A mobile steel bar binding platform

By designing a mobile steel bar binding platform with rolling components and driving components, the problem of steel bar binding outdoors is solved and the platform is flexible to move outdoors and indoors is achieved, and the construction efficiency and working environment are improved.

CN115415450BActive Publication Date: 2025-03-25THE 5TH ENG MBEC +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211027001.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-25
Publication Date
2025-03-25
Estimated Expiration
2042-08-25

AI Technical Summary

Technical Problem

During the bridge construction process, steel bar binding needs to be carried out outdoors, resulting in the construction progress being affected by bad weather and the workload of steel bars is large.

Method used

A mobile steel bar binding platform is designed. The platform body is equipped with a binding space, and multiple rolling components and driving components are added at the bottom. The driving components drive the rolling components to move, so that the platform can move flexibly between outdoor construction sites and indoor construction sites.

Benefits of technology

It improves the efficiency of steel bar binding construction, increases indoor working time, improves the working environment, and reduces the workload of steel bar handling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115415450B_ABST
    Figure CN115415450B_ABST
Patent Text Reader

Abstract

The present invention provides a mobile steel bar binding platform, comprising: a platform body, the platform body is provided with a binding space, the binding space is used for binding steel bars; a rolling assembly, the number of rolling assemblies is multiple, and the multiple rolling assemblies are connected to the platform body; a driving assembly, the number of driving assemblies is multiple, the multiple rolling assemblies arranged at the bottom of the platform body are connected to the platform body, and the multiple driving assemblies are correspondingly connected to the multiple rolling assemblies; wherein each driving assembly drives the corresponding rolling assembly to move, so that the steel bar binding platform can be switched in different usage scenarios. Compared with the prior art, the effect that can be achieved by this scheme is: a driving assembly and a rolling assembly are added under the platform body, so that the steel bar binding platform can be flexibly moved between an outdoor construction site and an indoor construction site, the indoor operation time of steel bar binding is increased, the working environment is improved, thereby improving the efficiency of the overall steel bar binding construction and reducing the workload of steel bar handling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge construction, and in particular to a mobile steel bar binding platform. Background Art

[0002] With the development of high-speed railway bridge construction in my country, whether the high-speed railway box girder adopts on-site casting or fully prefabricated production mode, the box girder steel cage needs to be tied during the construction process of each bridge component. Among them, the tying of the box girder steel cage is a factory construction. During the tying process of the steel cage, the steel bars need to be positioned and fixed to ensure that the steel bars can form the required shape, which requires the use of a steel bar tying platform. However, the construction of various bridge components by cast-in-place method has been increasingly restricted by the requirements of the surrounding construction environment and weather environment. The tied steel bars need to be lifted and transferred by crane for casting. Therefore, the tying platform of the steel cage cannot be set indoors. In the related technology, the steel bar tying of the box girder is an open-air operation. When encountering bad weather, the tying process of the steel bars outdoors will be affected, which will slow down the construction progress and increase the workload of steel bar handling.

[0003] It can be seen from this that how to enable the steel bar binding to be carried out indoors without affecting the transfer of the steel bars outdoors and reducing the workload of steel bar transportation has become an urgent problem to be solved. Summary of the invention

[0004] The purpose of the present invention is to provide a mobile steel bar tying platform that can be flexibly moved between outdoor construction sites and indoor construction sites, increase the indoor operation time of steel bar tying, improve the working environment, improve the construction efficiency of steel bar tying, and reduce the workload of steel bar handling.

[0005] The object of the present invention is achieved in that:

[0006] A mobile steel bar binding platform is characterized in that it includes: a platform body, the platform body includes a first support beam, a second support beam, a third support beam and a support member, a binding space is provided in the platform body, and the binding space is used for binding steel bars; a rolling assembly, a plurality of rolling assemblies, a plurality of rolling assemblies arranged at the bottom of the platform body are connected to the platform body; a driving assembly, a plurality of driving assemblies, a plurality of driving assemblies are connected to the platform body, and a plurality of driving assemblies are electrically connected to a plurality of rolling assemblies correspondingly; wherein each driving assembly drives the corresponding rolling assembly to move, so that the steel bar binding platform can be switched under different usage scenarios, thereby increasing the time for indoor operation of steel bar binding, improving the working environment and increasing the working efficiency, while reducing the workload of steel bar handling.

[0007] Compared with the prior art, the present solution can achieve the following effects: by adding a driving assembly and a rolling assembly under the platform body, the steel bar binding platform can be flexibly moved between outdoor construction sites and indoor construction sites, thereby improving the overall efficiency of the steel bar binding construction.

[0008] In one embodiment of the present invention, the rolling assembly includes: a first moving member connected to the platform body; a second moving member cooperating with the first moving member, and the first moving member can move relative to the second moving member.

[0009] Compared with the prior art, the present solution can achieve the following effects: In a specific embodiment, the first movable member is a crawler movable structure or a roller movable structure, and the second movable member is a movable platform to facilitate the movement of the first movable member.

[0010] In one embodiment of the present invention, the first moving member includes: a roller member connected to the platform body; the second moving member includes: a slide groove, and the roller member rolls in the slide groove.

[0011] Compared with the prior art, the present solution can achieve the following effect: in a specific embodiment, the slide is fixedly connected to the ground, and the slide connects the indoor construction site with the outdoor construction site, so that the roller can move in the slide, thereby facilitating the flexible movement of the steel bar binding platform between the outdoor construction site and the indoor construction site, thereby improving the overall steel bar binding construction efficiency.

[0012] In one embodiment of the present invention, the platform body includes: a first support beam, the first support beam is provided with a plurality of openings, and the plurality of openings are evenly spaced on the first support beam; wherein the plurality of openings are used to fix and limit the steel bars.

[0013] Compared with the prior art, the present solution can achieve the following effects: along the extension direction of the first support beam, a plurality of openings evenly spaced apart are provided, which is convenient for limiting the position of the steel bars during the binding process, thereby facilitating the binding and shaping operation of the steel bars.

[0014] In one embodiment of the present invention, the platform body includes: a second support beam; and a plurality of support members, wherein the plurality of support members are connected to the second support beam and are evenly spaced.

[0015] Compared with the prior art, the present solution can achieve the following effects: the provision of the support members can make the binding of the steel bars more convenient.

[0016] In one embodiment of the present invention, the support member includes: a first fixing rod, which is fixedly connected to the second support beam; a second fixing rod, which is fixedly connected to the second support beam, and the first fixing rod and the second fixing rod are arranged opposite to each other on both sides of the second support beam; a limiting rod, one end of the limiting rod is detachably connected to the first fixing rod, and the other end of the limiting rod is extended toward the binding space, and the second fixing rod is used to auxiliary support the limiting rod.

[0017] Compared with the prior art, the present solution can achieve the following effects: in a specific embodiment, the limiting rod is a metal rod body, one end of which is provided with a through hole, which can be rotatably connected to the protruding part of the first fixed rod, and at the same time, the assembly and disassembly of the first fixed rod and the limiting rod can be achieved by nesting; when the first fixed rod and the limiting rod are assembled, it is only necessary to press the limiting rod against the top of the second fixed rod to achieve the effective limiting support effect of the limiting rod on the transversely tied steel bars.

[0018] In one embodiment of the present invention, the platform body includes: a third support beam, the third support beam is provided with a plurality of first installation grooves evenly spaced on one side facing the binding space; a first support frame, one end of the first support frame is embedded in the first installation groove so that the first support frame is connected to the third support beam, and the first support frame is extended toward the binding space; wherein the first support frame is used to support steel bars.

[0019] Compared with the prior art, the present solution can achieve the following effects: since the middle of the steel cage formed by the steel bars is a hollow structure during the binding process, the first support frame is provided to support the steel bars at the top of the binding space.

[0020] In one embodiment of the present invention, the first support frame includes: a first connecting rod, one end of the first connecting rod is engaged with the first mounting groove, the other end of the first connecting rod is provided with a second mounting groove, and the first connecting rod is extended toward the binding space; a second connecting rod, the second connecting rod is engaged with the second mounting groove, and the first connecting rod and the second connecting rod are arranged perpendicular to each other.

[0021] Compared with the prior art, the present solution can achieve the following effects: In a specific embodiment, the second connecting rod cooperates with the first connecting rod to more effectively support the binding of the steel bars.

[0022] In one embodiment of the present invention, a limiting protrusion is provided at the end of the second connecting rod.

[0023] Compared with the prior art, the present solution can achieve the following effect: in a specific embodiment, a metal support rib is provided at the end of the second connecting rod to cooperate with the second connecting rod to support and limit the steel bar, and the limiting protrusion can prevent the metal support rib from slipping toward the two sides of the second connecting rod.

[0024] In one embodiment of the present invention, the first connecting rod includes: a first support rod, one end of which is engaged and connected with the first mounting groove; a second support rod, the second support rod is sleeved with the other end of the first support rod, and the second support rod can move relative to the first support rod; a fixing member, the fixing member is arranged at the sleeved position of the first support rod and the second support rod, and the fixing member is used to limit the movement of the second support rod.

[0025] Compared with the prior art, the present solution can achieve the following effects: the second support rod can be telescopically adjusted relative to the first support rod, thereby enabling the first support frame to be applicable to more different usage scenarios.

[0026] Therefore, the present invention has the advantages of being able to flexibly move between outdoor construction sites and indoor construction sites, increasing the indoor operation time of steel bar binding, improving the working environment, increasing the steel bar binding construction efficiency, and reducing the workload of steel bar handling. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 This is a structural diagram of the steel bar binding platform;

[0028] Figure 2 for Figure 1 A partial enlarged view of the middle A;

[0029] Figure 3 for Figure 1 A partial enlarged view of point B in the middle;

[0030] Figure 4 for Figure 1 A partial enlarged view of point C in the middle;

[0031] Figure 5 is a front view of a steel bar tying platform in some embodiments;

[0032] Figure 6 is another structural schematic diagram of a steel bar binding platform in some embodiments;

[0033] Figure 7 It is a schematic diagram of the structure of the fixing groove in some embodiments;

[0034] Figure 8 Schematic diagram of a partial structure of the first connecting rod in some embodiments.

[0035] Description of reference numerals:

[0036] 1. Binding space; 100. Platform body; 110. First support beam; 111. Opening; 120. Second support beam; 130. Support member; 131. First fixing rod; 132. Second fixing rod; 133. Limit rod; 134. Fixing groove; 135. Stop member; X1. First cross-sectional length; 140. Third support beam; 141. First mounting groove; 150. First support frame; 151. First connecting rod; 1510. Second mounting groove ; 1511, first support rod; 1512, second support rod; 1513, fixing member; 1514, sleeve; 1515, screw member; 152, second connecting rod; 1520, limiting protrusion; 200, rolling assembly; 210, first moving member; 211, roller member; 220, second moving member; 221, slide groove; 222, rib; 300, driving assembly; α, first angle; β, second angle; 400, spring steel ball; 500, hole structure. DETAILED DESCRIPTION

[0037] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, specific embodiments of the present invention are described in detail.

[0038] Embodiment 1:

[0039] See also Figure 1 , Figure 2 and Figure 5 The steel bar binding platform provided in this embodiment includes: a platform body 100, the platform body 100 includes a first support beam 110, a second support beam 120, a third support beam 140 and a support member 130, the platform body 100 is provided with a binding space 1, and the binding space 1 is used for binding steel bars; a rolling assembly 200, the number of the rolling assembly 200 is multiple, and the multiple rolling assemblies 200 arranged at the bottom of the platform body 100 are connected to the platform body 100; a driving assembly 300, the number of the driving assembly 300 is multiple, the multiple driving assemblies 300 are connected to the platform body 100, and the multiple driving assemblies 300 are electrically connected to the multiple rolling assemblies 200 correspondingly; wherein each driving assembly 300 drives the corresponding rolling assembly 200 to move, so that the steel bar binding platform 1 can be switched under different usage scenarios.

[0040] In this embodiment, the platform body 100 is the main part of the steel bar binding platform, and the binding space 1 provided in the platform body 100 is used for binding and shaping of the steel bars. Specifically, the platform body 100 is an isosceles trapezoidal structure, and the steel bars need to be shaped into an isosceles trapezoidal structure, corresponding to most existing elevated bridges with isosceles trapezoidal structures.

[0041] Among them, on both sides of the bottom of the platform body 100, that is, Figure 5On both sides below the middle steel bar binding platform, rolling components 200 and driving components 300 are arranged. Since the steel bar binding platform is used for binding steel bars, the mass of the steel bars is relatively large during operation. Therefore, multiple driving components 300 and rolling components 200 are extended on both sides of the platform body 100. The arrangement of multiple rolling components 200 can improve the supporting strength of the rolling components 200 on the platform body 100. At the same time, each driving component 300 is electrically connected to a rolling component 200. In this embodiment, the driving component 300 is specifically a driving motor, so that each driving component 300 can drive the corresponding rolling component 200 to roll. Specifically, see Figure 1 , motor a is used to drive rolling wheel b, motor c is used to drive rolling wheel d, and so on, so that the steel bar binding platform can be moved. Among them, the one-to-one correspondence between the rolling assembly 200 and the driving assembly 300 can facilitate the movement of a heavy-mass steel bar binding platform under a certain operating load. For example, when the steel bar binding platform is on an outdoor construction site, and the binding space 1 has already been bound with a half-worked steel bar cage, even if it encounters bad weather at this time, even if several of the multiple driving assemblies 300 are damaged at this time, but because a single driving assembly 300 drives a single rolling assembly 200, the steel bar binding platform 1 in this embodiment can also be smoothly moved to the indoor construction site for continued binding work.

[0042] Furthermore, specifically, a driving assembly 300 and a rolling assembly 200 are added under the platform body 100, so that the rebar binding platform 1 can be flexibly moved between the outdoor construction site and the indoor construction site, thereby improving the efficiency of the overall rebar binding construction, increasing the time for indoor rebar binding operations, improving the working environment and improving working efficiency, while reducing the workload of rebar handling.

[0043] Embodiment 2:

[0044] See also Figure 1 , Figure 2 and Figure 5 In this embodiment, the rolling assembly 200 includes: a first moving member 210, which is connected to the platform body 100; and a second moving member 220, which cooperates with the first moving member 210, and the first moving member 210 can move relative to the second moving member 220.

[0045] In this embodiment, the first moving member 210 can be a track moving structure or a roller moving structure, and the second moving member 220 is a moving platform to facilitate the movement of the first moving member 210 .

[0046] Among them, in this embodiment, preferably, the first moving member 210 includes: a roller member 211, and the roller member 211 is connected to the platform body 100; the second moving member 220 includes: a slide 221, and the roller member 211 rolls in the slide 221. Specifically, the first moving member 210 is a roller member 211, and the second moving member 220 is a slide 221, and the slide 221 is fixedly connected to the ground, and the slide 221 connects the indoor construction site with the outdoor construction site, so that the roller member 211 can move in the slide 221. Specifically, the slide 221 is buried in the floor, and the top area of ​​the slide 221 is flush with the ground. At the same time, in order for the roller member 211 in this embodiment to be able to move normally, the part of the roller member 211 that is less than 1 / 2 of the diameter is deep into the notch of the slide 221, so that the steel bar binding platform 1 can be flexibly moved between the outdoor construction site and the indoor construction site, thereby improving the efficiency of the overall steel bar binding construction.

[0047] Furthermore, parallel and spaced ribs 222 are provided on both sides of the slide groove 221, and the ribs 222 are fixedly connected to the sides of the slide groove 221. When the slide groove 221 is buried in the floor, the ribs 222 extend out of the ground. The ribs 222 are specifically a steel bar or a steel bar, that is, the ribs 222 play an anchoring role. The setting of the ribs 222 can prevent the roller member 211 from escaping toward the two sides of the slide groove 221, thereby further ensuring that the roller member 211 in this embodiment can roll normally and stably in the slide groove 221.

[0048] Embodiment 3:

[0049] See also Figure 1 and Figure 3 In this embodiment, the platform body 100 includes: a first support beam 110, on which a plurality of openings 111 are provided, and the plurality of openings 111 are evenly spaced apart on the first support beam 110; wherein the plurality of openings 111 are used to fix and limit the steel bars.

[0050] In this embodiment, the first support beam 110 is disposed on the side of the platform body 100, wherein Figure 1 Combination Figure 5 , the first support beam 110 is arranged in a direction perpendicular to the paper plane and inward. Preferably, the number of the first support beams 110 is also multiple, and the first support beams 110 are arranged on opposite sides of the platform body 100. Along the extension direction of the first support beam 110, multiple openings 111 are arranged at even intervals, which is convenient for limiting the position of the steel bars during the binding process, thereby facilitating the binding and shaping operation of the steel bars. At the same time, the opening 111 is specifically a semi-cylindrical structure with an opening, which is convenient for demoulding the steel bars.

[0051] Furthermore, a plurality of parallel first support beams 110 are provided in the vertical direction on both sides of the platform body 100, which can further enhance the limiting effect on the steel bar binding.

[0052] Embodiment 4:

[0053] See also Figure 1 and Figure 3 In this embodiment, the platform body 100 includes: a second support beam 120; a support member 130, the number of the support members 130 is multiple, the multiple support members 130 are connected to the second support beam 120, and the multiple support members 130 are evenly spaced.

[0054] In this embodiment, the second support beam 120 specifically needs to be connected to the first support beam 110, which can further improve the strength of the second support beam 120 and the first support beam 110. At the same time, the number of second support beams 120 is also multiple, and they are arranged on both sides of the platform body 100, wherein the multiple second support beams 120 are arranged vertically to the first support beam 110, and gaps are arranged between the multiple second support beams 120, which can facilitate the binding and shaping operation of the steel bars, and also facilitate demoulding after the steel bars are bound.

[0055] The support member 130 is connected to the second support beam 120. Figure 5 The plurality of second support beams 120 are vertically connected to the support members 130, and the plurality of support members 130 are evenly spaced. The support members 130 are used to support the steel bars for transverse loading and binding. Similarly, the arrangement of the support members 130 can make the binding of the steel bars more convenient.

[0056] Furthermore, since there are also multiple second support beams 120 , multiple support members 130 are connected to each second support beam 120 along the longitudinal direction, thereby facilitating the binding of steel bars.

[0057] Further, see Figure 5, the upper top portion of the second support beam 120 is extended at an angle, and the second angle β is greater than the first angle α, wherein the first angle α is an obtuse angle, so that the steel cage binding platform in this embodiment is suitable for binding and building steel cages of trapezoidal structures, wherein the second angle β is set so that the upper top portion of the second support beam 120 is bent outward, and the upper top portions of the second support beams 120 on both sides are bent outward and protrude, so that the upper top portion of the second support beam 120 forms an opening structure, which is convenient for the steel cage to be taken out and transferred from the steel cage binding platform in this embodiment through equipment such as a crane after the binding and building is completed. Preferably, the first angle α in this embodiment is 120 degrees, and the second angle β is 150 degrees, so that the steel cage binding platform in this embodiment ensures the convenience of demoulding and disassembling the steel cage under the premise of having sufficient support strength.

[0058] Embodiment 5:

[0059] See also Figure 1 , Figure 3 In this embodiment, the support member 130 includes: a first fixing rod 131, the first fixing rod 131 is fixedly connected to the second support beam 120; a second fixing rod 132, the second fixing rod 132 is fixedly connected to the second support beam 120, the first fixing rod 131 and the second fixing rod 132 are arranged opposite to each other on both sides of the second support beam 120; a limiting rod 133, one end of the limiting rod 133 is detachably connected to the first fixing rod 131, and the other end of the limiting rod 133 is extended toward the binding space 1, and the second fixing rod 132 is used to auxiliary support the limiting rod 133.

[0060] In this embodiment, the first fixing rod 131, the second fixing rod 132 and the limiting rod 133 are all made of high-strength metal, and preferably, the first fixing rod 131 and the second fixing rod 132 are welded to the second support beam 120 to ensure the support strength of the support member 130. At the same time, the first fixing rod 131 is connected to the second support beam 120 on the side close to the binding space 1, and the second fixing rod 132 is connected to the second support beam 120 on the side of the binding space 1, and the extension direction of the first fixing rod 131 and the second fixing rod 132 is consistent with the extension direction of the first support beam 110, and the first fixing rod 131 and the second fixing rod 132 are both provided with at least a portion extending out of the second support beam 120, so as to facilitate the connection and abutment of the limiting rod 133.

[0061] The limiting rod 133 is a metal rod body, and one end of the limiting rod 133 is provided with a through hole that can be rotatably connected to the extended portion of the first fixing rod 131. At the same time, the first fixing rod 131 and the limiting rod 133 can be assembled and disassembled by nesting. When the first fixing rod 131 and the limiting rod 133 are assembled, the limiting rod 133 only needs to be pressed against the top of the second fixing rod 132 to achieve the limiting support function of the limiting rod 133 for the transversely tied steel bars.

[0062] Furthermore, a stopper 135 is connected to the end position of the limit rod 133, that is, the end of the limit rod 133 away from the second support beam 120. The stopper 135 is specifically a steel bar baffle. The setting of the stopper 135 can further prevent the steel bars placed on the limit rod 133 from slipping, and can serve as a limit stop for the steel bars located on the limit rod 133.

[0063] Further, see Figure 3 and Figure 7 , a plurality of evenly spaced fixing grooves 134 are also provided on the second support beam 120. Specifically, the fixing grooves 134 are provided at adjacent positions of the second fixing rod 132. The fixing grooves 134 are grooves of a semi-enclosed structure, which facilitates the insertion of the second fixing rod 132 into the fixing grooves 134 to form a mortise and tenon structure. At the same time, a first cross-sectional length X1 of an opening position of the fixing groove 134 is smaller than a cross-sectional diameter of the second fixing rod 132, so that the second fixing rod 132 will not fall out when inserted into the fixing groove 134.

[0064] Among them, in the actual construction process, when the steel cage is built, the setting position of the second fixing rod 132 can be set by itself, and the interval between two adjacent second fixing rods 132 can be adjusted by itself according to the specifications of the steel cage that needs to be built, so that the steel bar binding platform 1 in this embodiment is suitable for the construction of more steel cages of different specifications and shapes.

[0065] Furthermore, since the limiting rod 133 in the present embodiment is resting on the second fixing rod 132, after a long period of construction with a certain strength, the second fixing rod 132 or the limiting rod 133 will inevitably undergo a certain degree of deformation. In the actual construction process, the limiting rod 133 is very likely to deform vertically downward along the direction of gravity, thereby affecting the overall construction accuracy of the steel cage during the construction of the steel cage. Therefore, a plurality of fixing grooves 134 are provided in the present embodiment, so that the position of the second fixing rod 132 can be changed so that the second fixing rod 132 is inserted into a higher position fixing groove 134, thereby increasing the support point of the limiting rod 133, thereby solving the problem of the support point decreasing due to the deformation of the limiting rod 133.

[0066] Embodiment 6:

[0067] See also Figure 1 , Figure 4 and Figure 5 In this embodiment, the platform body 100 includes: a third support beam 140, and the third support beam 140 is provided with a plurality of first installation grooves 141 evenly spaced on the side facing the binding space 1; the lower end of the first support frame 150 is embedded in the first installation groove 141, so that the first support frame 150 is connected to the third support beam 140, and the first support frame 150 is extended toward the binding space 1; wherein, the first support frame 150 is used to support steel bars.

[0068] In this embodiment, the third support beam 140, the first support beam 110, and the second support beam 120 are all made of a hard metal. Figure 5 The third support beam 140 is the bottom beam of the platform body 100 , and the second support beam 120 is connected to both ends of the third support beam 140 .

[0069] The first installation slot 141 is a slot structure, which is convenient for the first support frame 150 to be embedded. Similarly, a plurality of third support beams 140 are provided in parallel, and each third support beam 140 is provided with a first support frame 150. Since the middle of the steel cage formed by the steel bars is a hollow structure during the tying process of the steel bars, the first support frame 150 needs to be provided to support the steel bars at the top of the tying space 1.

[0070] Furthermore, according to specific use conditions and the shape of the steel bars to be tied, the first support frame 150 can be embedded and installed in different first installation grooves 141, so as to meet the support requirements of different positions of the steel cage.

[0071] Embodiment 7:

[0072] See also Figure 1 , Figure 4 and Figure 5 In this embodiment, the first support frame 150 includes: a first connecting rod 151, the lower end of the first connecting rod 151 is vertically engaged with the first mounting groove 141, and a second mounting groove 1510 opening upward is provided at the upper end of the first connecting rod 151, and the first connecting rod 151 extends toward the binding space 1; a second connecting rod 152, the second connecting rod 152 is engaged with the second mounting groove 1510, and the first connecting rod 151 and the second connecting rod 152 are vertically arranged to each other.

[0073] In this embodiment, the first connecting rod 151 is the main supporting rod, and the first connecting rod 151 is preferably two in this embodiment. The parts at the opposite ends of the second connecting rod 152 are engaged and connected with the second mounting groove 1510 set at the top of the first connecting rod 151. The opening of the second mounting groove 1510 is a rectangular opening. Correspondingly, the second connecting rod 152 is preferably a rod body corresponding to the shape of the second mounting groove 1510, that is, a rod body with a square cross-section, so that the second connecting rod 152 is not easy to rotate in the second mounting groove 1510.

[0074] At the same time, the extension direction of the second connecting rod 152 is the same as the extension direction of the third support beam 140, and together with the vertically arranged first connecting rod 151, the steel bars can be supported more effectively.

[0075] The two first connecting rods 151 can further ensure the connection stability between the first connecting rod 151 and the second connecting rod 152 .

[0076] Embodiment 8:

[0077] See also Figure 1 and Figure 4 In this embodiment, a limiting protrusion 1520 is provided at the end of the second connecting rod 152 .

[0078] In this embodiment, in combination with the seventh embodiment, a plurality of second connecting rods 152 are also provided, and the plurality of second connecting rods 152 are arranged in parallel. Preferably, a limiting protrusion 1520 is provided at both ends of the second connecting rod 152, and a metal support rib can be placed on the second connecting rod 152, and the metal support rib rests on the plurality of parallel second connecting rods 152. Figure 5 The setting direction of the metal support ribs is inward along the paper surface.

[0079] Among them, the metal support ribs are used to further cooperate with the second connecting rod 152 to support and limit the steel bars. At the same time, two metal support ribs are also provided, and the two metal support ribs are respectively arranged at both ends of the second connecting rod 152. The function of the limiting protrusion 1520 is to prevent the metal support ribs from slipping.

[0080] Embodiment 9:

[0081] See also Figure 1 , Figure 4 and Figure 5In this embodiment, the first connecting rod 151 includes: a first support rod 1511, one end of which is engaged with the first mounting groove 141; a second support rod 1512, the lower end of which is sleeved with the other end of the first support rod 1511, and the second support rod 1512 can move relative to the first support rod 1511; a fixing member 1513, which is arranged at the sleeved position of the first support rod 1511 and the second support rod 1512, and is used to limit the up and down movement of the second support rod 1512.

[0082] In this embodiment, the second support rod 1512 can be telescopically adjusted relative to the first support rod 1511, so that the first support frame 150 can be suitable for more different usage scenarios.

[0083] See also Figure 5 and Figure 8 When the second support rod 1512 is adjusted to a suitable position, the second support rod 1512 can be fixed by the lock, so that the second support rod 1512 cannot be adjusted up and down relative to the first support rod 1511. Preferably, a plurality of spring steel balls 400 structures arranged along the up and down directions are provided on the side wall surface of the second support rod 1512, and a hole structure 500 for facilitating the embedding of the spring steel balls 400 is provided corresponding to the first support rod 1511, wherein the spring steel balls 400 are squeezed to embed the spring steel balls 400 in the corresponding hole structure 500, so as to realize the fixation of the second support rod 1512 relative to the first support rod 1511. Furthermore, an identification is provided on the second support rod 1512, so that the length of the first connecting rod 151 can be adjusted more accurately. Furthermore, the fixing member 1513 is A lock, the fixing member 1513 is composed of a sleeve 1514 and a screw member 1515, the sleeve 1514 and the screw member 1515 are rotatably matched, when the screw member 1515 is tightened, the second support rod 1512 and the first support rod 1511 are compressed, and a large friction is generated between the first support rod 1511 and the second support rod 1512, so that the fixing member 1513 cooperates with the spring steel ball 400 and the hole structure 500, thereby further making it difficult for the second support rod 1512 to move relative to the first support rod 1511, so that the supporting strength of the first connecting rod 151 in this embodiment is higher.

[0084] Furthermore, in actual use, due to different actual working conditions and usage requirements, the construction and binding process of some steel cages is relatively long, so after the position of the first support frame 150 is fixed, the first support rod 1511 can be welded to the matching position of the first installation groove 141, which can further improve the support stability of the first support frame 150. After the steel cage is built, the first support frame 150 can be dismantled and de-welded.

[0085] Further, see Figure 6 In this embodiment, there are specifically six third support beams 140, and the six third support beams 140 are arranged in parallel. Correspondingly, each third support beam 140 is provided with two first connecting rods 151 arranged at intervals, and the first connecting rods 151 arranged on two adjacent third support beams 140 are staggered, that is, the first connecting rods 151 arranged on the odd-numbered third support beams 140 are arranged close to the right side, and the first connecting rods 151 arranged on the even-numbered third support beams 140 are arranged close to the left side, wherein the third support beams 140 numbered M, O, and Q are odd-numbered, and the third support beams 140 numbered N, P, and R are even-numbered. Among them, similarly, as the first connecting rods 151 are staggered, the second connecting rods 152 are also staggered, so that the limiting protrusions 1520 set on the second connecting rods 152 are staggered. Furthermore, when the steel bar binding platform in this embodiment is in use, two metal support ribs can be set on the left top and the right top of the second connecting rod 152, thereby further improving the supporting strength of the first support frame 150.

[0086] Among them, the staggered first connecting rods 151 enable the first support frame 150 to specifically support the steel cage located on the left or the right, thereby improving the stability of the steel cage when the steel cage is constructed.

[0087] Although the present invention is disclosed as above, the present invention is not limited thereto. Any person skilled in the art can make various changes and modifications without departing from the spirit and scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the scope defined by the claims.

Claims

1. A mobile steel bar tying platform, characterized by: include: The platform body includes a first support beam, a second support beam, a third support beam, a first support frame and a support member. A binding space is provided in the platform body, and the binding space is used for binding steel bars; Rolling components, the number of rolling components is multiple, and the multiple rolling components arranged at the bottom of the platform body are connected to the platform body; A driving assembly, wherein the number of the driving assemblies is multiple, the multiple driving assemblies are connected to the platform body, and the multiple driving assemblies are electrically connected to the multiple rolling assemblies correspondingly; Among them, in the platform body: The first support beam is provided with a plurality of openings, and the plurality of openings are evenly spaced on the first support beam; the plurality of openings are used to fix and limit the steel bars; The third support beam is provided with a plurality of first installation grooves evenly spaced on one side facing the binding space; One end of the first support frame is embedded in the first installation groove so that the first support frame is connected to the third support beam, and the first support frame is extended toward the binding space; the first support frame is used to support the steel bar; There are multiple support members, multiple support members are connected to the second support beam, and multiple support members are evenly spaced. The support member comprises: a first fixing rod, the first fixing rod being fixedly connected to the second supporting beam; a second fixing rod, the second fixing rod being fixedly connected to the second support beam, the first fixing rod and the second fixing rod being arranged on opposite sides of the second support beam; a limiting rod, one end of which is detachably connected to the first fixing rod, the other end of which is extended toward the binding space, and the second fixing rod is used to auxiliary support the limiting rod; Among them, each of the driving components drives the corresponding rolling component to move, so that the steel bar binding platform can be switched in different usage scenarios.

2. The mobile steel bar binding platform according to claim 1 is characterized in that: The rolling assembly comprises: a first moving member connected to the platform body; A second moving member, wherein the second moving member cooperates with the first moving member, and the first moving member can move relative to the second moving member.

3. The mobile steel bar binding platform according to claim 2 is characterized in that: The first moving member includes: a roller member, the roller member is connected to the platform body; The second moving member comprises a slide groove, and the roller member rolls in the slide groove.

4. The mobile steel bar binding platform according to claim 1 is characterized in that: The first support frame comprises: a first connecting rod, one end of which is engaged with the first mounting groove, the other end of which is provided with a second mounting groove, and the first connecting rod is extended toward the binding space; A second connecting rod is embedded in the second mounting groove, and the first connecting rod and the second connecting rod are arranged perpendicular to each other.

5. The mobile steel bar tying platform according to claim 4 is characterized in that: A limiting protrusion is provided at the end of the second connecting rod.

6. The mobile steel bar tying platform according to claim 4 is characterized in that: The first connecting rod comprises: A first support rod, one end of which is engaged and connected with the first mounting groove; a second support rod, the second support rod being sleeved with the other end of the first support rod, and the second support rod being movable relative to the first support rod; A fixing member, wherein the fixing member is arranged at a sleeve connection position between the first support rod and the second support rod, and the fixing member is used to limit the movement of the second support rod.

Citation Information

Patent Citations

  • Reinforcing steel bar binding JIG for variable cross-section concrete box girder

    AU2021105952A4

  • Beam manufacturing roof beam body reinforcement fetal membrane in advance

    CN206216902U