Base station network access data processing method, device, electronic equipment and storage medium
By dividing cell-level base station clusters and calculating single-user benefit assessment values, the problem of failing to consider the traffic absorption effect of surrounding base stations in the existing technology is solved, and more accurate base station network access benefit assessment and construction guidance are achieved.
Patent Information
- Application Number
- CN202111302992.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-04
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2041-11-04
AI Technical Summary
The existing technology fails to consider the absorption effect of new traffic on surrounding base stations after a single station is added to the network when evaluating the benefits of base station access to the network, resulting in unrepresentative evaluation values and inability to accurately guide base station construction.
By dividing the cell-level base station clusters, the target users are determined and the single-user benefit evaluation value is calculated. The evaluation value is assigned to the newly added base station, and the base station cluster benefit evaluation value is obtained after aggregation to more accurately evaluate the benefit impact of the new base station on the base station cluster.
It improves the accuracy of base station construction and benefit assessment, can more accurately guide the direction of base station construction, and avoids waste of resources.
Smart Images

Figure CN114007230B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of wireless communication and terminal technology, and in particular to a method, device, electronic device and storage medium for processing base station access data. Background Art
[0002] With the pursuit of efficiency and quality of mobile communications, the base station network, as the foundation of the industrial chain and the most basic network element unit in the communication system, needs to be continuously expanded. When constructing new base stations, by processing the network access data of new base stations, the impact of the new base station access on the entire communication system can be evaluated, so as to accurately reflect the construction status of the network, so as to effectively guide the deployment of base stations and avoid the waste of base station resources.
[0003] In the prior art, the traffic value assessment method is usually used to multiply the traffic of a single station by a value conversion coefficient that remains roughly unchanged in the short term as the benefit of the base station access to the network, so as to guide the construction planning of the base station based on the base station access to the network benefit data. However, this method does not take into account the effect of the additional traffic after the single station is connected to the network on the absorption of the traffic of surrounding base stations. The obtained evaluation value is not representative and cannot accurately guide the construction of base stations. Summary of the invention
[0004] To solve the above technical problems, the embodiments of the present application provide a base station network access data processing method and device, an electronic device, and a computer-readable storage medium. The obtained base station cluster benefit evaluation value can more accurately guide base station construction.
[0005] Other features and advantages of the present application will become apparent from the following detailed description, or may be learned in part by the practice of the present application.
[0006] According to one aspect of an embodiment of the present application, a method for processing base station access data is provided, including: dividing cell-level base station clusters according to access base station sites, and obtaining a base station-level base station cluster according to the cell-level base station cluster associated with the newly-accessed base station; determining the target users generated by traffic within a preset time period contained in the base station-level base station cluster, and calculating the single-user benefit evaluation value corresponding to each target user within the preset time period; extracting at least one target base station newly accessed within the preset time period from the base station-level base station cluster, allocating the single-user benefit evaluation value corresponding to each target user to the at least one target base station, and obtaining the single-user single-station benefit evaluation value of each target user under a single target base station; summarizing the single-user single-station benefit evaluation values of the base station-level base station cluster, and obtaining the base station cluster benefit evaluation value of the base station-level base station cluster within the preset time period.
[0007] In one embodiment, before dividing the cell-level base station clusters according to the network-entered base station sites, and obtaining the base station-level base station cluster according to the cell-level base station cluster associated with the newly-entered base station, the method also includes: defining a cell-level-basic base station cluster according to the neighboring cell switching performance data; determining a cell-level-number of layers base station cluster according to the base station level and cell antenna directivity obtained after layering processing; defining an entry-site completion-cell-level architecture base station cluster according to the base station coverage type; and combining the cell-level-basic base station cluster, the cell-level-number of layers base station cluster and the entry-site completion-cell-level architecture base station cluster to obtain the cell-level base station cluster.
[0008] In one embodiment, the cell-level-number-of-layers base station cluster is determined based on the base station level and cell antenna directivity obtained through layering processing, including: triangulating the surrounding outdoor sites to obtain multiple base station levels, the highest level of the multiple base station levels is equal to the highest level of the base station in the cell-level-basic base station cluster. The sector area is determined based on the cell antenna direction angle and the horizontal beam angle, and the sector area takes the newly-connected base station as the origin; the base stations located in the sector area in each base station level are obtained to obtain the cell-level-number-of-layers base station cluster.
[0009] In one embodiment, the definition of the entry-site completion - cell-level architecture base station cluster according to the base station coverage type includes: according to the type of the newly-connected base station, obtaining the indoor station or base station whose latitude falls within the sector area as the entry-site completion - cell-level architecture base station cluster; and according to the entry-site completion - cell-level architecture base station cluster, respectively completing the hetero-frequency cells within the cell-level - basic base station cluster and the cell-level - number of layers base station cluster.
[0010] In one embodiment, the method also includes: calculating a first base station cluster benefit evaluation value within a first preset time period; calculating a second base station cluster benefit evaluation value within a second preset time period, the first preset time period and the second preset time period being respectively billing cycles connected to each other; by comparing the first base station cluster benefit evaluation value with the second base station cluster benefit evaluation value, the benefit improvement of the newly-connected target base station within the second preset time period for the base station-level base station cluster is evaluated based on the comparison result.
[0011] In one embodiment, at least one target base station newly connected to the network within a preset time period is extracted from the base station-level base station cluster, and the single-user benefit evaluation value corresponding to each target user is allocated to the at least one target base station to obtain the single-user single-station benefit evaluation value of each target user under a single target base station, including: obtaining the traffic used by each target user under the target base station within the preset time period; determining the single-user single-station benefit evaluation value of each target user under a single target base station according to the traffic used by each target user under the target base station within the preset time period and the single-user benefit evaluation value corresponding to each target user.
[0012] In one embodiment, dividing the cell-level base station clusters according to the networked base station sites, and obtaining the base station-level base station clusters according to the cell-level base station clusters associated with the newly networked base stations, includes: merging the cell-level base station clusters associated with the newly networked base stations to obtain the base station-level base station clusters.
[0013] According to one aspect of an embodiment of the present application, a base station network access data processing device is provided, including: a base station-level base station cluster acquisition module, configured to divide cell-level base station clusters according to network access base station sites, and obtain a base station-level base station cluster according to the cell-level base station cluster associated with the newly-accessed base station; a single-user benefit evaluation value acquisition module, configured to determine the target users generated by traffic within a preset time period contained in the base station-level base station cluster, and calculate the single-user benefit evaluation value corresponding to each target user within the preset time period; a single-user single-station benefit evaluation value acquisition module, configured to extract at least one target base station newly accessed within the preset time period from the base station-level base station cluster, assign the single-user benefit evaluation value corresponding to each target user to the at least one target base station, and obtain the single-user single-station benefit evaluation value of each target user under a single target base station; a base station cluster benefit evaluation value acquisition module, configured to summarize the single-user single-station benefit evaluation values of the base station-level base station cluster, and obtain the base station cluster benefit evaluation value of the base station-level base station cluster within the preset time period.
[0014] According to one aspect of an embodiment of the present application, an electronic device is provided, comprising one or more processors; a storage device for storing one or more computer programs, wherein when the one or more computer programs are executed by the one or more processors, the electronic device implements the base station network access data processing method as described above.
[0015] According to one aspect of an embodiment of the present application, a computer-readable storage medium is provided, on which computer-readable instructions are stored. When the computer-readable instructions are executed by a processor of a computer, the computer executes the base station network access data processing method as described above.
[0016] According to one aspect of an embodiment of the present application, a computer program product or a computer program is provided, the computer program product or the computer program includes a computer instruction, and the computer instruction is stored in a computer-readable storage medium. A processor of a computer device reads the computer instruction from the computer-readable storage medium, and the processor executes the computer instruction, so that the computer device executes the base station network access data processing method provided in the above various optional embodiments.
[0017] In the technical solution provided in the embodiments of the present application, the base station-level base station cluster to which the newly-connected base station belongs is identified by means of a base station cluster associated with the newly-connected base station as the center, so as to more accurately evaluate the benefit changes of the overall base station-level base station cluster after the single station is connected to the network; at the same time, the single-user benefit evaluation value of the user in the base station cluster to which the newly-connected base station belongs is allocated to the newly-connected base station, which can improve the accuracy of the evaluation of the impact of the newly-connected base station on the benefit of the base station-level base station cluster, so that the benefit evaluation value obtained according to this embodiment can more accurately guide the direction of base station construction.
[0018] It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The drawings herein are incorporated into the specification and constitute a part of the specification, showing embodiments consistent with the present application, and together with the specification, are used to explain the principles of the present application. Obviously, the drawings described below are only some embodiments of the present application, and for those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative work. In the drawings:
[0020] Figure 1 It is a schematic diagram of an implementation environment involved in this application;
[0021] Figure 2 is a flow chart of a method for processing base station network access data shown in an exemplary embodiment of the present application;
[0022] Figure 3 is a flowchart of a method for processing base station network access data shown in another exemplary embodiment of the present application;
[0023] Figure 4 yes Figure 3 A flowchart of step S330 in the illustrated embodiment in an exemplary embodiment;
[0024] Figure 5 yes Figure 3 A flowchart of step S350 in an exemplary embodiment is shown;
[0025] Figure 6 is a flowchart of a method for processing base station network access data shown in another exemplary embodiment of the present application;
[0026] Figure 7 yes Figure 2 A flow chart of step S250 in the illustrated embodiment in an exemplary embodiment;
[0027] Figure 8 is a structural diagram of a base station network access data processing device shown in an exemplary embodiment of the present application;
[0028] Fig. 9 A schematic diagram of the structure of a computer system suitable for implementing an electronic device of an embodiment of the present application is shown. DETAILED DESCRIPTION
[0029] Here, exemplary embodiments will be described in detail, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements. The implementations described in the following exemplary embodiments do not represent all implementations consistent with the present application. Instead, they are only examples of devices and methods consistent with some aspects of the present application as detailed in the attached claims.
[0030] The block diagrams shown in the accompanying drawings are merely functional entities and do not necessarily correspond to physically independent entities. That is, these functional entities may be implemented in software form, or in one or more hardware modules or integrated circuits, or in different networks and / or processor devices and / or microcontroller devices.
[0031] The flowcharts shown in the accompanying drawings are only exemplary and do not necessarily include all the contents and operations / steps, nor must they be executed in the order described. For example, some operations / steps can be decomposed, and some operations / steps can be combined or partially combined, so the actual execution order may change according to actual conditions.
[0032] It should also be noted that the "multiple" mentioned in this application refers to two or more than two. "And / or" describes the association relationship of the associated objects, indicating that there can be three relationships. For example, A and / or B can mean: A exists alone, A and B exist at the same time, and B exists alone. The character " / " generally indicates that the previous and next associated objects are in an "or" relationship.
[0033] The base station network access data processing method and device, electronic device, and storage medium proposed in the embodiments of the present application involve artificial intelligence technology and machine learning technology, and these embodiments will be described in detail below.
[0034] First see Figure 1 , Figure 1It is a schematic diagram of an implementation environment involved in the present application. The implementation environment includes a terminal 100 and a server 200, and the terminal 100 and the server 200 communicate through a wired or wireless network. The terminal 100 is used to obtain base station information and user information. The base station information includes the network access time of the base station, the location information of each base station, the type of base station, the base station switching frequency, etc. The user information includes the package used by the user. The traffic used by the user under which base station, etc.; at the same time, the collected base station information and user information are input into the server 200, and the server 200 processes the base station information and user information, evaluates the benefits of the base station access to the network, obtains the base station cluster benefit evaluation value, and then sends the base station cluster benefit evaluation value to the terminal 100, and the data results can be visualized through the display module of the terminal 100.
[0035] Exemplarily, after receiving the base station information and the user information, the terminal 100 sends the base station information and the user information to the server 200, and the server 200 performs a base station access benefit evaluation. The specific evaluation method is: dividing the cell-level base station clusters according to the networked base station sites, and obtaining the base station-level base station cluster according to the cell-level base station cluster associated with the newly networked base station; determining the target users generated by traffic within a preset time period contained in the base station-level base station cluster, and calculating the single-user benefit evaluation value corresponding to each target user within the preset time period; extracting at least one target base station newly networked within the preset time period from the base station-level base station cluster, and allocating the single-user benefit evaluation value corresponding to each target user to at least one target base station, and obtaining the single-user single-station benefit evaluation value of each target user under a single target base station; summarizing the single-user single-station benefit evaluation values of the base station-level base station cluster, and obtaining the base station cluster benefit evaluation value of the base station-level base station cluster within the preset time period.
[0036] Among them, the terminal 100 can be any electronic device that can realize data visualization, such as a smart phone, a tablet, a laptop, a computer, etc., and there is no restriction here. The server end 200 can be an independent physical server, or a server cluster or a distributed system composed of multiple physical servers, wherein multiple servers can form a blockchain, and the server is a node on the blockchain. The server end 200 can also be a cloud server that provides basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, CDN (Content Delivery Network, content distribution network) and big data and artificial intelligence platforms, and there is no restriction here.
[0037] Figure 2 FIG. 1 is a flow chart of a method for processing base station network access data according to an exemplary embodiment. Figure 2As shown, in an exemplary embodiment, the method may include steps S210 to S270, which are described in detail as follows:
[0038] Step S210: dividing the cell-level base station clusters according to the networked base station sites, and obtaining the base station-level base station cluster according to the cell-level base station cluster associated with the newly networked base station.
[0039] In this embodiment, a cell-level base station cluster set is first divided into cells according to the base stations entering the network. Specifically, it can be divided into multiple cell-level base station clusters according to the switching frequency, location information, frequency and other properties of the base station; then the multiple cell-level base station clusters associated with the newly-entered base station are merged to obtain a base station-level base station cluster.
[0040] After obtaining the base station-level base station cluster, the relevant performance data of each base station in the base station-level base station cluster within a preset time period can be obtained. The relevant performance data includes a list of base station cluster base station IDs (unique codes, identity documents) of newly connected single stations in the base station-level base station cluster, user IDs, package information used by users, traffic information used by users through which base stations in the base station-level base station cluster, etc.
[0041] Step S230: determining target users in the base station-level base station cluster that generate traffic within a preset time period, and calculating a single-user benefit evaluation value corresponding to each target user within the preset time period.
[0042] In this embodiment, based on the performance data of the base station-level base station cluster obtained above, the target users generated traffic within the preset time period contained in the base station-level base station cluster are determined, that is, the target users generated traffic in the base station-level base station cluster within the preset time period are determined.
[0043] After the target users are determined, the single-user benefit evaluation value generated by each target user within a preset time period can be calculated. The single-user benefit evaluation value refers to the revenue value brought to the communication operator by the traffic used by the corresponding target user within the preset time period.
[0044] In this embodiment, the benefit evaluation value is identified by the ARPU (average revenue per user) value. The benefit evaluation value (i.e., ARPU) is the average revenue of communication services such as packages, traffic, or call duration used by each user in a period of time, and its unit is yuan / user. Specifically, the single user benefit evaluation value can be calculated by the following formula:
[0045]
[0046] Among them, U arpu represents the single user benefit evaluation value, P U / MIndicates the monthly mobile phone package fee (yuan) of a target user, F U / M It represents the monthly traffic usage (MB) of the target user. The U / M in the formula has no specific meaning and is only used for identification. Similarly, the subscripts of the relevant formulas in the embodiments are used for identification unless otherwise specified.
[0047] Of course, in actual applications, for the convenience of data acquisition, a base station ID list can be established for a single station in a base station-level base station cluster. The base station ID list can also identify whether it is a newly-connected base station, and form a list of target users who generate traffic in the base station-level base station cluster within a preset time period. At the same time, based on the traffic used by each target user at certain base stations within a preset time period, a connection can be established between the single station in the base station ID list and the target user list. One target user can correspond to one or more single stations, proving that the target user exchanges data with multiple single stations within the preset time period. At the same time, the traffic used by the target user at different single stations can also be recorded.
[0048] Step S250: extract at least one target base station newly connected to the network within a preset time period from the base station-level base station cluster, assign the single-user benefit evaluation value corresponding to each target user to at least one target base station, and obtain the single-user single-station benefit evaluation value of each target user under a single target base station.
[0049] In this embodiment, target base stations that are newly connected to the network within a preset time period are extracted from the base station-level base station cluster. The target base stations may be multiple or one, or there may be no target base station. If there is a newly connected target base station in the base station-level base station cluster within the preset time period, it proves that the number of base stations in the base station-level base station cluster remains unchanged. Therefore, there is no need to evaluate the benefits of the newly connected base station on the base station-level base station cluster. This base station access data processing method is used to evaluate the benefits of the newly connected base station, and therefore only the case where there is a target base station is considered.
[0050] Of course, the target base station can also be determined based on the newly-connected base stations identified in the base station ID list. After determining the target base station, the traffic used by the target user at each target base station within a preset time period can also be obtained. For example, for target user A, he used xMB of traffic at target base station a and yMB of traffic at target base station b. For a target user, he can use traffic at multiple different target base stations, or at a single target base station, or at other base stations other than the target base station. No specific restrictions are made here.
[0051] In this embodiment, after the traffic used by the target user under different target base stations is matched, the revenue value brought to the communication operator by the traffic used by each target user under a single target base station can be obtained, that is, the single-user single-station benefit evaluation value of the target user. The single-user single-station benefit evaluation value only exists between the target users who use the traffic under the target base station. The benefit evaluation value in the single-user single-station benefit evaluation value can also be identified by the arpu value. The single-user single-station benefit evaluation value can be calculated by the following formula:
[0052] v arpu =F v / M ×U arpu
[0053] As in the above formula, v arpu represents the single-user single-station benefit evaluation value, F v / M Indicates the traffic used by the user in a single station in the billing month (MB), U arpu Represents the single user benefit evaluation value.
[0054] Step S270: Summarize the single-user single-station benefit evaluation values of the base station-level base station cluster to obtain the base station cluster benefit evaluation value of the base station-level base station cluster within a preset time period.
[0055] In this embodiment, the base station cluster benefit evaluation value can be obtained by summarizing all single-user single-station benefit evaluation values of the base station-level base station cluster within a preset time period. The base station cluster benefit evaluation value can be used to evaluate the benefits brought by the newly-connected base stations to the base station-level base station cluster within the preset time period.
[0056] Specifically, first summarize the single-user single-station benefit evaluation values of all target users under a single target base station to obtain a single-station benefit evaluation value. The single-station benefit evaluation value is the revenue value brought to the communication operator by the traffic used by all target users through the target base station under a target base station. The calculation method can refer to the following formula:
[0057] R = {v arpul ,v arpu2 …v arpun}
[0058]
[0059] Where R represents the single-user single-station benefit evaluation value set of n target users under one target base station, v arpun V represents the single-user single-station benefit evaluation value of the nth target user. 单 Represents the single-station benefit evaluation value of a target base station.
[0060] Then, the single-station benefit evaluation values of all target base stations are summarized to obtain the base station cluster benefit evaluation value of the base station-level base station cluster within the preset time period, as shown in the following formula:
[0061]
[0062] As in the above formula: V 簇 represents the benefit evaluation value of the base station cluster, V 单 represents the single-station benefit evaluation value, and m represents m target base stations.
[0063] The existing base station cluster identification method is generally through manual identification, which may store the problem of base station omissions. In this embodiment, considering the effect of the additional traffic on the surrounding base station traffic after a single station is connected to the network, a base station-level base station cluster is obtained by associating the newly connected base station as the center, which can solve the problem of possible omissions in manual identification, thereby improving the traffic changes brought by the newly connected base station to the base station-level base station cluster, and providing more accurate reference data for the subsequent evaluation of the base station access benefits through the traffic usage of users in the base station-level base station cluster. It can improve the accuracy of evaluating the benefit changes brought by the newly connected base station to the base station-level base station cluster, and provide guidance for site construction; at the same time, in this method, the traffic used by users in the base station-level base station cluster is allocated to different newly connected base stations, and the benefits of the newly connected base stations are evaluated in a targeted manner. The evaluation is intelligent, more efficient, and more real-time, and the traffic changes of the overall cluster after the single station is connected to the network are evaluated more accurately; in addition, the evaluation method in this embodiment is also associated with traffic and packages, which can provide reference value for the subsequent package development of operators.
[0064] Figure 3 It is a flow chart of a method for processing base station network access data shown in another exemplary embodiment. Figure 3 The embodiments shown in the figure can be implemented in Figure 2 Before step S210 in Figure 3 As shown, in an exemplary embodiment, the method may include steps S310 to S370, which are described in detail as follows:
[0065] Step S310: Define a cell-level basic base station cluster according to neighboring cell handover performance data.
[0066] The neighboring cell switching performance data may include switching measurement time A3 hysteresis, neighboring cell offset, switching times, etc. In this embodiment, the switching times can be used to obtain the cell-level-basic base station cluster. For example, the neighboring cell in which a cell switches with a new base station more than a certain value within a preset time period is the cell-level-basic base station cluster. The switching times can be a value that can prove that the new base station frequently exchanges data with the neighboring cell, such as 3000, 5000, etc. Of course, in other embodiments, other neighboring cell switching performance data can also be used to determine the cell-level-basic base station cluster, and no specific restrictions are made here.
[0067] Step S330: Determine a cell-level-number-of-layers base station cluster according to the base station level and cell antenna directivity obtained after the layering process.
[0068] In this embodiment, regardless of whether the newly connected base station is an outdoor station or an indoor station, the surrounding outdoor stations are layered to obtain the base station level, and the direction of the cell antenna is obtained. The obtained base stations are divided into cell-level-number base station clusters based on the base station level and the direction of the cell antenna.
[0069] Step S350: Define a base station cluster for inbound completion-cell-level architecture according to the base station coverage type.
[0070] In this embodiment, the coverage types of different base stations are obtained, and the coverage types may include outdoor stations and indoor stations. Then, the in-station completion-cell level architecture base station cluster is determined according to the coverage types of different base stations. The in-station completion-cell level architecture base station cluster can be subsequently used to complete the hetero-frequency cells within the cell-level-basic base station cluster and the cell-level-layer base station cluster.
[0071] Step S370: The cell-level basic base station cluster, the cell-level layer base station cluster and the entry-site completion-cell-level architecture base station cluster are combined to obtain a cell-level base station cluster.
[0072] In this embodiment, the cell-level-basic base station cluster, the cell-level-number of layers base station cluster and the entry-site completion-cell-level architecture base station cluster obtained through the above steps are essentially a collection of multiple base stations. Therefore, the cell-level-basic base station cluster, the cell-level-number of layers base station cluster and the entry-site completion-cell-level architecture base station cluster are combined to obtain a cell-level base station cluster. Specifically, the cell-level base station cluster X={E1{A∩B∩C},E2{A∩B∩C}…E i {A∩B∩C}}; where: E i {A∩B∩C} represents the i-th cell-level base station cluster set, A represents the cell-level basic base station cluster of the i-th cell, B represents the cell-level layer base station cluster of the i-th cell, and C represents the entry-site completion-cell-level architecture base station cluster of the i-th cell.
[0073] In this embodiment, a plurality of different types of cell-level base station clusters are obtained with the network-accessed base station as the center, and then the different types of cell-level base station clusters are processed to obtain a cell-level base station cluster with the network-accessed base station as the center, thereby reducing the problem of base station omissions that may be caused when performing base station cluster benefit evaluation, and improving the accuracy of base station cluster benefit evaluation.
[0074] Figure 4 yes Figure 3 The flowchart of step S330 in the embodiment shown is in an exemplary embodiment. Figure 4As shown, in an exemplary embodiment, the process of determining the cell-level-layer base station cluster according to the base station level and the cell antenna directivity obtained after the hierarchical processing in step S330 may include steps S410 to S450, which are described in detail as follows:
[0075] Step S410: triangulate the surrounding outdoor sites to obtain multiple base station levels.
[0076] In this embodiment, the Delaunay triangulation method can be used to layer the surrounding outdoor sites to obtain multiple base station levels, where the highest level among the multiple base station levels is equal to the cell level - the highest level where the base station in the basic base station cluster is located, that is, the maximum number of layers n max Equal to the maximum number of layers where the base station in the cell-based base station cluster is located, n max =max{A:n bs1 ,n bs2 …n bsi}; where n bsi Indicates the layer number of base station i, indicating the cell level - basic base station cluster.
[0077] That is to say, in a certain aspect, the base stations in the cell-level-basic base station cluster can also be stratified by the same Delaunay triangulation method to obtain multiple base station levels, and the maximum number of layers where the base stations in the cell-level-basic base station cluster are located is determined. The maximum number of layers is the maximum number of layers for stratifying the surrounding outdoor sites using the Delaunay triangulation method.
[0078] Step S430: Determine the sector area according to the cell antenna direction angle and the horizontal beam angle, and the sector area takes the newly-connected base station as the origin.
[0079] In this embodiment, a sector area is obtained based on the cell antenna direction angle and the horizontal beam angle. The sector area takes the newly-connected base station as the origin center, and the sector angle = horizontal beam half-power angle * 2 (single-beam antenna) or the sector angle = beam configuration half-power angle (multi-beam antenna).
[0080] Step S450: Acquire base stations located in the sector area in each base station layer to obtain a cell-level-number-of-layers base station cluster.
[0081] In this embodiment, the base stations located in the sector area in each base station level are determined, that is, for each base station level, it is determined whether the base stations located in the base station level are located in different sector areas. If so, the base stations are aggregated to obtain a cell-level-layer base station cluster.
[0082] In this embodiment, the cell-level-layer base station cluster centered on the newly-connected base station is determined by triangulation layers and sector areas, which can accurately identify base stations characterized by base station layers and effectively reduce the problem of base station omissions that may occur in the subsequent determination of base station clusters.
[0083] Figure 5 yes Figure 3 The flowchart of step S350 in the embodiment shown is in an exemplary embodiment. Figure 5 As shown, in an exemplary embodiment, the process of defining the base station cluster of the cell-level architecture in step S350 according to the base station coverage type may include steps S510 to S530, which are described in detail as follows:
[0084] Step S510: According to the type of the new base station, the indoor base station or base station whose latitude falls within the sector area is obtained as the base station completion - cell-level architecture base station cluster.
[0085] In this embodiment, when the newly-connected base station is an outdoor station, the indoor station whose longitude and latitude fall within the sector area is included in the station completion - cell-level architecture base station cluster, and the sector area is the sector area obtained in step S430; if the newly-connected base station is an indoor station, there is no need to screen the indoor stations within the sector area, and the base station is classified into the station completion - cell-level architecture base station cluster.
[0086] Step S530: According to the in-station completion-cell-level architecture base station cluster, the inter-frequency cells in the cell-level-basic base station cluster and the cell-level-layer base station cluster are respectively completed.
[0087] In this embodiment, after obtaining the in-station completion-cell-level architecture base station cluster, the cells within the cell-level-basic base station cluster and the cell-level-layer base station cluster are identified, and then the inter-frequency cells of these cells are completed.
[0088] This embodiment provides a method for accurately acquiring a site completion - cell-level architecture base station cluster. It also proposes to complete the heterofrequency cells within the cell-level - basic base station cluster and the cell-level - layer base station cluster through the site completion - cell-level architecture base station cluster, thereby reducing the possible omission of base stations in the cell-level - basic base station cluster and the cell-level - layer base station cluster, and improving the accuracy of base station cluster identification.
[0089] Figure 6 FIG. 1 is a flow chart of a method for processing base station network access data according to another exemplary embodiment. Figure 6 As shown, in an exemplary embodiment, the method may include steps S610 to S650, which are described in detail as follows:
[0090] Step S610: Calculate a first base station cluster benefit evaluation value within a first preset time period.
[0091] In this embodiment, according to Figure 2 - Figure 5 The method calculates a first base station cluster benefit evaluation value within a first preset time period, and the first base station cluster benefit evaluation value can be expressed as the benefit brought by the newly connected base station to the base station-level base station cluster within the first preset time period.
[0092] Step S630: Calculate the benefit evaluation value of the second base station cluster within a second preset time period, where the first preset time period and the second preset time period are respectively consecutive billing cycles.
[0093] In this embodiment, also refer to Figure 2 - Figure 5 The method calculates a second base station cluster benefit evaluation value within a second preset time period, and the second base station cluster benefit evaluation value can be expressed as the benefit brought by the newly connected base station to the base station-level base station cluster within the second preset time period.
[0094] The first preset time period and the second preset time period are consecutive billing cycles. For example, if the first preset time period is a complete billing month or billing year, the second preset time period is the first complete billing month or billing year after the first preset time period.
[0095] Step S650: By comparing the first base station cluster benefit evaluation value with the second base station cluster benefit evaluation value, the benefit improvement of the target base station newly connected to the network within the second preset time period for the base station-level base station cluster is evaluated based on the comparison result.
[0096] In this embodiment, by comparing the first base station cluster benefit evaluation value with the second base station cluster benefit evaluation value, the benefit change brought by the new base station network access to the base station-level base station cluster as a whole within the second preset period can be evaluated; specifically, the comparison result can be calculated by the following formula:
[0097]
[0098] Where: ΔV 簇 represents the comparison result, V1 represents the benefit evaluation value of the first base station cluster, and V2 represents the benefit evaluation value of the second base station cluster; if ΔV 簇 =1, it means that the new base stations in the second preset time period have no impact on the overall revenue of the base station level base station cluster; if ΔV 簇 >1, it means that the new base stations added to the network during the second preset time period have caused the overall revenue of the base station cluster to decrease; if ΔV 簇 <1, it means that the new base stations added to the network during the second preset time period lead to an increase in the overall revenue of the base station cluster.
[0099] In this embodiment, the impact of the newly-connected base station on the base station-level base station cluster is determined by comparing the benefit evaluation values of the base station cluster in the previous and subsequent billing periods. In actual applications, new base stations can be selectively built in a base station-level base station cluster based on the comparison results. For example, when the comparison results show that the newly-connected base station leads to an increase in the overall revenue of the base station cluster, it proves that a new base station can be built in the base station-level base station cluster, and the new base station can bring higher revenue. If the comparison results show that the newly-connected base station leads to a decrease or no change in the overall revenue of the base station cluster, it proves that there is no need to build a new base station in the base station-level base station cluster, and the new base station will not only lead to the emergence of construction costs, but may also reduce revenue.
[0100] Figure 7 yes Figure 2 The flowchart of step S250 in the embodiment shown is in an exemplary embodiment. Figure 7 As shown, in an exemplary embodiment, step S250 extracts at least one target base station newly connected to the network within a preset time period from the base station-level base station cluster, allocates the single-user benefit evaluation value corresponding to each target user to at least one target base station, and the process of obtaining the single-user single-station benefit evaluation value of each target user under a single target base station may include steps S710 to S730, which are described in detail as follows:
[0101] Step S710: Obtain the traffic used by each target user under the target base station within a preset time period.
[0102] In this embodiment, the traffic used by the target user at each target base station within a preset time period can be obtained. Of course, for a certain target user b, the traffic used within the preset time period may be all under the target base station, or may not be under the target base station at all, or may be partly under the target base station and partly under other base stations. The traffic used by the target user b at the target base station may also be under multiple different target base stations or a single target base station, and no specific restrictions are made here.
[0103] Step S730: Determine the single-user single-station benefit evaluation value of each target user under a single target base station according to the traffic used by each target user under the target base station within a preset time period and the single-user benefit evaluation value corresponding to each target user.
[0104] In this embodiment, the single-user single-station benefit evaluation value of the target user under a single target base station can be determined based on the traffic used by the target user under different target base stations and the single-user benefit evaluation value of the target user; for example, for a target user A, who uses xMB traffic under target base station a and yMB traffic under target base station b, the single-user single-station benefit evaluation value of the target user A can be determined through the single-user benefit evaluation value of the target user A. The specific method for obtaining the single-user single-station benefit evaluation value can refer to step S270.
[0105] This embodiment proposes a method for obtaining a single-user single-station benefit evaluation value, which can accurately identify the benefits brought by different users in a single newly-connected base station.
[0106] Figure 8 FIG. 1 is a schematic diagram showing a structure of a base station network access data processing device according to an exemplary embodiment. Figure 8 As shown, in an exemplary embodiment, the base station network access data processing device includes:
[0107] The base station-level base station cluster acquisition module 810 is configured to divide the cell-level base station clusters according to the networked base station sites, and obtain the base station-level base station clusters according to the cell-level base station clusters associated with the newly networked base station; the base station-level base station cluster acquisition module 810 obtains the base station-level base station cluster by performing a union process on the cell-level base station clusters associated with the newly networked base station;
[0108] The single-user benefit evaluation value acquisition module 830 is configured to determine the target users that generate traffic within a preset time period and are included in the base station-level base station cluster, and calculate the single-user benefit evaluation value corresponding to each target user within the preset time period;
[0109] The single-user single-station benefit evaluation value acquisition module 850 is configured to extract at least one target base station newly connected to the network within a preset time period from the base station-level base station cluster, assign the single-user benefit evaluation value corresponding to each target user to the at least one target base station, and obtain the single-user single-station benefit evaluation value of each target user under a single target base station;
[0110] The base station cluster benefit evaluation value acquisition module 870 is configured to summarize the single-user single-station benefit evaluation values of the base station-level base station cluster to obtain the base station cluster benefit evaluation value of the base station-level base station cluster within a preset time period.
[0111] In this embodiment, the base station network access data processing device with the above-mentioned structure can solve the problem that the traditional traffic value evaluation method is relatively extensive and not accepted by marketing personnel. At the same time, it can improve the accuracy of the benefit evaluation of new base stations entering the network, and more accurately evaluate the traffic changes of the entire cluster after a single station enters the network.
[0112] In one embodiment, the base station network access data processing device further includes:
[0113] A cell-level-basic base station cluster acquisition module configured to define a cell-level-basic base station cluster according to neighboring cell handover performance data;
[0114] A cell-level-layer base station cluster acquisition module is configured to determine a cell-level-layer base station cluster according to the base station layer obtained after layering and the cell antenna directivity;
[0115] A station completion-cell-level architecture base station cluster acquisition module, configured to define a station completion-cell-level architecture base station cluster according to a base station coverage type;
[0116] The cell-level base station cluster acquisition module is configured to obtain a cell-level base station cluster by combining the cell-level basic base station cluster, the cell-level layer base station cluster and the entry-site completion-cell-level architecture base station cluster.
[0117] In one embodiment, the cell-level-layer base station cluster acquisition module includes:
[0118] The hierarchical unit is configured to triangulate the surrounding outdoor sites to obtain a plurality of base station hierarchies, wherein the highest hierarchical level among the plurality of base station hierarchies is equal to the cell level - the highest hierarchical level where the base station in the basic base station cluster is located;
[0119] A sector determination unit is configured to determine a sector area according to a cell antenna direction angle and a horizontal beam angle, wherein the sector area takes a newly-connected base station as an origin;
[0120] The cell-level base station cluster acquisition unit is configured to acquire base stations located in the sector area in each base station layer to obtain a cell-level-layer base station cluster.
[0121] In one embodiment, the station completion-cell level architecture base station cluster acquisition module includes:
[0122] The station completion-cell-level architecture base station cluster acquisition unit is configured to acquire, according to the type of the newly-connected base station, an indoor substation or base station whose latitude falls within the sector area as a station completion-cell-level architecture base station cluster;
[0123] The completion unit is configured to respectively complete the inter-frequency cells within the cell-level-basic base station cluster and the cell-level-number of layers base station cluster according to the in-station completion-cell-level architecture base station cluster.
[0124] In one embodiment, the base station network access data processing device further includes:
[0125] A first base station cluster benefit evaluation value acquisition module, configured to calculate a first base station cluster benefit evaluation value within a first preset time period;
[0126] A second base station cluster benefit evaluation value acquisition module, configured to calculate the benefit evaluation value of the second base station cluster within a second preset time period, the first preset time period and the second time period being respectively consecutive billing cycles;
[0127] The evaluation module is configured to compare the first base station cluster benefit evaluation value with the second base station cluster benefit evaluation value to evaluate the benefit improvement of the target base station newly connected to the network within the second preset time period for the base station-level base station cluster based on the comparison result.
[0128] In one embodiment, the single-user single-station benefit evaluation value acquisition module 850 includes:
[0129] A traffic distribution unit, configured to obtain the traffic used by each target user under the target base station within a preset time period;
[0130] The single-user single-station benefit evaluation value acquisition unit is configured to determine the single-user single-station benefit evaluation value of each target user under a single target base station according to the traffic used by each target user under the target base station within a preset time period and the single-user benefit evaluation value corresponding to each target user.
[0131] Fig. 9 A schematic diagram of the structure of a computer system suitable for implementing an electronic device of an embodiment of the present application is shown.
[0132] It should be noted that Fig. 9 The computer system 1600 of the electronic device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.
[0133] like Fig. 9 As shown, the computer system 1600 includes a central processing unit (CPU) 1601, which can perform various appropriate actions and processes according to the program stored in the read-only memory (ROM) 1602 or the program loaded from the storage part 1608 to the random access memory (RAM) 1603, such as executing the method in the above embodiment. In the RAM 1603, various programs and data required for system operation are also stored. The CPU 1601, the ROM 1602 and the RAM 1603 are connected to each other through the bus 1604. The input / output (I / O) interface 1605 is also connected to the bus 1604.
[0134] The following components are connected to the I / O interface 1605: an input section 1606 including a keyboard, a mouse, etc.; an output section 1607 including a cathode ray tube (CRT), a liquid crystal display (LCD), etc., and a speaker, etc.; a storage section 1608 including a hard disk, etc.; and a communication section 1609 including a network interface card such as a LAN (Local Area Network) card, a modem, etc. The communication section 1609 performs communication processing via a network such as the Internet. A drive 1610 is also connected to the I / O interface 1605 as needed. A removable medium 1611, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 1610 as needed so that a computer program read therefrom is installed into the storage section 1608 as needed.
[0135] In particular, according to an embodiment of the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present application includes a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a computer program for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication section 1609, and / or installed from a removable medium 1611. When the computer program is executed by a central processing unit (CPU) 1601, various functions defined in the system of the present application are executed.
[0136] It should be noted that the computer-readable medium shown in the embodiment of the present application may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM), a flash memory, an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present application, a computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, device or device. In the present application, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, which carries a computer-readable computer program. Such propagated data signals may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer-readable signal media may also be any computer-readable medium other than computer-readable storage media, which may send, propagate, or transmit programs for use by or in conjunction with an instruction execution system, apparatus, or device. The computer program contained on the computer-readable medium may be transmitted using any appropriate medium, including but not limited to: wireless, wired, etc., or any suitable combination of the above.
[0137] The flowchart and block diagram in the accompanying drawings illustrate the possible architecture, functions and operations of the system, method and computer program product according to various embodiments of the present application. Wherein, each box in the flowchart or block diagram can represent a module, a program segment, or a part of the code, and the above-mentioned module, program segment, or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram or flowchart, and the combination of boxes in the block diagram or flowchart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.
[0138] The units involved in the embodiments described in this application may be implemented by software or hardware, and the units described may also be set in a processor. The names of these units do not, in some cases, constitute limitations on the units themselves.
[0139] Another aspect of the present application further provides a computer-readable storage medium on which a computer program is stored, and when the computer program is executed by a processor, the base station network access data processing method as described above is implemented. The computer-readable storage medium may be included in the electronic device described in the above embodiment, or may exist independently without being assembled into the electronic device.
[0140] Another aspect of the present application further provides a computer program product or a computer program, the computer program product or the computer program includes a computer instruction, the computer instruction is stored in a computer-readable storage medium. The processor of the computer device reads the computer instruction from the computer-readable storage medium, and the processor executes the computer instruction, so that the computer device executes the base station network access data processing method provided in each of the above embodiments.
[0141] The above content is only a preferred exemplary embodiment of the present application and is not intended to limit the implementation scheme of the present application. A person skilled in the art can easily make corresponding changes or modifications based on the main concept and spirit of the present application. Therefore, the scope of protection of the present application shall be based on the scope of protection required by the claims.
Claims
1. A method for processing base station network access data, characterized in that: include: Divide the cell-level base station clusters according to the networked base station sites, and obtain the base station-level base station clusters according to the cell-level base station clusters associated with the newly networked base station; Determine the target users that generate traffic within a preset time period and are included in the base station-level base station cluster, and calculate the single-user benefit evaluation value corresponding to each target user within the preset time period; Extract at least one target base station newly connected to the network within the preset time period from the base station-level base station cluster, assign the single-user benefit evaluation value corresponding to each target user to the at least one target base station, and obtain the single-user single-station benefit evaluation value of each target user under a single target base station; Summarizing the single-user single-station benefit evaluation values of each target user under the single target base station to obtain a single-station benefit evaluation value; The single-station benefit evaluation values of all target base stations are summarized to obtain the base station cluster benefit evaluation value of the base station-level base station cluster within the preset time period.
2. The method according to claim 1, characterized in that Before dividing the cell-level base station clusters according to the networked base station sites, and obtaining the base station-level base station cluster according to the cell-level base station cluster associated with the newly networked base station, the method further includes: Define cell-level-basic base station clusters based on neighboring cell handover performance data; Determine the cell-level-number-of-layers base station cluster according to the base station level and cell antenna directivity obtained after the layering process; Define inbound completion based on base station coverage type - cell-level architecture base station cluster; The cell-level-basic base station cluster, the cell-level-number of layers base station cluster and the entry-site completion-cell-level architecture base station cluster are combined to obtain the cell-level base station cluster.
3. The method according to claim 2, characterized in that The step of determining the cell-level-number-of-layers base station cluster according to the base station level and the cell antenna directivity obtained after the hierarchical processing includes: Perform triangulation processing on the surrounding outdoor sites to obtain multiple base station levels, wherein the highest level of the multiple base station levels is equal to the highest level where the base stations in the cell level-basic base station cluster are located; Determine a sector area according to the cell antenna direction angle and the horizontal beam angle, wherein the sector area takes the newly connected base station as the origin; The base stations located in the sector area in each base station layer are obtained to obtain a cell-level-layer base station cluster.
4. The method according to claim 2, characterized in that: The step of defining a base station cluster for site completion-cell-level architecture according to a base station coverage type includes: According to the type of the newly connected base station, the indoor substation or base station whose latitude falls within the sector area is obtained as the incoming station completion-cell-level architecture base station cluster; According to the entry-site completion-cell-level architecture base station cluster, the hetero-frequency cells within the cell-level-basic base station cluster and the cell-level-number-of-layers base station cluster are respectively completed.
5. The method according to claim 1, characterized in that The method further comprises: Calculating a first base station cluster benefit evaluation value within a first preset time period; Calculating a benefit evaluation value of a second base station cluster within a second preset time period, wherein the first preset time period and the second preset time period are respectively consecutive billing cycles; By comparing the first base station cluster benefit evaluation value and the second base station cluster benefit evaluation value, the benefit improvement of the base station-level base station cluster by the target base stations newly connected to the network within the second preset time period is evaluated based on the comparison result.
6. The method according to claim 1, characterized in that The step of extracting at least one target base station newly connected to the network within the preset time period from the base station-level base station cluster, allocating the single-user benefit evaluation value corresponding to each target user to the at least one target base station, and obtaining the single-user single-station benefit evaluation value of each target user under a single target base station includes: Obtaining the traffic used by each target user under the target base station within the preset time period; The single-user single-station benefit evaluation value of each target user under a single target base station is determined according to the traffic used by each target user under the target base station within the preset time period and the single-user benefit evaluation value corresponding to each target user.
7. The method according to claim 1, characterized in that The dividing of the cell-level base station clusters according to the networked base station sites, and obtaining the base station-level base station cluster according to the cell-level base station cluster associated with the newly networked base station, includes: The cell-level base station clusters associated with the newly-connected base station are combined to obtain the base station-level base station cluster.
8. A base station network access data processing device, characterized in that: include: A base station level base station cluster acquisition module is configured to divide the cell level base station clusters according to the networked base station sites, and obtain the base station level base station clusters according to the cell level base station clusters associated with the newly networked base station; A single-user benefit evaluation value acquisition module is configured to determine the target users that generate traffic within a preset time period and are included in the base station-level base station cluster, and calculate the single-user benefit evaluation value corresponding to each target user within the preset time period; A single-user single-station benefit evaluation value acquisition module is configured to extract at least one target base station newly connected to the network within the preset time period from the base station-level base station cluster, assign the single-user benefit evaluation value corresponding to each target user to the at least one target base station, and obtain the single-user single-station benefit evaluation value of each target user under a single target base station; A base station cluster benefit evaluation value acquisition module is configured to summarize the single-user single-station benefit evaluation values of each target user under the single target base station to obtain a single-station benefit evaluation value; The single-station benefit evaluation values of all target base stations are summarized to obtain the base station cluster benefit evaluation value of the base station-level base station cluster within the preset time period.
9. An electronic device, characterized in that: include: one or more processors; A storage device, used to store one or more computer programs, when the one or more computer programs are executed by the one or more processors, enables the electronic device to implement the method according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: Computer-readable instructions are stored thereon, and when the computer-readable instructions are executed by a processor of a computer, the computer is caused to execute the method according to any one of claims 1 to 7.