A method for deploying information collection nodes for data center network devices
By collecting the operating status of equipment nodes and measuring network link delays, calculating the optimal monitoring frequency and tolerable delay, and using mathematical models to select the optimal collection node deployment plan, this solves the problem of non-real-time and inaccurate equipment information collection in the existing technology. problem, achieving efficient data collection and reducing costs.
Patent Information
- Application Number
- CN202211580442.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-09
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2042-12-09
AI Technical Summary
The existing data center network equipment information collection method cannot obtain the complete process of equipment operating status, and the deployment of information collection nodes does not consider the equipment itself and the overall status of the network, resulting in the inability to meet the real-time and accuracy requirements.
By collecting the operating status data of equipment nodes and measuring network link delays, the optimal monitoring frequency and monitoring tolerance delay are calculated, and mathematical models are used to select the optimal collection node deployment plan to ensure the data collection efficiency and accuracy of equipment nodes.
It effectively reduces monitoring costs, improves the efficiency of device information collection, reduces the number of collection nodes and reduces the average delay.
Smart Images

Figure CN115776442B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data center equipment information monitoring, and specifically to a method for deploying data center network equipment information collection nodes. Background Art
[0002] Data centers are the basic supporting facilities for the digitalization and intelligence of new power systems. The stable operation of data centers is the guarantee for the stable operation of various services in the power system. Monitoring of data center equipment information is the basis for the operation and maintenance of data center equipment. By continuously monitoring the equipment operation information, abnormal status of equipment can be discovered in time or in advance, which helps to improve the operation and maintenance efficiency of data centers and ensure the stable operation of various services.
[0003] At present, the way to monitor network equipment information in data centers is that the network management station (network equipment information collection node) sends data requests to each device agent in the network at a fixed frequency. After receiving the data request from the management station, the device agent responds and sends the required data to the management station. Due to the existence of the collection interval, the above-mentioned device information collection method may not be able to obtain the complete process of the device's operating status, and the deployment of the information collection node does not consider the device's own operating status and the overall network status, resulting in the network device information collection failing to meet the requirements of real-time and accuracy. Summary of the invention
[0004] The purpose of the embodiments of the present application is to provide a method for deploying data center network equipment information collection nodes, with a minimum number of collection nodes and a smaller average delay in equipment node data collection, which effectively reduces monitoring costs and improves the efficiency of equipment information collection.
[0005] To achieve the above objectives, this application provides the following technical solutions:
[0006] The present invention provides a method for deploying a data center network device information collection node, including the following steps:
[0007] Step 1: Collect the operating status data of each device node in the network over a period of time and measure the delay of each link in the network;
[0008] Step 2: Calculate the optimal monitoring frequency and monitoring tolerance delay of each device node according to the operating status data of the device node;
[0009] Step 3: Calculate the device nodes within the monitoring range after the device node is deployed as a collection node based on the monitoring tolerance delay of the device node and the network link delay;
[0010] Step 4: Use the monitoring range of each device node to build a mathematical model, calculate and select collection nodes based on the model, and obtain the optimal collection node deployment plan.
[0011] The network described in step 1 contains n device nodes v i (i=1,2,...,n), each device node v i Contains m running states s ik (k=1,2,...,m), device node v i With device node v j The delay between them is the shortest link delay t ij .
[0012] Step 2 specifically includes the following steps:
[0013] Step 2.1: Perform Fourier transform on each running status data sequence of the device node:
[0014]
[0015] Step 2.2: Calculate the maximum frequency of all running status data sequences of the device node:
[0016] f max (v i )=max{f max (s ik )},k=1,2,…,m
[0017] Step 2.3: According to the Nyquist sampling theorem, when the sampling frequency is greater than or equal to twice the maximum frequency of the signal, the sampled signal can be restored to the original signal without loss. In order to restore the operating status data of each device node at the information collection end, set the device node v i The optimal monitoring frequency is:
[0018]
[0019] Then the device node v i The monitoring tolerance delay is:
[0020]
[0021] Information collection node x in step 3 j It is selected from the device nodes. When a device node is selected as an information collection node, the device nodes v within its monitoring range i Should satisfy the information collection node x j The link delay of the device node v i Monitoring tolerance delay: t ij ≤R(v i ).
[0022] Step 4 specifically includes the following steps:
[0023] Step 4.1: The optimization goal of the mathematical model is to minimize the number of information collection nodes while ensuring that all device nodes can be monitored at the optimal monitoring frequency. Therefore, the following mathematical model can be constructed based on the monitoring range of the device nodes:
[0024]
[0025] st
[0026]
[0027]
[0028] x j ∈{0,1},j=1,2,…,n
[0029] Among them, a ij =1 indicates device node v i At information collection node x j Within the monitoring range, a ij =0 means device node v i At information collection node x j Outside the monitoring range, x j =1 indicates device node v j Selected as the information collection node, x j =1 indicates device node v j Not selected as an information collection node, Represents each device node v i Can be used by at least one information collection node x j monitor;
[0030] Step 4.2: Use the branch and bound method to solve the above integer linear programming model, and the solution result is the minimum number of information collection nodes and the device nodes selected as information collection nodes;
[0031] Step 4.3: If there are multiple minimum information collection node deployment schemes, in order to make the device node information collection more efficient, select the total delay T total The smallest one is used as the optimal information collection node deployment solution:
[0032]
[0033] Where x represents an optimal solution obtained in step 4.2.
[0034] Compared with the prior art, the present invention has the following beneficial effects:
[0035] By collecting the operating status of device nodes and measuring the network link delay, the monitoring frequency and monitoring tolerance delay of device nodes are calculated according to the device node operation sequence and Fourier transform. The monitoring range of device nodes after being deployed as collection nodes is calculated according to the monitoring tolerance delay and link delay of device nodes. An integer programming model is constructed using the monitoring range of each device node, and the optimal collection node deployment scheme is selected according to the average delay. The number of collection nodes in the proposed optimized deployment scheme is the least, and the average delay of device node data collection is smaller, which effectively reduces the monitoring cost and improves the efficiency of device information collection. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments of the present application will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0037] Figure 1 is a flow chart of the method of the present invention;
[0038] Figure 2 It is a network device topology diagram;
[0039] Figure 3 This is the information collection node deployment scheme of the method of the present invention. DETAILED DESCRIPTION
[0040] The technical solutions in the embodiments of the present application will be described below in conjunction with the drawings in the embodiments of the present application. It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings.
[0041] Figure 1 The figure is a flow chart of the method of the present invention.
[0042] Combine the following Figure 1 , Figure 2 and Figure 3 The specific implementation of the present invention is a data center network equipment information collection node deployment method, including the following specific steps:
[0043] Step 1: Collect the operating status data of each device node in the network over a period of time and measure the delay of each link in the network. The network contains n device nodes v i (i=1,2,...,n), each device node v i Contains m running states s ik(k=1,2,...,m), device node v i With device node v j The delay between them is the shortest link delay t ij ;
[0044] Step 2: Calculate the optimal monitoring frequency and monitoring tolerance delay of each device node according to the operating status data of the device node;
[0045] Step 2.1: Perform Fourier transform on each running status data sequence of the device node:
[0046]
[0047] Step 2.2: Calculate the maximum frequency of all running status data sequences of the device node:
[0048] f max (v i )=max{f max (s ik )},k=1,2,…,m
[0049] Step 2.3: According to the Nyquist sampling theorem, when the sampling frequency is greater than or equal to twice the maximum frequency of the signal, the sampled signal can be restored to the original signal without loss. In order to restore the operating status data of each device node at the information collection end, set the device node v i The optimal monitoring frequency is:
[0050]
[0051] Then the device node v i The monitoring tolerance delay is:
[0052]
[0053] Step 3: Calculate the device nodes within the monitoring range after the device node is deployed as a collection node based on the monitoring tolerance delay and network link delay of the device node, where the information collection node x j It is selected from the device nodes. When a device node is selected as an information collection node, the device nodes v within its monitoring range i Should satisfy the information collection node x j The link delay of the device node v i Monitoring tolerance delay: t ij ≤R(v i );
[0054] Step 4: Use the monitoring range of each device node to build a mathematical model, calculate and select the collection nodes according to the model, and obtain the optimal collection node deployment plan;
[0055] Step 4.1: The optimization goal of the mathematical model is to minimize the number of information collection nodes while ensuring that all device nodes can be monitored at the optimal monitoring frequency. Therefore, the following mathematical model can be constructed based on the monitoring range of the device nodes:
[0056]
[0057] st
[0058]
[0059]
[0060] x j ∈{0,1},j=1,2,…,n
[0061] Among them, a ij =1 indicates device node v i At information collection node x j Within the monitoring range, a ij =0 means device node v i At information collection node x j Outside the monitoring range, x j =1 indicates device node v j Selected as the information collection node, x j =1 indicates device node v j Not selected as an information collection node, Represents each device node v i Can be used by at least one information collection node x j monitor;
[0062] Step 4.2: Use the branch and bound method to find the optimal solution to the above optimization problem, and the solution result is the minimum number of information collection nodes and the device nodes selected as information collection nodes;
[0063] First, relax the integer variables, that is: 0≤x j≤1,j=1,2,…,n, the original integer linear programming problem is transformed into a general form of linear programming problem. The changed linear programming problem is solved. If the optimization variable obtained in the solution result is an integer, the solution result is the optimal solution of the original problem. If the optimization variable obtained in the solution result is a non-integer, the non-integer optimization variable is branched, that is, it is divided into two cases where the variable is 0 or 1, and the optimal solution in the two cases is solved respectively, and the branch solution is continued according to whether the optimization variable in the solution result is an integer. In the branch solution process, if a solution with integer variables of 0 or 1 appears, it is a feasible solution to the original problem and can be used as the upper bound of the original problem. When the optimal solution of any branch is higher than the upper bound, no branch is performed; and the lower bound of the original problem is determined by the minimum value of the optimal solution of all current branches. Through continuous branch and bound solution, the optimal solution of the original integer linear programming problem is finally obtained.
[0064] Step 4.3: If there are multiple minimum information collection node deployment schemes, in order to make the device node information collection more efficient, select the total delay T total The smallest one is used as the optimal information collection node deployment solution:
[0065]
[0066] Where x represents an optimal solution obtained in step 4.2.
[0067] The following is a further explanation with application examples. Figure 2 The figure shows a Fat-tree network topology with 4 pods, which includes 36 device nodes (4 Layer 3 switches, 16 Layer 2 switches, and 16 servers) and 48 links. The numbers in the figure are device numbers. The task manager of each device obtains the operating status data of the device over a period of time and calculates the spectrum components through Fourier transform to determine the optimal monitoring frequency and monitoring tolerance delay for each device. The network management software measures the delay of each link in the network, and determines the monitoring range of each device in combination with the monitoring tolerance delay of each device. After modeling and calculation, the information collection node deployment results are as follows: Figure 3 As shown, a total of 3 information collection nodes are deployed, among which nodes with the same color collect data by information collection nodes with the same color.
[0068] Compared with the prior art, the present invention proposes a data center network equipment information collection node deployment method, which collects the operating status of the equipment nodes and measures the network link delay, calculates the monitoring frequency and monitoring tolerance delay of the equipment nodes according to the equipment node operation sequence and Fourier transform, calculates the monitoring range of the equipment nodes after they are deployed as collection nodes according to the monitoring tolerance delay and link delay of the equipment nodes, constructs an integer programming model using the monitoring range of each equipment node, and selects the optimal collection node deployment plan according to the average delay. The number of collection nodes in the optimized deployment plan proposed by the present invention is the smallest, and the average delay of equipment node data collection is smaller, which effectively reduces the monitoring cost and improves the efficiency of equipment information collection.
[0069] The above description is only an embodiment of the present application and is not intended to limit the protection scope of the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A data center network equipment information collection node deployment method, characterized in that: The steps include: Step 1: Collect the operating status data of each device node in the network over a period of time and measure the delay of each link in the network; Step 2: Calculate the optimal monitoring frequency and monitoring tolerance delay of each device node according to the operating status data of the device node; Step 3: Calculate the device nodes within the monitoring range after the device node is deployed as a collection node based on the monitoring tolerance delay of the device node and the network link delay; Step 4: Use the monitoring range of each device node to build a mathematical model, calculate and select the collection nodes according to the model, and obtain the optimal collection node deployment plan; Step 4 specifically includes the following steps: Step 4.1: The optimization goal of the mathematical model is to minimize the number of information collection nodes while ensuring that all device nodes can be monitored at the optimal monitoring frequency. Therefore, the following mathematical model can be constructed based on the monitoring range of the device nodes: st x j ∈{0,1},j=1,2,…,n Among them, a ij =1 indicates device node v i At information collection node x j Within the monitoring range, a ij =0 means device node v i At information collection node x j Outside the monitoring range, x j =1 indicates device node v j Selected as the information collection node, x j =1 indicates device node v j Not selected as an information collection node, Represents each device node v i Can be used by at least one information collection node x j monitor; Step 4.2: Use the branch and bound method to solve the integer linear programming model, and the solution result is the minimum number of information collection nodes and the device nodes selected as information collection nodes; Step 4.3: If there are multiple minimum information collection node deployment schemes, in order to make the device node information collection more efficient, select the total delay T total The smallest one is used as the optimal information collection node deployment solution: Where x represents an optimal solution obtained in step 4.
2.
2. A data center network equipment information collection node deployment method according to claim 1, characterized in that: The network described in step 1 contains n device nodes v i (i=1,2,...,n), each device node v i Contains m running states s ik (k=1,2,...,m), device node v i With device node v j The delay between them is the shortest link delay t ij .
3. A data center network equipment information collection node deployment method according to claim 2, characterized in that: Step 2 specifically includes the following steps: Step 2.1: Perform Fourier transform on each running status data sequence of the device node: Step 2.2: Calculate the maximum frequency of all running status data sequences of the device node: f max (v i )=max{f max (s ik )},k=1,2,…,m Step 2.3: According to the Nyquist sampling theorem, when the sampling frequency is greater than or equal to twice the maximum frequency of the signal, the sampled signal can be restored to the original signal without loss. In order to restore the operating status data of each device node at the information collection end, set the device node v i The optimal monitoring frequency is: Then the device node v i The monitoring tolerance delay is:
4. A data center network equipment information collection node deployment method according to claim 3, characterized in that: Information collection node x in step 3 j It is selected from the device nodes. When a device node is selected as an information collection node, the device nodes v within its monitoring range i Should satisfy the information collection node x j The link delay of the device node v i Monitoring tolerance delay: t ij ≤R(v i ).
