Communication base station control method, device, electronic device and storage medium

By obtaining response status data and using real-time scheduling models and rolling correction algorithms to optimize the control plan of communication base stations, the problem of idle backup batteries and poor control effects of communication base stations is solved, and more efficient resource coordination and control effects are achieved.

CN117939602BActive Publication Date: 2024-10-18铁塔能源有限公司 +1
View PDF 12 Cites 0 Cited by

Patent Information

Application Number
CN202410101160.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-24
Publication Date
2024-10-18
Estimated Expiration
2044-01-24

AI Technical Summary

Technical Problem

When a mains power outage occurs in a communication base station, the backup battery is idle, resulting in a waste of flexible and adjustable energy storage resources, and the day-ahead dispatch cannot coordinate other site resources in a timely manner, resulting in poor control effects.

Method used

By obtaining the response status data, input it into the real-time dispatch model for load prediction, and use the rolling correction algorithm to modify the control plan and generate control instructions to optimize the working status of the communication base station and improve the control effect.

Benefits of technology

It improves the control effect of communication base stations, optimizes the use of backup batteries, ensures resource coordination capabilities in emergencies, and reduces control uncertainty.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117939602B_ABST
    Figure CN117939602B_ABST
Patent Text Reader

Abstract

The present application provides a control method, device, electronic device and storage medium for a communication base station, which relates to the field of communication technology. The method includes: obtaining response status data; inputting the response status data into a real-time scheduling model for prediction, and obtaining a first load prediction result within a target time period; correcting the first control plan according to a rolling correction algorithm to obtain a second control plan; generating a control instruction according to the second control plan, and controlling the working status of multiple communication base stations within the target time period according to the control instruction. After obtaining the response status data, the present application inputs the response status data into a real-time scheduling model to output a load prediction result, and corrects the load prediction result according to a rolling correction algorithm, thereby generating a control instruction to control the working status of the multiple communication base stations within the target time period, thereby improving the control effect of the communication base station.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present application relate to the field of communication technology, and in particular, to a control method, device, electronic device and storage medium for a communication base station. Background Art

[0002] With the development of communication technology, the power of communication base stations is jointly supplied by AC mains and backup batteries. When the AC mains is interrupted, the backup batteries supply power to the communication equipment alone. Since the frequency of mains interruptions is relatively low, the backup batteries of base stations are usually idle, resulting in a large waste of flexible and adjustable energy storage resources. In the current scheduling method, idle backup batteries are used to participate in the grid's day-ahead demand response, optimize battery scheduling and increase response subsidies without affecting the normal operation of base stations. However, day-ahead scheduling cannot perceive abnormal signals that occur during the actual demand response process. When a sudden abnormal condition occurs in the end-side communication base station and the communication base station exits urgently, day-ahead scheduling cannot coordinate other site resources in time to make up for it, resulting in poor control of the communication base station. Summary of the invention

[0003] The embodiments of the present application provide a control method, device, electronic device and storage medium for a communication base station to solve the problem of poor control effect of the communication base station in the prior art.

[0004] To solve the above problems, this application is implemented as follows:

[0005] In a first aspect, an embodiment of the present application provides a control method for a communication base station, the method comprising:

[0006] Acquiring response status data, wherein the response status data is used to indicate the operating status of multiple communication base stations;

[0007] Inputting the response status data into a real-time scheduling model for prediction to obtain a first load prediction result within a target time period, wherein the first load prediction result is used to indicate the loads that need to be output by the multiple communication base stations within the target time period;

[0008] Correcting the first control plan according to the rolling correction algorithm to obtain a second control plan, wherein the first control plan is generated according to the first load forecast result;

[0009] A control instruction is generated according to the second control plan, and the working status of the plurality of communication base stations is controlled within the target time period according to the control instruction.

[0010] Optionally, before inputting the response status data into the real-time scheduling model to generate a first load forecast result within a target time period, the method further includes:

[0011] Determine a first time point, a second time point, a first time interval, and a second time interval according to the response status data, wherein the first time point is the start time of executing the control instruction, the second time point is the end time of stopping executing the control instruction, the first time interval is the calculation time interval of the multiple communication base stations, the second time interval is the accuracy of the calculation time of the multiple communication base stations, and the second time interval is less than or equal to the first time interval;

[0012] The target time period is determined according to the first time point, the second time point and the first time interval, the start time point of the target time period is after the first time point, and the time interval between the target time period and the first time point is the time point of the first time interval, and the end time point of the target time period is the second time point.

[0013] Optionally, the load forecast result includes a plurality of second load forecast results, and the response state data is input into a real-time scheduling model to generate a first load forecast result within a target time period, including:

[0014] Within the target time period, when the current time point is after the first time point and the time interval between the current time point and the first time point is a third time interval, the response status data is input into the real-time scheduling model to generate the second load forecast result within the target time period, where N is a positive integer and the third time interval is the sum of N first time intervals.

[0015] Optionally, before inputting the response status data into the real-time scheduling model to generate a first load forecast result within a target time period, the method further includes:

[0016] Determine target variables to be optimized for the multiple communication base stations, where the target variables are used to characterize at least one of the following: a response plan of the communication base station, a charge and discharge plan of the communication base station, power consumption of the communication base station, and a response capacity of the communication base station;

[0017] Determine an objective function according to the objective variable, and determine a constraint condition according to the objective variable, wherein the objective function is used to calculate the objective variable, and the constraint condition is used to constrain the objective function;

[0018] The real-time scheduling model is generated based on the objective function and the constraint conditions.

[0019] Optionally, determining the objective function according to the objective variable, and determining the constraint condition according to the objective variable, includes:

[0020] Determine, according to the target variable, the response capacity deviation assessment cost, the equipment operation and maintenance cost, the electricity cost and the response subsidy corresponding to the multiple communication base stations;

[0021] generating the objective function based on the response capacity deviation assessment cost, the equipment operation and maintenance cost, the electricity cost and the response subsidy, wherein the objective function represents a minimum value of the target cost, and the minimum value of the target cost is the sum of the response capacity deviation assessment cost, the equipment operation and maintenance cost and the electricity cost minus the response subsidy;

[0022] Determine the household power consumption constraints, household response capacity constraints, switch power supply continuous response constraints, switch power supply charging constraints, backup battery power constraints, virtual power plant response effective identification constraints, virtual power plant response total capacity constraints, real-time tracking day-ahead constraints and switch power supply instruction control constraints corresponding to the multiple communication base stations according to the target variables;

[0023] The constraint conditions are generated based on the household power consumption constraint, the household response capacity constraint, the switch power supply continuous response constraint, the switch power supply charging constraint, the backup battery power constraint, the virtual power plant response effective recognition constraint, the virtual power plant response total capacity constraint, the real-time tracking day-ahead constraint and the switch power supply instruction control constraint.

[0024] Optionally, the step of correcting the first control plan according to the rolling correction algorithm to obtain the second control plan includes:

[0025] In the case where an abnormal communication base station is detected in the first control plan according to the rolling correction algorithm, a reply instruction is generated, wherein the reply instruction is used to add a new communication base station;

[0026] The first control plan is modified according to the reply instruction to obtain the second control plan.

[0027] Optionally, the step of correcting the first control plan according to the rolling correction algorithm to obtain the second control plan includes:

[0028] Obtain the upper limit and lower limit of response capacity assessment;

[0029] The first control plan is corrected according to the response capacity assessment upper limit, the response capacity assessment lower limit and the rolling correction algorithm to obtain the second control plan.

[0030] In a second aspect, an embodiment of the present application provides a control device for a communication base station, the device comprising:

[0031] An acquisition module, used to acquire response status data, wherein the response status data is used to indicate the operation status of multiple communication base stations;

[0032] A prediction module, used for inputting the response status data into a real-time scheduling model for prediction, and obtaining a first load prediction result within a target time period, wherein the first load prediction result is used for indicating the loads that need to be output by the multiple communication base stations within the target time period;

[0033] a correction module, configured to correct the first control plan according to a rolling correction algorithm to obtain a second control plan, wherein the first control plan is generated according to the first load forecast result;

[0034] A generation module is used to generate a control instruction according to the second control plan, and control the working status of the multiple communication base stations within the target time period according to the control instruction.

[0035] In a third aspect, an embodiment of the present application further provides a communication device, comprising: a transceiver, a memory, a processor, and a program stored in the memory and executable on the processor; the processor is used to read the program in the memory to implement the steps in the method described in the first aspect above.

[0036] In a fourth aspect, an embodiment of the present application further provides a readable storage medium for storing a program, which, when executed by a processor, implements the steps in the method described in the first aspect above.

[0037] The present application provides a control method, device, electronic device and storage medium for a communication base station, and relates to the field of communication technology. The method includes: obtaining response status data, the response status data is used to indicate the operating status of multiple communication base stations; inputting the response status data into a real-time scheduling model for prediction, and obtaining a first load prediction result within a target time period, the first load prediction result is used to indicate the load that the multiple communication base stations need to output within the target time period; correcting the first control plan according to a rolling correction algorithm to obtain a second control plan, the first control plan is generated according to the first load prediction result; generating a control instruction according to the second control plan, and controlling the working status of the multiple communication base stations within the target time period according to the control instruction. After obtaining the response status data, the present application inputs the response status data into a real-time scheduling model to output a load prediction result, and corrects the load prediction result according to a rolling correction algorithm, thereby generating a control instruction to control the working status of the multiple communication base stations within the target time period, thereby improving the control effect of the communication base station. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the description of the embodiments of the present application will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0039] Figure 1 It is a flowchart of a control method of a communication base station provided in an embodiment of the present application;

[0040] Figure 2 is a structural diagram of a control device of a communication base station provided in an embodiment of the present application;

[0041] Figure 3 It is a structural diagram of the communication device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0042] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0043] The terms "first", "second" etc. in the embodiments of the present application are used to distinguish similar objects, and need not be used to describe a specific order or sequential order. In addition, the terms "include" and "have" and any variation thereof are intended to cover non-exclusive inclusions, for example, the process, method, system, product or equipment comprising a series of steps or units need not be limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or equipment. In addition, "and / or" is used in the present application to represent at least one of connected objects, such as A and / or B and / or C, representing the inclusion of separate A, separate B, separate C, and A and B all exist, B and C all exist, A and C all exist, and 7 situations that A, B and C all exist.

[0044] See also Figure 1 , Figure 1 It is a flow chart of the control method of the communication base station provided in the embodiment of the present application.

[0045] like Figure 1 As shown, the control method of the communication base station may include the following steps:

[0046] Step 101: Acquire response status data, where the response status data is used to indicate the operating status of multiple communication base stations.

[0047] In this embodiment, the response status data is data corresponding to multiple base stations, wherein the response status data may include, but is not limited to, the operating status of the switch power supply (whether abnormal), the response status of the switch power supply (whether responsive), the real-time capacity of the backup battery, and other information. In addition, the response status data may also include historical power, historical weather, and future weather forecast data from multiple communication base stations, etc. It should be noted that these data generally come from widely distributed sensors and detection equipment, so that the response status data can be obtained in real time, and a control strategy can be generated based on the response status data to control multiple base stations.

[0048] Step 102: input the response status data into a real-time scheduling model for prediction to obtain a first load prediction result within a target time period, wherein the first load prediction result is used to indicate the loads that need to be output by the multiple communication base stations within the target time period.

[0049] In this embodiment, the real-time scheduling model is used to predict the first load forecast result, wherein the first load forecast result is used to indicate the load that needs to be output by the multiple communication base stations within the target time period. Specifically, the latest response status data is obtained, and the next step is to update the ultra-short-term load forecast result. By calling the ultra-short-term prediction algorithm package, the household number predicted mains power and the equipment predicted DC load power are updated according to more accurate and timely real-time information. As the prediction time scale continues to shorten, the prediction model can more keenly capture the instantaneous changes and fluctuations in the load, more accurately reflect the actual load level, help reduce the disturbance of uncertainty to demand response, and improve the stability of the real-time rolling correction algorithm.

[0050] Step 103: Correct the first control plan according to the rolling correction algorithm to obtain a second control plan, where the first control plan is generated according to the first load forecast result.

[0051] In this embodiment, the rolling correction algorithm is used to correct the first control plan according to the adjustment of the real-time parameter variables, so as to obtain the second control plan. Specifically, by evaluating the operating status of the current communication base station, an adjustment plan is formulated. The rolling correction algorithm takes into account a variety of factors, such as virtual power plant response deviation, communication base station abnormal alarm, switching power supply day-ahead response plan, switching power supply historical response status, backup battery adjustable capacity, etc. Through the real-time rolling correction algorithm, the response status of the equipment that needs to be adjusted in the first control plan can be calculated through the above factors, thereby generating a second control plan. It should be noted that the equipment response status includes normal status, change status, and newly added equipment status, etc., which are not specifically limited in this embodiment.

[0052] Step 104: Generate a control instruction according to the second control plan, and control the working status of the multiple communication base stations within the target time period according to the control instruction.

[0053] In this embodiment, a control instruction is generated according to a second control plan that is modified from the first control plan. The control instruction is used to control the working status of the multiple communication base stations within the target time period. Specifically, the adjustment scheme generated by the real-time rolling correction algorithm will be sent to each switching power supply and backup battery of the communication base station. These instructions involve the setting of the switching power supply voltage, including floating charge voltage, discharge voltage, and non-charge and non-discharge voltage. The issuance of instructions usually requires a quick response to ensure that the virtual power plant can adjust the response plan in time during actual operation. Among them, the target time period can be a time period set by the user, such as 2 o'clock to 12 o'clock, which can be adjusted according to actual conditions.

[0054] The present application provides a control method for a communication base station, the method comprising: obtaining response status data, the response status data being used to indicate the operating status of multiple communication base stations; inputting the response status data into a real-time scheduling model for prediction, and obtaining a first load prediction result within a target time period, the first load prediction result being used to indicate the load that the multiple communication base stations need to output within the target time period; correcting a first control plan according to a rolling correction algorithm to obtain a second control plan, the first control plan being generated according to the first load prediction result; generating a control instruction according to the second control plan, and controlling the working status of the multiple communication base stations within the target time period according to the control instruction. The present application obtains the response status data, inputs the response status data into a real-time scheduling model to output a load prediction result, and corrects the load prediction result according to a rolling correction algorithm, thereby generating a control instruction to control the working status of the multiple communication base stations within the target time period, thereby improving the control effect of the communication base station.

[0055] In some feasible implementations, optionally, before inputting the response status data into the real-time scheduling model to generate a first load forecast result within a target time period, the method further includes:

[0056] Determine a first time point, a second time point, a first time interval, and a second time interval according to the response status data, wherein the first time point is the start time of executing the control instruction, the second time point is the end time of stopping executing the control instruction, the first time interval is the calculation time interval of the multiple communication base stations, the second time interval is the accuracy of the calculation time of the multiple communication base stations, and the second time interval is less than or equal to the first time interval;

[0057] The target time period is determined according to the first time point, the second time point and the first time interval, the start time point of the target time period is after the first time point, and the time interval between the target time period and the first time point is the time point of the first time interval, and the end time point of the target time period is the second time point.

[0058] In this embodiment, the target time period is determined according to a first time point, a second time point and a first time interval. Among them, the first time point is the start time t of executing the control instruction, for example, 0:00. The second time point is the end time T of stopping the execution of the control instruction, for example, 2:15. The first time interval is the calculation time interval ΔT of multiple communication base stations, for example, 15 minutes. The second time interval is the accuracy Δt of the calculation time of multiple communication base stations, for example, 1 minute. By obtaining the latest response status data at time t, updating the ultra-short-term load forecast results for the time period t+ΔT~T, and performing a series of optimization calculations to determine the scheduling plan of the Δt level within t+ΔT~T, the scheduling instruction for the time period t+ΔT~T is finally issued.

[0059] Optionally, the load forecast result includes a plurality of second load forecast results, and the response state data is input into a real-time scheduling model to generate a first load forecast result within a target time period, including:

[0060] Within the target time period, when the current time point is after the first time point and the time interval between the current time point and the first time point is a third time interval, the response status data is input into the real-time scheduling model to generate the second load forecast result within the target time period, where N is a positive integer and the third time interval is the sum of N first time intervals.

[0061] In this embodiment, within the target time period, steps 101 to 104 are repeatedly executed at regular intervals, wherein when the current time point is after the first time point and the time interval between the current time point and the first time point is a third time interval, the response status data is input into the real-time scheduling model to generate the third load forecast result within the target time period. Specifically, for example, if the first time point is 0:00 and the third time interval is 15 minutes, the response data will be reacquired when 0:15 is reached. Similarly, when the time points such as 0:30, 0:45, etc. are reached, steps 101 to 104 will also be repeatedly executed.

[0062] Optionally, before inputting the response status data into the real-time scheduling model to generate a first load forecast result within a target time period, the method further includes:

[0063] Determine target variables to be optimized for the multiple communication base stations, where the target variables are used to characterize at least one of the following: a response plan of the communication base station, a charge and discharge plan of the communication base station, power consumption of the communication base station, and a response capacity of the communication base station;

[0064] Determine an objective function according to the objective variable, and determine a constraint condition according to the objective variable, wherein the objective function is used to calculate the objective variable, and the constraint condition is used to constrain the objective function;

[0065] The real-time scheduling model is generated based on the objective function and the constraint conditions.

[0066] In this embodiment, it should be noted that the scheduling time interval is Δt and the scheduling time window is ΔT. Since the load forecasting accuracy has the characteristic of gradually improving with the time scale, the shorter the forecasting time, the smaller the forecasting error is, and the smaller the uncertainty disturbance brought to the system is. After predicting the power of the ultra-short-term load, the switching power supply response state is adjusted by adding and changing.

[0067] Among them, the target variables include at least one of the following: a Δt-level response plan for the switching power supply within T to T+ΔT on D day; a Δt-level charging and discharging power plan for the backup battery within T to T+ΔT on D day; a Δt-level power consumption of the household within T to T+ΔT on D day; and a Δt-level response capacity of the household within T to T+ΔT on D day.

[0068] According to the target variable calculation, the target function and the constraint conditions are determined, wherein the target function is used to calculate the target variable, and the constraint conditions are used to constrain the target function. Finally, the real-time scheduling model is generated according to the target function and the constraint conditions.

[0069] Optionally, determining the objective function according to the objective variable, and determining the constraint condition according to the objective variable, includes:

[0070] Determine, according to the target variable, the response capacity deviation assessment cost, the equipment operation and maintenance cost, the electricity cost and the response subsidy corresponding to the multiple communication base stations;

[0071] generating the objective function based on the response capacity deviation assessment cost, the equipment operation and maintenance cost, the electricity cost and the response subsidy, wherein the objective function represents a minimum value of the target cost, and the minimum value of the target cost is the sum of the response capacity deviation assessment cost, the equipment operation and maintenance cost and the electricity cost minus the response subsidy;

[0072] Determine the household power consumption constraints, household response capacity constraints, switch power supply continuous response constraints, switch power supply charging constraints, backup battery power constraints, virtual power plant response effective identification constraints, virtual power plant response total capacity constraints, real-time tracking day-ahead constraints and switch power supply instruction control constraints corresponding to the multiple communication base stations according to the target variables;

[0073] The constraint conditions are generated based on the household power consumption constraint, the household response capacity constraint, the switch power supply continuous response constraint, the switch power supply charging constraint, the backup battery power constraint, the virtual power plant response effective recognition constraint, the virtual power plant response total capacity constraint, the real-time tracking day-ahead constraint and the switch power supply instruction control constraint.

[0074] In this embodiment, the economic level combines market rules to maximize the response subsidy while minimizing the electricity cost, and avoids the response capacity deviation assessment. At the same time, a multi-objective decomposition strategy is considered, including the response capacity deviation assessment cost C P , Equipment operation and maintenance costs caused by different equipment response priorities C H , Base station electricity cost C D With response subsidy C R wait.

[0075] This generates the objective function as follows:

[0076] min(C P +C H +C D -C R )

[0077]

[0078]

[0079]

[0080]

[0081] The constants include:

[0082] T is the time window for scheduling, which is 15 minutes in real-time scheduling.

[0083] Δt represents the scheduling time interval, which is 5 minutes in real-time scheduling.

[0084] ε represents the response capacity deviation penalty coefficient

[0085] δ represents the penalty coefficient for charging capacity deviation

[0086] Demand response subsidy price for time period t, in yuan / kWh

[0087] λ t The charging price of the backup battery in time period t, in yuan / kWh

[0088]

[0089] Backup battery floating charge power, in kW

[0090] The variables include:

[0091] C P Virtual power plant response capacity deviation assessment cost, unit: RMB

[0092]

[0093] C D The electricity cost of communication base stations, in yuan

[0094] C R Virtual power plant response subsidy, in yuan

[0095]

[0096] Backup battery i end-of-day charge slack capacity, in kW

[0097]

[0098] Response capacity of household number s in time period t, in kW.

[0099] The constraints are as follows:

[0100] Household power consumption constraints:

[0101] The household power consumption is based on its predicted power consumption, taking into account the load power provided by its backup battery and the charging power required for charging, while avoiding the household from sending power back to the grid.

[0102]

[0103] The constants include:

[0104] Predicted power consumption of household number s during period t, in kW

[0105] Predicted DC load power of the switching power supply during period i, in kW

[0106] Switching power supply i AC-DC power conversion factor

[0107] Backup battery i floating charge power, in kW

[0108] The variables include:

[0109] p s,t Electricity consumption of household number s during period t, in kW

[0110]

[0111] Account number response capacity constraints:

[0112] When the household power consumption drops below the baseline load, the household response is valid, and its response capacity is the difference between the baseline load and the power consumption; when the household power consumption is greater than the baseline load, the household response is invalid, and its response capacity is 0.

[0113]

[0114]

[0115]

[0116] The constants include:

[0117] Baseline load of household number s during period t, in kW

[0118] M is a sufficiently large positive number, usually 10 6

[0119] The variables include:

[0120]

[0121] Response capacity of household number s and time period t, in kW

[0122] p s,t Electricity power consumed by household s during period t, in kW.

[0123] Switching power supply continuous response constraints:

[0124] Once the switching power supply participates in the response, it must respond continuously. The latter can stop responding.

[0125]

[0126] The constants include:

[0127] The duration of the switching power supply i response, in time periods (15 minutes)

[0128] The variables include:

[0129]

[0130] Switching power supply maximum response times constraint:

[0131] The maximum number of responses of the switching power supply in a single invitation-type demand response is 1.

[0132] μ i,t -ν i,t =α i,t -α i,t-1

[0133] μ i,t +ν i,t ≤1

[0134]

[0135] The variables include:

[0136]

[0137] Switching power supply charging constraints:

[0138] The amount of charge required by the switching power supply is equal to the amount of power consumed by its backup battery due to participation in demand response.

[0139]

[0140] The constants include:

[0141] Predicted DC load power of the switching power supply during period i, in kW

[0142] Switching power supply i AC-DC power conversion factor

[0143] Backup battery i floating charge power, in kW

[0144] The variables include:

[0145]

[0146] The slack capacity of the backup battery at the end of day i, in kW.

[0147] Backup battery capacity limit:

[0148] The power of the backup battery at time t is equal to its power at time t-1 minus the power consumed in participating in demand response plus the power replenished by charging.

[0149]

[0150]

[0151] The constants include:

[0152] Switching power supply i predicts DC load power in time period t, in kW

[0153] Backup battery i floating charge power, in kW

[0154] The minimum capacity allowed for the backup battery i, in kWh

[0155] V i Maximum capacity of the backup battery i, in kWh

[0156] The variables include:

[0157] ESS i,t The power of backup battery i in time period t, in kWh

[0158]

[0159] Virtual power plant response effective identification constraints:

[0160] The criteria for determining effective virtual power plant response are: 1) the maximum load is less than the baseline maximum load; 2) the cumulative load is less than the baseline cumulative load.

[0161]

[0162]

[0163]

[0164] The constants include:

[0165] Baseline load of household number s during period t, in kW

[0166] Maximum baseline load of the virtual power plant invitation window, in kW

[0167] M is a sufficiently large positive number, usually 10 6

[0168] The variables include:

[0169]

[0170] Maximum power consumption of the virtual power plant invitation window, in kW

[0171] p s,t Electricity power consumed by household s during period t, in kW.

[0172] Virtual power plants respond to total capacity constraints:

[0173] The total response capacity of the virtual power plant is between the positive and negative deviation thresholds of the demand response assessment capacity [θ - ,θ + ] If this range is exceeded, deviation assessment penalties will be incurred.

[0174]

[0175] The constants include:

[0176] θ - Negative deviation threshold of virtual power plant demand response assessment capacity, %

[0177] θ + Virtual power plant demand response assessment capacity positive deviation threshold, %

[0178] D t Virtual power plant demand response winning bid capacity, in kW

[0179] The variables include:

[0180]

[0181] Response capacity of household number s in time period t, in kW.

[0182] Tracking day-ahead constraints in real time:

[0183] Real-time scheduling will track the results of day-ahead scheduling. If a switching power supply responds the day before but does not respond in real time, it will be penalized.

[0184]

[0185] The constants include:

[0186]

[0187] The variables include:

[0188]

[0189]

[0190] Switching power supply command control constraints:

[0191] Before the invitation period, the switch power supply control command is set to the floating charge voltage

[0192]

[0193] The constants include:

[0194] Switching power supply i floating charge voltage value, unit is V

[0195] The variables include:

[0196] u i,t The switching power supply i period t controls the power supply instruction: the unit is V.

[0197] During the invitation period, the switching power supply sets the control instructions according to its response status

[0198] i Before participating in the response, the switching power supply maintains the floating charge voltage

[0199]

[0200] The constants include:

[0201] Switching power supply i floating charge voltage value, unit is V

[0202] The variables include:

[0203] u i,t The switching power supply i period t controls the power supply instruction: the unit is V.

[0204] The switching power supply in the response is set to the discharge voltage

[0205]

[0206] The constants include:

[0207] Switching power supply i discharge voltage value, unit is V

[0208] The variables include:

[0209] u i,t The switching power supply i period t controls the power supply instruction: the unit is V.

[0210] After the response, the switch power supply is set to a non-charge and non-discharge voltage, the purpose is to maintain the non-charge and non-discharge state

[0211]

[0212] The constants include:

[0213] The voltage value of the switching power supply i when it is not charging or discharging, in V

[0214] The variables include:

[0215] u i,t The switching power supply i period t controls the power supply instruction: the unit is V.

[0216] After the invitation period, the switching power supply sets the control instructions according to its charging status;

[0217] During the charging period, the switch power supply control command is set to the floating charge voltage

[0218]

[0219] The constants include:

[0220] Switching power supply i floating charge voltage value, unit is V

[0221] The variables include:

[0222] u i,t The switching power supply i period t controls the power supply instruction: the unit is V.

[0223] During the non-charging period, the switch power control command is set to the non-charging and non-discharging state

[0224]

[0225] The constants include:

[0226] The voltage value of the switching power supply i when it is not charging or discharging, in V

[0227] The variables include:

[0228] u i,t The switching power supply i period t controls the power supply instruction: the unit is V.

[0229] Optionally, the step of correcting the first control plan according to the rolling correction algorithm to obtain the second control plan includes:

[0230] In the case where an abnormal communication base station is detected in the first load forecast result according to the rolling correction algorithm, a reply instruction is generated, and the reply instruction is used to add a new communication base station;

[0231] The first control plan is modified according to the reply instruction to obtain a second control plan.

[0232] In this embodiment, the rolling correction algorithm can exclude sites where abnormal situations such as decommissioning occur, and has the ability to detect and handle abnormal situations to ensure that instructions are not incorrectly adjusted under abnormal circumstances. As shown in the figure below, when force majeure factors cause a base station to be decommissioned or abnormal information alarms occur, the real-time rolling update algorithm regularly collects equipment operating conditions to determine whether it is abnormal; if the equipment is abnormal, it will not be included in the responsive base station resource pool, and a recovery instruction will be issued immediately. At the same time, in order to make up for the response gap caused by sudden anomalies, the algorithm will add idle communication base station resources to complete the response, ensuring that the total response capacity of the virtual power plant meets the assessment requirements.

[0233] Specifically, when the real-time rolling correction model obtains the abnormal alarm of base station s at time t, the responsive state variables of all devices under it are immediately set to 0, that is, α i,t =0, And modify its switch power control instruction to a recovery instruction, that is, At the same time, another idle base station s′ is added to participate in the response through optimized scheduling to ensure that the response capacity of the virtual power plant does not produce assessment deviation after the communication base station s is retired, that is, α i,t-1 = 0 and α i,t =1,

[0234] Optionally, the step of correcting the first control plan according to the rolling correction algorithm to obtain the second control plan includes:

[0235] Obtain the upper limit and lower limit of response capacity assessment;

[0236] The first load forecast result is corrected according to the response capacity assessment upper limit, the response capacity assessment lower limit and the rolling correction algorithm to obtain a second control plan.

[0237] In this embodiment, the virtual power plant obtains the actual operation data of the communication base station through a regular monitoring and data acquisition system, including the historical power consumption of the communication base station p s,t , Switching power supply historical response status α i,0 And the historical DC load power Based on this, the actual control response capacity of the communication base station is calculated and the theoretical response capacity Compare and identify actual control response deviation When the actual control deviation of the virtual power plant is large, the key deviation equipment is adaptively identified to form a deviation label. According to the reserved threshold and the equipment deviation status, the response capacity assessment threshold coefficient θ is appropriately adjusted according to the following formula - / θ +, calling the system's built-in algorithm to perform secondary corrections to the response execution information and secondary configuration of virtual power plant resources, to achieve minimum deviation execution of virtual power plant dispatch instructions.

[0238]

[0239] The present application provides a control method for a communication base station, the method comprising: obtaining response status data, the response status data being used to indicate the operating status of multiple communication base stations; inputting the response status data into a real-time scheduling model for prediction, and obtaining a first load prediction result within a target time period, the first load prediction result being used to indicate the load that the multiple communication base stations need to output within the target time period; correcting a first control plan according to a rolling correction algorithm to obtain a second control plan, the first control plan being generated according to the first load prediction result; generating a control instruction according to the second control plan, and controlling the working status of the multiple communication base stations within the target time period according to the control instruction. The present application obtains the response status data, inputs the response status data into a real-time scheduling model to output a load prediction result, and corrects the load prediction result according to a rolling correction algorithm, thereby generating a control instruction to control the working status of the multiple communication base stations within the target time period, thereby improving the control effect of the communication base station.

[0240] See also Figure 2 , Figure 2 is a structural diagram of a control device of a communication base station provided in an embodiment of the present application. Figure 2 As shown, the control device 300 of the communication base station includes:

[0241] An acquisition module 310 is used to acquire response status data, where the response status data is used to indicate the operating status of multiple communication base stations;

[0242] A prediction module 320, configured to input the response status data into a real-time scheduling model for prediction, and obtain a first load prediction result within a target time period, wherein the first load prediction result is used to indicate loads that need to be output by the multiple communication base stations within the target time period;

[0243] A correction module 330, configured to correct the first control plan according to a rolling correction algorithm to obtain a second control plan, wherein the first control plan is generated according to the first load forecast result;

[0244] The generating module 340 is used to generate a control instruction according to the second control plan, and control the working status of the plurality of communication base stations within the target time period according to the control instruction.

[0245] Optionally, also include:

[0246] A first determination module, configured to determine a first time point, a second time point, a first time interval, and a second time interval according to the response status data, wherein the first time point is a start time of executing the control instruction, the second time point is an end time of stopping executing the control instruction, the first time interval is a calculation time interval of the multiple communication base stations, the second time interval is an accuracy of the calculation time of the multiple communication base stations, and the second time interval is less than or equal to the first time interval;

[0247] A second determination module is used to determine the target time period according to the first time point, the second time point and the first time interval, the start time point of the target time period is after the first time point, and the time interval between the target time period and the first time point is the time point of the first time interval, and the end time point of the target time period is the second time point.

[0248] Optionally, the load forecast result includes a plurality of second load forecast results, and the forecast module 320 includes:

[0249] The first generating submodule is used to input the response status data into the real-time scheduling model to generate the second load forecast result within the target time period when the current time point is after the first time point and the time interval between the current time point and the first time point is a third time interval within the target time period, wherein N is a positive integer and the third time interval is the sum of N first time intervals.

[0250] Optionally, also include:

[0251] A third determination module is used to determine the target variables to be optimized for the multiple communication base stations, where the target variables are used to characterize at least one of the following: a response plan of the communication base station, a charge and discharge plan of the communication base station, power consumption of the communication base station, and response capacity of the communication base station;

[0252] a fourth determination module, configured to determine an objective function according to the objective variable, and to determine a constraint condition according to the objective variable, wherein the objective function is used to calculate the objective variable, and the constraint condition is used to constrain the objective function;

[0253] A model generation module is used to generate the real-time scheduling model based on the objective function and the constraint conditions.

[0254] Optionally, the fourth determining module includes:

[0255] A first determination unit is used to determine the response capacity deviation assessment cost, equipment operation and maintenance cost, electricity cost and response subsidy corresponding to the multiple communication base stations according to the target variable;

[0256] a first generating unit, configured to generate the objective function based on the response capacity deviation assessment cost, the equipment operation and maintenance cost, the electricity cost and the response subsidy, wherein the objective function represents a minimum value of the target cost, and the minimum value of the target cost is the sum of the response capacity deviation assessment cost, the equipment operation and maintenance cost and the electricity cost minus the response subsidy;

[0257] A second determination unit is used to determine the household power consumption constraints, household response capacity constraints, switch power supply continuous response constraints, switch power supply charging constraints, backup battery power constraints, virtual power plant response effective recognition constraints, virtual power plant response total capacity constraints, real-time tracking day-ahead constraints and switch power supply instruction control constraints corresponding to the multiple communication base stations according to the target variables;

[0258] The second generating unit is used to generate the constraint condition based on the household power consumption constraint, the household response capacity constraint, the switch power supply continuous response constraint, the switch power supply charging constraint, the backup battery power constraint, the virtual power plant response effective recognition constraint, the virtual power plant response total capacity constraint, the real-time tracking day-ahead constraint and the switch power supply instruction control constraint.

[0259] Optionally, the correction module 330 includes:

[0260] A second generation submodule is used to generate a reply instruction when an abnormal communication base station is detected in the first control plan according to the rolling correction algorithm, and the reply instruction is used to add a new communication base station;

[0261] The first correction submodule is used to correct the first control plan according to the reply instruction to obtain the second control plan.

[0262] Optionally, the correction module 330 includes:

[0263] The acquisition submodule is used to obtain the upper limit and lower limit of the response capacity assessment;

[0264] The second correction submodule is used to correct the first control plan according to the response capacity assessment upper limit, the response capacity assessment lower limit and the rolling correction algorithm to obtain the second control plan.

[0265] After obtaining the response status data, the present application inputs the response status data into the real-time scheduling model to output the load forecast result, and corrects the load forecast result according to the rolling correction algorithm, thereby generating a control instruction to control the working status of the multiple communication base stations within the target time period, thereby improving the control effect of the communication base stations.

[0266] The present application also provides an electronic device. Figure 3 , the electronic device may include a processor 401, a memory 402, and a program 4021 stored in the memory 402 and executable on the processor 401.

[0267] When the communication device is an electronic device, the program 4021 can be executed by the processor 401 to achieve Figure 1 Any step in the corresponding method embodiment:

[0268] Acquiring response status data, wherein the response status data is used to indicate the operating status of multiple communication base stations;

[0269] Inputting the response status data into a real-time scheduling model for prediction to obtain a first load prediction result within a target time period, wherein the first load prediction result is used to indicate the loads that need to be output by the multiple communication base stations within the target time period;

[0270] Correcting the first control plan according to the rolling correction algorithm to obtain a second control plan, wherein the first control plan is generated according to the first load forecast result;

[0271] A control instruction is generated according to the second control plan, and the working status of the plurality of communication base stations is controlled within the target time period according to the control instruction.

[0272] Optionally, before inputting the response status data into the real-time scheduling model to generate a first load forecast result within a target time period, the method further includes:

[0273] Determine a first time point, a second time point, a first time interval, and a second time interval according to the response status data, wherein the first time point is the start time of executing the control instruction, the second time point is the end time of stopping executing the control instruction, the first time interval is the calculation time interval of the multiple communication base stations, the second time interval is the accuracy of the calculation time of the multiple communication base stations, and the second time interval is less than or equal to the first time interval;

[0274] The target time period is determined according to the first time point, the second time point and the first time interval, the start time point of the target time period is after the first time point, and the time interval between the target time period and the first time point is the time point of the first time interval, and the end time point of the target time period is the second time point.

[0275] Optionally, the load forecast result includes a plurality of second load forecast results, and the response state data is input into a real-time scheduling model to generate a first load forecast result within a target time period, including:

[0276] Within the target time period, when the current time point is after the first time point and the time interval between the current time point and the first time point is a third time interval, the response status data is input into the real-time scheduling model to generate the second load forecast result within the target time period, where N is a positive integer and the third time interval is the sum of N first time intervals.

[0277] Optionally, before inputting the response status data into the real-time scheduling model to generate a first load forecast result within a target time period, the method further includes:

[0278] Determine target variables to be optimized for the multiple communication base stations, where the target variables are used to characterize at least one of the following: a response plan of the communication base station, a charge and discharge plan of the communication base station, power consumption of the communication base station, and a response capacity of the communication base station;

[0279] Determine an objective function according to the objective variable, and determine a constraint condition according to the objective variable, wherein the objective function is used to calculate the objective variable, and the constraint condition is used to constrain the objective function;

[0280] The real-time scheduling model is generated based on the objective function and the constraint conditions.

[0281] Optionally, determining the objective function according to the objective variable, and determining the constraint condition according to the objective variable, includes:

[0282] Determine, according to the target variable, the response capacity deviation assessment cost, the equipment operation and maintenance cost, the electricity cost and the response subsidy corresponding to the multiple communication base stations;

[0283] generating the objective function based on the response capacity deviation assessment cost, the equipment operation and maintenance cost, the electricity cost and the response subsidy, wherein the objective function represents a minimum value of the target cost, and the minimum value of the target cost is the sum of the response capacity deviation assessment cost, the equipment operation and maintenance cost and the electricity cost minus the response subsidy;

[0284] Determine the household power consumption constraints, household response capacity constraints, switch power supply continuous response constraints, switch power supply charging constraints, backup battery power constraints, virtual power plant response effective identification constraints, virtual power plant response total capacity constraints, real-time tracking day-ahead constraints and switch power supply instruction control constraints corresponding to the multiple communication base stations according to the target variables;

[0285] The constraint conditions are generated based on the household power consumption constraint, the household response capacity constraint, the switch power supply continuous response constraint, the switch power supply charging constraint, the backup battery power constraint, the virtual power plant response effective recognition constraint, the virtual power plant response total capacity constraint, the real-time tracking day-ahead constraint and the switch power supply instruction control constraint.

[0286] Optionally, the step of correcting the first control plan according to the rolling correction algorithm to obtain the second control plan includes:

[0287] In the case where an abnormal communication base station is detected in the first control plan according to the rolling correction algorithm, a reply instruction is generated, wherein the reply instruction is used to add a new communication base station;

[0288] The first control plan is modified according to the reply instruction to obtain the second control plan.

[0289] Optionally, the step of correcting the first control plan according to the rolling correction algorithm to obtain the second control plan includes:

[0290] Obtain the upper limit and lower limit of response capacity assessment;

[0291] The first control plan is corrected according to the response capacity assessment upper limit, the response capacity assessment lower limit and the rolling correction algorithm to obtain the second control plan.

[0292] After obtaining the response status data, the present application inputs the response status data into the real-time scheduling model to output the load forecast result, and corrects the load forecast result according to the rolling correction algorithm, thereby generating a control instruction to control the working status of the multiple communication base stations within the target time period, thereby improving the control effect of the communication base stations.

[0293] The embodiment of the present application also provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, each process of the control method of the above-mentioned communication base station is implemented, and the same technical effect can be achieved. To avoid repetition, it is not repeated here. Among them, the computer-readable storage medium is such as a read-only memory (ROM), a random access memory (RAM), a disk or an optical disk, etc.

[0294] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.

[0295] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, a magnetic disk, or an optical disk), and includes a number of instructions for a terminal (which can be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.) to execute the methods described in each embodiment of the present application.

[0296] The embodiments of the present application are described above in conjunction with the accompanying drawings, but the present application is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present application, ordinary technicians in this field can also make many forms without departing from the purpose of the present application and the scope of protection of the claims, all of which are within the protection of the present application.

Claims

1. A control method for a communication base station, characterized in that: The method comprises: Acquiring response status data, wherein the response status data is used to indicate the operating status of multiple communication base stations; Inputting the response status data into a real-time scheduling model for prediction to obtain a first load prediction result within a target time period, wherein the first load prediction result is used to indicate the loads that need to be output by the multiple communication base stations within the target time period; Before inputting the response status data into the real-time scheduling model to generate the first load forecast result within the target time period, the method further includes: determining a first time point, a second time point, a first time interval and a second time interval according to the response status data, the first time point being the start time of executing the control instruction, the second time point being the end time of stopping the execution of the control instruction, the first time interval being the calculation time interval of the multiple communication base stations, the second time interval being the accuracy of the calculation time of the multiple communication base stations, and the second time interval being less than or equal to the first time interval; determining the target time period according to the first time point, the second time point and the first time interval, the start time point of the target time period being after the first time point, and the time interval between the target time period and the first time point being the time point of the first time interval, and the end time point of the target time period being the second time point; Correcting the first control plan according to a rolling correction algorithm to obtain a second control plan, wherein the first control plan is generated according to the first load forecast result; A control instruction is generated according to the second control plan, and the working status of the plurality of communication base stations is controlled within the target time period according to the control instruction.

2. The method according to claim 1, characterized in that The load forecast result includes a plurality of second load forecast results, and the response state data is input into a real-time scheduling model to generate a first load forecast result within a target time period, including: Within the target time period, when the current time point is after the first time point and the time interval between the current time point and the first time point is a third time interval, the response status data is input into the real-time scheduling model to generate the second load forecast result within the target time period, where N is a positive integer and the third time interval is the sum of N first time intervals.

3. The method according to claim 1, characterized in that Before inputting the response status data into the real-time dispatch model to generate the first load forecast result within the target time period, the method further includes: Determine target variables to be optimized for the multiple communication base stations, where the target variables are used to characterize at least one of the following: a response plan of the communication base station, a charge and discharge plan of the communication base station, power consumption of the communication base station, and a response capacity of the communication base station; Determine an objective function according to the objective variable, and determine a constraint condition according to the objective variable, wherein the objective function is used to calculate the objective variable, and the constraint condition is used to constrain the objective function; The real-time scheduling model is generated based on the objective function and the constraint conditions.

4. The method according to claim 3, characterized in that Determining the objective function according to the objective variable, and determining the constraint condition according to the objective variable, comprises: Determine, according to the target variable, the response capacity deviation assessment cost, the equipment operation and maintenance cost, the electricity cost and the response subsidy corresponding to the multiple communication base stations; generating the objective function based on the response capacity deviation assessment cost, the equipment operation and maintenance cost, the electricity cost and the response subsidy, wherein the objective function represents a minimum value of the target cost, and the minimum value of the target cost is the sum of the response capacity deviation assessment cost, the equipment operation and maintenance cost and the electricity cost minus the response subsidy; Determine the household power consumption constraints, household response capacity constraints, switch power supply continuous response constraints, switch power supply charging constraints, backup battery power constraints, virtual power plant response effective identification constraints, virtual power plant response total capacity constraints, real-time tracking day-ahead constraints and switch power supply instruction control constraints corresponding to the multiple communication base stations according to the target variables; The constraint conditions are generated based on the household power consumption constraint, the household response capacity constraint, the switch power supply continuous response constraint, the switch power supply charging constraint, the backup battery power constraint, the virtual power plant response effective recognition constraint, the virtual power plant response total capacity constraint, the real-time tracking day-ahead constraint and the switch power supply instruction control constraint.

5. The method according to claim 1, characterized in that The step of correcting the first control plan according to the rolling correction algorithm to obtain the second control plan includes: In the case where an abnormal communication base station is detected in the first control plan according to the rolling correction algorithm, a reply instruction is generated, wherein the reply instruction is used to add a new communication base station; The first control plan is modified according to the reply instruction to obtain the second control plan.

6. The method according to claim 1, characterized in that The step of correcting the first control plan according to the rolling correction algorithm to obtain the second control plan includes: Obtain the upper limit and lower limit of response capacity assessment; The first control plan is corrected according to the response capacity assessment upper limit, the response capacity assessment lower limit and the rolling correction algorithm to obtain the second control plan.

7. A control device for a communication base station, characterized in that: The device comprises: An acquisition module, used to acquire response status data, wherein the response status data is used to indicate the operation status of multiple communication base stations; A prediction module, used for inputting the response status data into a real-time scheduling model for prediction, and obtaining a first load prediction result within a target time period, wherein the first load prediction result is used for indicating the loads that need to be output by the multiple communication base stations within the target time period; It also includes: a first determination module, used to determine a first time point, a second time point, a first time interval and a second time interval according to the response status data, the first time point is the start time of executing the control instruction, the second time point is the end time of stopping the execution of the control instruction, the first time interval is the calculation time interval of the multiple communication base stations, the second time interval is the accuracy of the calculation time of the multiple communication base stations, and the second time interval is less than or equal to the first time interval; a second determination module, used to determine the target time period according to the first time point, the second time point and the first time interval, the start time point of the target time period is after the first time point, and the time interval between the target time period and the first time point is the time point of the first time interval, and the end time point of the target time period is the second time point; a correction module, configured to correct the first control plan according to a rolling correction algorithm to obtain a second control plan, wherein the first control plan is generated according to the first load forecast result; A generation module is used to generate a control instruction according to the second control plan, and control the working status of the multiple communication base stations within the target time period according to the control instruction.

8. A communication device, comprising: A transceiver, a memory, a processor and a program stored in the memory and executable on the processor; wherein the processor is used to read the program in the memory to implement the steps in the control method of a communication base station as described in any one of claims 1 to 6.

9. A readable storage medium for storing a program, characterized in that: When the program is executed by a processor, the steps in the control method of the communication base station according to any one of claims 1 to 6 are implemented.

Citation Information

Patent Citations

  • Apparatus and method for controlling a wireless feeder network

    CN103548408A

  • Multi-objective coordinated optimization scheduling model for different power sources

    CN106384168A

  • Method for determining CQI information, base station and user equipment

    CN108370305A

  • Image processing method, device and equipment based on automatic driving, and storage medium

    CN112987759A

  • Real-time correction method and system for comprehensive service station

    CN113962553A