Method, device, equipment and medium for repairing nuclear power plant equipment failure

CN115586762BActive Publication Date: 2026-07-24SHANDONG NUCLEAR POWER CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
SHANDONG NUCLEAR POWER CO LTD
Filing Date
2022-11-03
Publication Date
2026-07-24

Smart Images

  • Figure CN115586762B_ABST
    Figure CN115586762B_ABST
Patent Text Reader

Abstract

The application discloses a kind of nuclear power plant equipment fault overhauling method, device, equipment and medium.The method comprises: when detecting the fault overhauling request of nuclear power plant equipment, control nuclear reactor to enter hot shutdown state, and control main pump to be in outage state;Based on the passive natural circulation of primary loop system, maintain nuclear reactor in hot shutdown state, and perform repair work;After repair work is completed, control main pump is switched from outage state to start state, and control nuclear reactor is switched from hot shutdown state to operating state.The technical scheme of the embodiment, after nuclear power plant shutdown, by using the passive natural circulation ability of primary loop system, maintain nuclear reactor in hot shutdown state, can shorten the temporary shutdown time when nuclear power plant equipment fault is overhauled, can improve the power generation efficiency of nuclear power unit.
Need to check novelty before this filing date? Find Prior Art