Bellows fixation device, tower drum mold and tower drum segment
By using bellows clamps and positioning seats to fix the position of the bellows in the wind turbine tower tube section, combined with the positioning rod of the elastic fastener, the problems of high cost and low efficiency caused by large top molds are solved, and precise positioning and efficient production are achieved.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- 上海风领新能源有限公司
- Filing Date
- 2023-11-30
- Publication Date
- 2026-06-26
AI Technical Summary
In existing technologies, wind turbine tower tube sections require large top molds to position the corrugated pipes during the manufacturing process, resulting in high production, transportation, and installation costs, and making it difficult to adapt to the needs of different tube segment sizes, thus leading to low efficiency.
A corrugated pipe clamp is used to fix the position of the corrugated pipe at the top, and a positioning seat is used to fix the position of the corrugated pipe at the bottom. A positioning rod is inserted in the middle and positioned by elastic fasteners to ensure the positional accuracy and stability of the corrugated pipe and reduce the construction difficulty.
It achieves precise positioning of corrugated pipes, reduces construction difficulty and cost, improves production efficiency, and adapts to the needs of different pipe segment sizes.
Smart Images

Figure CN117656328B_ABST