A lining pouring construction method for coping with systematic over-excavation of a tunnel
By adjusting the tunnel design outline and using a lining trolley for direct lining pouring, the problems of construction delays and concrete waste caused by systematic over-excavation of the tunnel were solved, achieving efficient tunnel construction.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CHINA RAILWAY 18TH BUREAU GRP CO LTD
- Filing Date
- 2023-07-05
- Publication Date
- 2026-07-07
AI Technical Summary
In existing tunnel construction, systematic over-excavation leads to delays in construction progress and increases in concrete usage. Traditional methods require spraying concrete to fill the over-excavated portion before lining is poured, which increases project costs.
By measuring the tunnel cross-section and adjusting the lining design outline, the lining is poured directly using a lining trolley, avoiding the use of sprayed concrete. A trolley with specific performance is used to pour the lining according to the adjusted outline.
Shorten the construction period, reduce the amount of concrete used, meet the requirements of green construction, and reduce project costs.