Railway line tunnel crossing coal mine goaf treatment method
By combining a specially designed grouting pipe with an exhaust hose and an expansion airbag, the problem of air emission during the grouting process is solved, ensuring the safety and quality of the grouting process, and achieving effective air removal and a reduction in the amount of work required.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- THE 8TH GRP OF CHINA RAILWAY 1ST ENG CO LTD
- Filing Date
- 2023-08-29
- Publication Date
- 2026-07-14
AI Technical Summary
In existing technologies, grouting pipes cannot effectively expel air from the goaf of coal mines, which leads to an impact on grouting pressure and an increase in construction workload. Furthermore, additional drilling or insertion holes cannot be effectively sealed, which may cause grout to flow out, affecting construction safety and quality.
A specially designed grouting pipe is used, combined with an exhaust hose and an expansion airbag. Air is discharged through an axial channel and an inflation passage. The detection components are used to monitor the condition of the goaf in real time to ensure the safety and effectiveness of the grouting process.
This method effectively removes air from the goaf during grouting, preventing increased air pressure, ensuring worker safety, reducing construction work, and improving grouting quality and safety.
Smart Images

Figure CN117072203B_ABST
Abstract
Citation Information
Patent Citations
CN116427995A
CN209115120U