An economic optimization scheduling method for wind-solar-storage-hydrogen production systems considering wind and solar curtailment penalties

By improving the adaptive simulated annealing particle swarm optimization algorithm and combining it with the cost of wind and solar curtailment penalties, the day-ahead scheduling of the wind-solar-storage-hydrogen production system is optimized. This solves the problem of the particle swarm optimization algorithm getting stuck in local optima in the wind-solar-storage-hydrogen production system, and improves the system's economy and the practical applicability of the scheduling.

CN115600858BActive Publication Date: 2026-11-10NORTHWEST ENGINEERING CORPORATION LIMITED
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211209866.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-30
Publication Date
2026-11-10
Estimated Expiration
2042-09-30

AI Technical Summary

Technical Problem

In existing technologies, particle swarm optimization algorithms are prone to getting stuck in local optima in the optimization and scheduling of wind, solar, energy storage and hydrogen production systems, and the objective function and constraints do not conform to actual production, resulting in low system economic efficiency.

Method used

An adaptive simulated annealing particle swarm optimization algorithm is adopted to improve the traditional PSO algorithm. Combined with the cost of wind and solar curtailment penalties, a day-ahead scheduling model for the hydrogen production system is established to optimize the solution of the daily operating cost of the wind, solar, storage and hydrogen production system.

Benefits of technology

It improves the overall economic efficiency of wind, solar, energy storage and hydrogen production systems, and the dispatching method is more in line with actual production, which can truly reflect the intermittency of new energy power generation and achieve economic dispatch.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115600858B_ABST
    Figure CN115600858B_ABST
Patent Text Reader

Abstract

This invention provides an economic optimization scheduling method for a wind-solar-storage-hydrogen production system considering the curtailment penalty, comprising the following steps: S1 establishing mathematical models for each part of the wind-solar-storage-hydrogen production system; S2 establishing a day-ahead optimization scheduling model for the wind-solar-storage-hydrogen production system considering the cost of wind and solar curtailment penalties; S3 using an adaptive simulated annealing particle swarm optimization algorithm to optimize and solve the scheduling model; S4 setting the wind-solar-storage-hydrogen production system based on the grid power purchase, battery operating power, wind power generation, photovoltaic power generation, and electrolyzer operating power obtained from the optimization solution for each time period, thereby achieving economic optimization scheduling of the wind-solar-storage-hydrogen production system. This invention considers the cost of wind and solar curtailment penalties and adjusts the constraints, taking into account the impact of time-of-use electricity prices and demand-side hydrogen response on the day-ahead scheduling model of the wind-solar-storage-hydrogen production system, which not only makes the scheduling method more in line with actual production but also improves the overall economic efficiency of the system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of new energy hydrogen production, storage and optimization scheduling technology, and specifically relates to an economic optimization scheduling method for wind, solar and energy storage hydrogen production systems that takes into account the penalties for wind and solar curtailment. Background Technology

[0002] In recent years, facing the dwindling fossil fuel resources and the resulting environmental problems such as air pollution and climate change, steadily promoting the optimization of the energy structure and achieving the orderly replacement of fossil fuels with renewable energy has become a consensus among countries worldwide regarding energy policy. However, due to limitations in current technological capabilities and power infrastructure, renewable energy still falls short in maintaining the stability of power supply. Renewable energy power generation is greatly affected by natural conditions, exhibiting intermittent power generation characteristics, which can adversely affect the stability and security of the power grid system. In the power system, energy storage technology is an effective technology for solving the problems caused by the grid connection of large-scale renewable energy power generation. Unlike the energy storage characteristics of traditional batteries, hydrogen energy storage can electrolyze water to produce hydrogen from abundant renewable energy power and store it, thereby achieving large-scale energy storage in the renewable energy transition. Electrolysis of water to produce hydrogen is a core technology in large-scale new energy hydrogen production.

[0003] Domestic and international scholars have conducted extensive research on improving the efficiency of water electrolysis equipment and optimizing the scheduling methods of wind, solar, energy storage, and hydrogen production systems. Research on optimized scheduling mainly focuses on two aspects: optimizing the structure of the wind, solar, energy storage, and hydrogen production system and improving optimization algorithms. The ultimate goal of optimization is to improve the system's economic efficiency. Most improvements to optimization algorithms focus on optimizing convergence speed and accuracy.

[0004] Particle Swarm Optimization (PSO) has achieved excellent results in the optimal scheduling of wind, solar, energy storage, and hydrogen production systems. PSO is a population-based stochastic search algorithm inspired by the natural behavior of bird flocks searching for food. Similar to other search algorithms, PSO starts with a randomly generated swarm of possible solutions. Particles determine their next move based on their own experience and the best experience of their peers, iteratively calculating and converging to the global optimum. Each particle in the swarm is a potential solution to the problem and corresponds to a fitness value determined by its position. The particle's velocity determines its direction and distance of motion, dynamically adjusting based on its own and other particles' movements, thus optimizing the individual particle within the feasible solution space.

[0005] The PSO algorithm has shown good performance in the optimal scheduling of wind, solar, energy storage, and hydrogen production systems. However, when using the traditional PSO algorithm to solve the model, it gets stuck in local optima during the iterative calculation process, failing to obtain the global optimum. Moreover, the determination of the objective function and constraints in existing technologies does not conform to actual production, resulting in low system economics. Summary of the Invention

[0006] The purpose of this invention is to provide an economic optimization scheduling method for a wind-solar-storage-hydrogen production system that considers the penalty for wind and solar curtailment. A day-ahead processing model for the hydrogen production system with the lowest daily operating cost is established. The traditional PSO algorithm is improved by utilizing the characteristics of the simulated annealing algorithm. The improved adaptive simulated annealing particle swarm algorithm is used to solve the problem, thereby obtaining the day-ahead scheduling scheme for the hydrogen production system with the lowest daily operating cost, overcoming the above-mentioned technical problems existing in the prior art.

[0007] Therefore, the technical solution provided by the present invention is as follows:

[0008] An economic optimization scheduling method for wind-solar-storage-hydrogen production systems that considers wind and solar curtailment penalties includes the following steps:

[0009] S1: Establish mathematical models for each part of the wind-solar-storage-hydrogen production system, including photovoltaic power generation model, wind power generation model, battery energy storage equipment model, and alkaline electrolyzer model;

[0010] S2: Considering the cost of wind and solar curtailment penalties, and based on the mathematical models of each part of the wind, solar, energy storage and hydrogen production system in S1, obtain the daily operating cost of each part, take the sum of the daily operating costs of the system as the objective function, establish an optimization scheduling model, and determine the various constraints when the system is running normally, including system power balance constraints, battery energy storage system constraints, grid interaction power constraints and hydrogen production constraints.

[0011] S3: The adaptive simulated annealing particle swarm optimization algorithm is used to optimize and solve the scheduling model, and the grid power purchase, battery operating power, wind power generation, photovoltaic power generation and electrolyzer operating power corresponding to the minimum daily operating cost of the wind-solar-storage-hydrogen production system for 24 hours in a typical day are obtained.

[0012] S4: Based on the power purchased by the grid, the operating power of the battery, the power of the wind power generation, the power of the photovoltaic power generation, and the operating power of the electrolyzer obtained in S3, the wind-solar-storage-hydrogen production system is set to achieve economic optimization scheduling of the wind-solar-storage-hydrogen production system.

[0013] The photovoltaic power generation model and the wind power generation model in S1 are as follows:

[0014] S11: Photovoltaic power generation model:

[0015]

[0016] In the formula, Let G be the output power of the photovoltaic array at a light intensity G(t); STC T STC P STCThese represent the light intensity, photovoltaic array temperature, and maximum output power under standard test conditions, respectively; k is the temperature coefficient, typically k = -0.45; T(t) is the surface temperature of the photovoltaic array at time t.

[0017] S12: Wind power generation model:

[0018] In the wind turbine model, the input wind speed v and the predicted output power P of a single wind turbine t The relationship is:

[0019]

[0020] In the formula: v is the actual wind speed at the hub height of the wind turbine, m / s; v i For the cut-in wind speed; v o To cut off the wind speed; v n Rated wind speed; P n ρ is the rated power of the wind turbine, in kW; ρ is the air density, in kg / m³. 3 R represents the length of the wind turbine blade, in meters.

[0021] The total dispatchable wind power predicted for time period t is expressed as:

[0022]

[0023] In the formula: M is the total number of wind turbine units; Let be the predicted output power of the j-th wind turbine at time t; Δt represents the adjacent time interval.

[0024] The battery energy storage device model and the alkaline electrolyzer model in S1 are as follows:

[0025] S13: Battery energy storage device model:

[0026] Battery storage devices play a role in peak shaving and valley filling, and their mathematical model can be expressed as:

[0027]

[0028] In the formula: E(t) is the total energy of the battery during time period t, kW·h; σ is the self-discharge efficiency of the battery; and The charging and discharging power of the battery device during time period t are respectively, in kW; η ch and η dis These refer to the charging and discharging efficiencies of the battery device, respectively.

[0029] S14: Alkaline electrolytic cell model:

[0030] Q el =P el ·Δt·ρ·ηel

[0031] In the formula: Q el For hydrogen production, m 3 ;P el Δt is the input power of the alkaline electrolyzer, in kW; Δt is the operating time of the electrolyzer, in h; ρ is the electro-hydrogen conversion parameter of the electrolyzer, in m. 3 / kW·h;η el The efficiency of the electrolytic cell is %.

[0032] The optimal scheduling model is established in S2 as follows:

[0033] C day =C new +C pen +C ele +C sto +C grid +C com

[0034] In the formula, C day C new C pen C ele C sto C grid C com These are the daily operating costs of the system dispatch, the operating costs of wind and solar power plants, the cost of wind and solar curtailment penalties, the cost of hydrogen production from alkaline electrolyzers, the maintenance costs of energy storage devices, the cost of purchasing electricity from the grid, and the cost of hydrogen storage in hydrogen storage tanks.

[0035] Among them, the operating cost C of wind power and photovoltaic power plants new =K w P w (t)+K pv P pv (t), where: K w K pv The operating costs of wind power and photovoltaic power plants are respectively, in yuan / kW; P w (t), P pv (t) represents the dispatch power of wind power and photovoltaic power during time period t, respectively, in kW;

[0036] Curtailment of wind and solar power penalties In the formula: k w k pv These are the penalty cost coefficients for wind curtailment and solar curtailment, respectively.

[0037]

[0038] These represent the amount of wind and solar power curtailed during time period t, respectively.

[0039] The cost of hydrogen production using an alkaline electrolyzer is C.ele (t)=P el (t)×C per_ele +C water In the formula: P el (t) represents the input power of the alkaline electrolyzer during time period t, in kW; C per_ele The operating cost of an alkaline electrolyzer is RMB / kWh; C water Water consumption cost, yuan / Nm 3 ;

[0040] Battery energy storage device maintenance cost C sto (t)=P bat (t)×C per_bat In the formula, P bat (t) represents the charging / discharging power of the battery, P bat (t)=E(t) / t;C per_bat The unit power maintenance cost of the battery device is expressed in yuan / kWh.

[0041] Hydrogen storage tank hydrogen storage cost C com (t)=Q el ×C per_com In the formula: Q el For hydrogen production, m 3 C per_com The unit cost of hydrogen storage in a hydrogen storage tank is RMB / Nm³. 3 ;

[0042] Electricity purchase cost C grid (t)=P grid (t)×C per_grid In the formula: P grid (t) represents the power purchased by the system from the grid during time period t, in kW; C per_grid The time-of-use electricity price for industrial electricity sold by the power grid is RMB / kWh.

[0043] The system power balance constraints, battery energy storage system constraints, grid interaction power constraints, and hydrogen production constraints in S2 are as follows:

[0044] S221: System power balance constraint:

[0045]

[0046]

[0047] In the formula: P renew (t) represents the output of renewable energy, specifically the maximum output power of wind-solar hybrid power generation during time period t, in kW; P bat (t) represents the charging / discharging power of the battery during time period t, where the battery discharging power is positive and the charging power is negative, denoted by kW; P grid(t) represents the power purchased by the system from the grid during time period t, in kW; P el (t) represents the input power of the alkaline electrolyzer during time period t, in kW;

[0048] S222: Constraints on battery energy storage systems:

[0049] The capacity of a battery is related to its capacity in the previous time period, as well as the charging / discharging power and self-discharge during that period. The state of charge (SOC) of the battery in time period t is:

[0050]

[0051] In the formula: η represents the state of charge of the battery during time period t; σ represents the self-discharge rate of the battery; η represents the state of charge of the battery during time period t. c Battery charge / discharge efficiency; E bat The total capacity of the battery is expressed in kW·h. Same as P bat (t);

[0052] S223: Power grid interaction constraints:

[0053]

[0054] In the formula: and These represent the minimum and maximum power that the system purchases from the grid, respectively, in kW;

[0055] S224: Electrolytic cell operating power constraint:

[0056]

[0057] In the formula: and These are the minimum and maximum operating power (kW) of the alkaline electrolyzer during production.

[0058] S225: Hydrogen Production Constraints

[0059]

[0060] In the formula: The remaining hydrogen storage capacity of the system during time period t is expressed in Nm³. 3 ; The hydrogen production rate of the alkaline electrolyzer during time period t is expressed in Nm³. 3 / h; For the demand-side hydrogen load during period t, Nm 3 ; The remaining hydrogen capacity of the system at the end of the daytime operation plan, in Nm 3 .

[0061] The constraints of the S222 battery energy storage system also include upper and lower limits for charge and discharge power, and upper and lower limits for battery state of charge, as detailed below:

[0062] The upper and lower limits of battery charging and discharging power are constrained as follows:

[0063]

[0064] In the formula: and These are the battery charging power limit and discharge power limit, respectively, in kW;

[0065] The upper and lower limits of the battery's state of charge are constrained as follows:

[0066]

[0067] In the formula: and These are the minimum and maximum state-of-charge values ​​of the battery, respectively.

[0068] The optimization process of the scheduling model using the adaptive simulated annealing particle swarm optimization algorithm is as follows:

[0069] Step 1: Set initial parameters, including population size N, maximum number of iterations M, variable dimension D, initial temperature, and temperature decay coefficient;

[0070] Step 2: Input the parameters of wind power, photovoltaic, energy storage battery, and electrolytic cell equipment to generate initial particles, including particle position and velocity;

[0071] Step 3: Calculate the fitness value of each particle in the initial population, find the optimal value of the objective function, and record the best position of the individual and the best position globally;

[0072] Step 4: Set the initial temperature for simulated annealing, and adaptively change ω, c1, and c2; ω is the inertia weighting coefficient; c1 represents the self-cognitive factor; c2 represents the social cognitive factor;

[0073] Step 5: Perform a simulated annealing algorithm neighborhood search on the particles according to the Metropolis criterion;

[0074] Step 6: Update the optimal positions of each particle and the global optimal positions of the population using the velocity update formula;

[0075] Step 7: Determine if the maximum number of iterations has been reached. If not, return to step S34; otherwise, stop iterating.

[0076] Step 8: Output the current optimal particle, i.e. the optimization result, and the algorithm terminates.

[0077] The speed update formula in step 6 is:

[0078]

[0079] In the formula, This represents the velocity of the i-th particle in the (k+1)-th iteration; and These represent the velocity and position of the i-th particle in the k-th iteration, respectively; ω is the inertia weight coefficient; c1 represents the self-cognition factor; c2 represents the social cognition factor; r1 and r2 are random numbers; p ibest Let be the optimal position for the i-th particle.

[0080] The beneficial effects of this invention are:

[0081] The present invention provides an economic optimization scheduling method for wind-solar-storage-hydrogen production systems that considers the penalty for wind and solar curtailment. Prioritizing economic efficiency, the method incorporates the cost of wind and solar curtailment penalties into the objective function, establishing a day-ahead scheduling model for the hydrogen production system that minimizes the system's daily operating cost. Based on this, the constraints are adjusted to consider the impact of time-of-use electricity pricing and demand-side hydrogen response on the day-ahead scheduling model of the wind-solar-storage-hydrogen production system. This not only makes the scheduling method more consistent with actual production but also improves the overall economic efficiency of the system.

[0082] This invention employs a parameter adaptive algorithm, utilizing an improved adaptive simulated annealing particle swarm optimization algorithm to obtain the day-ahead scheduling scheme for the hydrogen production system with the lowest daily operating cost. This optimized scheduling method considers the intermittency of renewable energy generation in real power production, and can more realistically reflect the wind and solar hydrogen production process, which is conducive to the realization of economical scheduling.

[0083] Further details will be provided below. Attached Figure Description

[0084] Figure 1 This is a flowchart of the adaptive simulated annealing particle swarm algorithm of the present invention;

[0085] Figure 2 This is a structural diagram of a wind, solar, energy storage, and hydrogen production system;

[0086] Figure 3 These are curves from photovoltaic power generation models and wind power generation models;

[0087] Figure 4 This is the hydrogen load demand curve;

[0088] Figure 5 This is the day-ahead scheduling plan for the wind, solar, energy storage, and hydrogen production system;

[0089] Figure 6 This is a schematic diagram showing the hydrogen production rate of an alkaline electrolyzer and the remaining hydrogen capacity in a hydrogen storage tank.

[0090] Figure 7 This is a schematic diagram of the state of charge of a battery energy storage device. Detailed Implementation

[0091] The following specific embodiments illustrate the implementation of the present invention. Those skilled in the art can easily understand other advantages and effects of the present invention from the content disclosed in this specification.

[0092] Exemplary embodiments of the present invention are now described; however, the present invention may be embodied in many different forms and is not limited to the embodiments described herein. These embodiments are provided to fully and completely disclose the invention and to fully convey its scope to those skilled in the art. The terminology used in the exemplary embodiments is not intended to limit the invention.

[0093] Unless otherwise stated, the terms used herein (including technical terms) have their common meaning as understood by one of ordinary skill in the art. Furthermore, it is understood that terms defined in commonly used dictionaries should be understood to have a meaning consistent with the context of their relevant field, and not to be interpreted as having an idealized or overly formal meaning.

[0094] Example 1:

[0095] This embodiment provides an economic optimization scheduling method for a wind-solar-storage-hydrogen production system that considers the penalty for wind and solar curtailment, including the following steps:

[0096] S1: Establish mathematical models for each part of the wind-solar-storage-hydrogen production system, including photovoltaic power generation model, wind power generation model, battery energy storage equipment model, and alkaline electrolyzer model;

[0097] S2: Considering the cost of wind and solar curtailment penalties, and based on the mathematical models of each part of the wind, solar, energy storage and hydrogen production system in S1, obtain the daily operating cost of each part, take the sum of the daily operating costs of the system as the objective function, establish an optimization scheduling model, and determine the various constraints when the system is running normally, including system power balance constraints, battery energy storage system constraints, grid interaction power constraints and hydrogen production constraints.

[0098] S3: The adaptive simulated annealing particle swarm optimization algorithm is used to optimize and solve the scheduling model, and the grid power purchase, battery operating power, wind power generation, photovoltaic power generation and electrolyzer operating power corresponding to the minimum daily operating cost of the wind-solar-storage-hydrogen production system for 24 hours in a typical day are obtained.

[0099] S4: Based on the power purchased by the grid, the operating power of the battery, the power of the wind power generation, the power of the photovoltaic power generation, and the operating power of the electrolyzer obtained in S3, the wind-solar-storage-hydrogen production system is set to achieve economic optimization scheduling of the wind-solar-storage-hydrogen production system.

[0100] The present invention provides an economic optimization scheduling method for wind-solar-storage-hydrogen production systems that considers the penalty for curtailment of wind and solar power. With economic efficiency as the priority objective, the method incorporates the cost of curtailment penalty into the objective function and establishes a day-ahead scheduling model for the hydrogen production system that minimizes the daily operating cost of the system. Based on this model, the constraints are adjusted, which not only makes the scheduling method more in line with actual production, but also improves the overall economic efficiency of the system.

[0101] Example 2:

[0102] Based on Example 1, this example provides an economic optimization scheduling method for a wind-solar-storage-hydrogen production system that considers wind and solar curtailment penalties. In S1, the photovoltaic power generation model and the wind power generation model are as follows:

[0103] S11: Photovoltaic power generation model:

[0104] The output power of a photovoltaic (PV) cell module varies with uncertain factors such as sunlight intensity and temperature. The output power of a photovoltaic array is:

[0105]

[0106] In the formula, Let G be the output power of the photovoltaic array at a light intensity G(t); STC T STC P STC These represent the light intensity, photovoltaic array temperature, and maximum output power under standard test conditions, respectively; k is the temperature coefficient, typically k = -0.45; T(t) is the surface temperature of the photovoltaic array at time t.

[0107] S12: Wind power generation model:

[0108] In the wind turbine model, the input wind speed v and the predicted output power P of a single wind turbine t The relationship is:

[0109]

[0110] In the formula: v is the actual wind speed at the hub height of the wind turbine, m / s; v i For the cut-in wind speed; v o To cut off the wind speed; v n Rated wind speed; P n ρ is the rated power of the wind turbine, in kW; ρ is the air density, in kg / m³. 3 R represents the length of the wind turbine blade, in meters.

[0111] The total dispatchable wind power predicted for time period t is expressed as:

[0112]

[0113] In the formula: M is the total number of wind turbine units; Let be the predicted output power of the j-th wind turbine at time t; Δt represents adjacent time intervals.

[0114] S13: Battery energy storage device model:

[0115] Battery storage devices play a role in peak shaving and valley filling, and their mathematical model can be expressed as:

[0116]

[0117] In the formula: E(t) is the total energy of the battery during time period t, kW·h; σ is the self-discharge efficiency of the battery; and The charging and discharging power of the battery device during time period t are respectively, in kW; η ch and η dis These refer to the charging and discharging efficiencies of the battery device, respectively.

[0118] S14: Alkaline electrolytic cell model:

[0119] The electro-gas conversion relationship of the electrolyzer and the expression for the volume of hydrogen produced:

[0120] Q el =P el ·Δt·ρ·η el

[0121] In the formula: Q el For hydrogen production, m 3 ;P el Δt is the input power of the alkaline electrolyzer, in kW; Δt is the operating time of the electrolyzer, in h; ρ is the electro-hydrogen conversion parameter of the electrolyzer, in m. 3 / kW·h;η el The efficiency of the electrolytic cell is %.

[0122] This embodiment establishes mathematical models for each part of the wind-solar-storage-hydrogen production system, and obtains the output characteristic curves of wind power and photovoltaic power through mathematical modeling.

[0123] Example 3:

[0124] Based on Example 1, this example provides an economic optimization scheduling method for a wind-solar-storage-hydrogen production system that considers the penalty for wind and solar curtailment. The optimization scheduling model established in S2 is as follows:

[0125] C day =C new +C pen +C ele +C sto +C grid +C com

[0126] In the formula, C day C new C pen C ele C sto C grid C com These are the daily operating costs of the system dispatch, the operating costs of wind and solar power plants, the cost of wind and solar curtailment penalties, the cost of hydrogen production from alkaline electrolyzers, the maintenance costs of energy storage devices, the cost of purchasing electricity from the grid, and the cost of hydrogen storage in hydrogen storage tanks.

[0127] Among them, the operating cost C of wind power and photovoltaic power plants new =K w P w (t)+K pv P pv (t), where: K w K pv The operating costs of wind power and photovoltaic power plants are respectively, in yuan / kW; P w (t), P pv (t) represents the dispatch power of wind power and photovoltaic power during time period t, respectively, in kW;

[0128] Curtailment of wind and solar power penalties In the formula: k w k pv These are the penalty cost coefficients for wind curtailment and solar curtailment, respectively.

[0129]

[0130] These represent the amount of wind and solar power curtailed during time period t, respectively.

[0131] The cost of hydrogen production using an alkaline electrolyzer is C. ele (t)=P el (t)×C per_ele +C water In the formula: P el (t) represents the input power of the alkaline electrolyzer during time period t, in kW; C per_ele The operating cost of an alkaline electrolyzer is RMB / kWh; C water Water consumption cost, yuan / Nm 3 Nm 3 Indicates standard cubic meters.

[0132] Assuming each electrolyzer produces 1 / Nm 3 Hydrogen production requires 0.89 kg of water, with a water cost of 10 yuan / t for electrolysis, producing 1 / Nm³ of hydrogen. 3 The water cost for hydrogen is 0.0089 yuan.

[0133] Battery energy storage device maintenance cost Csto (t)=P bat (t)×C per_bat In the formula, P bat (t) represents the charging / discharging power of the battery, P bat (t)=E(t) / t;C per_bat The unit power maintenance cost of the battery device is expressed in yuan / kWh.

[0134] Hydrogen storage tank hydrogen storage cost C com (t)=Q el ×C per_com In the formula: Q el For hydrogen production, m 3 C per_com The unit cost of hydrogen storage in a hydrogen storage tank is RMB / Nm³. 3 ;

[0135] Electricity purchase cost C grid (t)=P grid (t)×C per_grid In the formula: P grid (t) represents the power purchased by the system from the grid during time period t, in kW; C per_grid The time-of-use electricity price for industrial electricity sold by the power grid is RMB / kWh.

[0136] This embodiment considers the penalty cost of wind and solar curtailment, takes the sum of the system's daily operating costs as the objective function, takes time-of-use pricing into account, and establishes a day-ahead optimization scheduling model for the wind-solar-storage-hydrogen production system based on the system's daily operating costs, making the scheduling method more in line with actual production.

[0137] Example 4:

[0138] Based on Example 1, this example provides an economic optimization scheduling method for a wind-solar-storage-hydrogen production system that considers wind and solar curtailment penalties. The system power balance constraints, battery storage system constraints, grid interaction power constraints, and hydrogen production constraints in S2 are as follows:

[0139] S221: System power balance constraint:

[0140]

[0141]

[0142] In the formula: P renew (t) represents the output of renewable energy, specifically the maximum output power of wind-solar hybrid power generation during time period t, in kW; P bat (t) represents the charging / discharging power of the battery during time period t, where the battery discharging power is positive and the charging power is negative, denoted by kW; P grid (t) represents the power purchased by the system from the grid during time period t, in kW; Pel (t) represents the input power of the alkaline electrolyzer during time period t, in kW;

[0143] S222: Constraints on battery energy storage systems:

[0144] The capacity of a battery is related to its capacity in the previous time period, as well as the charging / discharging power and self-discharge during that period. The state of charge (SOC) of the battery in time period t is:

[0145]

[0146] In the formula: η represents the state of charge of the battery during time period t; σ represents the self-discharge rate of the battery; η represents the state of charge of the battery during time period t. c Battery charge / discharge efficiency; E bat The total capacity of the battery is expressed in kW·h. Same as P bat (t);

[0147] S223: Power grid interaction constraints:

[0148]

[0149] In the formula: and These represent the minimum and maximum power that the system purchases from the grid, respectively, in kW;

[0150] S224: Electrolytic cell operating power constraint:

[0151]

[0152] In the formula: and These are the minimum and maximum operating power (kW) of the alkaline electrolyzer during production.

[0153] S225: Hydrogen Production Constraints

[0154]

[0155] In the formula: The remaining hydrogen storage capacity of the system during time period t is expressed in Nm³. 3 ; The hydrogen production rate of the alkaline electrolyzer during time period t is expressed in Nm³. 3 / h; For the demand-side hydrogen load during period t, Nm 3 ; The remaining hydrogen capacity of the system at the end of the daytime operation plan, in Nm 3 .

[0156] This embodiment determines the state constraints and power constraints during normal system operation. It adds load-side hydrogen demand response behavior to the wind-solar-storage-hydrogen production system model that considers power interaction, and considers the impact of time-of-use electricity pricing and demand-side hydrogen response on the day-ahead scheduling model of the wind-solar-storage-hydrogen production system.

[0157] Example 5:

[0158] Based on Example 4, this example provides an economic optimization scheduling method for a wind-solar-storage-hydrogen production system that considers the penalty for wind and solar curtailment. The constraints of the S222 battery energy storage system also include upper and lower limits for charge and discharge power and upper and lower limits for battery state of charge, as detailed below:

[0159] The upper and lower limits of battery charging and discharging power are constrained as follows:

[0160]

[0161] In the formula: and These are the battery charging power limit and discharge power limit, respectively, in kW;

[0162] The upper and lower limits of the battery's state of charge are constrained as follows:

[0163]

[0164] In the formula: and These are the minimum and maximum state-of-charge values ​​of the battery, respectively.

[0165] In addition to meeting the capacity variation constraint, this embodiment also provides upper and lower limits for charging and discharging power, upper and lower limits for capacity, and the constraint that the battery's daily capacity is equal from beginning to end, in order to meet the battery safety constraints.

[0166] Example 6:

[0167] Based on Example 4, this example provides an economic optimization scheduling method for a wind-solar-storage-hydrogen production system that considers wind and solar curtailment penalties, such as... Figure 1 As shown, the optimization process of the scheduling model using the adaptive simulated annealing particle swarm optimization algorithm is as follows:

[0168] Step 1: Set initial parameters, including population size N, maximum number of iterations M, variable dimension D, initial temperature, and temperature decay coefficient;

[0169] Step 2: Input the parameters of wind power, photovoltaic, energy storage battery, and electrolytic cell equipment to generate initial particles, including particle position and velocity;

[0170] Step 3: Calculate the fitness value of each particle in the initial population, find the optimal value of the objective function, and record the best position of the individual and the best position globally;

[0171] Step 4: Set the initial temperature for simulated annealing, and adaptively change ω, c1, and c2; ω is the inertia weighting coefficient; c1 represents the self-cognitive factor; c2 represents the social cognitive factor;

[0172] Step 5: Perform a simulated annealing algorithm neighborhood search on the particles according to the Metropolis criterion;

[0173] Step 6: Update the optimal positions of each particle and the global optimal positions of the population using the velocity update formula;

[0174] Step 7: Determine if the maximum number of iterations has been reached. If not, return to step S34; otherwise, stop iterating.

[0175] Step 8: Output the current optimal particle, i.e. the optimization result, and the algorithm terminates.

[0176] This invention utilizes an adaptive simulated annealing particle swarm optimization algorithm to obtain the day-ahead scheduling scheme for a hydrogen production system with the lowest daily operating cost. This optimized scheduling method considers the intermittency of renewable energy generation in real power production, and can more realistically reflect the wind and solar hydrogen production process, which is conducive to the realization of economical scheduling.

[0177] Example 7:

[0178] Based on Example 6, this example provides an economic optimization scheduling method for a wind-solar-storage-hydrogen production system that considers wind and solar curtailment penalties. The speed update formula in step 6 is:

[0179]

[0180] In the formula, This represents the velocity of the i-th particle in the (k+1)-th iteration; and These represent the velocity and position of the i-th particle in the k-th iteration, respectively; ω is the inertia weight coefficient; c1 represents the self-cognition factor; c2 represents the social cognition factor; r1 and r2 are random numbers; p ibest Let be the optimal position for the i-th particle.

[0181] The existing standard particle swarm optimization algorithm's velocity update formula is:

[0182]

[0183]

[0184] In the formula: and ω represents the velocity and position of the i-th particle in the k-th iteration; ω is the inertia weight coefficient, which controls the algorithm's development and exploration capabilities; c1 and c2 represent the self-cognitive factor and the social cognitive factor, respectively; r1 and r2 are random numbers; p ibest G represents the optimal position for the i-th particle. best This is the optimal location for the population.

[0185] To improve the optimization speed and accuracy of the particle swarm optimization algorithm and avoid getting trapped in local optima, this embodiment uses the following hyperbolic tangent function to control the inertia weight coefficient to undergo nonlinear adaptive changes:

[0186] ω=(ω max +ω min ) / 2+tanh(-4+8×(k max -k) / k max (ω) max -ω min ) / 2

[0187] In the formula: ω max and ω min These are the maximum and minimum values ​​of the inertia weight coefficient, which are often taken as 0.95 and 0.4 respectively; k is the current iteration number. max It represents the maximum number of iterations.

[0188] The expressions for learning factors c1 and c2 are:

[0189]

[0190]

[0191] In the formula: c1(k) and c2(k) are the values ​​of learning factors c1 and c2 respectively in the kth iteration; c 1max c 1min c 2max c 2min These are the maximum and minimum values ​​of learning factors c1 and c2, respectively.

[0192] Simulated annealing is introduced, and the population is guided by the Metropolis criterion and temperature to accept the difference solution with a certain probability. A roulette wheel betting strategy is used to select the solution from all p. i Determine the globally optimal candidate value p' g Rewrite the speed update formula:

[0193]

[0194] Example 8:

[0195] To further illustrate the specific implementation process of the method of the present invention, this embodiment takes a certain wind-solar-storage-hydrogen production system as an example for specific calculation analysis.

[0196] 1. Example parameters

[0197] The structure of the wind-solar-storage-hydrogen production system is as follows: Figure 2 As shown, the system is equipped with a wind turbine capacity of 700kW and a photovoltaic power station capacity of 900kW. The maximum power that the system can purchase from the upstream grid is 400kW, and the grid electricity sales adopt a peak-valley time-of-use pricing mechanism. Specific data are shown in Table 1.

[0198] Table 1. Time-of-use electricity price data

[0199]

[0200] The optimization model determines the daily scheduling plan at 1-hour intervals. Based on the mathematical model given in S1, a wind-solar combined power generation system model is built in MATLAB / Simulink. Using wind speed, temperature, and solar irradiance data, the output power of the wind turbines and photovoltaic system is calculated in the Simulink model. The predicted output curves of wind and solar power in the system are shown below. Figure 3 As shown.

[0201] The operating parameters of each energy storage device in the system are shown in Table 2.

[0202] Table 2 Operating parameters of energy storage equipment

[0203]

[0204] Hydrogen load demand curve as follows Figure 4 As shown in the figure, the values ​​of other parameters are shown in Table 3.

[0205] Table 3 Values ​​of other parameters

[0206]

[0207] To evaluate the performance of the proposed economic operation optimization model for wind-solar-storage-hydrogen production system and the effectiveness of the improved optimization algorithm, the numerical examples in this paper are solved using the adaptive simulated annealing particle swarm optimization algorithm in MATLAB software.

[0208] 2. Analysis of the Calculation Results

[0209] (1) System daily operation plan and energy storage equipment status

[0210] Figure 5 This is a schematic diagram of the day-ahead scheduling plan for a wind-solar-storage-hydrogen production system. Under this day-ahead operating plan, the daily operating cost of the system is 9.61 × 10⁻⁶. 3 .like Figure 5As shown, the power grid purchase period is from 04:00 to 07:00. At 04:00, the grid purchased 398kW; at 05:00, 400kW; at 06:00, 398kW; and at 07:00, 398kW. The battery operating power from 01:00 to 24:00 was -35.2kW, 217kW, 10kW, -472kW, 295kW, -141kW, -323kW, 0kW, 369kW, -178kW, 186kW, -140kW, -63.1kW, 180kW, 89.1kW, -473kW, and -104kW, respectively. 343kW, 72.5kW, -78.6kW, 20.7kW, -23kW, -167kW, 59.3kW; positive values ​​indicate discharge, negative values ​​indicate charging. The wind power generation during the period from 01:00 to 24:00 are 428kW, 417kW, 340kW, 308kW, 280kW, 315kW, 343kW, 298kW, 276kW, 292kW, 288kW, 298kW, 320kW, 124kW, 293kW, 258kW, 255kW, 263kW, 278kW, 235kW, 400kW, 432kW, 399kW, 235kW. The photovoltaic power generation period is from 07:00 to 19:00, and the photovoltaic power generation capacity is 70kW, 206kW, 326kW, 446kW, 521kW, 596kW, 654kW, 667kW, 614kW, 517kW, 637kW, 196kW, and 49.9kW respectively.

[0211] Figure 6 This diagram illustrates the hydrogen production rate of the electrolyzer within the system and the remaining hydrogen capacity in the hydrogen storage tank. (Combined with...) Figure 5 , Figure 6 It can be seen that the electrolyzer increases its electrolysis power during periods of high wind and solar power output, low grid electricity prices, or low hydrogen load to meet the hydrogen demand during these periods, and then replenishes the hydrogen storage tank. For example, from 04:00 to 07:00, when grid electricity prices are low and solar power output is very low, the system purchases low-cost electricity from the grid to drive the electrolyzer to produce a large amount of hydrogen, storing hydrogen energy for subsequent increased hydrogen load demand. When wind and solar power output is low, grid electricity prices are high, or the hydrogen demand at the load end exceeds the hydrogen production rate of the corresponding wind and solar power output, the remaining hydrogen in the hydrogen storage tank and the hydrogen produced by electrolysis in the electrolyzer jointly meet the hydrogen demand. During the period from 14:00 to 15:00, there is wind curtailment. This is because the hydrogen demand at the load end is low at this time, and the hydrogen storage tank has sufficient remaining hydrogen, so the system does not need to drive the electrolyzer to produce a large amount of hydrogen, resulting in excess electricity with nowhere to be consumed.

[0212] Figure 7 This is a schematic diagram of the state of charge of a battery energy storage device, combined with... Figure 5 , Figure 6It can be seen that when hydrogen demand is low, wind and solar power output is high, or grid electricity prices are low, the batteries are charged to store energy; when hydrogen demand is high, wind and solar power output is insufficient, or grid electricity prices are high, the batteries discharge to maintain the operation of the electrolyzer. The batteries play a role in "peak shaving and valley filling," and the energy storage equipment increases the stability and reliability of the system operation.

[0213] (2) System operating cost analysis

[0214] This section calculates the operating costs of each part of the wind, solar, energy storage and hydrogen production system. The adaptive simulated annealing particle swarm optimization (BSAPSO) algorithm was used to solve the problem 10 times and the average value was taken as the final calculation result. The results are shown in Table 4.

[0215] Table 4 Operating Costs of Each Component in the System

[0216]

[0217] As shown in Table 1, under the energy storage parameters of the example, the system still exhibits some wind and solar power curtailment. This is mainly because the model cannot fully utilize wind and solar energy by selling electricity to the grid. The system can only purchase electricity from the upstream grid and cannot sell excess electricity back to it; the system lacks the function of bidirectional power exchange with the grid. Furthermore, the limited capacity of the energy storage battery is also a contributing factor; in this example, the energy storage battery capacity is 800 kWh.

[0218] (3) Algorithm Comparison

[0219] Table 5 compares the objective function values ​​of the Standard Particle Swarm Optimization (PSO) algorithm and the Adaptive Simulated Annealing Particle Swarm Optimization (BSAPSO) algorithm when solving the optimization results of this model. It can be seen that the Adaptive Simulated Annealing Particle Swarm Optimization (BSAPSO) algorithm performs better.

[0220] Table 5 Comparison of Objective Function Values ​​of the Two Algorithms

[0221]

[0222] The daily operating cost of a wind-solar-storage-hydrogen production system calculated using the standard particle swarm optimization algorithm is typically around 1.41 × 10⁻⁶. 4 The daily operating cost of the system calculated by the adaptive simulated annealing particle swarm optimization algorithm is only about 1.02 × 10⁻⁶ yuan, while the daily operating cost of the system is only about 1.02 × 10⁻⁶ yuan. 4 This reduces costs by approximately 28%. This is because the former algorithm gets stuck in local optima during iterative computation, unable to escape these local optima to search for the global optimum. The BSAPSO algorithm incorporates a simulated annealing operator, which features probabilistic jumps, helping it escape local optima during the search process. Furthermore, adaptive changes to key parameters such as the inertia weight coefficient ω and the learning factor enhance the algorithm's global search capability.

[0223] The above examples are merely illustrative of the present invention and do not constitute a limitation on the scope of protection of the present invention. All designs that are the same as or similar to the present invention are within the scope of protection of the present invention.

Claims

1. An economic optimization scheduling method for a wind-solar-storage-hydrogen production system considering wind and solar curtailment penalties, characterized in that, Includes the following steps: S1: Establish mathematical models for each part of the wind-solar-storage-hydrogen production system, including photovoltaic power generation model, wind power generation model, battery energy storage equipment model, and alkaline electrolyzer model; Based on the mathematical models given in S1, establish a wind-solar combined power generation system model in MATLAB / Simulink, and calculate the output power of the wind turbine generator and photovoltaic system in the Simulink model using wind speed, temperature, and solar irradiance data; S2: Considering the penalty cost of wind and solar curtailment, and based on the mathematical models of each part of the wind-solar-storage-hydrogen production system in S1, the daily operating costs of each part are obtained. The sum of the daily operating costs of the system is used as the objective function to establish an optimal scheduling model, and various constraints during normal system operation are determined, including system power balance constraints, battery energy storage system constraints, grid interaction power constraints, and hydrogen production constraints; the daily operating cost C of the system is then used as the objective function. day An optimization scheduling model is established using this as the objective function, and the daily operating cost of the system is: In the formula, , , , , , , These are the daily operating costs of the system dispatch, the operating costs of wind and solar power plants, the cost of wind and solar curtailment penalties, the cost of hydrogen production from alkaline electrolyzers, the maintenance costs of energy storage devices, the cost of purchasing electricity from the grid, and the cost of hydrogen storage in hydrogen storage tanks. Among them, the operating costs of wind power and photovoltaic power plants In the formula: , These are the operating costs of wind power and photovoltaic power plants, respectively. , Wind power and solar power respectively t Scheduling power during specific time periods; Costs of curtailing wind and solar power In the formula: , These are the penalty cost coefficients for wind curtailment and solar curtailment, respectively. , They are respectively t The amount of wind and solar power curtailed during different time periods; Alkaline electrolyzer hydrogen production cost In the formula: for t Input power of the alkaline electrolyzer during a given time period; This refers to the operating cost of an alkaline electrolyzer. Water consumption cost; Maintenance costs of battery energy storage devices In the formula, For the charging / discharging power of the battery, ; Maintenance cost per unit of battery capacity; Hydrogen storage tank hydrogen storage cost In the formula: For hydrogen production, m 3 ; The unit cost of hydrogen storage in a hydrogen storage tank; Electricity purchase cost In the formula: for t Power purchased from the grid by the system during certain time periods; Time-of-use pricing for electricity sold to industrial users by the power grid; S3: The adaptive simulated annealing particle swarm optimization algorithm is used to optimize and solve the scheduling model, and the grid power purchase, battery operating power, wind power generation, photovoltaic power generation and electrolyzer operating power corresponding to the minimum daily operating cost of the wind-solar-storage-hydrogen production system for 24 hours in a typical day are obtained. The optimization process of the optimal scheduling model using the adaptive simulated annealing particle swarm optimization algorithm is as follows: Step 1: Set initial parameters, including population size N, maximum number of iterations M, variable dimension D, initial temperature, and temperature decay coefficient; Step 2: Input the parameters of wind power, photovoltaic, energy storage battery, and electrolytic cell equipment to generate initial particles, including particle position and velocity; Step 3: Calculate the fitness value of each particle in the initial population, find the optimal value of the objective function, and record the best position of the individual and the best position globally; Step 4: Set the initial temperature for simulated annealing and adaptively change it. , ; This is the inertia weighting coefficient; c 1 represents one's own cognitive factor; c 2 represents the social cognitive factor; Step 5: Perform a simulated annealing algorithm neighborhood search on the particles according to the Metropolis criterion; Step 6: Update the optimal position of each particle and the global optimal position of the population using the velocity update formula; Step 7: Determine if the maximum number of iterations has been reached. If not, return to step S34; otherwise, stop iterating. Step 8: Output the current optimal particle, i.e., the optimization result, and the algorithm terminates; S4: Based on the power purchased by the grid, the operating power of the battery, the power of the wind power generation, the power of the photovoltaic power generation, and the operating power of the electrolyzer obtained in S3, the wind-solar-storage-hydrogen production system is set to achieve economic optimization scheduling of the wind-solar-storage-hydrogen production system.

2. The method for economically optimizing the scheduling of a wind-solar-storage-hydrogen production system considering wind and solar curtailment penalties, as described in claim 1, is characterized in that... The photovoltaic power generation model and the wind power generation model in S1 are as follows: S11: Photovoltaic power generation model: In the formula, For photovoltaic arrays under light intensity Output power at that time; , , These are the light intensity, photovoltaic array temperature, and maximum output power under standard test conditions, respectively. For temperature coefficient, ; Let t be the surface temperature of the photovoltaic array. S12: Wind power generation model: Input wind speed of a single wind turbine in the wind turbine model With predicted output power The relationship is: In the formula: is the actual wind speed at the hub height of the wind turbine, in m / s; To cut in wind speed; To cut off the wind speed; Rated wind speed; The rated power of the wind turbine is kW; air density, kg / m³ 3 R represents the length of the wind turbine blade, in meters. t The total dispatchable wind power predicted for a given period is expressed as follows: In the formula: M is the total number of wind turbine units; For the first j Typhoon turbine units t Predicted output power at any given time; These are adjacent time periods.

3. The method for economically optimizing the scheduling of a wind-solar-storage-hydrogen production system considering wind and solar curtailment penalties, as described in claim 1, is characterized in that... The battery energy storage device model and the alkaline electrolyzer model in S1 are as follows: S13: Battery energy storage device model: Battery storage devices play a role in peak shaving and valley filling, and their mathematical model can be expressed as: In the formula: For the storage battery t Total energy over a period of time, kW•h; This refers to the self-discharge efficiency of the battery. and The battery device is respectively t Charging and discharging power during the same period, in kW; and These refer to the charging and discharging efficiencies of the battery device, respectively. S14: Alkaline electrolytic cell model: In the formula: For hydrogen production, m 3 ; Input power for the alkaline electrolyzer, kW; The electrolytic cell operating time, in hours (h). For the electro-hydrogen conversion parameters of the electrolyzer, m 3 / kW•h; For the working efficiency of the electrolytic cell, %.

4. The method for economically optimizing the scheduling of a wind-solar-storage-hydrogen production system considering wind and solar curtailment penalties, as described in claim 1, is characterized in that... The system power balance constraints, battery energy storage system constraints, grid interaction power constraints, and hydrogen production constraints in S2 are as follows: S221: System power balance constraint: In the formula: Contributing to renewable energy, namely wind-solar hybrid power generation t Maximum output power during the period, kW; for t The charging / discharging power of the battery during a given period, where the battery discharge power is a positive value and the charging power is a negative value, in kW; for t Power purchased from the grid by the time-of-use system, in kW; for t Input power of alkaline electrolyzer during a given period, in kW; S222: Constraints on battery energy storage systems: The capacity of a battery is related to its capacity in the previous period, as well as the charging and discharging power and self-discharge rate in that period. t The state of charge during the time period is: In the formula: For storage batteries t The state of charge during a given time period; σ is the battery's self-discharge rate; For battery charging / discharging efficiency; The total capacity of the battery is expressed in kW•h. same ; S223: Power grid interaction constraints: In the formula: and These represent the minimum and maximum power that the system purchases from the grid, respectively, in kW; S224: Electrolytic cell operating power constraint: In the formula: and These are the minimum and maximum operating power (kW) of the alkaline electrolyzer during production. S225: Constraints on Hydrogen Production In the formula: for t Hydrogen storage capacity of the system during the time period, Nm 3 ; for t Hydrogen production rate of alkaline electrolyzer during the time period, Nm 3 / h; for t Hydrogen load on the demand side during the period, Nm 3 ; The remaining hydrogen capacity of the system at the end of the daytime operation plan, in Nm 3 .

5. The method for economically optimizing the scheduling of a wind-solar-storage-hydrogen production system considering wind and solar curtailment penalties, as described in claim 4, is characterized in that: The constraints of the S222 battery energy storage system also include upper and lower limits for charge and discharge power, and upper and lower limits for battery state of charge, as detailed below: The upper and lower limits of battery charging and discharging power are constrained as follows: In the formula: and These are the battery charging power limit and discharge power limit, respectively, in kW; The upper and lower limits of the battery's state of charge are constrained as follows: In the formula: and These are the minimum and maximum state-of-charge values ​​of the battery, respectively.

6. The method for economically optimizing the scheduling of a wind-solar-storage-hydrogen production system considering wind and solar curtailment penalties, as described in claim 1, is characterized in that: The speed update formula in step 6 is: In the formula, Indicates the first i The first particle k Speed ​​at +1 iteration; and Representing the first i The first particle k Velocity and position at the next iteration; This is the inertia weighting coefficient; c 1 represents one's own cognitive factor; c 2 represents the social cognitive factor; and It is a random number; For the first i The optimal position of each individual particle.

Citation Information

Patent Citations

  • Optimized scheduling method for wind-solar storage hybrid system

    CN108306331A

  • Day-ahead scheduling method for wind and light hydrogen storage and production system based on simulated annealing algorithm

    CN115115130A