Fire emergency plan management method for highway tunnels
By obtaining fire alarm information and formulating emergency plans, and automatically controlling equipment in the tunnel, timeliness problems in highway tunnel fire emergency management are solved, and rapid and effective fire rescue and loss reduction are achieved.
Patent Information
- Application Number
- CN202210605966.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-31
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2042-05-31
AI Technical Summary
When highway tunnel fires occur, firefighters often miss the best rescue opportunity and are unable to carry out initial rescue in a timely manner. It is difficult for existing technology to achieve real-time monitoring and emergency treatment.
By obtaining fire alarm information, we formulate fire emergency plans, including induction of escape, rescue and fire extinguishing and traffic recovery stages, and use the fire alarm main engine, temperature sensing grating, monitoring system and PLC controller to automatically control traffic lights, lane indicators, fire water pumps, roller shutter doors and fan equipment to achieve rapid response.
Minimize the losses of fire accidents, ensure the first-time fire rescue and disposal, and improve the efficiency and effectiveness of fire emergency management.
Smart Images

Figure CN115035672B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tunnel fire management and relates to a fire emergency plan management method for a highway tunnel. Background Art
[0002] At present, highway traffic safety has long become a serious social problem in my country. Once a traffic accident occurs on a highway, especially in a tunnel, it will cause serious consequences and seriously endanger people's lives. In recent years, the exposure rate of tunnel safety accidents has become increasingly high, which has made the fire safety management of tunnels more and more concerned by the society. In 2012, the Ministry of Transport issued the "Technical Requirements for Highway Monitoring", proposing the need to build a traffic incident detection system.
[0003] There are many sources of tunnel fires. Tunnels are generally humid, which can easily accelerate the aging of various electrical equipment and lines, and is prone to problems such as short circuits and excessive local resistance. Since the tunnel space is relatively closed, in order to eliminate harmful gases and ensure ventilation, the wind speed in the tunnel is generally relatively high. Once a fire occurs, the fire spreads rapidly.
[0004] At present, in the emergency management of tunnel fires, when a fire occurs, firefighters rush to the scene to take measures after receiving the alarm, which often misses the best rescue opportunity and fails to carry out early rescue in time. Therefore, it is necessary to monitor and warn tunnel fires in real time and carry out emergency treatment for early fires. Summary of the invention
[0005] In order to make up for the deficiencies of the prior art, the present invention generates a tunnel fire emergency plan based on fire alarm information, reasonably guides highway managers to carry out fire rescue and disposal in the first time, and promptly takes corresponding emergency measures to minimize the losses of fire accidents. The present invention is achieved through the following technical solutions: The present invention provides a highway tunnel fire plan management method, including the following steps: S1 obtains fire alarm information; S2 formulates a corresponding fire emergency plan based on the fire alarm information, and the fire emergency plan includes an escape induction stage, a fire rescue and extinguishing stage, and a traffic restoration stage; S3 executes the fire emergency plan.
[0006] As a preferred solution, a fire alarm host, a temperature-sensitive grating and a fire alarm button are installed in the tunnel. The temperature-sensitive grating and the fire alarm button are electrically connected to the fire alarm host respectively. The fire alarm host is connected to the monitoring platform through a network protocol and exchanges data with it. When the temperature-sensitive grating or the alarm button is triggered, the monitoring system will obtain fire alarm information such as the status and location of the alarm equipment through the fire alarm host.
[0007] As a preferred solution, after the monitoring system obtains the alarm information from the fire alarm device, it transmits information such as the alarm device, alarm location and on-site monitoring video to the highway tunnel manager in the form of a sound alarm; after the manager confirms the actual occurrence of the fire through on-site monitoring video or emergency calls, the monitoring system will automatically formulate a fire emergency plan based on the confirmed fire location. The specific fire emergency plan methods include the escape induction stage, the rescue and fire extinguishing stage and the traffic restoration stage.
[0008] As the preferred solution, the traffic lights, lane indicators, tunnel lighting, fire pumps, rolling doors, fans and other equipment involved in the implementation of the fire emergency plan are all controlled by the monitoring system connected to the PLC controller, and the information board and broadcast are connected to the monitoring system through the network.
[0009] The beneficial effects of the present invention are:
[0010] The present invention generates a tunnel fire emergency plan according to the fire alarm information, reasonably guides the highway administrator to carry out the fire rescue disposal in the first time, takes corresponding emergency measures in time, and minimizes the losses caused by the fire accident. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] The present invention will be further described below in conjunction with the accompanying drawings.
[0012] Figure 1 It is a schematic diagram of the fire alarm process of the present invention.
[0013] Figure 2 A schematic diagram of a fire emergency plan generation process of the present invention.
[0014] Figure 3 It is a schematic diagram of the method for the escape induction phase of the fire emergency plan of the present invention. DETAILED DESCRIPTION
[0015] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present invention, so the present invention is not limited by the specific embodiments disclosed below.
[0016] The accompanying figure is a specific embodiment of the highway tunnel fire plan management method of the present invention. The embodiment includes the following steps: S1 obtains fire alarm information; S2 formulates a corresponding fire emergency plan according to the fire alarm information, and the fire emergency plan includes an escape induction stage, a fire rescue and extinguishing stage, and a traffic restoration stage; S3 executes the fire emergency plan.
[0017] A specific embodiment of step S1 includes: a fire alarm host, a temperature-sensitive grating and a fire alarm button are installed in the tunnel, the temperature-sensitive grating and the fire alarm button are electrically connected to the fire alarm host respectively, the fire alarm host is connected to the monitoring platform through a network protocol and exchanges data with it, when the temperature-sensitive grating or the alarm button is triggered, the monitoring system will obtain fire alarm information such as the status and location of the alarm equipment through the fire alarm host.
[0018] A specific implementation of step S2 includes: after the monitoring system obtains the alarm information of the fire alarm device, it transmits information such as the alarm device, the alarm location and the on-site monitoring video to the highway tunnel manager in the form of a sound alarm; after the manager confirms the actual occurrence of the fire through on-site monitoring video or emergency calls, the monitoring system will automatically formulate a fire emergency plan based on the confirmed fire location. The specific fire emergency plan method includes an escape induction stage, a rescue and fire extinguishing stage and a traffic restoration stage.
[0019] The fire emergency plan methods in the induced escape stage include:
[0020] (1) Traffic light control: The traffic light control status of Shuangtunnel is no-go, and vehicles are prohibited from entering;
[0021] (2) Lane indicator control: vehicles are prohibited from entering the lane indicator control status of the upstream lane of the fire tunnel and the lane indicator control status of the entrance lane of the non-fire tunnel.
[0022] (3) Information board release: Information board outside the twin tunnels releases: Tunnel fire, park on the right, no passage; Information board inside the twin tunnels releases: Tunnel fire, escape in an orderly manner; Speed limit sign at the entrance of the fire tunnel, speed limit: 0;
[0023] (4) Broadcast fire warning information;
[0024] (5) Turn on all tunnel lighting, double-hole tunnel lighting, status: on;
[0025] (6) Turn on the fire tunnel water pump and obtain all the water pumps in this tunnel. Status: turned on;
[0026] (7) Open the upstream rolling shutter door, the rolling shutter door upstream of the fire point, status: open;
[0027] (8) Turn on the fan near the fire point. Fan near the fire point, status: on.
[0028] The emergency plan methods for the rescue and fire fighting stage include:
[0029] (1) Open the fans in sections according to the location of the fire point in the tunnel.
[0030] The fire point is at 1 / 3 near the exit: the fan at the downstream hole of the fire point is turned on, exhausting air towards the hole, and the fan rotates forward;
[0031] The fire point is at 1 / 3 near the entrance: the fan at the upstream hole of the fire point is turned on, exhausting air towards the hole, and the fan is reversed;
[0032] The fire point is at 2 / 3 near the exit: the fans from the fire point to the exit are all turned on, exhausting air in the direction of travel, and the fans rotate forward;
[0033] The fire point is at 2 / 3 near the entrance: the fans from the fire point to the nearest tunnel entrance are all turned on, exhausting air in the direction of driving, and the fans rotate forward;
[0034] (2) Close the rolling shutter doors, including all rolling shutter doors in the fire tunnel and non-fire tunnel, to prevent the fire from spreading or smoke, harmful gases, etc. from entering the non-fire tunnel and expanding the scope of the fire;
[0035] (3) Turn on all fans, including those in the fire tunnel and non-fire tunnel, and turn them on in the forward direction to help with on-site rescue and reduce fire damage, while improving the air quality in the tunnel and allowing harmful gases to be discharged in a timely manner.
[0036] During the rescue and firefighting phase, when the tunnel needs to restore lane traffic, emergency plans are provided for lane diversion and lane diversion that is not required.
[0037] When traffic is restored without diversion:
[0038] (1) The lane indicator controls the lane that is being restored to traffic, and the lane indicator indicates that traffic is allowed in the positive direction; the lane indicator indicates that traffic is prohibited in a non-traveled lane;
[0039] (2) In tunnels where traffic lights have been restored, traffic will continue at the current traffic lights status;
[0040] (3) Information boards will be posted on the tunnel entrance and inside the tunnel to inform you of the reopening of the tunnel.
[0041] When traffic diversion is restored:
[0042] (1) Open the rolling shutter door for diversion, diversion horizontal hole rolling shutter door, the state is open;
[0043] (2) Lane indicators guide diversion. In non-fire tunnels, lanes near the fire tunnels pass in the opposite direction, while other lanes pass in the forward direction. In fire tunnels, when the diversion point is a cross tunnel in the tunnel, upstream vehicles pass, while vehicles near the cross tunnel turn left.
[0044] (3) Traffic lights guide diversion. In non-fire tunnels, traffic lights are used for passing. In fire tunnels, when the diversion point is outside the tunnel, the traffic light turns left. When the diversion point is inside the tunnel, the traffic light is used for passing.
[0045] (4) Information boards guide diversion. For non-fire tunnels, information boards at the entrance and inside the tunnel remind you to travel in both directions. Please pay attention to safety.
[0046] Traffic restoration phase planning methods include:
[0047] (1) The water pump is restored to the state before the implementation of the plan;
[0048] (2) Lighting restoration: Lighting is restored to the state before the implementation of the plan;
[0049] (3) The rolling door is restored to the state before the implementation of the plan;
[0050] (4) Wind turbine recovery: the wind turbine is restored to the state before the implementation of the plan;
[0051] (5) Lane indicator restoration: the lane indicator is restored to the state before the plan is executed;
[0052] (6) Traffic lights are restored to the state before the implementation of the plan;
[0053] (7) The variable information sign is restored to the state before the implementation of the plan;
[0054] (8) Stop broadcasting fire reports.
[0055] In the three stages of the fire emergency plan, the administrator can manually intervene in the pending state of each execution device according to the actual situation of the sudden incident on site and decide which specific step to execute; after confirming the execution, the device control instructions will be issued according to the pending state through the interaction lines of each device; after execution, the actual execution results will be fed back to the administrator in real time.
[0056] The traffic lights, lane indicators, tunnel lighting, fire pumps, rolling doors, fans and other equipment involved in the implementation of the fire emergency plan are all controlled by the monitoring system connected to the PLC controller, and the information board and broadcast are connected to the monitoring system through the network.
[0057] As attached Figure 1 As shown, the fire alarm process of the present invention includes the following steps: the alarm record is stored in a database in real time, the server pushes the alarm information to the front desk, and transmits the alarm record to the fire alarm host in the form of a message, the fire alarm host transmits the alarm information to the monitoring system in the form of a message, the monitoring system receives the alarm information and parses it to determine whether the alarm already exists. If so, no processing is performed. If not, the alarm record is stored in the database and pushed to the front desk, the data is parsed when passing through the back end, and pushed to the front end. After receiving the data, the front end continues to parse the data and issues an alarm prompt, and the fire alarm process ends.
[0058] As attached Figure 2 As shown, the fire emergency plan generation process of the present invention includes the following steps: the front end determines whether the current state is the fire emergency plan state; if it is confirmed to be, it jumps to the plan execution interface, calls the plan steps, and obtains the interface; if not, calls the interface for obtaining alarm detailed information; the back end queries the alarm detailed information, including tunnels, openings, pile numbers, fire point cameras, etc.; the front end displays detailed information, the pile number can be modified, and provides a video image of the fire point; determines whether it is a fire event; if it is a false alarm, calls the false alarm interface; updates the alarm event to a false alarm state, and adds an operation record; if it is determined to be a fire event, calls the confirmation interface; the back end updates the alarm event to a confirmed state, adds an operation record, and calls the plan generation method; generates a fire emergency plan; judges the error result, and prompts information when it fails; jumps to the plan execution interface when successful, calls the plan steps, and obtains the interface; the back end queries the plan steps and assembles json data; the front end displays the plan steps.
[0059] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.
Claims
1. A method for managing a highway tunnel fire emergency plan, characterized in that: The following steps are involved: S1 obtains fire alarm information; S2 formulates a corresponding fire emergency plan based on the fire alarm information, which includes the escape induction stage, the fire rescue and fire extinguishing stage, and the traffic restoration stage; S3 executes the fire emergency plan; The tunnel is equipped with a fire alarm host, a temperature-sensitive grating and a fire alarm button. The temperature-sensitive grating and the fire alarm button are electrically connected to the fire alarm host respectively. The fire alarm host is connected to the monitoring platform through a network protocol and exchanges data with it. When the temperature-sensitive grating or the alarm button is triggered, the monitoring system will obtain the fire alarm information of the status and location of the alarm equipment through the fire alarm host. The emergency plan methods for the rescue and fire fighting stage include: (1) Open the fans in sections according to the location of the fire point in the tunnel. The fire point is at 1 / 3 near the exit: the fan at the downstream hole of the fire point is turned on, exhausting air towards the hole, and the fan rotates forward; The fire point is at 1 / 3 near the entrance: the fan at the upstream hole of the fire point is turned on, exhausting air towards the hole, and the fan is reversed; The fire point is at 2 / 3 near the exit: the fans from the fire point to the exit are all turned on, exhausting air in the direction of travel, and the fans rotate forward; The fire point is at 2 / 3 near the entrance: the fans from the fire point to the nearest tunnel entrance are all turned on, exhausting air in the direction of driving, and the fans rotate forward; (2) Close the rolling shutter doors, including all rolling shutter doors in the fire tunnel and non-fire tunnel, to prevent the fire from spreading or smoke and harmful gases from entering the non-fire tunnel and expanding the scope of the fire; (3) Turn on all fans, including those in the fire tunnel and non-fire tunnel, and turn them on in the forward direction to help with on-site rescue and reduce fire damage, while also improving the air quality in the tunnel and allowing harmful gases to be discharged in a timely manner; The fire alarm process includes the following steps: the alarm record is stored in the database in real time, the server pushes the alarm information to the front desk, and transmits the alarm record to the fire alarm host in the form of a message, the fire alarm host transmits the alarm information to the monitoring system in the form of a message, the monitoring system receives the alarm information and parses it to determine whether the alarm already exists. If it does, it will not be processed. If it does not exist, the alarm record is stored in the database and pushed to the front desk, and the data is parsed when passing through the back end and pushed to the front end. After receiving it, the front end continues to parse the data and issues an alarm prompt, and the fire alarm process ends; The fire emergency plan generation process includes the following steps: the front end determines whether the current state is the fire emergency plan state; if it is confirmed to be, it jumps to the plan execution interface, calls the plan steps, and obtains the interface; if not, it calls the interface for obtaining alarm detailed information; the back end queries the alarm detailed information, including the tunnel, hole, pile number, and fire point camera; the front end displays the detailed information, the pile number can be modified, and the video image of the fire point is provided; Determine whether it is a fire incident; if it is a false alarm, call the false alarm interface; update the alarm event to a false alarm state and add an operation record; if it is determined to be a fire incident, call the confirmation interface; the backend updates the alarm event to a confirmed state, adds an operation record, and calls the plan generation method; generates a fire emergency plan; judges the error result and gives a message prompt when it fails; jumps to the plan execution interface when successful, calls the plan steps, and obtains the interface; the backend queries the plan steps and assembles json data; the front end displays the plan steps.
2. The highway tunnel fire emergency plan management method according to claim 1 is characterized in that: After the monitoring system obtains the alarm information from the fire alarm device, it transmits the alarm device, alarm location and on-site monitoring video information to the highway tunnel manager in the form of a sound alarm; after the manager confirms the actual occurrence of the fire through the on-site monitoring video or emergency call, the monitoring system will automatically formulate a fire emergency plan based on the confirmed fire location. The specific fire emergency plan methods include the escape induction stage, the rescue and fire extinguishing stage and the traffic restoration stage.
3. The highway tunnel fire emergency plan management method according to claim 1 is characterized in that: The fire emergency plan methods in the induced escape stage include: (1) Traffic light control: The traffic light control status of Shuangtunnel is no-go, and vehicles are prohibited from entering; (2) Lane indicator control: vehicles are prohibited from entering the lane indicator control status of the upstream lane of the fire tunnel and the lane indicator control status of the entrance lane of the non-fire tunnel. (3) Information board announcement: Information board outside the two tunnels announces: Tunnel fire, park on the right, no passage; Information boards inside the twin tunnels announced: Tunnel fire, escape in an orderly manner; speed limit sign at the entrance of the fire tunnel, speed limit: 0; (4) Broadcast fire warning information; (5) Turn on all tunnel lighting, double-hole tunnel lighting, status: on; (6) Turn on the fire tunnel water pump and obtain all the water pumps in this tunnel. Status: turned on; (7) Open the upstream rolling shutter door, the rolling shutter door upstream of the fire point, status: open; (8) Turn on the fan near the fire point. Fan near the fire point, status: on.
4. The highway tunnel fire emergency plan management method according to claim 1, characterized in that: The traffic restoration phase plan methods include: (1) The water pump is restored to the state before the implementation of the plan; (2) Lighting restoration: Lighting is restored to the state before the implementation of the plan; (3) The rolling door is restored to the state before the implementation of the plan; (4) Wind turbine recovery: the wind turbine is restored to the state before the implementation of the plan; (5) Lane indicator restoration: the lane indicator is restored to the state before the plan is executed; (6) Traffic lights are restored to the state before the implementation of the plan; (7) The variable information sign is restored to the state before the implementation of the plan; (8) Stop broadcasting fire reports.
5. The highway tunnel fire emergency plan management method according to claim 1 is characterized in that: The traffic lights, lane indicators, tunnel lighting, fire pumps, rolling doors, and fan equipment involved in the implementation of the fire emergency plan are all controlled by the monitoring system connected to the PLC controller, and the information board and broadcast are connected to the monitoring system through the network.
Citation Information
Patent Citations
Dynamic feedback type tunnel fire intelligent evacuating and rescuing system based on digitizing technique
CN102117528A
Safety management system of cable tunnel
CN103036951A
Expressway tunnel fire control linkage system and control method
CN103247125A
Intelligent system for highway tunnel event monitoring
CN106097713A
Intelligent comprehensive command management and control system based on deep-layer integrated mode for municipal tunnels
CN108038812A
