Video push method, device, equipment and storage medium

By predicting the popularity of videos and optimizing the fitting model, the video is pushed to edge nodes reasonably, solving the problems of CDN bandwidth cost and low edge node cache utilization, achieving efficient resource utilization and improving user experience.

CN116112754BActive Publication Date: 2024-10-01DOUYIN VISION CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310151600.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-02-13
Publication Date
2024-10-01
Estimated Expiration
2043-02-13

AI Technical Summary

Technical Problem

While existing technologies reduce CDN bandwidth costs, they also result in low cache utilization of edge nodes, resulting in a waste of storage resources and bandwidth resources, and poor user experience.

Method used

By predicting the popularity of each video in the video collection to be pushed, the predicted request volume of each video during the peak request period is determined, and the target fitting model is determined based on the predicted request volume and video bit rate to characterize the video copy volume and The changing relationship between the throughput of edge nodes, optimizing video copy volume decisions, reasonably pushing videos to edge nodes, and balancing cache hit rate and cache utilization.

Benefits of technology

It effectively reduces CDN bandwidth costs, improves users' ability to obtain videos from edge nodes during peak request periods, and improves edge node cache utilization and user experience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116112754B_ABST
    Figure CN116112754B_ABST
Patent Text Reader

Abstract

The disclosed embodiments provide a video push method, device, equipment and storage medium. The method includes: obtaining a video set to be pushed; predicting the popularity of each video in the video set, and determining the predicted request volume of each video during the peak request period; determining the target fitting model corresponding to each video based on the predicted request volume and video bit rate corresponding to each video, and the target fitting model is used to characterize the changing relationship between the video copy volume and the edge node throughput; making an optimization decision on the video copy volume based on the target fitting model, determining the target copy volume corresponding to each video determined, and pushing the video based on the target copy volume during the non-peak request period. Through the technical solution of the disclosed embodiments, the appropriate video copy volume is pushed while reducing the CDN bandwidth cost, thereby effectively balancing the cache hit rate and cache utilization of the edge node.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present disclosure relate to computer technology, and more particularly to a video push method, apparatus, device and storage medium. Background Art

[0002] With the rapid development of computer technology, videos in CDN (Content Delivery Network) servers can be pushed to edge node networks for caching, allowing users to obtain videos from closer edge nodes, thereby improving the video acquisition speed and reducing the bandwidth traffic for obtaining videos from CDN.

[0003] Currently, in order to reduce CDN bandwidth costs, CDN can pre-push excessive video copies to the edge node network to improve the cache hit rate of the edge nodes, but this will cause low cache utilization of some edge nodes, resulting in a waste of storage resources and bandwidth resources. Summary of the invention

[0004] The present disclosure provides a video push method, apparatus, device and storage medium to push an appropriate amount of video copies while reducing CDN bandwidth costs, thereby effectively balancing the cache hit rate and cache utilization rate of edge nodes.

[0005] In a first aspect, an embodiment of the present disclosure provides a video push method, including:

[0006] Get the video collection to be pushed;

[0007] Predicting the popularity of each video in the video set to determine a predicted request volume for each video during a peak request period;

[0008] Determine a target fitting model corresponding to each video based on the predicted request amount and the video bit rate corresponding to each video, wherein the target fitting model is used to characterize the relationship between the video copy amount and the edge node throughput;

[0009] An optimization decision is made on the video copy amount based on the target fitting model, a target copy amount corresponding to each video determined by the decision is determined, and video push is performed based on the target copy amount during a non-request peak period.

[0010] In a second aspect, the embodiment of the present disclosure further provides a video push device, including:

[0011] A video collection acquisition module is used to acquire the video collection to be pushed;

[0012] A predicted request volume determination module, used to perform popularity prediction on each video in the video set, and determine the predicted request volume of each video during a request peak period;

[0013] A target fitting model determination module, used to determine a target fitting model corresponding to each video based on the predicted request amount and video bit rate corresponding to each video, wherein the target fitting model is used to characterize the change relationship between the video copy amount and the edge node throughput;

[0014] The video push module is used to make an optimization decision on the video copy amount based on the target fitting model, determine the target copy amount corresponding to each video decided, and push the video based on the target copy amount during the non-request peak period.

[0015] In a third aspect, an embodiment of the present disclosure further provides an electronic device, the electronic device comprising:

[0016] one or more processors;

[0017] a storage device for storing one or more programs,

[0018] When the one or more programs are executed by the one or more processors, the one or more processors implement the video pushing method as described in any one of the embodiments of the present disclosure.

[0019] In a fourth aspect, the embodiments of the present disclosure further provide a storage medium comprising computer executable instructions, which, when executed by a computer processor, are used to execute the video push method as described in any one of the embodiments of the present disclosure.

[0020] In the disclosed embodiment, the popularity of each video in the video set to be pushed is predicted, and the predicted request amount of each video in the peak request period is determined; based on the predicted request amount and video bit rate corresponding to each video, the target fitting model corresponding to each video is determined, and the target fitting model is used to characterize the changing relationship between the video copy amount and the edge node throughput; the video copy amount is optimized based on the target fitting model, and the target copy amount corresponding to each video is determined, and the video is pushed based on the target copy amount during the non-peak request period. By considering the predicted request amount and video bit rate of each video during the peak request period at the same time, the appropriate target copy amount of each video can be more accurately determined, and the cache hit rate and cache utilization rate of the edge node are effectively balanced. Moreover, the target copy amount of videos is pushed to the edge node network during the non-peak request period, so that the user end obtains more videos from the edge node during the peak request period, thereby reducing the CDN peak bandwidth that occurs during the peak request period, thereby reducing the CDN bandwidth cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The above and other features, advantages and aspects of the embodiments of the present disclosure will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. Throughout the accompanying drawings, the same or similar reference numerals represent the same or similar elements. It should be understood that the drawings are schematic and the originals and elements are not necessarily drawn to scale.

[0022] Figure 1 It is a hybrid end video transmission architecture diagram provided by an embodiment of the present disclosure;

[0023] Figure 2 It is a flowchart of a video push method provided by an embodiment of the present disclosure;

[0024] Figure 3 is an example diagram of a relationship between a video copy amount and an edge node throughput involved in an embodiment of the present disclosure;

[0025] Figure 4 It is a flowchart of another video push method provided by an embodiment of the present disclosure;

[0026] Figure 5 It is a structural schematic diagram of a video push device provided by an embodiment of the present disclosure;

[0027] Figure 6 It is a structural schematic diagram of an electronic device provided by an embodiment of the present disclosure. DETAILED DESCRIPTION

[0028] Embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although certain embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be construed as being limited to the embodiments described herein, which are instead provided for a more thorough and complete understanding of the present disclosure. It should be understood that the drawings and embodiments of the present disclosure are only for exemplary purposes and are not intended to limit the scope of protection of the present disclosure.

[0029] It should be understood that the various steps described in the method embodiments of the present disclosure may be performed in different orders and / or in parallel. In addition, the method embodiments may include additional steps and / or omit the steps shown. The scope of the present disclosure is not limited in this respect.

[0030] The term "including" and its variations used herein are open inclusions, i.e., "including but not limited to". The term "based on" means "based at least in part on". The term "one embodiment" means "at least one embodiment"; the term "another embodiment" means "at least one additional embodiment"; the term "some embodiments" means "at least some embodiments". The relevant definitions of other terms will be given in the following description.

[0031] It should be noted that the concepts such as "first" and "second" mentioned in the present disclosure are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units.

[0032] It should be noted that the modifications of "one" and "plurality" mentioned in the present disclosure are illustrative rather than restrictive, and those skilled in the art should understand that unless otherwise clearly indicated in the context, it should be understood as "one or more".

[0033] The names of the messages or information exchanged between multiple devices in the embodiments of the present disclosure are only used for illustrative purposes and are not used to limit the scope of these messages or information.

[0034] It is understandable that before using the technical solutions disclosed in the embodiments of the present disclosure, the types, scope of use, usage scenarios, etc. of the personal information involved in the present disclosure should be informed to the user and the user's authorization should be obtained in an appropriate manner in accordance with relevant laws and regulations.

[0035] It is understandable that the data involved in this technical solution (including but not limited to the data itself, the acquisition or use of the data) shall comply with the requirements of relevant laws, regulations and relevant provisions.

[0036] Before introducing the embodiments of the present disclosure, a video push scenario is described. Figure 1 A hybrid end video transmission architecture diagram is given. Figure 1 As shown, the architecture includes a terminal, an edge node, and a CDN. Among them, the terminal can be a user device for playing videos. The edge node can refer to a small network device with caching capabilities, such as a base station side server, a small data center of a network operator, a small computer room of a community or enterprise, etc. CDN can refer to a cloud server for storing all videos. The storage capacity of CDN is higher than that of the edge node. For example, CDN can be a large computer room, and the edge node can be a decentralized storage node such as a home router or a small computer room. A CDN can be connected to an edge node network, which includes multiple edge nodes. CDN can copy the same video multiple times and push each copy of the video to an edge node in the edge node network, so that multiple edge nodes in the edge node network store the same video. The user end can directly pull the video from the closer edge node instead of pulling the video from the CDN, thereby reducing the bandwidth traffic requested to the CDN. Since the edge node is close to the user end and widely distributed, multiple edge nodes can be used to provide services to a user at the same time, thereby providing the user with a high-latency or low-throughput video experience.

[0037] The bandwidth cost billing method of CDN often adopts the 95 bandwidth billing method. The 95 bandwidth billing method can be understood as follows: within a bandwidth billing cycle, a peak bandwidth actual value can be counted every 5 minutes, so that the actual values ​​of all bandwidth statistical points within the bandwidth billing cycle can be obtained. All bandwidth statistical point actual values ​​within the bandwidth billing cycle are sorted in descending order, and the top 5% of the bandwidth statistical point actual values ​​are removed, that is, the 5% highest bandwidth statistical point actual values ​​are removed, and the bandwidth statistical point corresponding to the highest actual value among the remaining bandwidth statistical point actual values ​​is determined to be the 95 bandwidth billing point, which is the billing value charged by the operator, that is, the actual value of the bandwidth billing point. Among them, the actual value of the bandwidth statistical point is counted once every 5 minutes, and the statistical time point corresponding to the actual value of the bandwidth statistical point is the bandwidth statistical point. 288 bandwidth statistical points are obtained every day, and 8640 points are obtained in a month. After determining the actual value of the 95 bandwidth billing point, the product of the actual value of the 95 bandwidth billing point and the number of days in the bandwidth billing cycle, such as 30 days, can be used as the bandwidth operating cost within the bandwidth billing cycle. In order to reduce bandwidth operating costs, it is necessary to reduce the peak bandwidth of CDN. The peak bandwidth of CDN occurs during the peak request period, such as 20:00-21:00, so that the video is pushed to the edge node network during the non-peak request period, so that the user end can obtain the video from the edge node during the peak request period, thereby reducing the CDN peak bandwidth that occurs during the peak request period, thereby reducing the CDN bandwidth cost.

[0038] It should be noted that the number of copies of different videos pushed to the edge node network is different, that is, the number of edge nodes pushed to is different. For example, if the video has a small bit rate and low popularity, only a small number of video copies need to be pushed to the network; if not, more video copies need to be pushed to the network. It should be noted that the same video content can be encoded into multiple different video files by adjusting its encoding parameters, and each video file will have a different bit rate and popularity.

[0039] Exemplarily, the pushed video copy quantity is determined only based on the video bit rate, that is, when the bit rates of two videos are the same, the pushed copy quantities of the two videos are the same, but there will be the following problems:

[0040] 1. When the video copy amount is less than the actual required copy amount, if too many users request the same video content at the same time, the edge node will not be able to bear so many users, resulting in an increase in CDN bandwidth usage; if too many users request video content from the same edge node at the same time, it will cause fierce bandwidth competition at the edge node, reduce the service quality of the edge node, and cause users to have a poor video viewing experience.

[0041] 2. When the amount of video copies is greater than the actual amount required, the pushed copy videos will have a lower utilization rate, resulting in a waste of storage resources. Compared with CDN, the cache space of edge nodes is several orders of magnitude smaller. If edge nodes do not cache highly popular videos, they will be frequently replaced, reducing the life of edge nodes. At the same time, since it takes a certain amount of time to deploy tasks on edge nodes, videos pushed to edge nodes can be stored for a longer time, thereby reducing the deployment volume and failure rate of tasks.

[0042] For example, the number of video copies pushed is determined based only on video popularity, that is, when the popularity of two videos is the same, the number of pushed copies of the two videos is the same. However, for two videos of the same length, in order to ensure the stability of the user's playback experience, transmitting high-bitrate video files requires a larger bandwidth. Therefore, this method also has the problem of insufficient storage resource utilization and difficulty in ensuring user experience:

[0043] 1. For high-bitrate videos, large bandwidth is required to provide users with stable video services. Multiple edge nodes are used to provide services to a single user to ensure the throughput when the user downloads the video. However, if the number of video copies pushed is small, the edge node will not be able to provide users with enough throughput to maintain a stable video download and viewing experience, which will cause fluctuations in user experience.

[0044] 2. Compared with high-bitrate videos, users need less throughput to download low-bitrate videos, so fewer edge nodes are needed to provide users with stable services. Therefore, if too many copies are pushed to the edge network, the cache utilization rate of some edge nodes will be low, resulting in a waste of storage resources and bandwidth resources.

[0045] In view of the above problems, the embodiments of the present disclosure determine the amount of video copies to be pushed based on video popularity and video bit rate, thereby effectively balancing the cache hit rate and cache utilization rate of edge nodes and reducing the usage of CDN bandwidth.

[0046] Figure 2 A flow chart of a video push method provided in an embodiment of the present disclosure is applicable to the case where a CDN pushes a video with an appropriate amount of copies to an edge node network. The method can be executed by a video push device, which can be implemented in the form of software and / or hardware, and optionally, by an electronic device, which can be a CDN server, etc.

[0047] like Figure 2 As shown, the video push method specifically includes the following steps:

[0048] S110: Obtain a video set to be pushed.

[0049] The video set may be a set of all videos that need to be pushed to the edge node. The video in this embodiment may be a video file in the form of a file. Different videos may have different video bit rates and video popularity.

[0050] Specifically, CDN can use all stored videos as videos to be pushed, or select videos with high popularity from all stored videos as videos to be pushed, so as to improve cache utilization. For example, the historical request volume corresponding to each video can be obtained, and videos with historical request volumes greater than a preset request volume can be used as videos to be pushed. All videos to be pushed are combined to obtain a set of videos to be pushed.

[0051] Exemplarily, S110 may include: acquiring a video set to be pushed in a current push cycle, wherein each preset duration in a non-request peak period is a push cycle.

[0052] Among them, the non-request peak period may refer to the period other than the request peak period. The request peak period may refer to the time period when the request volume peaks. For example, the request peak period is: 20:00-21:00, and the non-request peak period is: 0:00-20:00 and 21:00-24:00. In the non-request peak period, each preset duration, such as 5 minutes, is used as a push cycle, thereby dividing the non-request peak period into multiple push cycles, and performing video push in each push cycle, thereby achieving periodic push and further improving the video push effect. The current push cycle may refer to the push cycle at the current moment. For example, the video set to be pushed is Among them, N m is the number of videos to be pushed in the current push cycle m.

[0053] S120: Predict the popularity of each video in the video set, and determine the predicted request volume of each video during the request peak period.

[0054] Among them, popularity prediction can be used to predict the request volume of the video in the subsequent request peak period. The request volume can be the number of times the user terminal requests to pull the video, that is, the number of visits. The predicted request volume refers to the predicted request volume result in the request peak period. The larger the predicted request volume, the higher the popularity of the video.

[0055] Specifically, regression prediction can be performed on the historical request volume and video features of each video in the past period to obtain the predicted request volume of each video in the peak request period.

[0056] Exemplarily, S120 may include: obtaining video feature information and historical request volume corresponding to each video in the video collection; inputting the video feature information and historical request volume corresponding to each video into a target regression model for popularity prediction; and obtaining the predicted request volume for each video during the peak request period based on the output of the target regression model.

[0057] The video feature information may include but is not limited to: video bit rate, video size, encoding method and video resolution. The historical request volume may be the video request volume in the most recent period. For example, with 1 hour as the granularity, the historical request volume in the past L hours is obtained. The target regression model may be a regression network model trained based on sample data and used to predict the popularity of the video during the peak request period. For example, the target regression model may be but is not limited to a GBDT (Gradient Boosting Decision Tree) model.

[0058] Specifically, for each video in the video set, the video feature information corresponding to the video can be obtained from the video feature storage module, and the historical request volume corresponding to the video can be extracted from the video request log. The video feature information and historical request volume corresponding to the video are input into the trained target regression model. The target regression model can integrate the video feature information and historical request volume, predict the predicted request volume of the video during the request peak period, and output the predicted request volume. By using the target regression model, the video feature information of each video can be determined more accurately and quickly. n Predicted request volume during peak request periods

[0059] It should be noted that the target regression model can be periodically updated based on the generated new sample data to ensure the prediction accuracy of the target regression model.

[0060] S130: Determine a target fitting model corresponding to each video based on the predicted request amount and the video bit rate corresponding to each video, where the target fitting model is used to characterize the changing relationship between the video copy amount and the edge node throughput.

[0061] Among them, the video copy quantity may refer to the number of copies of the same video. Each copy of the video is cached on an edge node, and the video copy quantity is equal to the number of edge nodes that cache the video. The edge node throughput may refer to the throughput of pulling the same video from the edge node. The throughput may refer to the number of video data successfully transmitted per unit time. The throughput is multiplied by the preset duration to obtain the bandwidth flow used within the preset duration. If the same video is cached on multiple edge nodes, the edge node throughput may refer to the throughput of pulling the video from a single edge node during the peak request period, or the edge node throughput may refer to the total throughput of pulling the video from all edge nodes that cache the video during the peak request period. The meaning of the edge node throughput can be specifically set based on business needs and scenarios. The target fitting model can be the relationship between the video copy quantity and the edge node throughput under the specific predicted request volume and video bit rate obtained by data fitting. The video corresponds to the target fitting model one by one.

[0062] Specifically, since the number and performance distribution of edge nodes in the edge node network are long-term stable, the historical video request data can be fitted to determine the target fitting model corresponding to each video under the specific predicted request amount and video bit rate of each video. For example, for each video, the historical video copy amount and historical edge node throughput corresponding to other videos with the same predicted request amount and video bit rate as the video can be determined from the historical video request data, and data fitting can be performed with the video copy amount as the horizontal axis and the edge node throughput as the vertical axis, and the change relationship between the fitted video copy amount and edge node throughput is used as the target fitting model corresponding to the video. For example, when the predicted request amount is 8000 and the video bit rate is 78.125kB / s, the change relationship between the video copy amount and the edge node throughput is as follows: Figure 3 shown. Figure 3 The dots in the figure are historical data, and the fitting curve is the changing relationship between the video copy amount and the edge node throughput.

[0063] Exemplarily, S130 may include: obtaining a multivariate fitting model generated based on historical video request data, the multivariate fitting model being used to characterize the changing relationship between multiple video parameters and edge node throughput, wherein the video parameters include video copy quantity, predicted request quantity, and video bit rate; inputting the predicted request quantity and video bit rate corresponding to each video into the multivariate fitting model to obtain a target fitting model corresponding to each video.

[0064] Among them, the historical video request data may include the video copy quantity corresponding to the historical video, the request quantity during the peak request period, the video bit rate, and the throughput of pulling the video from the edge node during the peak request period. The historical video request data can be extracted and obtained from the video request log. The independent variables in the multivariate fitting model are multiple video parameters, that is, the three video parameters of video copy quantity, predicted request quantity and video bit rate are used as the three independent variables in the multivariate fitting model. The dependent variable in the multivariate fitting model is the edge node throughput.

[0065] Specifically, data fitting can be performed on historical video request data to obtain a multivariate fitting model for characterizing the changing relationship between multiple video parameters and edge node throughput. For example, the GBDT model can be used for offline fitting to obtain a multivariate fitting model When pushing videos, for each video, the specific predicted request volume can be and video bitrates n Input into the multivariate fitting model, fix the two independent variables of the predicted request amount and video bit rate in the multivariate fitting model, so as to obtain a multivariate fitting model with only one independent variable, the video copy amount That is, the target fitting model.

[0066] S140: Optimize the video copy amount based on the target fitting model, determine the target copy amount corresponding to each video determined, and push the video based on the target copy amount during a non-request peak period.

[0067] The target copy amount may refer to the appropriate copy amount that is finally determined by taking into account the popularity of the video and the video bit rate, and reducing the CDN peak bandwidth, so as to effectively balance the cache hit rate and cache utilization rate of the edge node. It should be noted that if you want to reduce the CDN peak traffic during the peak request period, you need to increase the edge node peak traffic during the peak request period. The CDN peak traffic and the edge node peak traffic are added to obtain the peak total traffic, and the ratio between the edge node peak traffic and the peak total traffic is used as the sharing ratio. The larger the sharing ratio, the more bandwidth cost is saved.

[0068] Specifically, based on the target fitting model corresponding to each video, the edge node throughput of each video under different copy amounts can be obtained, so that optimization decisions can be made by maximizing the total throughput of pulling videos from edge nodes, and the target copy amount corresponding to each video when the total throughput is maximum can be obtained. By maximizing the total throughput of edge nodes, the CDN peak traffic is minimized, thereby reducing the CDN peak bandwidth that occurs during the peak request period.

[0069] After determining the target copy quantity for each video, the corresponding number of videos can be copied and all the copied videos can be pushed to the edge node network. For example, if the target copy quantity for video A is 5, 5 copies of video A are made and 5 copies of video A are pushed to 5 edge nodes in the edge node network, so that one video A is cached in each edge node.

[0070] Exemplarily, "pushing videos based on the target copy amount during the non-request peak period" in S140 may include: pushing videos based on the target copy amount at the end of the current push cycle. By triggering the video push operation when the end of the current push cycle is reached, the periodic push of the video is achieved, further improving the video push effect. During periodic push, the determined target copy amount may refer to the video copy amount required to be pushed in the current push cycle, and the target copy amount will be re-determined for incremental video push in each push cycle.

[0071] The technical solution of the disclosed embodiment is to predict the popularity of each video in the video set to be pushed, and determine the predicted request amount of each video in the peak request period; determine the target fitting model corresponding to each video based on the predicted request amount and video bit rate corresponding to each video, and the target fitting model is used to characterize the changing relationship between the video copy amount and the edge node throughput; make an optimization decision on the video copy amount based on the target fitting model, determine the target copy amount corresponding to each video determined, and push the video based on the target copy amount in the non-peak request period. By considering the predicted request amount and video bit rate of each video in the peak request period at the same time, the appropriate target copy amount of each video can be more accurately determined, and the cache hit rate and cache utilization rate of the edge node can be effectively balanced. Moreover, the target copy amount of videos is pushed to the edge node network in the non-peak request period, so that the user end obtains more videos from the edge node in the peak request period, thereby reducing the CDN peak bandwidth that occurs in the peak request period, thereby reducing the CDN bandwidth cost.

[0072] On the basis of the above technical solution, "making an optimization decision on the video copy amount based on the target fitting model, and determining the target copy amount corresponding to each video decided" in S140 may include: determining the target edge throughput optimization function corresponding to all videos based on the target fitting model; maximizing the target edge throughput optimization function based on preset constraints to obtain the target copy amount corresponding to each solved video.

[0073] Among them, the target edge throughput optimization function can be a function for determining the total throughput of all videos downloaded from the edge node network. If the video is pushed periodically, the target edge throughput optimization function can refer to the total throughput function of all videos pushed at the time downloaded from the edge node network after the current push cycle is pushed. The preset constraint condition can be a constraint condition set in advance based on the business scenario and used to solve the optimization function. For example, the preset constraint condition may include: the video copy amount corresponding to each video is a positive integer or 0, the copy amount of all video pushes cannot exceed a certain value, etc.

[0074] Specifically, when only a single push is performed, the total amount of video copies corresponding to each video is taken as the optimization object, and the target edge throughput optimization function is maximized based on the preset constraints to obtain the target copy amount corresponding to each video. The target copy amount at this time can be understood as the target total copy amount, and a one-time push is performed based on the target copy amount. For example, the target edge throughput optimization function for a single push is: Among them, h n For video v n Alternatively, when performing periodic push, the video copy increment corresponding to each video is taken as the optimization object, and the target edge throughput optimization function is maximized based on the preset constraints to obtain the target copy amount corresponding to each video. The target copy amount at this time can be understood as the target copy increment, that is, the amount of video copy that needs to be pushed in the current push cycle. Periodic dynamic push based on the target copy increment corresponding to each video further improves the video push effect.

[0075] Figure 4 This is a flow chart of another video push method provided by an embodiment of the present disclosure. Based on the above disclosed embodiment, the present disclosed embodiment optimizes the step of "determining the target edge throughput optimization function corresponding to all videos based on the target fitting model". The explanations of the terms that are the same or corresponding to the above disclosed embodiments are not repeated here.

[0076] like Figure 4 As shown, the video push method specifically includes the following steps:

[0077] S210: Obtain a video set to be pushed.

[0078] S220: Predict the popularity of each video in the video set, and determine the predicted request volume of each video during the request peak period.

[0079] S230: Determine a target fitting model corresponding to each video based on the predicted request amount and the video bit rate corresponding to each video, where the target fitting model is used to characterize the changing relationship between the video copy amount and the edge node throughput.

[0080] S240: Determine a total edge throughput sub-function corresponding to each video based on the target fitting model and the video copy increment and existing copy amount corresponding to each video.

[0081] The video copy increment corresponding to each video may refer to the amount of video copies that need to be pushed again in the current push cycle. The existing copy amount corresponding to each video may refer to the amount of video copies that have been pushed to the edge node network before the current push cycle. The total edge throughput sub-function corresponding to each video may be a sub-function for determining the total throughput of pulling the video from all edge nodes that cache the video during the peak request period. The total edge throughput sub-function is optimized based on the video copy increment corresponding to each video.

[0082] Specifically, for each video, a total edge throughput sub-function for pulling the video from all edge nodes during the request peak period can be constructed based on the target fitting model corresponding to the video.

[0083] Exemplarily, S240 may include: determining the total copy amount corresponding to each video based on the video copy increment and the existing copy amount corresponding to each video; and determining the total edge throughput sub-function corresponding to each video based on the target fitting model and the total copy amount.

[0084] Specifically, each video v n The corresponding video copy increment ρ n and the corresponding existing copy g n Add them together to get the total number of copies of each video in the edge node network after the push. n +g n If the edge node throughput in the target fitting model refers to the throughput of pulling the video from a single edge node during the peak request period, the target fitting model is Then substitute the total copy amount corresponding to each video into the corresponding target fitting model In the example, we obtain the throughput of a single edge node corresponding to each video. The throughput of a single edge node is multiplied by the total number of copies, and the multiplication result is the constructed total edge throughput sub-function, that is, If the edge node throughput in the target fitting model refers to the total throughput of pulling the video from all edge nodes that cache the video during the peak request period, the target fitting model at this time is Then substitute the total copy amount corresponding to each video into the corresponding target fitting model In the above example, we can directly obtain the total edge throughput sub-function corresponding to each video, namely:

[0085] S250: Determine a target edge throughput optimization function corresponding to all videos based on the total edge throughput sub-function corresponding to each video.

[0086] Among them, the total edge throughput sub-function is to optimize the video copy increment corresponding to each video. Specifically, the total edge throughput sub-functions corresponding to each video can be added together, and the sum obtained is the target edge throughput optimization function corresponding to all videos constructed. For example, the target edge throughput optimization function is: Or the target edge throughput optimization function is:

[0087] Exemplarily, S250 may include: determining the existing edge throughput corresponding to each video based on the target fitting model and the existing copy amount corresponding to each video; determining the target edge throughput optimization function corresponding to all videos based on the total edge throughput sub-function corresponding to each video and the existing edge throughput.

[0088] Specifically, if the target fitting model corresponding to each video is Then the existing copy amount g corresponding to each video n Substitute the corresponding target fitting model In the example, we obtain the existing throughput of a single edge node corresponding to each video. The existing throughput of a single edge node is multiplied by the existing copy amount, and the multiplication result is the constructed existing edge throughput, that is, If the target fitting model corresponding to each video is Then substitute the existing copy quantity corresponding to each video into the corresponding target fitting model In , we can directly obtain the existing edge throughput corresponding to each video, that is, Based on the total edge throughput sub-function corresponding to each video and the existing edge throughput, the edge throughput increment sub-function after pushing each video can be determined, and the target edge throughput optimization function corresponding to all videos can be determined based on all edge throughput increment sub-functions. The target edge throughput optimization function obtained at this time refers to the bandwidth increase of the edge node after the current push cycle, that is, the CDN bandwidth saving.

[0089] Exemplarily, based on the total edge throughput sub-function corresponding to each video and the existing edge throughput, determining the target edge throughput optimization function corresponding to all videos can include: subtracting the total edge throughput sub-function corresponding to each video from the corresponding existing edge throughput to obtain an edge throughput increment sub-function corresponding to each video; adding the edge throughput increment sub-functions corresponding to all videos to obtain the target edge throughput optimization function corresponding to all videos.

[0090] Specifically, the target edge throughput optimization function obtained can be: Or:

[0091] S260: Based on preset constraints, maximize the target edge throughput optimization function to obtain the target copy quantity corresponding to each solved video.

[0092] Exemplarily, when the video copy increment corresponding to each video is taken as the optimization object, the preset constraint condition may include: the total video copy increment corresponding to all videos is less than or equal to the copy amount threshold, that is, Among them, the copy amount threshold Ω m It can refer to the maximum total amount of video copies pushed to the edge node network in the push cycle m. By distributing the copy amount between different videos without exceeding the copy amount threshold, the bandwidth flow of the edge node is maximized and the peak bandwidth of the CDN is minimized.

[0093] The process of solving the target edge throughput optimization function can be converted into a 0-1 integer programming problem for solution.

[0094] S270: Push the video based on the target copy amount during the non-request peak period.

[0095] The technical solution of the disclosed embodiment determines the total edge throughput sub-function corresponding to each video based on the target fitting model and the video copy increment and existing copy amount corresponding to each video; based on the total edge throughput sub-function corresponding to each video, determines the target edge throughput optimization function corresponding to all videos, so as to construct a target edge throughput optimization function with the video copy increment corresponding to each video as the optimization object, and then more accurately decides the target copy amount corresponding to each video, further effectively balances the cache hit rate and cache utilization of the edge node, and improves the video push effect.

[0096] Figure 5 A schematic diagram of the structure of a video push device provided by an embodiment of the present disclosure is shown in FIG. Figure 5 As shown, the device specifically includes: a video set acquisition module 310, a predicted request quantity determination module 320, a target fitting model determination module 330 and a video push module 340.

[0097] Among them, the video set acquisition module 310 is used to acquire the video set to be pushed; the predicted request quantity determination module 320 is used to predict the popularity of each video in the video set and determine the predicted request quantity of each video during the request peak period; the target fitting model determination module 330 is used to determine the target fitting model corresponding to each video based on the predicted request quantity and video bit rate corresponding to each video, and the target fitting model is used to characterize the changing relationship between the video copy quantity and the edge node throughput; the video push module 340 is used to make an optimization decision on the video copy quantity based on the target fitting model, determine the target copy quantity corresponding to each video decided, and push the video based on the target copy quantity during the non-request peak period.

[0098] The technical solution provided by the embodiment of the present disclosure predicts the popularity of each video in the video set to be pushed, and determines the predicted request amount of each video in the peak request period; based on the predicted request amount and video bit rate corresponding to each video, the target fitting model corresponding to each video is determined, and the target fitting model is used to characterize the changing relationship between the video copy amount and the edge node throughput; based on the target fitting model, the video copy amount is optimized and decided, and the target copy amount corresponding to each video is determined, and the video is pushed based on the target copy amount during the non-peak request period. By considering the predicted request amount and video bit rate of each video during the peak request period at the same time, the appropriate target copy amount of each video can be more accurately determined, and the cache hit rate and cache utilization rate of the edge node can be effectively balanced. Moreover, the target copy amount of videos is pushed to the edge node network during the non-peak request period, so that the user end obtains more videos from the edge node during the peak request period, thereby reducing the CDN peak bandwidth that occurs during the peak request period, thereby reducing the CDN bandwidth cost.

[0099] Based on the above technical solution, the predicted request amount determination module 320 is specifically used for:

[0100] Obtain video feature information and historical request volume corresponding to each video in the video collection; input the video feature information and historical request volume corresponding to each video into a target regression model for popularity prediction; and obtain the predicted request volume for each video during the request peak period based on the output of the target regression model.

[0101] Based on the above technical solutions, the target fitting model determination module 330 is specifically used to:

[0102] A multivariate fitting model generated based on historical video request data is obtained, where the multivariate fitting model is used to characterize the changing relationship between multiple video parameters and edge node throughput, where the video parameters include video copy quantity, predicted request quantity, and video bit rate; the predicted request quantity and video bit rate corresponding to each video are input into the multivariate fitting model to obtain a target fitting model corresponding to each video.

[0103] Based on the above technical solutions, the video push module 340 includes:

[0104] A target edge throughput optimization function determination unit, configured to determine a target edge throughput optimization function corresponding to all videos based on the target fitting model;

[0105] The target copy amount determination unit is used to maximize the target edge throughput optimization function based on preset constraints to obtain the target copy amount corresponding to each video.

[0106] Based on the above technical solutions, the target edge throughput optimization function determination unit includes:

[0107] A total edge throughput sub-function determining sub-unit, used to determine the total edge throughput sub-function corresponding to each video based on the target fitting model and the video copy increment and the existing copy amount corresponding to each video;

[0108] A target edge throughput optimization function determination subunit, used to determine the target edge throughput optimization function corresponding to all videos based on the total edge throughput subfunction corresponding to each video;

[0109] The total edge throughput sub-function and the target edge throughput optimization function both take the video copy increment corresponding to each video as the optimization object.

[0110] On the basis of the above technical solutions, the preset constraint condition includes: the total video copy increment corresponding to all videos is less than or equal to the copy amount threshold.

[0111] On the basis of the above technical solutions, the total edge throughput sub-function determining sub-unit is specifically used for:

[0112] Based on the video copy increment and the existing copy amount corresponding to each video, the total copy amount corresponding to each video is determined; based on the target fitting model and the total copy amount, the total edge throughput sub-function corresponding to each video is determined.

[0113] Based on the above technical solutions, the target edge throughput optimization function determines the sub-unit, including:

[0114] An existing edge throughput determination submodule, used to determine the existing edge throughput corresponding to each video based on the target fitting model and the existing copy amount corresponding to each video;

[0115] The target edge throughput optimization function determination submodule is used to determine the target edge throughput optimization function corresponding to all videos based on the total edge throughput subfunction corresponding to each video and the existing edge throughput.

[0116] Based on the above technical solutions, the target edge throughput optimization function determines the submodule, which is specifically used for:

[0117] The total edge throughput sub-function corresponding to each video is subtracted from the corresponding existing edge throughput to obtain the edge throughput increment sub-function corresponding to each video; the edge throughput increment sub-functions corresponding to all videos are added together to obtain the target edge throughput optimization function corresponding to all videos.

[0118] Based on the above technical solutions, the video set acquisition module 310 is specifically used to:

[0119] Get the video set to be pushed in the current push cycle, where each preset duration in the non-request peak period is a push cycle;

[0120] The video push module 340 is specifically configured to push the video based on the target copy amount at the end time of the current push cycle.

[0121] The video push device provided in the embodiments of the present disclosure can execute the video push method provided in any embodiment of the present disclosure, and has the corresponding functional modules and beneficial effects for executing the video push method.

[0122] It is worth noting that the various units and modules included in the above-mentioned device are only divided according to functional logic, but are not limited to the above-mentioned division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the protection scope of the embodiments of the present disclosure.

[0123] Figure 6 This is a schematic diagram of the structure of an electronic device provided by an embodiment of the present disclosure. Figure 6 , which shows an electronic device (eg, Figure 6The terminal device in the embodiment of the present disclosure may include but is not limited to mobile terminals such as mobile phones, notebook computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc. Figure 6 The electronic device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present disclosure.

[0124] like Figure 6 As shown, the electronic device 500 may include a processing device (e.g., a central processing unit, a graphics processing unit, etc.) 501, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 502 or a program loaded from a storage device 508 into a random access memory (RAM) 503. In the RAM 503, various programs and data required for the operation of the electronic device 500 are also stored. The processing device 501, the ROM 502, and the RAM 503 are connected to each other via a bus 504. An edit / output (I / O) interface 505 is also connected to the bus 504.

[0125] Typically, the following devices may be connected to the I / O interface 505: an input device 506 including, for example, a touch screen, a touch pad, a keyboard, a mouse, a camera, a microphone, an accelerometer, a gyroscope, etc.; an output device 507 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; a storage device 508 including, for example, a magnetic tape, a hard disk, etc.; and a communication device 509. The communication device 509 may allow the electronic device 500 to communicate with other devices wirelessly or by wire to exchange data. Although Figure 6 The electronic device 500 is shown with various devices, but it should be understood that it is not required to implement or possess all the devices shown. More or fewer devices may be implemented or possessed instead.

[0126] In particular, according to an embodiment of the present disclosure, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present disclosure includes a computer program product, which includes a computer program carried on a non-transitory computer-readable medium, and the computer program contains program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication device 509, or installed from a storage device 508, or installed from a ROM 502. When the computer program is executed by the processing device 501, the above-mentioned functions defined in the method of the embodiment of the present disclosure are executed.

[0127] The names of the messages or information exchanged between multiple devices in the embodiments of the present disclosure are only used for illustrative purposes and are not used to limit the scope of these messages or information.

[0128] The electronic device provided by the embodiment of the present disclosure and the video push method provided by the above embodiment belong to the same inventive concept. The technical details not fully described in this embodiment can be referred to the above embodiment, and this embodiment has the same beneficial effects as the above embodiment.

[0129] The embodiment of the present disclosure provides a computer storage medium on which a computer program is stored. When the program is executed by a processor, the video push method provided in the above embodiment is implemented.

[0130] It should be noted that the computer-readable medium disclosed above may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present disclosure, a computer-readable storage medium may be any tangible medium containing or storing a program that may be used by or in combination with an instruction execution system, device or device. In the present disclosure, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, in which a computer-readable program code is carried. This propagated data signal may take a variety of forms, including but not limited to an electromagnetic signal, an optical signal, or any suitable combination of the above. The computer readable signal medium may also be any computer readable medium other than a computer readable storage medium, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer readable medium may be transmitted using any suitable medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.

[0131] In some embodiments, the client and the server may communicate using any currently known or future developed network protocol such as HTTP (HyperText Transfer Protocol), and may be interconnected with any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include a local area network ("LAN"), a wide area network ("WAN"), an internet (e.g., the Internet), and a peer-to-peer network (e.g., an ad hoc peer-to-peer network), as well as any currently known or future developed network.

[0132] The computer-readable medium may be included in the electronic device, or may exist independently without being incorporated into the electronic device.

[0133] The computer-readable medium carries one or more programs. When the one or more programs are executed by the electronic device, the electronic device: obtains a video set to be pushed; predicts the popularity of each video in the video set, and determines the predicted request volume of each video during the request peak period; determines a target fitting model corresponding to each video based on the predicted request volume and video bit rate corresponding to each video, and the target fitting model is used to characterize the changing relationship between the video copy volume and the edge node throughput; makes an optimization decision on the video copy volume based on the target fitting model, determines the target copy volume corresponding to each video determined, and pushes the video based on the target copy volume during the non-request peak period.

[0134] Computer program code for performing the operations of the present disclosure may be written in one or more programming languages ​​or a combination thereof, including, but not limited to, object-oriented programming languages, such as Java, Smalltalk, C++, and conventional procedural programming languages, such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., through the Internet using an Internet service provider).

[0135] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present disclosure. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some implementations as replacements, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0136] The units involved in the embodiments described in the present disclosure may be implemented by software or hardware. The name of a unit does not limit the unit itself in some cases. For example, the first acquisition unit may also be described as a "unit for acquiring at least two Internet Protocol addresses".

[0137] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.

[0138] In the context of the present disclosure, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0139] According to one or more embodiments of the present disclosure, [Example 1] provides a video push method, including:

[0140] Get the video collection to be pushed;

[0141] Predicting the popularity of each video in the video set to determine a predicted request volume for each video during a peak request period;

[0142] Determine a target fitting model corresponding to each video based on the predicted request amount and the video bit rate corresponding to each video, wherein the target fitting model is used to characterize the relationship between the video copy amount and the edge node throughput;

[0143] An optimization decision is made on the video copy amount based on the target fitting model, a target copy amount corresponding to each video determined by the decision is determined, and video push is performed based on the target copy amount during a non-request peak period.

[0144] According to one or more embodiments of the present disclosure, [Example 2] provides a video push method, further comprising:

[0145] Optionally, performing popularity prediction on each video in the video set to determine a predicted request volume of each video during a request peak period includes:

[0146] Obtaining video feature information and historical request volume corresponding to each video in the video set;

[0147] Input the video feature information and historical request volume corresponding to each video into the target regression model to predict popularity;

[0148] Based on the output of the target regression model, the predicted request volume of each video during the request peak period is obtained.

[0149] According to one or more embodiments of the present disclosure, [Example 3] provides a video push method, further comprising:

[0150] Optionally, determining the target fitting model corresponding to each video based on the predicted request amount and the video bit rate corresponding to each video includes:

[0151] Obtaining a multivariate fitting model generated based on historical video request data, wherein the multivariate fitting model is used to characterize a change relationship between a plurality of video parameters and edge node throughput, wherein the video parameters include a video copy amount, a predicted request amount, and a video bit rate;

[0152] The predicted request amount and video bit rate corresponding to each video are input into the multivariate fitting model to obtain the target fitting model corresponding to each video.

[0153] According to one or more embodiments of the present disclosure, [Example 4] provides a video push method, further comprising:

[0154] Optionally, performing an optimization decision on the video copy amount based on the target fitting model to determine a target copy amount corresponding to each video determined by the decision includes:

[0155] Based on the target fitting model, determining a target edge throughput optimization function corresponding to all videos;

[0156] Based on preset constraints, the target edge throughput optimization function is maximized to obtain the target copy quantity corresponding to each solved video.

[0157] According to one or more embodiments of the present disclosure, [Example 5] provides a video push method, further comprising:

[0158] Optionally, determining a target edge throughput optimization function corresponding to all videos based on the target fitting model includes:

[0159] Determine a total edge throughput sub-function corresponding to each video based on the target fitting model and the video copy increment and the existing copy amount corresponding to each video;

[0160] Based on the total edge throughput sub-function corresponding to each video, determine the target edge throughput optimization function corresponding to all videos;

[0161] The total edge throughput sub-function and the target edge throughput optimization function both take the video copy increment corresponding to each video as the optimization object.

[0162] According to one or more embodiments of the present disclosure, [Example 6] provides a video push method, further comprising:

[0163] Optionally, the preset constraint condition includes: a total video copy increment corresponding to all videos is less than or equal to a copy amount threshold.

[0164] According to one or more embodiments of the present disclosure, [Example 7] provides a video push method, further comprising:

[0165] Optionally, determining the total edge throughput sub-function corresponding to each video based on the target fitting model and the video copy increment and the existing copy amount corresponding to each video includes:

[0166] Determine the total copy amount corresponding to each video based on the video copy increment corresponding to each video and the existing copy amount;

[0167] Based on the target fitting model and the total copy amount, a total edge throughput sub-function corresponding to each video is determined.

[0168] According to one or more embodiments of the present disclosure, [Example 8] provides a video push method, further comprising:

[0169] Optionally, determining the target edge throughput optimization function corresponding to all videos based on the total edge throughput sub-function corresponding to each video includes:

[0170] Determine the existing edge throughput corresponding to each video based on the target fitting model and the existing copy amount corresponding to each video;

[0171] Based on the total edge throughput sub-function corresponding to each video and the existing edge throughput, the target edge throughput optimization function corresponding to all videos is determined.

[0172] According to one or more embodiments of the present disclosure, [Example 9] provides a video push method, further comprising:

[0173] Optionally, determining the target edge throughput optimization function corresponding to all videos based on the total edge throughput sub-function corresponding to each video and the existing edge throughput includes:

[0174] Subtract the total edge throughput sub-function corresponding to each video from the corresponding existing edge throughput to obtain the edge throughput increment sub-function corresponding to each video;

[0175] The edge throughput increment sub-functions corresponding to all videos are added together to obtain the target edge throughput optimization functions corresponding to all videos.

[0176] According to one or more embodiments of the present disclosure, [Example 10] provides a video push method, further comprising:

[0177] Optionally, obtaining a video set to be pushed includes:

[0178] Get the video set to be pushed in the current push cycle, where each preset duration in the non-request peak period is a push cycle;

[0179] The pushing of the video based on the target copy amount during the non-request peak period includes:

[0180] At the end of the current push cycle, video push is performed based on the target copy amount.

[0181] According to one or more embodiments of the present disclosure, [Example 11] provides a video push device, including:

[0182] A video collection acquisition module is used to acquire the video collection to be pushed;

[0183] A predicted request volume determination module, used to perform popularity prediction on each video in the video set, and determine the predicted request volume of each video during a request peak period;

[0184] A target fitting model determination module, used to determine a target fitting model corresponding to each video based on the predicted request amount and video bit rate corresponding to each video, wherein the target fitting model is used to characterize the change relationship between the video copy amount and the edge node throughput;

[0185] The video push module is used to make an optimization decision on the video copy amount based on the target fitting model, determine the target copy amount corresponding to each video decided, and push the video based on the target copy amount during the non-request peak period.

[0186] The above description is only a preferred embodiment of the present disclosure and an explanation of the technical principles used. Those skilled in the art should understand that the scope of disclosure involved in the present disclosure is not limited to the technical solutions formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the above disclosed concept. For example, the above features are replaced with the technical features with similar functions disclosed in the present disclosure (but not limited to) by each other to form a technical solution.

[0187] In addition, although each operation is described in a specific order, this should not be understood as requiring these operations to be performed in the specific order shown or in a sequential order. Under certain circumstances, multitasking and parallel processing may be advantageous. Similarly, although some specific implementation details are included in the above discussion, these should not be interpreted as limiting the scope of the present disclosure. Some features described in the context of a separate embodiment can also be implemented in a single embodiment in combination. On the contrary, the various features described in the context of a single embodiment can also be implemented in multiple embodiments individually or in any suitable sub-combination mode.

[0188] Although the subject matter has been described in language specific to structural features and / or methodological logical actions, it should be understood that the subject matter defined in the appended claims is not necessarily limited to the specific features or actions described above. On the contrary, the specific features and actions described above are merely example forms of implementing the claims.

Claims

1. A video push method, characterized in that: include: Get the video collection to be pushed; Predicting the popularity of each video in the video set to determine a predicted request volume for each video during a peak request period; Based on the predicted request amount and video bit rate corresponding to each video, determine the target fitting model corresponding to each video, wherein the target fitting model is used to characterize the changing relationship between the video copy amount and the edge node throughput, wherein the video copy amount refers to the number of copies of the same video, each copied video is cached on an edge node, and the video copy amount is equal to the number of edge nodes that cache the video; An optimization decision is made on the video copy amount based on the target fitting model, a target copy amount corresponding to each video determined is determined, and the video is pushed to the edge node network based on the target copy amount during a non-request peak period.

2. The video push method according to claim 1, characterized in that: The performing popularity prediction on each video in the video set to determine the predicted request volume of each video in the request peak period includes: Obtaining video feature information and historical request volume corresponding to each video in the video set; Input the video feature information and historical request volume corresponding to each video into the target regression model to predict popularity; Based on the output of the target regression model, the predicted request volume of each video during the request peak period is obtained.

3. The video push method according to claim 1, characterized in that: The step of determining a target fitting model corresponding to each video based on the predicted request amount and the video bit rate corresponding to each video includes: Obtaining a multivariate fitting model generated based on historical video request data, wherein the multivariate fitting model is used to characterize a change relationship between a plurality of video parameters and edge node throughput, wherein the video parameters include a video copy amount, a predicted request amount, and a video bit rate; The predicted request amount and video bit rate corresponding to each video are input into the multivariate fitting model to obtain the target fitting model corresponding to each video.

4. The video push method according to claim 1, characterized in that: The optimizing decision of the video copy amount based on the target fitting model and determining the target copy amount corresponding to each video determined by the decision include: Based on the target fitting model, determining a target edge throughput optimization function corresponding to all videos; Based on preset constraints, the target edge throughput optimization function is maximized to obtain the target copy quantity corresponding to each solved video.

5. The video push method according to claim 4, characterized in that: The step of determining a target edge throughput optimization function corresponding to all videos based on the target fitting model includes: Determine a total edge throughput sub-function corresponding to each video based on the target fitting model and the video copy increment and the existing copy amount corresponding to each video; Based on the total edge throughput sub-function corresponding to each video, determine the target edge throughput optimization function corresponding to all videos; The total edge throughput sub-function and the target edge throughput optimization function both take the video copy increment corresponding to each video as the optimization object.

6. The video push method according to claim 5, characterized in that: The preset constraint condition includes: the total video copy increment corresponding to all videos is less than or equal to the copy amount threshold.

7. The video push method according to claim 5, characterized in that: The determining of the total edge throughput sub-function corresponding to each video based on the target fitting model and the video copy increment and the existing copy amount corresponding to each video includes: Determine the total copy amount corresponding to each video based on the video copy increment corresponding to each video and the existing copy amount; Based on the target fitting model and the total copy amount, a total edge throughput sub-function corresponding to each video is determined.

8. The video push method according to claim 5, characterized in that: The determining of the target edge throughput optimization function corresponding to all videos based on the total edge throughput sub-function corresponding to each video includes: Determine the existing edge throughput corresponding to each video based on the target fitting model and the existing copy amount corresponding to each video; Based on the total edge throughput sub-function corresponding to each video and the existing edge throughput, the target edge throughput optimization function corresponding to all videos is determined.

9. The video push method according to claim 8, characterized in that: The determining of the target edge throughput optimization function corresponding to all videos based on the total edge throughput sub-function corresponding to each video and the existing edge throughput includes: Subtract the total edge throughput sub-function corresponding to each video from the corresponding existing edge throughput to obtain the edge throughput increment sub-function corresponding to each video; The edge throughput increment sub-functions corresponding to all videos are added together to obtain the target edge throughput optimization functions corresponding to all videos.

10. The video push method according to any one of claims 1 to 9, characterized in that: The step of obtaining a video set to be pushed includes: Get the video set to be pushed in the current push cycle, where each preset duration in the non-request peak period is a push cycle; The pushing of the video to the edge node network based on the target copy amount during the non-request peak period includes: At the end of the current push cycle, the video is pushed to the edge node network based on the target copy amount.

11. A video push device, characterized in that: include: A video collection acquisition module is used to acquire the video collection to be pushed; A predicted request volume determination module, used to perform popularity prediction on each video in the video set, and determine the predicted request volume of each video during a request peak period; A target fitting model determination module is used to determine a target fitting model corresponding to each video based on the predicted request amount and video bit rate corresponding to each video, wherein the target fitting model is used to characterize the changing relationship between the video copy amount and the edge node throughput, wherein the video copy amount refers to the number of copies of the same video, each copied video is cached on an edge node, and the video copy amount is equal to the number of edge nodes that cache the video; The video push module is used to make an optimization decision on the video copy amount based on the target fitting model, determine the target copy amount corresponding to each video decided, and push the video to the edge node network based on the target copy amount during the non-request peak period.

12. An electronic device, characterized in that: The electronic device comprises: one or more processors; a storage device for storing one or more programs, When the one or more programs are executed by the one or more processors, the one or more processors implement the video pushing method as described in any one of claims 1-10.

13. A storage medium containing computer executable instructions, characterized in that: The computer executable instructions are used to execute the video pushing method as described in any one of claims 1-10 when executed by a computer processor.