MCG and the uplink transmission of the secondary cell group SCG occur simultaneously (i.e. overlap, specifically, the uplink transmission of any serving cell in the MCG and the uplink transmission of any serving cell in the SCG occur simultaneously), the UE needs to adjust the uplink transmission power of the MCG or SCG to ensure that the sum of the two does not exceed P total .

[0038] Assume that the UE starts SCG uplink transmission at time T0, and the SCG uplink transmission power is represented by pwr_SCG. The UE calculates pwr_SCG at time T0 according to the following method:

[0039] Before time T0-T_offset, the UE monitors the Physical Downlink Control Channel (PDCCH) of the MCG:

[0040] ■ If the PDCCH triggers / indicates that the UE has an MCG uplink transmission that overlaps with the SCG uplink transmission at time T0, the UE's SCG uplink transmission power should satisfy pwr_SCG<=min{P SCG ,P total –MCG tx power}; where P total is the maximum uplink transmission power of UE, P SCG is the maximum uplink transmission power of SCG, MCG tx power is the uplink transmission power of MCG;

[0041] ■ Otherwise, pwr_SCG <= P total ;

[0042] After T0-T_offset, the UE does not want the PDCCH of the MCG to schedule the UE to perform MCG uplink transmission that overlaps with the SCG uplink transmission at time T0.

[0043] Among them, T_offset is the time offset used by the UE in the uplink power sharing mechanism. The following describes the value of T_offset:

[0044] The current value of T_offset is in is the maximum preparation time of UE in MCG, The maximum preparation time of the UE in the SCG. The value of T proc,2 ,T proc,CSI , and / or The maximum value in; When "Without look-ahead", The value of T proc,2 ,T proc,CSI , and / or The maximum value in .

[0045] Explanation of the above parameters:

[0046] ■T proc,2Physical Uplink Shared Channel (PUSCH) processing time of the terminal in MCG or SCG;

[0047] It should be noted that processing time can be understood as preparation time, processing time, preparation delay or processing delay, etc.

[0048] ■T proc,CSI Preparation time for the terminal's channel state information (CSI) in MCG or SCG;

[0049] ■ The SPS PDSCH release preparation time when the PUSCH or PUCCH for sending SPS PDSCH release on the MCG or SCG is multiplexed with other PUCCH and / or PUSCH;

[0050] ■ It is the PUSCH preparation time of the terminal when the PUSCH of MCG or SCG is multiplexed with PUCCH and / or other PUSCH;

[0051] ■ It is the CSI preparation time when the PUSCH or PUCCH on which the terminal sends CSI on the MCG or SCG is multiplexed with other PUCCH or PUSCH.

[0052] In the process of implementing the present invention, the prior art has the following problems:

[0053] 1) The UE can calculate the above-mentioned and Then T_offset is obtained. Since there is a certain risk when MN schedules UE during [T0-T_offset, T0] (UE may not monitor the uplink scheduling of MN during this period), it is understandable that during [T0-T_offset, T0], if MCG chooses not to schedule UE, there will be a certain loss, and the larger the value of T_offset, the greater the loss of MCG's uplink transmission.

[0054] When the SN configures the SCG configuration for the UE, there are two ways to transmit it to the UE:

[0055] Mode 1: Transmitted to UE via MN SRB1;

[0056] Mode 2: SN is transmitted to UE via SRB3.

[0057] In mode 1, when MN transmits SCG configuration information, it can obtain the same acquisition method as UE. and And T_offset.

[0058] In method 2, the MN cannot obtain the SCG configuration and thus cannot calculate and And T_offset.

[0059] 2) Since the UE needs to monitor the PDCCH of the MCG before time T0-T_offset to determine whether there is overlap transmission, if so, it is necessary to prioritize the uplink transmission power of the MCG and adjust the uplink transmission power of the SCG.

[0060] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0061] The term "comprise" and any variation thereof in the specification and claims of the present application are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units need not be limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices. In addition, the use of "and / or" in the specification and claims to indicate at least one of the connected objects, such as A and / or B, means that A alone, B alone, and A and B exist in three cases.

[0062] In the embodiments of the present invention, words such as "exemplary" or "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "exemplary" or "for example" in the embodiments of the present invention should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in a specific way.

[0063] The technology described in this article is not limited to Long Time Evolution (LTE) / LTE-Advanced (LTE-A) systems, and can also be used in various wireless communication systems, such as Code Division Multiple Access (CDMA), Time Division Multiple Access (TDMA), Frequency Division Multiple Access (FDMA), Orthogonal Frequency Division Multiple Access (OFDMA), Single-carrier Frequency Division Multiple Access (SC-FDMA) and other systems.

[0064] The terms "system" and "network" are often used interchangeably. A CDMA system may implement radio technologies such as CDMA2000, Universal Terrestrial Radio Access (UTRA). UTRA includes Wideband Code Division Multiple Access (WCDMA) and other CDMA variants. A TDMA system may implement radio technologies such as Global System for Mobile Communication (GSM). An OFDMA system may implement radio technologies such as Ultra Mobile Broadband (UMB), Evolution-UTRA (E-UTRA), IEEE 802.11 (Wi-Fi), IEEE 802.16 (WiMAX), IEEE 802.20, Flash-OFDM, etc. UTRA and E-UTRA are parts of Universal Mobile Telecommunications System (UMTS). LTE and more advanced LTE (such as LTE-A) are new UMTS versions that use E-UTRA. UTRA, E-UTRA, UMTS, LTE, LTE-A, and GSM are described in documents from an organization named "3rd Generation Partnership Project" (3GPP). CDMA2000 and UMB are described in documents from an organization named "3rd Generation Partnership Project 2" (3GPP2). The techniques described herein may be used for the systems and radio technologies mentioned above as well as for other systems and radio technologies.

[0065] The following describes an embodiment of the present invention in conjunction with the accompanying drawings. A transmission control method and device provided by the embodiment of the present invention can be applied to a wireless communication system. Figure 1 , is a schematic diagram of the architecture of a wireless communication system provided by an embodiment of the present invention. Figure 1 As shown, the wireless communication system may include: a network device 10, a network device 11 and a terminal 12, the terminal 12 may be denoted as UE12, and the terminal 12 may communicate with the network device 10 and the network device 11 (transmit signaling or transmit data). In practical applications, the connection between the above-mentioned devices may be a wireless connection. In order to conveniently and intuitively represent the connection relationship between the devices, Figure 1 Solid lines are used to indicate this.

[0066] The network device 10 and the network device 11 provided in the embodiment of the present invention may be a base station, which may be a commonly used base station, an evolved node base station (eNB), or a network device in a 5G system (for example, a next generation node base station (gNB) or a transmission and reception point (TRP)).

[0067] The terminal 12 provided in the embodiment of the present invention can be a mobile phone, a tablet computer, a laptop computer, an ultra-mobile personal computer (UMPC), a netbook or a personal digital assistant (PDA), a mobile Internet device (MID), a wearable device (Wearable Device) or a vehicle-mounted device, etc.

[0068] See also Figure 2 The embodiment of the present invention further provides a transmission control method, the execution subject of the method is a terminal, and includes: step 201.

[0069] Step 201: Send first information, where the first information is used to notify the master node (MasterNode, MN) and / or the secondary node (Secondary Node, SN) of the terminal of the power control parameters used by the terminal in the dual-connection uplink power sharing mechanism, so that the master node and / or the secondary node performs transmission control according to the first information, such as power control of uplink transmission in MCG or SCG, optimization of network scheduling, etc.

[0070] In some implementations, the terminal directly sends at least part of the first information to the primary node or the secondary node, and the first information is used to notify the primary node of the terminal of the power control parameters used by the terminal in the dual-connection uplink power sharing mechanism; or, the terminal sends at least part of the first information to the secondary node through the primary node, and the first information is used to notify the secondary node of the terminal of the power control parameters used by the terminal in the dual-connection uplink power sharing mechanism; or, the terminal sends at least part of the first information to the primary node through the secondary node, and the first information is used to notify the primary node of the terminal of the power control parameters used by the terminal in the dual-connection uplink power sharing mechanism.

[0071] In some implementations, the terminal sends the first information via one of the following: (a) terminal assistance information; (b) radio resource control (RRC) reconfiguration complete message; (c) terminal capabilities; (d) RRC connection recovery complete message; and (e) RRC connection establishment complete message. That is, the terminal can carry the first information in one of (a) to (e) and report it to the network device.

[0072] In some implementations, the first information may include at least one of the following:

[0073] (1) The time offset (T_offset) used by the uplink power sharing mechanism;

[0074] For example, the MN may obtain T_offset through the first information, and the MN may optimize network scheduling according to T_offset to avoid loss in uplink transmission of the MCG.

[0075] For another example, the SN may obtain T_offset through the first information, and the SN may schedule the UE to perform SCG uplink transmission at an appropriate time to avoid loss of the SCG uplink transmission.

[0076] (2) the maximum preparation time of the terminal in the SCG;

[0077] For example, the MN can calculate T_offset based on the maximum preparation time of the terminal in the SCG, thereby optimizing network scheduling, such as scheduling the UE to perform MCG uplink transmission at an appropriate time to avoid loss of MCG uplink transmission.

[0078] (3) the maximum preparation time of the terminal in the MCG;

[0079] For example, SN can calculate T_offset based on the maximum preparation time of the terminal in MCG. SN can know whether the UE can use the maximum uplink total power for SCG uplink transmission, thereby optimizing network scheduling, such as scheduling the UE to perform SCG uplink transmission at an appropriate time to avoid loss of SCG uplink transmission.

[0080] Optionally, the MN may send the maximum preparation time of the terminal in the MCG to the SN, or the terminal may send the maximum preparation time of the terminal in the MCG to the SN.

[0081] (4) a first parameter set, wherein the first parameter set is used to calculate the maximum preparation time of the MCG;

[0082] For example, SN can calculate T_offset based on the maximum preparation time of the terminal in MCG. SN can know whether the UE can use the maximum uplink total power for SCG uplink transmission, thereby optimizing network scheduling, such as scheduling the UE to perform SCG uplink transmission at an appropriate time to avoid loss of SCG uplink transmission.

[0083] (5) A second parameter set, wherein the second parameter set is used to calculate the maximum preparation time of the SCG.

[0084] For example, the MN can calculate T_offset based on the maximum preparation time of the terminal in the SCG, thereby optimizing network scheduling, such as scheduling the UE to perform MCG uplink transmission at an appropriate time to avoid loss of MCG uplink transmission. It can be understood that sending at least part of the first information is equivalent to sending one or more of (1) to (5) of the above power control parameters, or sending at least part of the above first parameter set or second parameter set.

[0085] Optionally, the first parameter set includes at least one of the following:

[0086] (1) PUSCH preparation time of the terminal in the MCG;

[0087] It can be understood that the PUSCH preparation time is the time from when the terminal receives the last symbol of the PDCCH scheduling the PUSCH to when the UE starts to send the PUSCH.

[0088] (2) CSI preparation time of the terminal in the MCG;

[0089] (3) PUSCH preparation time of the terminal when the PUSCH of the MCG is multiplexed with the PUCCH and / or other PUSCHs;

[0090] It can be understood that other PUSCHs may refer to PUSCHs other than the PUSCH of the MCG.

[0091] (4) CSI preparation time when the PUSCH or PUCCH for sending CSI by the terminal on the MCG is multiplexed with other PUCCHs or PUSCHs;

[0092] It can be understood that other PUCCH or PUSCH refers to PUCCH or PUSCH other than PUCCH or PUSCH for sending CSI on MCG.

[0093] (5) SPS PDSCH release preparation time when the PUSCH or PUCCH for sending SPS PDSCH release by the terminal on the MCG is multiplexed with other PUCCH and / or PUSCH;

[0094] It can be understood that other PUCCH or PUSCH refers to PUCCH or PUSCH other than the PUCCH or PUSCH for sending SPS PDSCH release on MCG.

[0095] (6) a third parameter, wherein the third parameter is used by the terminal to calculate one or more of the following:

[0096] The PUSCH preparation time of the MCG or the CSI preparation time of the MCG;

[0097] The PUSCH preparation time, CSI preparation time or SPS PDSCH release preparation time when the PUCCH or PUSCH of the MCG is multiplexed with other PUCCHs and / or PUSCHs.

[0098] It can be understood that other PUCCH or PUSCH refers to PUCCH or PUSCH other than the PUCCH or PUSCH of the MCG.

[0099] It can be understood that the third parameter is not limited to one but can be multiple.

[0100] Optionally, the second parameter set includes at least one of the following:

[0101] (1) PUSCH preparation time of the terminal in the SCG;

[0102] (2) CSI preparation time of the terminal in the SCG;

[0103] (3) PUSCH preparation time of the terminal when the PUSCH of the SCG is multiplexed with the PUCCH and / or other PUSCHs;

[0104] (4) CSI preparation time when the PUSCH or PUCCH for sending CSI by the terminal on the SCG is multiplexed with other PUCCH or PUSCH;

[0105] (5) SPS PDSCH release preparation time when the PUSCH or PUCCH for sending SPS PDSCH release on the SCG is multiplexed with other PUCCH and / or PUSCH;

[0106] (6) a fourth parameter, wherein the fourth parameter is used by the terminal to calculate one or more of the following:

[0107] A PUSCH preparation time or a CSI preparation time of the SCG;

[0108] The PUSCH preparation time, CSI preparation time or SPS PDSCH release preparation time when the PUCCH or PUSCH of the SCG is multiplexed with other PUCCH and / or PUSCH.

[0109] It can be understood that the fourth parameter is not limited to one but can be multiple.

[0110] In an embodiment of the present invention, the terminal reports the power control parameters used in the dual-connection uplink power sharing mechanism to the network side, so that the main node and / or auxiliary node of the terminal can perform transmission control according to the power allocation of the terminal, such as power control of uplink transmission in MCG or SCG, optimization of network scheduling, etc., to improve the uplink transmission quality.

[0111] See also Figure 3 The embodiment of the present invention further provides a transmission control method, the execution subject of the method is a network device, including: step 301 and step 302.

[0112] Step 301: Receive first information from a terminal, where the first information is used to notify a primary node and / or a secondary node of the terminal of a power control parameter used by the terminal in a dual-connection uplink power sharing mechanism.

[0113] For example, the network device is a secondary node of the terminal, and the secondary node may receive at least part of the first information from the terminal through the primary node.

[0114] In some implementations, the first information may include at least one of the following:

[0115] (1) The time offset used by the uplink power sharing mechanism;

[0116] For example, the MN can obtain T_offset through the first information, and the MN can optimize network scheduling according to T_offset to avoid the loss of uplink transmission of MCG. For another example, the SN can obtain T_offset through the first information, and the SN can schedule the UE to perform SCG uplink transmission at an appropriate time to avoid the loss of uplink transmission of SCG.

[0117] (2) the maximum preparation time of the terminal in the SCG;

[0118] For example, the MN can calculate T_offset based on the maximum preparation time of the terminal in the SCG, thereby optimizing network scheduling, such as scheduling the UE to perform MCG uplink transmission at an appropriate time to avoid loss of MCG uplink transmission.

[0119] (3) the maximum preparation time of the terminal in the MCG;

[0120] For example, SN can calculate T_offset based on the maximum preparation time of the terminal in MCG. SN can know whether the UE can use the maximum uplink total power for SCG uplink transmission, thereby optimizing network scheduling, such as scheduling the UE to perform SCG uplink transmission at an appropriate time to avoid loss of SCG uplink transmission.

[0121] (4) a first parameter set, wherein the first parameter set is used to calculate the maximum preparation time of the MCG;

[0122] For example, SN can calculate T_offset based on the maximum preparation time of the terminal in MCG. SN can know whether the UE can use the maximum uplink total power for SCG uplink transmission, thereby optimizing network scheduling, such as scheduling the UE to perform SCG uplink transmission at an appropriate time to avoid loss of SCG uplink transmission.

[0123] (5) A second parameter set, wherein the second parameter set is used to calculate the maximum preparation time of the SCG.

[0124] For example, the MN can calculate T_offset based on the maximum preparation time of the terminal in the SCG, thereby optimizing network scheduling, such as scheduling the UE to perform MCG uplink transmission at an appropriate time to avoid loss of MCG uplink transmission.

[0125] It should be noted that the description of the first parameter set and the second parameter set can refer to Figure 2 The embodiment shown.

[0126] Step 302: Perform transmission control on the terminal according to the first information.

[0127] Optionally, the performing transmission control on the terminal includes at least one of the following:

[0128] (1) controlling the uplink transmission power of the terminal in the primary cell group;

[0129] For example, controlling the uplink transmission power of the terminal in any serving cell in the primary cell group;

[0130] (2) controlling the uplink transmission power of the terminal in the secondary cell group;

[0131] For example, the uplink transmission power of any serving cell in the secondary cell group of the terminal is controlled.

[0132] (3) Optimize network scheduling;

[0133] For example, adjusting the uplink transmission position of the terminal in the primary cell group; or scheduling the terminal to perform uplink transmission at a suitable time; or controlling the terminal to prioritize or postpone uplink transmission, and so on.

[0134] Optionally, the network device is a primary node of the terminal, and the method further includes: sending second information to a secondary node of the terminal, where the second information includes at least one of the following:

[0135] (1) The time offset used by the uplink power sharing mechanism;

[0136] (2) the maximum preparation time of the terminal in the MCG;

[0137] (3) PUSCH preparation time of the terminal in the MCG;

[0138] (4) CSI preparation time of the terminal in the MCG;

[0139] (5) PUSCH preparation time of the terminal when the PUSCH of the MCG is multiplexed with the PUCCH and / or other PUSCHs;

[0140] (6) CSI preparation time when the PUSCH or PUCCH for sending CSI by the terminal on the MCG is multiplexed with other PUCCHs and / or PUSCHs;

[0141] (7) SPS PDSCH release preparation time when the PUSCH or PUCCH for sending SPS PDSCH release by the terminal on the MCG is multiplexed with other PUCCH and / or PUSCH;

[0142] (8) a fifth parameter, wherein the fifth parameter is used by the terminal to calculate one or more of the following:

[0143] The PUSCH preparation time or CSI preparation time of the MCG;

[0144] PUSCH preparation time, CSI preparation time or SPS PDSCH release preparation time when the PUCCH or PUSCH of the MCG is multiplexed with other PUCCH and / or PUSCH;

[0145] It can be understood that the fifth parameter is not limited to one but can be multiple.

[0146] (9) A sixth parameter, where the sixth parameter is used by the auxiliary node to obtain configuration information related to the physical downlink control channel of the terminal in the MCG.

[0147] It can be understood that the sixth parameter is not limited to one but can be multiple.

[0148] It is understandable that the auxiliary node obtains the PDCCH configuration of the terminal in the MCG, and can infer whether the UE can use the maximum uplink total power for SCG uplink transmission, and then the auxiliary node optimizes network scheduling or controls transmission power based on this information.

[0149] Optionally, the network device is a secondary node of the terminal, and the method further includes: sending third information to the primary node of the terminal, the third information including at least one of the following:

[0150] (1) the time offset used by the terminal in the uplink power sharing mechanism;

[0151] (2) the maximum preparation time of the terminal in the SCG;

[0152] (3) PUSCH preparation time of the terminal in the SCG;

[0153] (4) CSI preparation time of the terminal in the SCG;

[0154] (5) PUSCH preparation time of the terminal when the PUSCH of the SCG is multiplexed with the PUCCH and / or other PUCCHs and / or PUSCHs;

[0155] (6) CSI preparation time when the PUSCH or PUCCH for sending CSI by the terminal on the SCG is multiplexed with other PUCCH or PUSCH;

[0156] (7) SPS PDSCH release preparation time when the PUSCH or PUCCH for sending SPS PDSCH release on the SCG is multiplexed with other PUCCH and / or PUSCH;

[0157] (8) a seventh parameter, wherein the seventh parameter is used by the terminal to calculate one or more of the following:

[0158] PUSCH preparation time or CSI preparation time of the SCG;

[0159] PUSCH preparation time, CSI preparation time or SPS PDSCH release preparation time when the PUCCH or PUSCH of the SCG is multiplexed with other PUCCH and / or PUSCH;

[0160] It can be understood that the seventh parameter is not limited to one but can be multiple.

[0161] (9) An eighth parameter, where the eighth parameter is used by the secondary node to obtain configuration information of a physical downlink control channel of the terminal in the SCG.

[0162] It can be understood that the eighth parameter is not limited to one but can be multiple.

[0163] In an embodiment of the present invention, the main node and / or auxiliary node of the terminal can perform transmission control according to the power allocation reported by the terminal, such as performing power control on the uplink transmission in the MCG or SCG, optimizing network scheduling, etc., to improve the uplink transmission quality in the MCG or SCG.

[0164] The following is an introduction in combination with Embodiment 1, Embodiment 2, Embodiment 3 and Embodiment 4.

[0165] Embodiment 1:

[0166] Step 1: MN sends MCG configuration to UE in MCG signaling radio bearer (SRB) 1;

[0167] Step 2: After receiving the MCG configuration, the UE calculates T according to the configuration parameters in the MCG configuration and the parameter values ​​agreed upon in some protocols. proc,2 , T proc,CSI , One or more of them, and take the maximum value as

[0168] Step 3: SN sends the SCG configuration to UE via SRB3;

[0169] Step 4: After receiving the SCG configuration, the UE calculates T according to the configuration parameters in the SCG configuration and the parameter values ​​agreed upon in some protocols. proc,2 , T proc,CSI , And take the maximum value as

[0170] Step 5: UE will and The maximum value in is set as T_offset;

[0171] Step 6: The UE sends information A to the MN, where the information A includes T_offset;

[0172] Step 7: MN performs network scheduling according to T_offset.

[0173] Step 8: Optionally, the UE sends information B to the SN, where the information B includes T_offset;

[0174] For example, information B can be sent via MCG SRB1 or SRB3.

[0175] Step 9: SN performs network scheduling according to T_offset.

[0176] It can be understood that the above information A and information B are equivalent to the first information.

[0177] Embodiment 2

[0178] Step 1: MN sends MCG configuration to UE in MCG SRB1;

[0179] Step 2: After receiving the MCG configuration, the UE calculates T according to the configuration parameters in the MCG configuration and the parameter values ​​agreed upon in some protocols. proc,2 , T proc,CSI , And take the maximum value as

[0180] Step 3: SN sends the SCG configuration to UE via SRB3;

[0181] Step 4: After receiving the SCG configuration, the UE calculates T according to the configuration parameters in the SCG configuration and the parameter values ​​agreed upon in some protocols. proc,2 , T proc,CSI , And take the maximum value as

[0182] Step 5: UE will and The maximum value in is set as T_offset;

[0183] Step 6: The UE sends information A to the MN, where the information A includes at least one of the following: SCG corresponding T proc,2 , T proc,CSI ,

[0184] Step 7: MN performs network scheduling according to information A;

[0185] Step 8: The UE sends information B to the SN, where the information B contains at least one of the following: MCG corresponding T proc,2 , T proc,CSI ,

[0186] Step 9: SN performs network scheduling according to information B.

[0187] It can be understood that the above information A and information B are equivalent to the first information.

[0188] Embodiment three:

[0189] Step 1: UE sends information A to MN;

[0190] Optionally, the information A includes at least one of the following: MCG corresponding T proc,2 , T proc,CSI , SCG corresponding T proc,2 , T proc,CSI ,

[0191] Step 2: MN sends information B to SN;

[0192] Optionally, the information B includes at least one of the following: T_offset, MCG corresponding T proc,2 , T proc,CSI , PDCCH configuration information of MCG;

[0193] Optionally, the PDCCH configuration information includes one of the following:

[0194] (1) Serving cell PDCCH configuration information in the serving cell configuration (UE-specific);

[0195] (2) PDCCH public configuration information in the downlink bandwidth part public configuration;

[0196] (3) PDCCH configuration information in the downlink bandwidth configuration;

[0197] Step 3: SN obtains the MCG PDCCH configuration in information B and learns that the UE receives an MCG uplink transmission on the MCG PDCCH before T0-T_offset. This transmission overlaps with the SCG uplink transmission at time T0. According to the dual connection power sharing mechanism, the UE's uplink transmission power in the SCG will be reduced.

[0198] If the MCG has no uplink transmission for a long period of time after T0-T_offset, the SN can schedule the UE to transmit with the maximum uplink power during this period of time and avoid low-power transmission at time T0.

[0199] It can be understood that the above information A and information B are equivalent to the first information.

[0200] Embodiment 4

[0201] Step 1: MN sends MCG configuration to UE in MCG SRB1;

[0202] Step 2: After receiving the MCG configuration, the UE calculates T according to the configuration parameters in the MCG configuration and the parameter values ​​agreed upon in some protocols. proc,2 , T proc,CSI , And take the maximum value as

[0203] Step 3: SN sends the SCG configuration to UE via SRB3;

[0204] Step 4: After receiving the SCG configuration, the UE calculates T based on the configuration parameters and the parameter values ​​agreed in some protocols. proc,2 , T proc,CSI , And take the maximum value as

[0205] Step 5: UE will and The maximum value in is set as T_offset;

[0206] Step 6: The UE sends information A to the MN, which includes at least one of the following: Calculate the T corresponding to the SCG proc,2 , T proc,CSI , Necessary parameters, such as subcarrier spacing, parameters, etc.;

[0207] Step 7: MN performs network scheduling according to information B;

[0208] Step 8: The UE sends information B to the SN, which includes at least one of the following: Calculate the T corresponding to the MCG proc,2 , T proc,CSI , Necessary parameters, such as subcarrier spacing, parameters, etc.;

[0209] Step 9: SN performs network scheduling according to information B.

[0210] It can be understood that the above information A and information B are equivalent to the first information.

[0211] See also Figure 4 The embodiment of the present invention further provides a terminal, the terminal 400 includes:

[0212] The first sending module 401 is used to send first information, where the first information is used to notify the main node and / or the auxiliary node of the terminal of the power control parameters used by the terminal in the dual connection uplink power sharing mechanism, so that the main node and / or the auxiliary node performs power control according to the first information.

[0213] In some implementations, the first sending module 401 may send the first information directly to the primary node; or, the first sending module 401 may send the first information to the secondary node through the primary node.

[0214] In some implementations, the terminal sends the first information via one of the following messages: (a) terminal assistance information; (b) RRC reconfiguration complete message; (c) terminal capabilities; (d) RRC connection recovery complete message; and (e) RRC connection establishment complete message.

[0215] In some implementations, the first information may include at least one of the following:

[0216] (1) The time offset used by the uplink power sharing mechanism;

[0217] (2) the maximum preparation time of the terminal in the MCG;

[0218] (3) the maximum preparation time of the terminal in the SCG;

[0219] (4) a first parameter set, wherein the first parameter set is used to calculate the maximum preparation time of the MCG;

[0220] (5) A second parameter set, wherein the second parameter set is used to calculate the maximum preparation time of the SCG.

[0221] Optionally, the first parameter set includes at least one of the following:

[0222] (1) PUSCH preparation time of the terminal in the MCG;

[0223] It can be understood that the PUSCH preparation time is the time from when the terminal receives the last symbol of the PDCCH scheduling the PUSCH to when the UE starts to send the PUSCH.

[0224] (2) CSI preparation time of the terminal in the MCG;

[0225] (3) PUSCH preparation time of the terminal when the PUSCH of the MCG is multiplexed with the PUCCH and / or other PUSCHs;

[0226] (4) CSI preparation time when the PUSCH or PUCCH for sending CSI by the terminal on the MCG is multiplexed with other PUCCHs or PUSCHs;

[0227] (5) SPS PDSCH release preparation time when the PUSCH or PUCCH for sending SPS PDSCH release by the terminal on the MCG is multiplexed with other PUCCH and / or PUSCH;

[0228] (6) a third parameter, wherein the third parameter is used by the terminal to calculate one or more of the following:

[0229] The PUSCH preparation time of the MCG or the CSI preparation time of the MCG;

[0230] The PUSCH preparation time, CSI preparation time or SPS PDSCH release preparation time when the PUCCH or PUSCH of the MCG is multiplexed with other PUCCHs and / or PUSCHs.

[0231] It can be understood that the third parameter is not limited to one but can be multiple.

[0232] Optionally, the second parameter set includes at least one of the following:

[0233] (1) PUSCH preparation time of the terminal in the SCG;

[0234] (2) CSI preparation time of the terminal in the SCG;

[0235] (3) PUSCH preparation time of the terminal when the PUSCH of the SCG is multiplexed with the PUCCH and / or other PUSCHs;

[0236] (4) CSI preparation time when the PUSCH or PUCCH for sending CSI by the terminal on the SCG is multiplexed with other PUCCH or PUSCH;

[0237] (5) SPS PDSCH release preparation time when the PUSCH or PUCCH for sending SPS PDSCH release on the SCG is multiplexed with other PUCCH and / or PUSCH;

[0238] (6) a fourth parameter, wherein the fourth parameter is used by the terminal to calculate one or more of the following:

[0239] A PUSCH preparation time or a CSI preparation time of the SCG;

[0240] The PUSCH preparation time, CSI preparation time or SPS PDSCH release preparation time when the PUCCH or PUSCH of the SCG is multiplexed with other PUCCH and / or PUSCH.

[0241] It can be understood that the fourth parameter is not limited to one but can be multiple.

[0242] The terminal provided in the embodiment of the present invention can execute the above Figure 2 The implementation principle and technical effect of the method embodiment shown are similar, and this embodiment will not be repeated here.

[0243] See also Figure 5 The embodiment of the present invention further provides a network device, the network device 500 includes:

[0244] A receiving module 501 is configured to receive first information from a terminal, where the first information is used to notify a primary node and / or a secondary node of the terminal of a power control parameter used by the terminal in a dual-connection uplink power sharing mechanism;

[0245] For example, the network device is a secondary node of the terminal, and the receiving module 501 may receive at least part of the first information from the terminal through the primary node.

[0246] The control module 502 is used to perform transmission control on the terminal according to the first information.

[0247] Optionally, the performing transmission control on the terminal includes at least one of the following:

[0248] (1) controlling the uplink transmission power of the terminal in the primary cell group;

[0249] For example, controlling the uplink transmission power of the terminal in any serving cell in the primary cell group;

[0250] (2) controlling the uplink transmission power of the terminal in the secondary cell group;

[0251] For example, the uplink transmission power of any serving cell in the secondary cell group of the terminal is controlled.

[0252] (3) Optimize network scheduling;

[0253] For example, adjusting the uplink transmission position of the terminal in the primary cell group; or scheduling the terminal to perform uplink transmission at a suitable time; or controlling the terminal to prioritize or postpone uplink transmission, and so on.

[0254] Optionally, the network device 500 is a master node of the terminal, and the network device 500 further includes:

[0255] The second sending module is configured to send second information to the secondary node of the terminal, where the second information includes at least one of the following:

[0256] (1) The time offset used by the uplink power sharing mechanism;

[0257] (2) the maximum preparation time of the terminal in the MCG;

[0258] (3) PUSCH preparation time of the terminal in the MCG;

[0259] (4) CSI preparation time of the terminal in the MCG;

[0260] (5) PUSCH preparation time of the terminal when the PUSCH of the MCG is multiplexed with the PUCCH and / or other PUSCHs;

[0261] (6) CSI preparation time when the PUSCH or PUCCH for sending CSI by the terminal on the MCG is multiplexed with other PUCCHs and / or PUSCHs;

[0262] (7) SPS PDSCH release preparation time when the PUSCH or PUCCH for sending SPS PDSCH release by the terminal on the MCG is multiplexed with other PUCCH and / or PUSCH;

[0263] (8) a fifth parameter, wherein the fifth parameter is used by the terminal to calculate one or more of the following:

[0264] The PUSCH preparation time or CSI preparation time of the MCG;

[0265] PUSCH preparation time, CSI preparation time or SPS PDSCH release preparation time when the PUCCH or PUSCH of the MCG is multiplexed with other PUCCH and / or PUSCH;

[0266] It can be understood that the fifth parameter is not limited to one but can be multiple.

[0267] (9) A sixth parameter, where the sixth parameter is used by the secondary node to obtain configuration information of a physical downlink control channel of the terminal in the MCG.

[0268] It can be understood that the sixth parameter is not limited to one but can be multiple.

[0269] Optionally, the network device 500 is a secondary node of the terminal, and the network device 500 further includes:

[0270] A third sending module is configured to send third information to the master node of the terminal, where the third information includes at least one of the following:

[0271] (1) the time offset used by the terminal in the uplink power sharing mechanism;

[0272] (2) the maximum preparation time of the terminal in the SCG;

[0273] (3) PUSCH preparation time of the terminal in the SCG;

[0274] (4) CSI preparation time of the terminal in the SCG;

[0275] (5) PUSCH preparation time of the terminal when the PUSCH of the SCG is multiplexed with the PUCCH and / or other PUCCHs and / or PUSCHs;

[0276] (6) CSI preparation time when the PUSCH or PUCCH for sending CSI by the terminal on the SCG is multiplexed with other PUCCH or PUSCH;

[0277] (7) SPS PDSCH release preparation time when the PUSCH or PUCCH for sending SPS PDSCH release on the SCG is multiplexed with other PUCCH and / or PUSCH;

[0278] (8) a seventh parameter, wherein the seventh parameter is used by the terminal to calculate one or more of the following:

[0279] PUSCH preparation time or CSI preparation time of the SCG;

[0280] PUSCH preparation time, CSI preparation time or SPS PDSCH release preparation time when the PUCCH or PUSCH of the SCG is multiplexed with other PUCCH and / or PUSCH;

[0281] It can be understood that the seventh parameter is not limited to one but can be multiple.

[0282] (9) An eighth parameter, where the eighth parameter is used by the secondary node to obtain configuration information of a physical downlink control channel of the terminal in the SCG.

[0283] It can be understood that the eighth parameter is not limited to one but can be multiple.

[0284] The network device provided by the embodiment of the present invention can execute the above Figure 3 The implementation principle and technical effect of the method embodiment shown are similar, and this embodiment will not be repeated here.

[0285] See also Figure 6 , Figure 6 is a structural diagram of a communication device to which an embodiment of the present invention is applied, such as Figure 6 As shown, the communication device 600 includes: a processor 601, a transceiver 602, a memory 603 and a bus interface, wherein:

[0286] In one embodiment of the present invention, the communication device 600 further includes: a computer program stored in the memory 603 and executable on the processor 601, the computer program being executed by the processor 601 to implement Figure 2 or Figure 3 Steps in the illustrated embodiment.

[0287] exist Figure 6 In the embodiment, the bus architecture may include any number of interconnected buses and bridges, specifically linking various circuits of one or more processors represented by processor 601 and memory represented by memory 603. The bus architecture may also link various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. The bus interface provides an interface. The transceiver 602 may be a plurality of components, namely, a transmitter and a receiver, providing a unit for communicating with various other devices on a transmission medium, and it is understood that the transceiver 602 is an optional component.

[0288] The processor 601 is responsible for managing the bus architecture and general processing, and the memory 603 can store data used by the processor 601 when performing operations.

[0289] The communication device provided in the embodiment of the present invention can execute the above Figure 2 or Figure 3 The implementation principle and technical effect of the method embodiment shown are similar, and this embodiment will not be repeated here.

[0290] The steps of the method or algorithm described in conjunction with the disclosure of the present invention may be implemented in hardware or by executing software instructions by a processor. The software instructions may be composed of corresponding software modules, which may be stored in a random access memory (RAM), a flash memory, a read-only memory (ROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), a register, a hard disk, a mobile hard disk, a read-only optical disk, or any other form of storage medium known in the art. An exemplary storage medium is coupled to a processor so that the processor can read information from the storage medium and write information to the storage medium. Of course, the storage medium may also be a component of the processor. The processor and the storage medium may be located in an application specific integrated circuit (ASIC). In addition, the ASIC may be located in a core network interface device. Of course, the processor and the storage medium may also exist in the core network interface device as discrete components.

[0291] Those skilled in the art will appreciate that in one or more of the above examples, the functions described in the present invention may be implemented in hardware, software, firmware, or any combination thereof. When implemented using software, the functions may be stored in a computer-readable medium or transmitted as one or more instructions or codes on a computer-readable medium. Computer-readable media include computer storage media and communication media, wherein communication media include any media that facilitates the transmission of a computer program from one place to another. The storage medium may be any available medium that a general or special-purpose computer can access.

[0292] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made on the basis of the technical solution of the present invention should be included in the scope of protection of the present invention.

[0293] Those skilled in the art will appreciate that the embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the embodiments of the present invention may take the form of complete hardware embodiments, complete software embodiments, or embodiments combining software and hardware. Moreover, the embodiments of the present invention may take the form of computer program products implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.

[0294] The embodiments of the present invention are described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to the embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0295] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0296] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0297] Obviously, those skilled in the art can make various changes and modifications to the embodiments of the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the embodiments of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A power control method, applied to a network device, characterized in that: include: receiving first information from a terminal, where the first information is used to notify a primary node and / or a secondary node of the terminal of a power control parameter used by the terminal in a dual-connection uplink power sharing mechanism; performing transmission control on the terminal according to the first information; Wherein, the network device is a master node of the terminal, and the method further includes: Sending second information to the secondary node of the terminal, where the second information includes at least one of the following: A time offset used by the terminal in the uplink power sharing mechanism; A fifth parameter, wherein the fifth parameter is used by the terminal to calculate one or more of the following: PUSCH preparation time or CSI preparation time of MCG; PUSCH preparation time, CSI preparation time or SPS PDSCH release preparation time when the PUCCH or PUSCH of the MCG is multiplexed with other PUCCH and / or PUSCH; A sixth parameter, the sixth parameter is used by the secondary node to obtain relevant configuration information of the physical downlink control channel of the terminal in the MCG; Alternatively, the network device is a secondary node of the terminal, and the method further includes: Sending third information to the master node of the terminal, the third information including at least one of the following: A time offset used by the terminal in the uplink power sharing mechanism; The maximum preparation time of the terminal in the SCG; A seventh parameter, wherein the seventh parameter is used by the terminal to calculate one or more of the following: PUSCH preparation time or CSI preparation time of the SCG; PUSCH preparation time, CSI preparation time or SPS PDSCH release preparation time when the PUCCH or PUSCH of the SCG is multiplexed with other PUCCH and / or PUSCH; An eighth parameter, the eighth parameter is used by the auxiliary node to obtain relevant configuration information of the physical downlink control channel of the terminal in the SCG.

2. The method according to claim 1, characterized in that: The network device is a secondary node of the terminal, and the receiving first information from the terminal includes: At least part of the first information is received from the terminal through the master node.

3. The method according to claim 1, characterized in that The time offset is used to determine a period of time earlier than time T0, at which the SCG uplink transmission starts.

4. A network device, characterized in that: include: A receiving module, configured to receive first information from a terminal, where the first information is used to notify a primary node and / or a secondary node of the terminal of a power control parameter used by the terminal in a dual-connection uplink power sharing mechanism; A control module, configured to perform transmission control on the terminal according to the first information; The network device is a master node of the terminal, and the network device further includes: The second sending module is configured to send second information to the secondary node of the terminal, where the second information includes at least one of the following: A time offset used by the terminal in the uplink power sharing mechanism; A fifth parameter, wherein the fifth parameter is used by the terminal to calculate one or more of the following: PUSCH preparation time or CSI preparation time of MCG; PUSCH preparation time, CSI preparation time or SPS PDSCH release preparation time when the PUCCH or PUSCH of the MCG is multiplexed with other PUCCH and / or PUSCH; A sixth parameter, the sixth parameter is used by the secondary node to obtain relevant configuration information of the physical downlink control channel of the terminal in the MCG; Alternatively, the network device is a secondary node of the terminal, and the network device further includes: A third sending module is configured to send third information to the master node of the terminal, where the third information includes at least one of the following: A time offset used by the terminal in the uplink power sharing mechanism; The maximum preparation time of the terminal in the SCG; A seventh parameter, wherein the seventh parameter is used by the terminal to calculate one or more of the following: PUSCH preparation time or CSI preparation time of the SCG; PUSCH preparation time, CSI preparation time or SPS PDSCH release preparation time when the PUCCH or PUSCH of the SCG is multiplexed with other PUCCH and / or PUSCH; An eighth parameter, the eighth parameter is used by the auxiliary node to obtain relevant configuration information of the physical downlink control channel of the terminal in the SCG.

5. The network device according to claim 4, characterized in that: The time offset is used to determine a period of time earlier than time T0, at which the SCG uplink transmission starts.

6. A communication device, characterized in that: include: A processor, a memory, and a program stored in the memory and executable on the processor, wherein when the program is executed by the processor, the steps of the power control method according to any one of claims 1 to 3 are implemented.

7. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the power control method according to any one of claims 1 to 3 are implemented.