Existing tunnel vertical deformation control structure and construction method during up-down overlapped tunnel construction
An existing tunnel and vertical deformation technology, applied in tunnels, earthwork drilling, mining equipment, etc., can solve the problems of uneven distribution of reinforcement range, limited deformation control ability, and permanent structural deformation, so as to ensure the tunnel structure and operation Safe, enhanced durability, easy-to-implement effects
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2022-04-08
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of geotechnical and underground engineering, in particular to a vertical deformation control structure of an existing tunnel during the construction of an upper and lower overlapping tunnel. In addition, the present invention also relates to a construction method of the existing tunnel vertical deformation control structure during the construction of the above-mentioned upper and lower overlapping tunnels. Background technique
[0002] With the construction of urban rail transit, by the end of 2020, the operating mileage of existing subways across the country will exceed 6,400 kilometers, and the mileage of subways under construction will exceed 5,000 kilometers. At the same time, a large number of municipal road tunnels are planned. Due to the limited urban shallow underground space resources, with the continuous construction of subways, it will become more and more common for new tunnels to cross over / und...
Examples
Embodiment Construction
[0029] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings, but the present invention can be implemented in various ways defined and covered below.
[0030] refer to Figure 4 , the preferred embodiment of the present invention provides an existing tunnel vertical deformation control structure during the construction of the upper and lower overlapping tunnels, which is arranged in the upper and lower overlapping influence area between the new tunnel 20 to be newly built and the closest existing tunnel 10 30, or arranged in the upper and lower overlapping influence area 30 between the new tunnel 20 to be newly built and two existing tunnels 10 close to its two sides, the vertical deformation control structure includes: along the depth of the upper and lower overlapping influence area 30 The rigid partition layers are sequentially arranged at intervals in the horizontal direction, and the rigid partition layers i...