Online evaluation and optimization method of current transformer operating error based on big data deduction

Through the application of big data deduction and neural network models, online evaluation of current transformer errors is achieved, which solves the problem of low error evaluation efficiency in the existing technology and improves the accuracy and applicability of the evaluation.

CN115480204BActive Publication Date: 2024-10-22WUHAN GELANRUO ELECTRICAL TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211203324.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-29
Publication Date
2024-10-22
Estimated Expiration
2042-09-29

AI Technical Summary

Technical Problem

The existing current transformer error evaluation method has a long calibration cycle and low work efficiency, making it difficult to detect errors in time and affecting the fairness of electric energy measurement.

Method used

An online evaluation method of current transformer operating error based on big data deduction is adopted. By collecting and processing three-phase current measurement data, an error estimation neural network model is constructed, and the RBM neural network is used for error estimation to achieve real-time evaluation of the status of the current transformer.

Benefits of technology

It improves the accuracy of current transformer error assessment and gets rid of the dependence on power outages and physical standards. It is suitable for current transformers of different principles or accuracy levels and has the advantages of high accuracy and strong usability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115480204B_ABST
    Figure CN115480204B_ABST
Patent Text Reader

Abstract

The present invention relates to an online evaluation and optimization method for current transformer operation error based on big data deduction, comprising: collecting secondary side three-phase current measurement data of the current transformer on the same busbar in a substation during normal operation, selecting stable segment three-phase current measurement data by using a mean value method; dividing the stable segment three-phase current measurement data into data sets of various ranges by using a current-carrying classification method; acquiring a training data set for training an error estimation neural network model; using the data sets of various ranges to respectively train corresponding error estimation neural network models; inputting the secondary side current data of the current transformer to be evaluated into the corresponding trained error estimation neural network model, and outputting the status information of the current transformer to be evaluated; improving the evaluation accuracy, getting rid of the dependence on power outages and physical standard devices, being applicable to current transformers of different principles or accuracy levels, and having the advantages of high accuracy and strong usability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of online monitoring of electric power metering, and in particular to an online evaluation and optimization method for operating errors of current transformers based on big data deduction. Background Art

[0002] Current transformers are important measuring devices in power systems. Their primary winding is connected in series in the main power transmission and transformation circuit, and their secondary winding is connected to measuring instruments, relay protection or automatic devices according to different requirements. They are used to change the large current of the primary circuit into a small current on the secondary side for safe collection by measurement, control, protection and metering equipment. Their accuracy and reliability are of great significance to the safe operation, control and protection, electric energy measurement and trade settlement of power systems.

[0003] At present, the current transformer error assessment usually adopts the method of offline calibration or online calibration, and the ratio error and angle error of the current transformer are obtained by direct comparison. However, these methods have a long calibration cycle, complex on-site wiring, and low work efficiency. In order to improve the current transformer error state assessment system, it is urgent to establish a current transformer error state assessment method to timely discover the error out-of-tolerance problem, reduce the current transformer error over-limit operation time, guide the transformer detection work, and thus ensure the fairness of electric energy metering. Summary of the invention

[0004] In view of the technical problems existing in the prior art, the present invention provides an online evaluation and optimization method for the operating error of a current transformer based on big data deduction, which improves the evaluation accuracy, gets rid of the dependence on power outages and physical standards, and can be applied to current transformers of different principles or accuracy levels. It has the advantages of high precision and strong usability.

[0005] According to a first aspect of the present invention, there is provided a method for online evaluation and optimization of current transformer operation errors based on big data deduction, comprising: step 1, collecting secondary side three-phase current measurement data of current transformers on the same busbar in a substation during normal operation, and selecting stable segment three-phase current measurement data by using a mean value method;

[0006] Step 2, dividing the three-phase current measurement data of the stable segment into data sets of various ranges using a current classification method;

[0007] Step 3, obtaining a training data set for training the error estimation neural network model according to the physical relationship between the individual error of each current transformer and the current vector sum of the measurement node, wherein the training data set includes an input data set and an output data set of the error estimation neural network model; the input data set is the product data B of the true value of the current transformer error and the turns ratio and the sequence data X of the secondary current value of the current transformer, and the output data set is the rated transformation ratio sequence data T of the current transformer, TX=B;

[0008] Step 4, use the data sets of each range in step 3 to train the corresponding error estimation neural network models respectively; input the secondary side current data of the current transformer to be evaluated into the corresponding trained error estimation neural network model, and output the status information of the current transformer to be evaluated.

[0009] Based on the above technical solution, the present invention can also make the following improvements.

[0010] Optionally, the process of selecting the stable segment three-phase current measurement data by using the mean value method in step 1 includes:

[0011] Performing a time stamp check on the collected current amplitude data, performing mean processing on the missing current amplitude data according to formula (1), and obtaining the three-phase current data of the stable segment;

[0012] (1)

[0013] i is the number of the data point whose time stamp check result is missing, Amp o is the original current amplitude data, and Amp is the calculated value of the missing data points of the current amplitude.

[0014] Optionally, the process of selecting the stable segment three-phase current measurement data in step 1 further includes:

[0015] When the line current is lower than the rated current for more than a certain range, the three-phase current measurement data of 50% and above of the rated range are screened.

[0016] Optionally, in step 2, dividing the stable segment three-phase current measurement data into data sets of various ranges includes: , , and ;

[0017] (2)

[0018] in, .

[0019] Optionally, the method for obtaining the training data set in step 3 includes:

[0020] Step 301, define and determine the ratio difference between the current values ​​of the primary side circuit and the secondary side circuit Phase Difference , i represents the i-th line;

[0021] Step 302: Based on the current measurement value of the secondary side circuit The difference between the ratio The phase difference Calculate the amplitude of the true value of the current in the primary line ; m and r both represent the phase sequence in a three-phase circuit;

[0022] Step 303: according to the amplitude of the true value of the current of the primary side circuit Get the true value of the current in the primary line ;

[0023] Step 304, according to Kirchhoff's current law, we get ; The product TX of the vector X and the vector T represents the product of the sequence data of the secondary current value of each current transformer and the rated transformation ratio sequence data of the corresponding current transformer, and the obtained , that is, TX=0;

[0024] Step 305, calculate and record the product of the true value of the current deviation and the turns ratio as B.

[0025] Optionally, the ratio difference in step 301 ;in, , and are the current measurement values ​​of the primary and secondary sides respectively, and are the number of coil turns on the primary and secondary sides respectively.

[0026] Optionally, the current measurement value of the secondary side circuit in step 302 is ; , It represents the phase of the true value of the current of the primary side line, e represents the natural constant e, and j represents the complex number;

[0027] The current true value of the primary side circuit in step 303 .

[0028] Optionally, step 4 further includes:

[0029] After the secondary side current data of the current transformer to be evaluated is input into the corresponding trained error estimation neural network model, the ratio error estimation value is calculated according to the output of the error estimation neural network model. ;

[0030] Set the ratio error estimate The respective states of the current transformer to be evaluated corresponding to the respective interval ranges, and the corresponding state information is determined according to the interval range to which the ratio error estimation value of the current transformer to be evaluated belongs.

[0031] Optionally, the ratio error estimate ; Represents the corrected transformation ratio of the ith current transformer in the corrected transformation ratio sequence data of the current transformer output by the error estimation neural network model.

[0032] Optionally, various states of the current transformer include: normal, alarm and abnormal.

[0033] The present invention provides an online evaluation and optimization method for current transformer operating errors based on big data deduction, which constructs a physical relationship between the individual errors of each CT and the current vector sum of the measurement value node, takes the deviation distribution as the distribution, and trains the characteristics of the distribution and the current transformation ratio data using the RBM neural network model. The current data and the error are input into the obtained model to obtain the CT error estimation value; the evaluation accuracy is improved, and the dependence on power outages and physical standards is eliminated, and the method can be applied to current transformers of different principles or accuracy levels, and has the advantages of high accuracy and strong usability. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 A flowchart of an online evaluation and optimization method for current transformer operating error based on big data deduction provided by the present invention;

[0035] FIG. 2( a ) is a wiring diagram of an embodiment of a single-phase current transformer;

[0036] FIG2( b ) is an equivalent circuit diagram of FIG2( a ). DETAILED DESCRIPTION

[0037] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.

[0038] Figure 1 A flowchart of an online evaluation and optimization method for current transformer operation error based on big data deduction provided by the present invention is shown in FIG. Figure 1 As shown, the online evaluation optimization method includes:

[0039] Step 1: collect the secondary side three-phase current measurement data of the current transformer on the same busbar in the substation during normal operation, and select the stable segment three-phase current measurement data by using the mean value method.

[0040] Step 2: Use the current classification method to divide the three-phase current measurement data of the stable segment into data sets of various ranges.

[0041] Step 3, according to the physical relationship between the individual error of each current transformer and the current vector sum of the measurement node, a training data set of the training error estimation neural network model is obtained, and the training data set includes an input data set and an output data set of the error estimation neural network model; the input data set is the product data B of the true value of the current transformer error and the turns ratio and the sequence data X of the secondary current value of the current transformer, and the output data set is the rated transformation ratio sequence data T of the current transformer, TX=B.

[0042] Step 4, use the data sets of each range in step 3 to train the corresponding error estimation neural network models respectively; input the secondary side current data of the current transformer to be evaluated into the corresponding trained error estimation neural network model, and output the state information of the current transformer to be evaluated.

[0043] The present invention provides an online evaluation and optimization method for current transformer operating errors based on big data deduction. The method constructs a physical relationship between the individual errors of each CT and the vector sum of the currents of the measurement value nodes, takes the deviation distribution as the distribution, and trains the characteristics of the distribution and the current transformation ratio data using an RBM neural network model. The current data and the error are input into the obtained model to obtain the CT error estimate. The evaluation accuracy is improved, and the dependence on power outages and physical standards is eliminated. The method is applicable to current transformers of different principles or accuracy levels, and has the advantages of high accuracy and strong usability.

[0044] Example 1

[0045] Embodiment 1 provided by the present invention is an embodiment of online evaluation and optimization of current transformer operation error based on big data deduction provided by the present invention. In combination with FIG. 2 (a) and FIG. 2 (b), it can be seen that the embodiment includes:

[0046] Step 1: collect the secondary side three-phase current measurement data of the current transformer on the same busbar in the substation during normal operation, and select the stable segment three-phase current measurement data by using the mean value method.

[0047] In a possible implementation manner, the process of selecting the stable segment three-phase current measurement data by using the mean value method in step 1 includes:

[0048] The current in the power grid fluctuates greatly, and there will be many data breakpoints in the current data. Therefore, the collected current amplitude data are checked in sequence. For the missing current amplitude data, the improved mean method is used according to formula (1) to solve the current data breakpoint problem.

[0049] (1)

[0050] i is the number of the data point whose time stamp check result is missing, Amp o is the original current amplitude data, and Amp is the calculated value of the missing data points of the current amplitude.

[0051] In a possible implementation manner, the process of selecting the stable segment three-phase current measurement data in step 1 further includes:

[0052] When the line current is lower than the rated current for more than a certain range, the three-phase current measurement data of 50% and above of the rated range are screened.

[0053] For current transformers, when the line current is lower than the rated current, the current transformer itself has a large error and the data quality is low, so current data of 50% and above of the rated range is screened out.

[0054] Step 2: Use the current classification method to divide the three-phase current measurement data of the stable segment into data sets of various ranges.

[0055] In a possible implementation manner, dividing the stable segment three-phase current measurement data into data sets of various ranges in step 2 includes: , , and .

[0056] In order to accurately evaluate the metering status of the transformer under different current amplitudes, this patent adopts the current classification method to classify the stable current data according to the rated current. The percentages are divided into four sets:

[0057] (2)

[0058] in, .

[0059] Step 3, according to the physical relationship between the individual error of each current transformer and the current vector sum of the measurement node, a training data set of the training error estimation neural network model is obtained, and the training data set includes an input data set and an output data set of the error estimation neural network model; the input data set is the product data B of the true value of the current transformer error and the turns ratio and the sequence data X of the secondary current value of the current transformer, and the output data set is the rated transformation ratio sequence data T of the current transformer, TX=B.

[0060] In a possible implementation manner, the method for obtaining the training data set in step 3 includes:

[0061] Step 301, define and determine the ratio difference between the current values ​​of the primary side circuit and the secondary side circuit Phase Difference , i represents the i-th line.

[0062] Step 302: Based on the current measurement value of the secondary side circuit The difference between the ratio The phase difference Calculate the amplitude of the true value of the current in the primary line ; m and r both represent the phase sequence in a three-phase circuit, that is, m and r represent phase A, phase B or phase C.

[0063] Step 303: according to the amplitude of the true value of the current of the primary side circuit Get the true value of the current in the primary line .

[0064] Step 304, according to Kirchhoff's current law, we get ; The product TX of the vector X and the vector T represents the product of the sequence data of the secondary current value of each current transformer and the rated transformation ratio sequence data of the corresponding current transformer, and the obtained , that is, TX=0.

[0065] Step 305 , calculate and record the product of the true value of the current deviation and the turns ratio (ie, the impact on the primary side) as B.

[0066] Specifically, FIG2( a ) is a wiring diagram of an embodiment of a single-phase current transformer, and FIG2( b ) is an equivalent circuit diagram of FIG2( a ).

[0067] Define the current transformer ratio difference and phase difference:

[0068] Rated current ratio is:

[0069] (3)

[0070] Using the magnetic potential balance, we can get:

[0071] (4)

[0072] Because there is , there will be a ratio difference and phase difference between the primary current value and the secondary current value, and the ratio error is:

[0073] (5)

[0074] in, is the rated current ratio, and are the current measurement values ​​of the primary and secondary sides respectively, and are the number of coil turns on the primary and secondary sides respectively.

[0075] Calculate the relationship between the three-phase current measurement value and the current measurement true value.

[0076] The three-phase current measurement values ​​of the evaluation group constitute the test data set, which consists of the true value of each line current on the same bus and the individual errors (ratio difference, phase difference) of different CTs. Determined by Kirchhoff's current law: the sum of the node current vector constructed by the true value of each line current on the same bus is 0, but because the measurement data set contains the individual error of each CT, and the individual errors are different due to the physical differences of each CT, the sum of the node current vector constructed by the measurement value is not 0, so the node current vector sum is related to the individual errors of each CT.

[0077] The true value of the current in the primary line is recorded as:

[0078] (6)

[0079] in, Indicates the true value of the current in the primary line, represents the amplitude of the true value of the current in the primary line, r represents the phase sequence (r=A, B, C), i represents the i-th line, Indicates the phase of the true value of the current in the primary line.

[0080] The measured current value of the secondary line is recorded as:

[0081] (7)

[0082] in, is the true value of each line current, is the measured value of each line current, is the corresponding ratio difference, is the corresponding phase difference, there are n lines in total, m represents the phase sequence (m=A, B, C), , It represents the phase of the true value of the current in the primary line, e represents the natural constant e, and j represents a complex number.

[0083] According to Kirchhoff's current law, we have:

[0084] (8)

[0085] in: is the true value of each line current, is the measured value of each line current, is the corresponding ratio difference, is the corresponding phase difference, with a total of n lines.

[0086] According to Kirchhoff's current law, a judgment model is established.

[0087] Based on the current classification, the following operations are performed on the four data sets to establish the model. According to Kirchhoff's current law Ideally, the current flowing through the node is 0. The three-phase current data Amp (i) in the stable stage is recorded as xi (i <= n), n is the number of lines, that is, the number of current transformers, and ti is the transformation ratio of the secondary side to the primary side (rated transformation ratio). According to Kirchhoff's current law KCL, , use the product TX of vector X and vector T to represent the product of the sequence data of the secondary current value of each current transformer and the rated transformation ratio sequence data of the corresponding current transformer, that is, TX=0. Record the data of the current transformer offline detection in this area, obtain the true value E of the current transformer error (ratio difference), calculate and count the rated transformation ratio sequence data of the current transformer multiplied by the sequence data of the secondary current value, that is, TX, calculate and record the product of the true value of the current deviation and the turns ratio (that is, the impact on the primary side) as B, ( ), which is a normal distribution with mean μ and standard deviation σ, that is, B~N(μ,σ), T, X, B are all wide-area CT data at a certain moment, and from the above, we can get TX=B.

[0088] Step 4, use the data sets of each range in step 3 to train the corresponding error estimation neural network models respectively; input the secondary side current data of the current transformer to be evaluated into the corresponding trained error estimation neural network model, and output the state information of the current transformer to be evaluated.

[0089] The T, X, and B data at different times are used as data sets to train the restricted Boltzmann machine (RBM) neural network model. This model is a special topological structure in the neural network. This model is suitable for distributed input. Although the performance is poor, the amount of data in this scenario will not affect the efficiency. X and B~N(μ, σ) are used as input data, and T is used as output data. The model M is obtained through training. According to the results of current classification, four models are obtained, which are denoted as M1, M2, M3 and M4 respectively.

[0090] In a possible implementation manner, step 4 further includes:

[0091] After the secondary current data of the current transformer to be evaluated is input into the corresponding trained error estimation neural network model, the ratio error estimation value is calculated according to the output of the error estimation neural network model. .

[0092] When predicting the state of the transformer, the corresponding model M is imported according to the result of the current classification, that is, B and the secondary current sequence data X' of the transformer at the time to be tested are imported, and T' is output, which is the corrected transformation ratio, and the ratio error estimate is calculated.

[0093] In one possible embodiment, the ratio error estimate ; Represents the corrected transformation ratio of the i-th current transformer in the corrected transformation ratio sequence data of the current transformer output by the error estimation neural network model.

[0094] Set the ratio error estimate The respective states of the current transformer to be evaluated corresponding to the respective interval ranges are determined, and the corresponding state information is determined according to the interval range to which the ratio error estimation value of the current transformer to be evaluated belongs.

[0095] In a possible embodiment, various states of the current transformer include: normal, warning, and abnormal.

[0096] Specifically, according to the current classification results, the current transformer secondary current data is used correspondingly using models M1, M2, M3 and M4 to calculate the error estimate , and output the current transformer status information through the threshold method.

[0097] Set the ratio error estimate An embodiment of each state of the current transformer to be evaluated corresponding to each interval range may be:

[0098] 1) When the error When it falls within the interval [-0.1776%, 0.1776%], the probability of the corresponding CT being out of tolerance will not be higher than 38.26%, giving "normal" information.

[0099] 2) When the error When it falls into the interval [-0.2735%, -0.1776%), (0.1776%, 0.2735%], the probability of the corresponding CT being out of tolerance will be higher than 38.26% but not higher than 83.65%, and an "alarm" message will be given.

[0100] 3) When the error When it falls into the interval [-∞,-0.2735%), (0.2735%,∞], the probability of the corresponding CT being out of tolerance will be higher than 83.65%, and an "abnormal" message will be given.

[0101] An embodiment of the present invention provides an online evaluation and optimization method for current transformer operating errors based on big data deduction, which constructs a physical relationship between each CT individual error and the current vector sum of the measurement value node, takes the deviation distribution as the distribution, and uses the characteristics of the distribution and the current ratio data to train the RBM neural network model, and inputs the current data and the error into the obtained model to obtain the CT error estimate; the evaluation accuracy is improved, and the dependence on power outages and physical standards is eliminated, and it can be applied to current transformers of different principles or accuracy levels, and has the advantages of high precision and strong usability.

[0102] It should be noted that in the above embodiments, the description of each embodiment has its own emphasis, and for parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0103] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0104] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded computer, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0105] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0106] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0107] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.

[0108] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A method for online evaluation and optimization of current transformer operating error based on big data deduction, characterized in that: The online evaluation optimization method comprises: Step 1: Collect the secondary side three-phase current measurement data of the current transformer on the same busbar in the substation during normal operation, and select the stable segment three-phase current measurement data using the averaging method; Step 2: using a current classification method to divide the three-phase current measurement data of the stable segment into data sets of various ranges; Step 3: Obtain a training data set for training the error estimation neural network model based on the physical relationship between the individual error of each current transformer and the vector sum of the measurement node currents. The training data set includes an input data set and an output data set of the error estimation neural network model; the input data set is the product data B of the true value of the current transformer error and the turns ratio and the sequence data X of the secondary current value of the current transformer; the output data set is the rated transformation ratio sequence data T of the current transformer, TX=B; Step 4: Use the data sets of each range in step 2 to train the corresponding error estimation neural network models; input the secondary side current data of the current transformer to be evaluated into the corresponding trained error estimation neural network model, and output the status information of the current transformer to be evaluated.

2. The online evaluation optimization method according to claim 1, characterized in that: The process of selecting the stable segment three-phase current measurement data using the mean value method in step 1 includes: Perform time stamp check on the collected current amplitude data, perform mean processing on the missing current amplitude data according to formula (1), and obtain the three-phase current data of the stable segment; (1) i is the number of the data point whose time stamp check result is missing, Amp o is the original current amplitude data, and Amp is the calculated value of the missing data point of current amplitude.

3. The online evaluation optimization method according to claim 1, characterized in that: The process of selecting the stable segment three-phase current measurement data in step 1 further includes: When the line current is lower than the rated current and exceeds the set range, the three-phase current measurement data of more than 50% of the rated range is screened.

4. The online evaluation optimization method according to claim 1, characterized in that: The step 2 of dividing the stable segment three-phase current measurement data into data sets of various ranges includes: 、 、 and ; (2) in, .

5. The online evaluation optimization method according to claim 1, characterized in that: The method for obtaining the training data set in step 3 includes: Step 301: Define and determine the ratio difference between the current values ​​of the primary side circuit and the secondary side circuit. Phase difference , i represents the i-th line; Step 302: Based on the current measurement value of the secondary side circuit The difference between the ratio The phase difference Calculate the amplitude of the true value of the current in the primary side line ; m and r both represent the phase sequence in a three-phase circuit; Step 303: according to the amplitude of the true value of the current of the primary side circuit Get the true value of the current in the primary side line ; Step 304: According to Kirchhoff's current law, ; The product TX of vector X and vector T represents the product of the sequence data of the secondary current value of each current transformer and the rated transformation ratio sequence data of the corresponding current transformer, and the result is , that is, TX=0; Step 305: Calculate and record the product of the true value of the current deviation and the turns ratio as B.

6. The online evaluation optimization method according to claim 5, characterized in that: The ratio difference in step 301 ;in, , and are the current measurement values ​​of the primary and secondary sides respectively, and are the number of coil turns on the primary and secondary sides respectively.

7. The online evaluation optimization method according to claim 5, characterized in that: The current measurement value of the secondary side circuit in step 302 ; , It represents the phase of the true value of the current in the primary side line, e represents the natural constant e, and j represents a complex number; The true value of the current of the primary side circuit in step 303 .

8. The online evaluation optimization method according to claim 5, characterized in that: The step 4 further comprises: After the secondary side current data of the current transformer to be evaluated is input into the corresponding trained error estimation neural network model, the ratio error estimation value is calculated according to the output of the error estimation neural network model. ; Set the ratio error estimate The respective states of the current transformer to be evaluated corresponding to the respective interval ranges are determined, and the corresponding state information is determined according to the interval range to which the ratio error estimation value of the current transformer to be evaluated belongs.

9. The online evaluation optimization method according to claim 8, characterized in that: The ratio error estimate ; Represents the corrected transformation ratio of the i-th current transformer in the corrected transformation ratio sequence data of the current transformer output by the error estimation neural network model.

10. The online evaluation optimization method according to claim 8, characterized in that: The various states of the current transformer include: normal, alarm and abnormal.