Wastewater recycling equipment for green building construction
By designing wastewater treatment components and water flow buffer components in the wastewater recycling equipment, the problems of poor mixing effect and water flow impact of the existing equipment are solved, and the mixing effect and the service life of the filter plate are improved.
Patent Information
- Application Number
- CN202211206310.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-30
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When existing wastewater recycling equipment mixes wastewater with reaction drugs, the mixing method is single and the mixing effect is poor. In addition, strong water flow impact can easily damage the filter plate and reduce the service life of the device.
A wastewater recycling equipment for green building construction is designed, including an installation tank, a treatment chamber, a water flow buffer component and a linkage installation component. The wastewater treatment component is used for stirring and mixing, and the water flow buffer component is opened when the filter plate is inserted to slow down the impact of the water flow. , extend the service life of the filter plate.
It improves the mixing effect of wastewater and reaction drugs, and by slowing down the impact of water flow, it extends the service life of the filter plate and improves the overall reliability of the equipment.
Smart Images

Figure CN115838191B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of wastewater recovery, and in particular relates to wastewater recovery equipment for green building construction. Background Art
[0002] Wastewater resource utilization, also known as wastewater recovery, is the process of introducing industrial, agricultural and domestic wastewater into a predetermined purification system and treating it with physical, chemical or biological methods to make it reach the standard for reuse. This is an important measure to improve the utilization rate of water resources. The properties and material composition of various wastewaters (industrial wastewater, agricultural wastewater and domestic wastewater, etc.) are very different, and they need to be treated and recycled in different ways. The amount of sewage discharged in Chinese cities is increasing. After treatment, sewage is converted into usable water resources, which has dual significance for urban development. One is to reduce pollution and protect the environment, and the other is to increase water resources and alleviate the water shortage crisis.
[0003] Existing wastewater recovery equipment usually processes wastewater and reaction drugs by simple stirring. This method has a single stirring method and poor mixing effect. After mixing, the sewage is directly sprayed onto the filter plate. The strong water flow impact can easily damage the filter plate and reduce the service life of the entire device. Summary of the invention
[0004] The purpose of the embodiment of the present invention is to provide a wastewater recovery device for green building construction, aiming to solve the problem that most of the existing wastewater recovery equipment mixes wastewater with reaction drugs by simple stirring. This stirring method is single and the mixing effect is poor. After the mixing is completed, the sewage is directly sprayed onto the filter plate. The strong water flow impact can easily damage the filter plate and reduce the service life of the overall device.
[0005] The embodiment of the present invention is implemented as follows: a green building construction wastewater recovery device comprises: a mounting tank, the mounting tank is connected to a water inlet pipe and a drain pipe, a filter plate is arranged inside the mounting tank, and the green building construction wastewater recovery device further comprises:
[0006] A treatment chamber is provided inside the installation tank, wherein a wastewater treatment component is installed inside the treatment chamber, and the wastewater treatment component is used for mixing wastewater and reaction drugs;
[0007] A water flow buffer assembly is installed on one side of the processing chamber to mitigate the impact of water flow on the filter plate;
[0008] The linkage installation component is installed inside the installation tank, and the linkage installation component is used to control the opening and closing of the water flow buffer component through the installation of the filter plate.
[0009] Preferably, the wastewater treatment component comprises:
[0010] An output motor is installed inside the installation tank, the output end of the output motor is connected to a main turntable, a first gear is rotatably connected inside the main turntable, and a first bevel gear ring is installed on the side wall of the main turntable;
[0011] A second gear is fixedly mounted on the inner wall of the mounting tank and is rotationally connected to the middle of the main rotating disk, and the first gear and the second gear cooperate with each other;
[0012] A collar, rotatably connected to the inner wall of the mounting tank, a second bevel gear ring being mounted on the inner wall of the collar;
[0013] A bevel gear, rotatably connected to the inner wall of the mounting tank, the bevel gear and the first bevel gear ring and the second bevel gear ring cooperate with each other;
[0014] The rotating shaft is mounted on the collar and the first gear, and a stirring rod is mounted on the side wall of the rotating shaft.
[0015] Preferably, the water flow buffer assembly comprises:
[0016] A downpipe is installed on one side of the processing chamber, a water guide pipe is also installed on one side of the processing chamber, and the downpipe is arranged inside the water guide pipe;
[0017] A water receiving pipe is installed on the inner wall of the down pipe, one end of which is connected to a water flow conduit, and the water flow conduit is installed on the inner wall of the water guide pipe;
[0018] A water spray port is installed at one end of the water flow conduit, and the water spray port cooperates with the down pipe.
[0019] Preferably, the water flow direction of the water spray outlet is opposite to the water flow direction of the sewer pipe.
[0020] Preferably, the linkage installation assembly comprises:
[0021] A mounting groove is provided on the inner wall of the mounting tank, a connecting plate is installed on the side of the filter plate, and the connecting plate cooperates with the mounting groove;
[0022] A toothed plate is mounted on the connecting plate, a third gear is rotatably connected inside the mounting tank, and the third gear cooperates with the toothed plate;
[0023] The linked opening and closing assembly is installed on the water pipe and is used to control the opening and closing of the water pipe through the installation of the filter plate.
[0024] Preferably, the linked opening and closing assembly comprises:
[0025] A slot is formed on the side wall of the water pipe, wherein a closed tooth plate is slidably connected inside the slot;
[0026] A fourth gear, rotatably connected to one side of the water pipe, the fourth gear and the closed tooth plate cooperate with each other;
[0027] A first bevel gear is rotatably connected to the inside of the mounting tank, a second bevel gear is mounted on the third gear, and the first bevel gear and the second bevel gear cooperate with each other;
[0028] The transmission belt is sleeved between the first bevel gear and the fourth gear.
[0029] Preferably, an adapting groove is provided on the inner wall of the installation tank, and the adapting groove cooperates with the closed tooth plate.
[0030] The green building construction wastewater recovery equipment provided by the embodiment of the present invention has the following beneficial effects:
[0031] When the wastewater recovery equipment for green building construction is used, sewage and reaction drugs are injected into the treatment chamber through the water inlet pipe, and then the wastewater treatment component is driven to operate to stir and mix the sewage and reaction drugs. The wastewater treatment component can increase the stirring range and enhance the mixing effect. After the mixing is completed, the filter plate can be inserted into the installation tank. During the insertion of the filter plate, the water flow buffer component will be opened through the linkage installation component. At this time, the treated water flow will flow to the filter plate through the water flow buffer component for filtration, and the water flow buffer component can reduce the impact of the water flow on the filter plate and increase the service life. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 A schematic diagram of the structure of a wastewater recovery device for green building construction provided by an embodiment of the present invention;
[0033] Figure 2 A schematic diagram of the partial structure of a wastewater recovery device for green building construction provided by an embodiment of the present invention;
[0034] Figure 3 for Figure 1 A partial enlarged view of the middle A;
[0035] Figure 4 for Figure 1 A partial enlarged view of point B in the middle;
[0036] Figure 5 for Figure 1 A partial enlarged view of point C in the middle.
[0037] In the accompanying drawings: 1-installation tank; 2-water inlet pipe; 3-drain pipe; 4-filter plate; 5-treatment chamber; 6-wastewater treatment component; 61-output motor; 62-main turntable; 63-first gear; 64-first bevel gear ring; 65-second gear; 66-ring; 67-second bevel gear ring; 68-bevel gear; 69-rotating shaft; 610-stirring rod; 7-water flow buffer component; 71-down pipe; 72-water guide pipe; 73-water connecting pipe; 74-water flow guide pipe; 75-water nozzle; 8-linked installation component; 81-installation groove; 82-connecting plate; 83-tooth plate; 84-third gear; 85-slot; 86-closed tooth plate; 87-fourth gear; 88-first bevel gear; 89-second bevel gear; 810-transmission belt; 811-adapter groove. DETAILED DESCRIPTION
[0038] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0039] The specific implementation of the present invention is described in detail below in conjunction with specific embodiments.
[0040] like Figure 1 As shown, in the embodiment of the present invention, it includes: an installation tank 1, to which an inlet pipe 2 and a drain pipe 3 are connected, and a filter plate 4 is arranged inside the installation tank 1. The wastewater recycling equipment for green building construction also includes:
[0041] A processing chamber 5 is provided inside the installation tank 1, and a wastewater treatment component 6 is installed inside the processing chamber 5, and the wastewater treatment component 6 is used for mixing wastewater and reaction drugs;
[0042] A water flow buffer component 7, installed on one side of the processing chamber 6, is used to mitigate the impact of water flow on the filter plate 4;
[0043] The linkage installation component 8 is installed inside the installation tank 1 , and the linkage installation component 8 is used to control the opening and closing of the water flow buffer component 7 through the installation of the filter plate 4 .
[0044] When the wastewater recovery equipment for green building construction is used, the sewage and the reaction drug are injected into the treatment chamber 5 through the water inlet pipe 2, and then the wastewater treatment component 6 is driven to operate to stir and mix the sewage and the reaction drug, and the wastewater treatment component 6 can increase the stirring range and enhance the mixing effect. After the mixing is completed, the filter plate 4 can be inserted into the installation tank 1. During the insertion of the filter plate 4, the water flow buffer component 7 will be opened through the linkage installation component 8. At this time, the treated water flow will flow to the filter plate 4 through the water flow buffer component 7 for filtration, and the water flow buffer component 7 can slow down the impact of the water flow on the filter plate 4 and improve the service life.
[0045] like Figures 1 to 5 As shown, in this embodiment of the present invention, the wastewater treatment component 6 includes:
[0046] An output motor 61 is installed inside the installation tank 1. The output end of the output motor 61 is connected to a main rotating disk 62. A first gear 63 is rotatably connected inside the main rotating disk 62. A first bevel gear ring 64 is installed on the side wall of the main rotating disk 62.
[0047] The second gear 65 is fixedly mounted on the inner wall of the installation tank 1 and is rotatably connected to the middle of the main turntable 62. The first gear 63 and the second gear 65 cooperate with each other.
[0048] A collar 66 is rotatably connected to the inner wall of the mounting tank 1, and a second bevel gear ring 67 is mounted on the inner wall of the collar 66;
[0049] A bevel gear 68 is rotatably connected to the inner wall of the mounting tank 1, and the bevel gear 68 cooperates with the first bevel gear ring 64 and the second bevel gear ring 67;
[0050] The rotating shaft 69 is mounted on the collar 66 and the first gear 63 , and a stirring rod 610 is mounted on the side wall of the rotating shaft 69 .
[0051] When in use, start the output motor 61, the output motor 61 will drive the main turntable 62 to rotate, and the main turntable 62 will cause the first gear 63 to rotate around the second gear 65, and drive the first gear 63 itself to rotate under the meshing action, thereby causing the stirring rod 610 to rotate and stir. At the same time, during the rotation of the main turntable 62, the first bevel gear 64 will control the rotation of the bevel gear 68, and then the second bevel gear ring 67 will be used to make the ring 66 rotate in the opposite direction, and the rotating shaft 69 and the stirring rod 610 connected thereto will be used to perform reverse stirring and rotation, thereby enriching the stirring method and improving the stirring effect.
[0052] like Figures 1 to 5 As shown, in the embodiment of the present invention, the water flow buffer component 7 includes:
[0053] A downpipe 71 is installed at one side of the processing chamber 5. A water guide pipe 72 is also installed at one side of the processing chamber 5. The downpipe 71 is arranged inside the water guide pipe 72.
[0054] A water receiving pipe 73 is installed on the inner wall of the down pipe 71. One end of the water receiving pipe 73 is connected to a water flow conduit 74. The water flow conduit 74 is installed on the inner wall of the water guide pipe 72.
[0055] A water spray port 75 is installed at one end of the water flow conduit 74 , and the water spray port 75 cooperates with the down pipe 71 .
[0056] In the embodiment of the present invention, the water flow direction of the water spray port 75 is opposite to the water flow direction of the down pipe 71 .
[0057] During use, when water flows through the downpipe 71, part of the water will enter the water flow conduit 74 through the water receiving pipe 73, and will be sprayed out in the opposite direction of the water flow direction of the downpipe 71 under the guidance of the water flow conduit 74, so as to impact the water flow and reduce the flow rate of the water, thereby reducing the impact on the filter plate 4 and extending the service life of the filter plate 4.
[0058] like Figures 1 to 5 As shown, in the embodiment of the present invention, the linkage installation assembly 8 includes:
[0059] The mounting groove 81 is provided on the inner wall of the mounting tank 1, and a connecting plate 82 is installed on the side of the filter plate 4, and the connecting plate 82 cooperates with the mounting groove 81;
[0060] The tooth plate 83 is mounted on the connecting plate 82. The installation tank 1 is rotatably connected with a third gear 84 inside. The third gear 84 cooperates with the tooth plate 83.
[0061] The linked opening and closing assembly is installed on the water pipe 72 and is used to control the opening and closing of the water pipe 72 by installing the filter plate 4.
[0062] like Figures 1 to 5 As shown, in an embodiment of the present invention, the linked opening and closing assembly includes:
[0063] A slot 85 is formed on the side wall of the water conduit 72, and a closed tooth plate 86 is slidably connected inside the slot 85;
[0064] A fourth gear 87, rotatably connected to one side of the water pipe 72, the fourth gear 87 and the closed gear plate 86 cooperate with each other;
[0065] A first bevel gear 88 is rotatably connected to the inside of the mounting tank 1, and a second bevel gear 89 is installed on the third gear 84, and the first bevel gear 88 and the second bevel gear 89 cooperate with each other;
[0066] The transmission belt 810 is sleeved between the first bevel gear 88 and the fourth gear 87 .
[0067] During use, when the filter plate 4 is inserted, after the filter plate 4 completely passes through the sewer pipe 71, the tooth plate 83 will contact the third gear 84 and drive the third gear 84 to rotate, and then use the cooperation between the first bevel gear 88 and the second bevel gear 89 to drive the transmission belt 810 to move, and the transmission belt will control the fourth gear 87 to rotate, and then pull the closed tooth plate 86 to move, so that the sewer pipe 71 is completely open, and at this time the water will flow to the filter plate 4 for filtration.
[0068] like Figures 1 to 5 As shown, in the embodiment of the present invention, an adapting groove 811 is opened on the inner wall of the installation tank 1, and the adapting groove 811 cooperates with the closed tooth plate 86.
[0069] In summary, when the wastewater recovery equipment for green building construction is used, the sewage and the reaction drug are injected into the treatment chamber 5 through the water inlet pipe 2, and then the wastewater treatment component 6 is driven to operate to stir and mix the sewage and the reaction drug, and the wastewater treatment component 6 can increase the stirring range and enhance the mixing effect. After the mixing is completed, the filter plate 4 can be inserted into the installation tank 1. During the insertion of the filter plate 4, the water flow buffer component 7 will be opened through the linkage installation component 8. At this time, the treated water flow will flow through the water flow buffer component 7 to the filter plate 4 for filtration, and the water flow buffer component 7 can slow down the impact of the water flow on the filter plate 4 and improve the service life.
[0070] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A wastewater recycling device for green building construction, comprising: The installation tank is connected to a water inlet pipe and a drain pipe, and a filter plate is arranged inside the installation tank. The green building construction wastewater recovery equipment further comprises: A treatment chamber is provided inside the installation tank, wherein a wastewater treatment component is installed inside the treatment chamber, and the wastewater treatment component is used for mixing wastewater and reaction drugs; A water flow buffer assembly is installed on one side of the processing chamber to mitigate the impact of water flow on the filter plate; A linkage installation component is installed inside the installation tank, and the linkage installation component is used to control the opening and closing of the water flow buffer component by installing the filter plate; Wherein, the water flow buffer component comprises: A downpipe is installed on one side of the processing chamber, a water guide pipe is also installed on one side of the processing chamber, and the downpipe is arranged inside the water guide pipe; A water receiving pipe is installed on the inner wall of the down pipe, one end of which is connected to a water flow conduit, and the water flow conduit is installed on the inner wall of the water guide pipe; A water spray port is installed at one end of the water flow conduit, and the water spray port cooperates with the down pipe; The direction of water flow from the water spray outlet is opposite to the direction of water flow from the sewer pipe; The linkage installation assembly comprises: A mounting groove is provided on the inner wall of the mounting tank, a connecting plate is installed on the side of the filter plate, and the connecting plate cooperates with the mounting groove; A toothed plate is mounted on the connecting plate, a third gear is rotatably connected inside the mounting tank, and the third gear cooperates with the toothed plate; A linked opening and closing assembly is installed on the water pipe and is used to control the opening and closing of the water pipe by installing the filter plate; The linked opening and closing assembly comprises: A slot is formed on the side wall of the water pipe, wherein a closed tooth plate is slidably connected inside the slot; A fourth gear, rotatably connected to one side of the water pipe, the fourth gear and the closed tooth plate cooperate with each other; A first bevel gear is rotatably connected to the inside of the mounting tank, a second bevel gear is mounted on the third gear, and the first bevel gear and the second bevel gear cooperate with each other; The transmission belt is sleeved between the first bevel gear and the fourth gear.
2. The green building construction wastewater recovery equipment according to claim 1, characterized in that: The wastewater treatment component comprises: An output motor is installed inside the installation tank, the output end of the output motor is connected to a main turntable, a first gear is rotatably connected inside the main turntable, and a first bevel gear ring is installed on the side wall of the main turntable; A second gear is fixedly mounted on the inner wall of the mounting tank and is rotationally connected to the middle of the main rotating disk, and the first gear and the second gear cooperate with each other; A collar, rotatably connected to the inner wall of the mounting tank, a second bevel gear ring being mounted on the inner wall of the collar; A bevel gear, rotatably connected to the inner wall of the mounting tank, the bevel gear and the first bevel gear ring and the second bevel gear ring cooperate with each other; The rotating shaft is mounted on the collar and the first gear, and a stirring rod is mounted on the side wall of the rotating shaft.
3. The green building construction wastewater recovery equipment according to claim 1, characterized in that: An adapting groove is provided on the inner wall of the installation tank, and the adapting groove cooperates with the closed tooth plate.
Citation Information
Patent Citations
Wastewater recovery device used in green building construction
CN215288203U
Automatic drainage system of integrated prefabricated pump station
CN216640860U