Calculation method and device for penalty fee of wind power storage system output deviation

By calculating the output deviation penalty cost of the wind storage system, the power imbalance problem of wind storage combined power generation system under the hill climb rate limit is solved, ensuring the safe operation and economic benefits of the power grid.

CN113988897BActive Publication Date: 2024-11-01GUANGXI POWER GRID CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111072564.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-14
Publication Date
2024-11-01
Estimated Expiration
2041-09-14

AI Technical Summary

Technical Problem

The existing technology fails to consider the climbing rate limit of the wind storage combined power generation system, resulting in power imbalance in the system under extreme meteorological events, which may cause accidents such as frequency overlimits and power outages.

Method used

By obtaining the actual wind speed measurement data of the wind turbine, calculating the corrected output, evaluating the charge and discharge power of the energy storage device, and calculating the output deviation penalty cost of the wind storage system, ensuring the economic benefits of the system under the conditions of climbing rate limit.

Benefits of technology

Effectively ensure the safe operation of the power grid, evaluate the economic benefits of the wind and storage combined power generation system, and avoid power imbalance caused by hill climbing events.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113988897B_ABST
    Figure CN113988897B_ABST
Patent Text Reader

Abstract

The present invention provides a method and device for calculating the penalty cost of output deviation of a wind-storage system, wherein the method comprises: obtaining a measured wind speed data sequence of a wind turbine; calculating the expected output according to the output power function of the wind turbine or the output characteristic curve of the wind turbine; calculating the corrected output of the wind-storage combined power generation system according to the ramp limit; calculating the theoretical charge and discharge power of the energy storage device; calculating the actual charge and discharge power of the energy storage device; and calculating the penalty cost of output deviation of the wind-storage system. The present invention evaluates the economic benefits of the wind-storage combined power generation system on the basis of ensuring the safe operation of the power grid and considering the ramp rate limit of the wind-storage combined power generation system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power market, and in particular to a method and device for calculating output deviation penalty fees of a wind power storage system. Background Art

[0002] Large-scale grid connection of new energy has become an inevitable trend. Since new energy sources such as wind power are intermittent and volatile, the output of wind power can be smoothed by configuring energy storage systems, relieving system regulation pressure and improving safety factors.

[0003] Existing related research contents include the effect of configuring energy storage on improving wind power quality, the control strategy of energy storage system to smooth wind power output, the benefit evaluation model and capacity ratio optimization method of wind-storage combined power generation system (hereinafter referred to as wind-storage system), etc. However, the above studies failed to consider the impact of ramp rate limit on the economic operation evaluation of the combined system, and usually directly used the wind power calculated according to wind speed, or adopted the mode of tracking planned output, etc.

[0004] The so-called ramping event refers to: when there is a strong low-pressure system (or cyclone), low-level jet stream, thunderstorm, gusty wind or similar long-term extreme meteorological events, the power of the wind farm will increase suddenly for a period of time, and an up-ramp event will occur; when a relative meteorological event occurs or the wind speed of the wind turbine is higher than the cut-out wind speed, some wind turbines will be withdrawn from operation one after another, and the power of the wind farm will drop sharply for a period of time, and a down-ramp event will occur. After the system has a ramping event, the active power will be seriously unbalanced for a short time, which may easily cause frequency limit violations, and even cause load shedding or large-scale power outages. According to different regions and application scenarios, there are different definitions and control standards for wind power "ramp events". However, the wind power grid connection guidelines of various countries all list ramp rate limits. For example, the United States and Canada require that the power change within 1 minute is less than 10% of the rated power; Denmark requires that the power change within 1 minute is less than 5% of the rated power; South Africa requires that the power change within 1 minute is less than 50MW, etc. Summary of the invention

[0005] The purpose of the present invention is to provide a method and device for calculating the penalty fee for output deviation of a wind-storage system, which can solve the problem caused by not considering the climbing rate limit of the wind-storage combined power generation system in the prior art.

[0006] The objective of the present invention is achieved through the following technical solutions:

[0007] In a first aspect, the present invention provides a method for calculating a penalty fee for output deviation of a wind-storage system, comprising the following steps:

[0008] Obtain the wind speed measured data sequence v(t) of the wind turbine;

[0009] Calculate the expected output e(t) according to the wind turbine output power function or the wind turbine output characteristic curve;

[0010] Calculate the corrected output e′(t) of the wind-storage combined power generation system according to the ramp limit;

[0011] Calculate the theoretical charge and discharge power R(t) of the energy storage device;

[0012] Calculate the actual charging and discharging power R′(t) of the energy storage device;

[0013] Calculate the penalty cost F(t) for wind-storage system output deviation.

[0014] Furthermore, the formula for calculating the expected output e(t) according to the output power function of the wind turbine is:

[0015]

[0016] Among them, v ci represents the cut-in wind speed, v co Indicates the cut-out wind speed, v r Indicates rated wind speed, P r Indicates rated power.

[0017] Furthermore, the calculation formula of the corrected output e′(t) is:

[0018]

[0019] Among them, lim represents the system's limit on the output ramp rate of the wind turbine, that is, the absolute value of the wind turbine output change between period t and the previous period t-1 cannot exceed lim.

[0020] Furthermore, the calculation formula of the theoretical charge and discharge power R(t) is: R(t)=e(t)-e′(t).

[0021] Furthermore, the calculation formula of the actual charge and discharge power R′(t) is:

[0022] R′(t)=S(t)-S(t-1),

[0023] Where S(t) represents the charge and discharge power during period t, and S(t-1) represents the charge and discharge power during period t-1.

[0024] Furthermore, the calculation formula of S(t) is:

[0025]

[0026] In the formula, c max and c min Respectively represent the upper and lower limits of the capacity of the energy storage device; Δ+ and Δ - They are respectively the upper limit of charging rate and the upper limit of discharging rate of the energy storage device.

[0027] Furthermore, the calculation formula of the wind-storage system output deviation penalty fee F(t) is:

[0028]

[0029] In the formula, x + (t), x - (t) are the unit prices of upward and downward adjustment costs for the output deviation of the wind-storage system, respectively.

[0030] Furthermore, each data of the wind speed measured data sequence v(t) is the average wind speed within a fixed time interval.

[0031] In a second aspect, the present invention provides a wind-storage system output deviation penalty cost calculation device, comprising a wind speed measurement unit, a first calculation unit, a second calculation unit, a third calculation unit, a fourth calculation unit, a fifth calculation unit and a sixth calculation unit, wherein:

[0032] Wind speed measurement unit, used to measure the real-time wind speed of the wind turbine;

[0033] The first calculation unit is used to calculate the average wind speed within a fixed time interval and form a wind speed measured data sequence;

[0034] The second calculation unit is used to calculate the expected output;

[0035] The third calculation unit is used to calculate the corrected output of the wind storage system;

[0036] A fourth calculation unit, used to calculate the theoretical charge and discharge power of the energy storage device;

[0037] A fifth calculation unit, used to calculate the actual charging and discharging power of the energy storage device;

[0038] The sixth calculation unit is used to calculate the penalty fee for the output deviation of the wind-storage system.

[0039] Furthermore, the second calculation unit includes a first calculation module and a second calculation module, wherein the first calculation module is used to calculate the expected output according to the wind turbine output power function, and the second calculation module is used to calculate the expected output according to the wind turbine output characteristic curve.

[0040] The method and device for calculating the penalty cost of output deviation of a wind-storage system of the present invention evaluate the economic benefits of the wind-storage combined power generation system on the premise of ensuring the safe operation of the power grid and considering the ramp rate limit of the wind-storage combined power generation system. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0042] Figure 1 It is a flow chart of the method for calculating the penalty fee for storage system output deviation of the present invention;

[0043] Figure 2 This is a graph showing the output characteristic of the wind turbine generator set of the present invention. DETAILED DESCRIPTION

[0044] The embodiments of the present disclosure are described in detail below with reference to the accompanying drawings.

[0045] The following describes the embodiments of the present disclosure through specific examples, and those skilled in the art can easily understand other advantages and effects of the present disclosure from the contents disclosed in this specification. Obviously, the described embodiments are only a part of the embodiments of the present disclosure, rather than all of the embodiments. The present disclosure can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present disclosure. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present disclosure.

[0046] The method for calculating the penalty fee for output deviation of the wind-storage system of the present invention comprises the following steps:

[0047] Step S1, obtaining a wind speed measured data sequence v(t) of a wind turbine generator system.

[0048] Each data in the sequence is the average wind speed within a fixed time interval (such as 1 hour).

[0049] Step S2: Calculate the estimated output e(t) according to the wind turbine output power function or the wind turbine output characteristic curve.

[0050] Furthermore, the formula for calculating the expected output e(t) according to the output power function of the wind turbine is:

[0051]

[0052] (1) In the formula, v cirepresents the cut-in wind speed, v co Indicates the cut-out wind speed, v r Indicates rated wind speed, P r Indicates rated power.

[0053] Furthermore, according to the wind turbine output characteristic curve Figure 2 shown.

[0054] Step S3: Calculate the corrected output e′(t) of the wind-storage combined power generation system according to the ramp limit.

[0055]

[0056] Among them, lim represents the system's limit on the output ramp rate of the wind turbine. That is, the absolute value of the wind turbine output change between period t and the previous period t-1 cannot exceed lim. lim and the initial condition e′(0) need to be set manually.

[0057] Step S4, calculating the theoretical charge and discharge power R(t) of the energy storage device.

[0058] R(t)=e(t)-e′(t), which represents the theoretical charging and discharging power of the energy storage device.

[0059] When the expected output e(t) is greater than the limited output e′(t), the excess power needs to be stored in the energy storage device (charging), and R(t)>0; when the expected output e(t) is less than the limited output e′(t), the power shortage needs to be supplemented by the energy storage device (discharging), and R(t)<0; when the two are equal, it means that the energy storage device does not need to be charged or discharged, and R(t)=0.

[0060] The actual charging and discharging power of the energy storage device requires additional consideration of some limitations.

[0061] Step S5: Calculate the actual charge and discharge power R'(t) of the energy storage device.

[0062]

[0063] In the formula, S(t) represents the charge and discharge power in period t, S(t-1) represents the charge and discharge power in period t-1, and c max and c min are the upper and lower limits of the capacity of the energy storage device respectively; Δ + and Δ - They are the upper limit of the charging rate and the upper limit of the discharging rate of the energy storage device. The initial condition S(0) needs to be set manually.

[0064] Based on this, the actual charging and discharging power of the energy storage device is calculated as R′(t)=S(t)-S(t-1).

[0065] Step S6: Calculate the penalty cost F(t) for the wind-storage system output deviation.

[0066]

[0067] In the formula, x + (t), x - (t) are the unit price of upward cost and downward cost of the output deviation of the wind storage system. In the market-oriented trading environment of the new power system, the market price of the corresponding period can be taken.

[0068] It can be seen that the cost is related to wind speed v(t), wind turbine output characteristics, wind turbine ramp rate limit lim, wind storage system initial output e′(0), and energy storage device capacity upper and lower limits c max and c min , the initial state of the energy storage device S(0), the upward and downward adjustment costs of the wind storage system output deviation x + (t), x - (t) and other parameters.

[0069] The wind-storage system output deviation penalty cost calculation device of the present invention comprises a wind speed measurement unit, a first calculation unit, a second calculation unit, a third calculation unit, a fourth calculation unit, a fifth calculation unit and a sixth calculation unit, wherein:

[0070] Wind speed measurement unit, used to measure the real-time wind speed of wind turbines.

[0071] The first calculation unit is used to calculate the average wind speed within a fixed time interval and form a wind speed measured data sequence.

[0072] The second calculation unit is used to calculate the expected output.

[0073] Furthermore, the second calculation unit includes a first calculation module and a second calculation module, wherein the first calculation module is used to calculate the expected output according to the wind turbine output power function, and the second calculation unit is used to calculate the expected output according to the wind turbine output characteristic curve.

[0074] The third calculation unit is used to calculate the corrected output of the wind storage system.

[0075] The fourth calculation unit is used to calculate the theoretical charging and discharging power of the energy storage device.

[0076] The fifth calculation unit is used to calculate the actual charging and discharging power of the energy storage device.

[0077] The sixth calculation unit is used to calculate the penalty fee for the output deviation of the wind-storage system.

[0078] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0079] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, each unit may exist physically separately, or two or more units may be integrated into one unit. The above integrated unit may be implemented in the form of hardware or software functional unit.

[0080] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, read-only memory), random access memory (RAM, random access memory), disk or optical disk and other media that can store program code.

[0081] The above is only for explaining the implementation mode of the present invention and is not intended to limit the present invention. For those skilled in the art, any modification, equivalent substitution, improvement, etc. made within the spirit and principle of the present invention without creative work should be included in the protection scope of the present invention.

Claims

1. The calculation method of the penalty fee for wind-storage system output deviation is characterized by: It includes the following steps: Obtain the wind speed measured data sequence v(t) of the wind turbine; Calculate the expected output e(t) according to the wind turbine output power function or the wind turbine output characteristic curve; Calculate the corrected output e'(t) of the wind-storage combined power generation system according to the ramp limit; Calculating the theoretical charge and discharge power R(t) of the energy storage device according to the estimated output e(t) and the corrected output e'(t); Calculate the actual charging and discharging power R'(t) of the energy storage device; According to the theoretical charge and discharge power R (t) and the actual charge and discharge power R' (t) Calculate the penalty cost F(t) for wind-storage system output deviation; The calculation formula for calculating the expected output e(t) according to the output power function of the wind turbine generator set is: Among them, v ci represents the cut-in wind speed, v co Indicates the cut-out wind speed, v r Indicates rated wind speed, P r Indicates rated power; The calculation formula of the corrected output e'(t) is: Among them, lim represents the system's limit on the output ramp rate of the wind turbine, that is, the absolute value of the wind turbine output change between period t and the previous period t-1 cannot exceed lim; The calculation formula of the theoretical charge and discharge power R(t) is: R(t)=e(t)-e'(t); The calculation formula of the actual charge and discharge power R'(t) is: R'(t)=S(t)-S(t-1), Wherein, S(t) represents the charge and discharge power in period t, and S(t-1) represents the charge and discharge power in period t-1; The calculation formula of S(t) is: In the formula, c max and c min Respectively represent the upper and lower limits of the capacity of the energy storage device; Δ + and Δ _ They are the upper limit of charging rate and the upper limit of discharging rate of the energy storage device respectively; The calculation formula of the wind-storage system output deviation penalty fee F(t) is: In the formula, x + (t), x - (t) are the unit prices of upward and downward adjustment costs for the output deviation of the wind-storage system, respectively.

2. The method for calculating the penalty fee for wind-storage system output deviation according to claim 1 is characterized in that: Each data of the wind speed measured data sequence v(t) is the average wind speed within a fixed time interval.

3. A wind-storage system output deviation penalty fee calculation device, which executes the wind-storage system output deviation penalty fee calculation method according to claim 1 or 2, characterized in that: It includes a wind speed measurement unit, a first calculation unit, a second calculation unit, a third calculation unit, a fourth calculation unit, a fifth calculation unit and a sixth calculation unit, wherein: Wind speed measurement unit, used to measure the real-time wind speed of the wind turbine; The first calculation unit is used to calculate the average wind speed within a fixed time interval and form a wind speed measured data sequence; The second calculation unit is used to calculate the expected output; A third calculation unit is used to calculate the corrected output of the wind storage system; A fourth calculation unit, used to calculate the theoretical charge and discharge power of the energy storage device according to the estimated output and the corrected output; A fifth calculation unit, used to calculate the actual charging and discharging power of the energy storage device; The sixth calculation unit is used to calculate the penalty fee for output deviation of the wind storage system according to the theoretical charging and discharging power and the actual charging and discharging power.

4. The wind-storage system output deviation penalty cost calculation device according to claim 3, characterized in that: The second calculation unit includes a first calculation module and a second calculation module, wherein the first calculation module is used to calculate the expected output according to the wind turbine output power function, and the second calculation unit is used to calculate the expected output according to the wind turbine output characteristic curve.