An emergency decision-making method for important users' power supply protection based on digital twin
Patent Information
- Application Number
- CN202210568549.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-24
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-05-24
AI Technical Summary
The prior art is difficult to effectively evaluate and eliminate the power supply risks of important users in the future and in the event of failure of the power grid, resulting in insufficient power supply reliability.
Using the important user power maintenance emergency decision-making method based on digital twins, by inputting pre-acquisition user data, equipment models and section data, the important user-related model extraction algorithm, the coordinated risk analysis algorithm for the use of the Monte Carlo sampling method, and the Monte Carlo sampling method. Calculate the power supply range of heavy overload equipment and faulty equipment in the power grid, output users with power supply risks and provide risk elimination solutions.
It realizes the power supply risk assessment and risk elimination of important users, ensures the power supply reliability of important users, and uses digital twin technology to conduct future risk assessment and elimination of failure situations, providing emergency decision-making functions for power maintenance.
Smart Images

Figure CN114925916B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to an emergency auxiliary decision-making method for power supply protection for important users based on digital twins, and belongs to the technical field of power supply protection for important users. Background Art
[0002] Digital twins create virtual models of physical entities in a digital way, use data to simulate the behavior of physical entities in real environments, and achieve connectivity between the physical world and the information world through virtual-reality interactive feedback, data fusion analysis, and decision-making iterative optimization.
[0003] Important users are generally users with important economic or political attributes, and they have relatively high requirements for power supply reliability. Important users are generally at the end of the power grid, and their power supply grid includes the transmission grid and the distribution grid. With the access of new energy and adjustable loads to the transmission and distribution grid, the power generation output of the power grid and the system load fluctuations have increased. At the same time, the grid operators will often adjust the operation mode of the grid, and the grid equipment may also fail. Therefore, it is necessary to fully consider the risks brought to the power supply of important users by changes in the operation mode of the transmission and distribution networks, system load, system power generation fluctuations, and power grid failures. Summary of the invention
[0004] The purpose of the present invention is to overcome the shortcomings of the prior art and provide an emergency auxiliary decision-making method for power supply protection of important users based on digital twins, which uses digital twin technology to conduct risk assessment and risk elimination for important users in the future and in the event of power grid failures, thereby realizing the emergency auxiliary decision-making function for power supply protection.
[0005] To achieve the above object, the present invention is implemented by adopting the following technical solutions:
[0006] The present invention provides an emergency auxiliary decision-making method for power supply protection of important users based on digital twins, comprising:
[0007] Input the pre-acquired important user data, transmission and distribution network equipment model and section data, and obtain the local power grid digital model related to the important user through the important user related model extraction algorithm;
[0008] Input the pre-acquired power generation forecast and load forecast result data, calculate the heavy overload equipment in the power grid and search for important users within the power supply range of the heavy overload equipment through the transmission and distribution collaborative risk analysis algorithm, and list these users as power supply risk users, thereby outputting important users with power supply risks in future sections and providing risk elimination solutions;
[0009] Input the pre-acquired equipment reliability parameters, perform fault simulation based on the Monte Carlo sampling method, calculate the grid equipment that may fail, search for important users within the power supply range of the faulty equipment, and list these users as power supply risk users, thereby outputting important users with power supply risks and providing risk elimination solutions.
[0010] Furthermore, the input of the pre-acquired important user data, transmission and distribution network equipment model and section data, and the acquisition of the local power grid digital model related to the important user through the important user related model extraction algorithm, include:
[0011] Input the pre-acquired important user data and the transmission and distribution network equipment model, and output the transmission and distribution network equipment model related to the important user based on the pre-acquired matching relationship between the important user and the distribution transformer, and the relationship between the feeder to which the distribution transformer belongs and the plant station;
[0012] Input the transmission and distribution network equipment model related to the important users, and output the transmission and distribution network operation mode section related to the important users according to the matching relationship between the pre-acquired section data and the equipment model;
[0013] Input the transmission and distribution network equipment model and operation mode section related to important users, match the two based on the pre-acquired equipment ID, and obtain the local power grid digital model related to important users including the equipment model and section.
[0014] Furthermore, the input of the pre-acquired power generation forecast and load forecast result data is used to calculate the heavy overload equipment in the power grid and search for important users within the power supply range of the heavy overload equipment through the transmission and distribution collaborative risk analysis algorithm, and these users are listed as power supply risk users, thereby outputting important users with power supply risks in the future section and providing risk elimination solutions, including:
[0015] Input the pre-obtained power generation forecast results under different weather conditions, and calculate the future heavy overload conditions of the equipment under different output levels based on the transmission and distribution coordinated power flow calculation method;
[0016] Input the load forecast results obtained in advance under different load regulation levels, and calculate the future heavy overload conditions of the equipment under different load levels based on the transmission and distribution coordinated power flow calculation method;
[0017] Input important user data and equipment overload conditions, search for important users within the power supply range of overloaded equipment based on the association between important users and overloaded equipment, and list these users as power supply risk users, thereby outputting important users with power supply risks that will be affected in the future;
[0018] Input important users with power supply risks that will be affected in the future, and output a risk elimination plan that includes a grid operation mode adjustment strategy through transmission and distribution coordinated load transfer technology.
[0019] Furthermore, the calculation method based on the transmission and distribution coordinated power flow calculation method calculates the future heavy overload conditions of the equipment at different output levels, including:
[0020] Based on the transmission and distribution coordinated power flow calculation method, the load rate of the equipment is calculated by dividing the apparent power of the line and transformer by the rated capacity. The load rate of the equipment is compared with the heavy overload threshold value. The equipment with a load rate higher than the heavy overload threshold is a heavy overload device, thereby calculating the future heavy overload situation of the equipment at different output levels.
[0021] Furthermore, the calculation method based on the transmission and distribution coordinated power flow calculation method calculates the future heavy overload conditions of the equipment under different load levels, including:
[0022] Based on the transmission and distribution coordinated power flow calculation method, the load rate of the equipment is calculated by dividing the apparent power of the line and transformer by the rated capacity. The load rate of the equipment is compared with the heavy overload threshold value. The equipment with a load rate higher than the heavy overload threshold is a heavy overload device. The future heavy overload situation of the equipment under different load levels is calculated.
[0023] Furthermore, the risk elimination scheme including the grid operation mode adjustment strategy is outputted through the transmission and distribution coordinated load transfer technology, including:
[0024] Through the transmission and distribution coordinated load transfer technology, we search for important users within the power supply range of heavy-load equipment and transfer them to the list of switch opening and closing operations required to achieve the goal of power supply by other equipment. These switch opening and closing operation lists are formed into a power grid operation mode adjustment strategy. By executing the adjustment strategy, the power supply risks of important users are eliminated. Finally, the switch opening and closing operation list is output as a risk elimination plan that includes the power grid operation mode adjustment strategy.
[0025] Furthermore, the input of the pre-acquired equipment reliability parameters is used to perform fault simulation based on the Monte Carlo sampling method, calculate the grid equipment that may fail, search for important users within the power supply range of the failed equipment, and list these users as power supply risk users, thereby outputting important users with power supply risks and providing risk elimination solutions, including:
[0026] Obtain equipment reliability parameters from the power grid production management system;
[0027] Input equipment reliability parameters, analyze the equipment that may fail based on the Monte Carlo sampling method, analyze it through the transmission and distribution collaborative risk analysis algorithm, and output the important users with power supply risks affected by the failure;
[0028] Input important users with power supply risks affected by the fault, and output a risk elimination plan that includes a grid operation mode adjustment strategy through transmission and distribution coordinated load transfer technology.
[0029] Furthermore, the analysis is performed by using a transmission and distribution collaborative risk analysis algorithm to output important users with power supply risks affected by the fault, including:
[0030] Through the collaborative risk analysis algorithm for transmission and distribution, the analysis is carried out, and the important users within the power supply range that are affected by the failure of the power grid equipment are calculated through topological search. These users are listed as power supply risk users, and the important users with power supply risks affected by the failure are output.
[0031] Furthermore, the risk elimination scheme including the grid operation mode adjustment strategy is outputted through the transmission and distribution coordinated load transfer technology, including:
[0032] Through the transmission and distribution coordinated load transfer technology, we search for important users affected by the faulty equipment and transfer them to the switch opening and closing operation list required for the goal of power supply by other equipment. These switch opening and closing operation lists are formed into a power grid operation mode adjustment strategy. By executing the adjustment strategy, the power supply risk of important users is eliminated. Finally, the switch opening and closing operation list is output as a risk elimination plan that includes the power grid operation mode adjustment strategy.
[0033] Compared with the prior art, the present invention has the following beneficial effects:
[0034] The present invention provides an emergency auxiliary decision-making method for power supply protection for important users based on digital twins, which analyzes the transmission and distribution network model related to important users and its multiple typical operation modes, and realizes the digitization of the power grid model and operation mode related to important users; performs power generation forecasting and load forecasting on the transmission and distribution network related to important users, forms multiple future sections of the transmission and distribution network, evaluates the power supply risk of important users under the future sections, and provides risk elimination solutions; combines equipment reliability parameters, evaluates the power supply risk of important users when the power grid has faults based on a sampling method, and provides risk elimination solutions. The present invention uses digital twin technology to perform risk assessment and risk elimination for important users in the future and fault conditions of the power grid, thereby realizing the function of emergency auxiliary decision-making for power supply protection. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 It is a flow chart of an emergency auxiliary decision-making method for power supply protection for important users based on digital twins provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0036] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.
[0037] Example 1
[0038] This embodiment introduces an emergency auxiliary decision-making method for power supply protection of important users based on digital twins, including:
[0039] Related model extraction algorithm to obtain the local power grid digital model related to important users;
[0040] Input the pre-acquired power generation forecast and load forecast result data, calculate the heavy overload equipment in the power grid and search for important users within the power supply range of the heavy overload equipment through the transmission and distribution collaborative risk analysis algorithm, and list these users as power supply risk users, thereby outputting important users with power supply risks in future sections and providing risk elimination solutions;
[0041] Input the pre-acquired equipment reliability parameters, perform fault simulation based on the Monte Carlo sampling method, calculate the grid equipment that may fail, search for important users within the power supply range of the faulty equipment, and list these users as power supply risk users, thereby outputting important users with power supply risks and providing risk elimination solutions.
[0042] The application process of the important user power supply emergency auxiliary decision-making method based on digital twin provided in this embodiment specifically involves the following steps:
[0043] S100: Analyze the transmission and distribution network models and typical operation modes related to important users to realize the digitization of physical power grid.
[0044] There are many transmission and distribution network devices, but usually there are few important users, so the number of grid devices related to them only accounts for a small part of the entire grid. Therefore, it is necessary to extract the transmission and distribution network models related to important users from the regional power grid based on the matching relationship between important users and distribution transformers and the relationship between the feeders and plants to which the distribution transformers belong; the load of the power grid system changes all the time, but several typical full-grid system loads of the power grid can be selected according to its typical load curve to extract the transmission and distribution network operation mode sections related to important users; the transmission and distribution network models and operation mode sections related to important users are entered into the database to realize the digitization of the physical power grid related to important users. This lays the foundation for various power supply analysis and decision-making functions later.
[0045] S200: Carry out power generation forecast and load forecast for the transmission and distribution networks related to important users, evaluate the future power supply risks of important users, and provide risk elimination solutions.
[0046] With the requirements of carbon peak and carbon neutrality. The transmission network and distribution network will be connected to a large number of centralized and distributed new energy sources. New energy has the characteristics of randomness and volatility in output. Therefore, it is necessary to consider the volatility of the output of new energy sources such as photovoltaic and wind power in the power grid, and predict the total power generation of the power grid; with the development of electric vehicles and the power market, more and more adjustable loads have appeared in the power grid. These adjustable loads have the bidirectional flow characteristics of power generation and power consumption. Therefore, it is necessary to consider the adjustable loads such as charging piles, virtual power plants, and load aggregators in the power grid to predict the total load of the power grid; in order to realize the future risk prediction of important users, it is necessary to establish the future operation mode section of the power grid. Therefore, it is necessary to combine the power generation forecast and load forecast results and multiple typical operation modes of the power grid to form multiple future sections of the transmission and distribution network, and evaluate the power supply risk of important users based on the future sections; finally, according to the power supply risk of important users, the risk elimination plan under the future operation mode section of the power grid is given.
[0047] S300: Sampling equipment failures in the transmission and distribution networks related to important users, assessing the power supply risks of important users in the event of grid failures, and providing risk elimination solutions.
[0048] Power grid equipment has a certain probability of failure, and power grid equipment failure may bring risks to important users. Therefore, it is necessary to obtain equipment reliability parameters from the power grid production management system, such as equipment failure rate and other information; because there are many devices in the power grid, based on the sampling method, simulate the failure of some power grid equipment and analyze the power supply risk of important users after the failure; finally, according to the power supply risk of important users, a risk elimination plan is given in the case of power grid failure.
[0049] The present invention provides an emergency auxiliary decision-making technology for power supply protection for important users based on digital twins, analyzes the transmission and distribution network model related to important users and its multiple typical operation modes, realizes the digitization of the power grid model and operation mode related to important users; performs power generation forecasting and load forecasting on the transmission and distribution network related to important users, forms multiple future sections of the transmission and distribution network, evaluates the power supply risk of important users under the future sections, and provides risk elimination solutions; combines equipment reliability parameters, evaluates the power supply risk of important users when the power grid fails based on the sampling method, and provides risk elimination solutions. The present invention uses digital twin technology to perform risk assessment and risk elimination for important users in the future and failure conditions of the power grid, thereby realizing the function of emergency auxiliary decision-making for power supply protection.
[0050] In order to further explain in detail the emergency auxiliary decision-making technology for important user power supply protection based on digital twins of the present invention, a specific embodiment will be used for explanation. The details are as follows:
[0051] 1) Analyze the transmission and distribution network models and typical operation modes related to important users to realize the digitization of the physical power grid.
[0052] First, search the plant / station to which the user belongs based on the user->distribution transformer->feeder->plant / station relationship matching table:
[0053] User ID Distribution transformer ID Feeder ID Plant ID User 1 Distribution transformer 1 Feeder 1 Plant Station 1 User 2 Distribution transformer 2 Feeder 2 Plant Station 2 User 3 Distribution 3 Feeder 3 Plant Station 3 User 4 Transformer 4 Feeder 4 Plant Station 4 User 5 Transformer 5 Feeder 5 Plant Station 5
[0054] Then search for other plants and stations based on the connection relationship between the plant and station where the important user is located and other plants and stations:
[0055] Factory Station Name Topological connection plant station Plant Station 1 Plant 10, Plant 11, Plant 12 Plant Station 2 Plant Station 20, Plant Station 21, Plant Station 22 Plant Station 3 Plant Station 30, Plant Station 31, Plant Station 32 Plant Station 4 Plant Station 40, Plant Station 41, Plant Station 42 Plant Station 5 Plant Station 50, Plant Station 51, Plant Station 52
[0056] From this, it can be seen that the plants related to important users include plant 1 to plant 5, plant 10 to plant 12, plant 20 to plant 22, plant 30 to plant 32, plant 40 to plant 42, and plant 50 to plant 52.
[0057] Assuming that the load of a power grid system varies between 10,000MW and 19,000MW, 10 operation mode sections of the system load can be obtained at intervals of 1,000MW as the typical operation mode section of the power grid. The power grid operation mode section should include the following information:
[0058] a) Switch open or closed state.
[0059] b) Active power and reactive power of generators, capacitors, transformers, lines and loads.
[0060] The above power grid model information and power grid section information are entered into the database to realize the digitization of the physical power grid related to important users.
[0061] 2) Carry out power generation forecast and load forecast for the transmission and distribution networks related to important users, assess the future power supply risks of important users, and provide risk elimination solutions.
[0062] The transmission and distribution networks will be connected to a large number of centralized and distributed renewable energy sources, so it is necessary to forecast the power generation of renewable energy sources. The forecast results include the following:
[0063] a) Photovoltaic power generation output forecast in the day ahead, forming a 96-point power generation curve for tomorrow at 15-minute intervals.
[0064] b) Prediction of wind power output in advance, forming a 96-point active power curve for tomorrow at 15-minute intervals.
[0065] There are more and more adjustable loads in the transmission and distribution networks. These adjustable loads have bidirectional flow characteristics of power generation and consumption. Therefore, it is necessary to consider the system load including adjustable loads. The prediction results include the following:
[0066] a) The load forecast results of adjustable loads such as charging piles, virtual power plants, and load aggregators form a 96-point load active power curve for tomorrow at intervals of 15 minutes.
[0067] Assess the future power supply risks of important users, and form multiple future operation mode sections of the power grid based on the power generation forecast and load forecast results combined with the typical operation mode sections of the power grid. Perform flow calculations on each section to analyze whether there are heavy overload devices and the power supply risks of these heavy overload devices to important users, forming the following risk scan results:
[0068] Important Users Power supply heavy load plant Power supply heavy load equipment User 1 Plant Station 1 Main transformer 1 User 2 Plant Station 1 Main transformer 1 User 3 Plant Station 3 Main transformer 2 User 4 Plant Station 3 Main transformer 2
[0069] According to the power supply risk of important users, the load of heavy-load equipment is transferred to other equipment through load transfer, thereby eliminating the equipment overload phenomenon. The risk elimination plan under the future operation mode section of the formed power grid is as follows:
[0070]
[0071]
[0072] 3) Conduct equipment failure sampling on the transmission and distribution networks related to important users, assess the power supply risks of important users in the event of power grid failures, and provide risk elimination solutions.
[0073] According to the reliability parameters of the equipment, fault sampling is carried out on the power grid equipment, and the sampling results are as follows:
[0074] Faulty equipment Number of failures Single failure time (hours) Station 1 main transformer 1 1 1.5 Station 1 main transformer 2 2 2.2 Line 1 1 0.5 Route 2 3 2.5
[0075] Analyze the single power supply duration of important users based on the equipment failure sampling results:
[0076]
[0077] In order to avoid important users being powered by a single power supply when equipment fails, the grid operation mode should be adjusted so that other equipment can supply power to important users, ensuring that important users are powered by dual power supplies. The operation mode adjustment plan is as follows:
[0078]
[0079]
[0080] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. An emergency auxiliary decision-making method for power supply protection of important users based on digital twins, characterized in that: include: Input the pre-acquired important user data, transmission and distribution network equipment model and section data, and obtain the local power grid digital model related to the important user through the important user related model extraction algorithm; Input the pre-acquired power generation forecast and load forecast result data, calculate the heavy overload equipment in the power grid and search for important users within the power supply range of the heavy overload equipment through the transmission and distribution collaborative risk analysis algorithm, and list these users as power supply risk users, so as to output the important users with power supply risks in the future section and provide risk elimination solutions, including: Input the pre-obtained power generation forecast results under different weather conditions, and calculate the future heavy overload conditions of the equipment under different output levels based on the transmission and distribution coordinated power flow calculation method; Input the load forecast results obtained in advance under different load regulation levels, and calculate the future heavy overload conditions of the equipment under different load levels based on the transmission and distribution coordinated power flow calculation method; Input important user data and equipment overload conditions, search for important users within the power supply range of overloaded equipment based on the association between important users and overloaded equipment, and list these users as power supply risk users, thereby outputting important users with power supply risks that will be affected in the future; Input important users with power supply risks that will be affected in the future, and output risk elimination solutions including grid operation mode adjustment strategies through transmission and distribution coordinated load transfer technology; The method for calculating the future heavy overload conditions of equipment at different output levels based on the transmission and distribution coordinated power flow calculation method includes: Based on the transmission and distribution coordinated power flow calculation method, the load rate of the equipment is calculated by dividing the apparent power of the line and transformer by the rated capacity. The load rate of the equipment is compared with the heavy overload threshold value. The equipment with a load rate higher than the heavy overload threshold is a heavy overload equipment, so as to calculate the future heavy overload situation of the equipment at different output levels; The method for calculating the future heavy overload conditions of equipment under different load levels based on the transmission and distribution coordinated power flow calculation method includes: Based on the transmission and distribution coordinated power flow calculation method, the load rate of the equipment is calculated by dividing the apparent power of the line and transformer by the rated capacity. The load rate of the equipment is compared with the heavy overload threshold value. The equipment with a load rate higher than the heavy overload threshold is a heavy overload equipment. The future heavy overload situation of the equipment under different load levels is calculated. The risk elimination scheme including the grid operation mode adjustment strategy is outputted through the transmission and distribution coordinated load transfer technology, including: Through the transmission and distribution coordinated load transfer technology, important users in the power supply range of heavy-load equipment are searched, and the switch opening and closing operation list required for the goal of power supply by other equipment is transferred. The switch opening and closing operation list is formed into a grid operation mode adjustment strategy, and the power supply risk of important users is eliminated by executing the adjustment strategy. Finally, the switch opening and closing operation list is output as a risk elimination plan containing the grid operation mode adjustment strategy; Input the pre-acquired equipment reliability parameters, perform fault simulation based on the Monte Carlo sampling method, calculate the grid equipment that may fail, search for important users within the power supply range of the faulty equipment, and list these users as power supply risk users, thereby outputting important users with power supply risks and providing risk elimination solutions, including: Obtain equipment reliability parameters from the power grid production management system; Input equipment reliability parameters, analyze the equipment that may fail based on the Monte Carlo sampling method, analyze it through the transmission and distribution collaborative risk analysis algorithm, and output the important users with power supply risks affected by the failure; Input important users with power supply risks affected by the fault, and output risk elimination solutions including grid operation mode adjustment strategies through transmission and distribution coordinated load transfer technology; The above-mentioned collaborative risk analysis algorithm for transmission and distribution is used to analyze and output important users with power supply risks affected by the fault, including: Through the coordinated risk analysis algorithm for transmission and distribution, the topology search is used to calculate the important users within the power supply range that are affected by the failure of the power grid equipment, and these users are listed as power supply risk users, and the important users with power supply risks affected by the failure are output; The risk elimination scheme including the grid operation mode adjustment strategy is outputted through the transmission and distribution coordinated load transfer technology, including: Through the transmission and distribution coordinated load transfer technology, we search for important users affected by the faulty equipment and transfer them to the switch opening and closing operation list required for the goal of power supply by other equipment. These switch opening and closing operation lists are formed into a power grid operation mode adjustment strategy. By executing the adjustment strategy, the power supply risk of important users is eliminated. Finally, the switch opening and closing operation list is output as a risk elimination plan that includes the power grid operation mode adjustment strategy.
2. The method for emergency decision-making for important user power supply protection based on digital twin according to claim 1 is characterized in that: The input of the pre-acquired important user data, transmission and distribution network equipment model and section data, and the acquisition of the local power grid digital model related to the important user through the important user related model extraction algorithm, include: Input the pre-acquired important user data and the transmission and distribution network equipment model, and output the transmission and distribution network equipment model related to the important user based on the pre-acquired matching relationship between the important user and the distribution transformer, and the relationship between the feeder to which the distribution transformer belongs and the plant station; Input the transmission and distribution network equipment model related to the important users, and output the transmission and distribution network operation mode section related to the important users according to the matching relationship between the pre-acquired section data and the equipment model; Input the transmission and distribution network equipment model and operation mode section related to important users, match the two based on the pre-acquired equipment ID, and obtain the local power grid digital model related to important users including the equipment model and section.
