Construction method of steel-shell diaphragm composite cofferdam for shallow overburden and deep hard bedrock
CN115748772BActive Publication Date: 2026-07-03CHINA RAILWAY GUANGZHOU ENG GRP CO LTD +2
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CHINA RAILWAY GUANGZHOU ENG GRP CO LTD
- Filing Date
- 2022-12-03
- Publication Date
- 2026-07-03
Smart Images

Figure CN115748772B_ABST
Abstract
This application discloses a construction method for a steel-shell diaphragm wall combined cofferdam for deep, hard bedrock with shallow overburden, relating to the field of bridge cofferdam construction. The method includes the following steps: S1, driving steel casings into the main pier to construct the main pier pile foundation; S2, installing internal supports on the main pier steel casings and using these supports as guides to lower a guide steel shell below the riverbed line; S3, constructing the diaphragm wall in sections within the guide steel shell to complete the entire cofferdam construction. This application solves the problem of poor waterproofing and soil-retaining effect caused by steel sheet pile deformation, improves the waterproofing and soil-retaining effect of the cofferdam, effectively reduces construction difficulty, reduces the amount of steel sheets used, and effectively controls construction costs.
Need to check novelty before this filing date? Find Prior Art