A multifunctional bridge deck crane for cable-stayed bridges with a deck surface
By designing a multi-functional bridge deck crane, the complex installation problem of steel box girders in cable-stayed bridges with intermediate cable planes was solved, enabling efficient installation of steel box girders and stay cables without the need for auxiliary truck cranes, thus improving construction efficiency and reducing costs.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- SICHUAN ROAD & BRIDGE CONSTRUCTION GROUP CO LTD
- Filing Date
- 2022-07-26
- Publication Date
- 2026-07-17
AI Technical Summary
The existing method for installing steel box girders in cable-stayed bridges with medium cable planes is complex and requires the use of mobile cranes for cable installation, which increases construction costs and reduces production efficiency.
Design a multi-functional bridge deck crane, including a main truss, lifting system, walking mechanism, support and anchoring system, cable-stayed cable hoisting system and rear anchoring system. It can hang the cable-stayed cables on the crane before hoisting the steel beam, and adjust the cable-stayed cables to the installation position through sliding beam, lateral movement mechanism and jacking mechanism.
The process of installing steel box girders has been simplified, reducing reliance on truck cranes, improving construction efficiency, and lowering costs.